Home / Financial Firm (Unknown - Insurer) / Determination 478308
Determination 478308
Claim denied for ceiling collapse as damage not caused by an insured event
Summary
The applicants claimed $4,500 for a ceiling collapse, attributing it to an earthquake or storm-related leak. The FSP denied the claim as the damage was not caused by an insured event, and AFCA agreed.
The proximate cause of the collapse was gradual water absorption by the plasterboard and inadequate fixings, not an insured earthquake or storm event, so the policy did not respond.
Issues
- Claim denial primary · not upheld“I am satisfied that the proximate cause of the damage to the ceiling was a failure of the fixings when the plasterboard became too heavy due to gradual absorption of moisture.”
Subjects and remedies
home or building damagenatural disasterno remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Determination
Case No: 478308 Determination Page 1 of 6
Case number: 478308 30 October 2017
1 Overview
1.1 Dispute
The applicants hold a home insurance policy (Policy) issued by the financial services
provider (FSP). The Policy started on 13 November 2016. The Policy is an insured
events policy and does not include accidental damage cover.
On 10 February 2017 a portion of the ceiling in the lounge room collapsed. The
applicants lodged a claim for damage caused by earthquake on the same day.
The FSP has denied the claim. It says the damage has not been caused by an
insured event and is therefore not covered.
The applicants say the collapse was caused by an earthquake. Alternatively, they
say the damage may have been caused by a leak that occurred when a tree branch
fell on the roof and cracked a roof tile.
As both these events are covered under the Policy, the applicants say the claim
should be paid. They are seeking $4,500 to complete the repairs.
1.2 Issues and key findings
Is the FSP entitled to deny the claim?
The Policy provides cover for insured events only. I am satisfied, based on the
information available, that the proximate cause of the damage to the ceiling was a
failure of the fixings when the plasterboard became too heavy due to gradual
absorption of moisture over time.
As the damage was not the result of an insured event, the FSP is entitled to deny the
claim.
1.3 Determination
This determination is in favour of the FSP. It is entitled to deny the claim and does
not need to take any further action.
Case No: 478308 Determination Page 2 of 6
2 Reasons for determination
2.1 Is the FSP entitled to deny the claim?
The Policy covers damage caused by insured events only
There is no dispute that the applicants received the Policy documents and the parties
are entitled to rely on the Policy terms and conditions.
The product disclosure statement (PDS) says:
We will insure you for:
• loss or damage caused by one or more of the insured e vents
„Insured events‟ include earthquake and storm, rainwater and run -off. The Policy
wording for these events can be found at the end of this determination.
The onus rests with the applicants to establish, on the balance of probabilities, that
the proximate cause of the ceiling collapse was either an earthquake or a storm (or
other insured event).
An earthquake was felt in the area prior to the collapse
The property is rented. Based on the information provided by the tenants , I am
satisfied that the ceiling collapsed on 10 February 2017 sometime before 3.30 pm in
the afternoon.
There is no dispute that on the same day, at about 12.30 pm, an earthquake was
recorded in the vicinity of the property. The earthquake registered 2.9 on the Richter
scale. Its epicentre was 13 kilometers underground.
„ Damage ‟ and „felt‟ radius information is not provided for earthquakes under 3.0 on
the Richter scale. However the applicant has provided many local reports that
confirm the earthquake was felt in the area. I accept that the earthquake was felt, and
shaking in properties in the area was noted .
The earthquake was not the proximate cause of the damage
The timing of the collapse so soon after the earthquake indicates that the two events
are connected. However, the proximate or „direct‟ cause is not the first, or the last or
the sole cause of a loss. It is the effective or dominant or operative cause.
If there are several causes of a loss at the same time, each must be examined for the
qualities of reality, predominance and efficiency as the active, efficient cause that
sets a relevant chain of events in action. If one cause would have caused the harm in
any case, and the other would not have done so in the absence of the first, the first is
the proximate cause.
In determining the proximate cause of the damage, all of the information needs to be
considered, including that:
according to Geoscience Australia the magnitude and location of the
earthquake make it unlikely that it caused damage to property
Case No: 478308 Determination Page 3 of 6
the reports of the event supplied by the applicants (for example strong rumbling
like a truck and shaking) are consistent with an intensity on the Modified
Mercalli (MM) scale of IV
generally damage to buildings will not occur unless the intensity of an
earthquake reached VI or above on the MM scale
no other earthquake related damage to the proiperty was evident, and
the ceiling was sagging in the area of the collapse prior to the earthquake.
Based on all of the information available I am not satisfied that the earthquake was
the proximate cause of the damage.
On the balance of probabilities the ceiling collasped because of water ingress
The area of damage is located in the lounge room. From the photographs and
reports provided, I am satisfied that the portion of the ceiling that collapsed was in the
area above the door, in the North West corner. I am also satisfied that prior to the
collapse:
the ceiling was sagging in this area (the extent of the sagging or bowing is
disputed, however there is no dispute that some saggi ng was noted by the
applicants and tenants)
the carpet beneath the area appeared to be water stained, and
the eaves in the North West corner were water damaged and rotting.
The FSP provided an engineering report on the cause of the damage. The engineer
concluded that:
…the proximate cause of the observed ceiling collapse is due to the gradual absorption of
moisture by the plasterboard itself, resulting in a significant weight increase along with the
initial insufficient perimeter fixings.
Based on all of the information provided I am satisfied that prior to collapsing the
ceiling was sagging due to additional weight in the plasterboard caused by water
ingress.
The damage occurred over time and was not the result of a storm event
The applicants say that:
the ceiling was inspected by a building inspector in October 2016 and they had
regularly checked the condition of the ceiling and it was solid and did not show
any signs of flex or movement
the ceiling was secured to Australian standards, and
an earlier storm event allowed water to enter the property.
I accept that during a storm a tree branch fell on the roof and broke a tile allowing
rainwater to enter the property. However, due to the location and nature of the
damage, I am satisfied that there has been gradual absorption of moisture over time.
On the balance of probabilities the plasterboard eventually became too heavy to be
supported by the fixings and collapsed. The damage is not the result of an insured
event and is not covered under the Policy.
Case No: 478308 Determination Page 4 of 6
Case No: 478308 Determination Page 5 of 6
3 Supporting information
3.1 Policy terms and conditions
Insuring provisions
Earthquake
(Applicable whether you have buildings and/or contents cover)
We will pay for loss or damage caused by earthquake. An excess of $200 or the amount shown in
the current schedule, whichever is the greater, applies to loss or damage caused by an earthquake
or a series of earthquakes during any period of 48 consecutive hours.
Storm, rainwater or run-off
(Applicable whether you have buildings and/or contents cover)
We will pay for loss or damage caused by storm, rainwater or run-off.
“storm” means violent wind (including cyclones and tornadoes), thunderstorms and hail which may
be accompanied by rain or snow.
“rainwater” means rain falling naturally from the sky onto the buildings and/or ground.
“run - off” means rainwater that has collected on or has flowed across normally dry ground or has
overflowed from swimming pools or spas.
We will not pay for loss or damage:
a. caused by:
• flood, or
• flood water combined with run-off and/or rainwater;
“flood” means the inundation of normally dry land by water that has escaped or has been released
from the normal confines of any natural watercourse, lake or lagoon whether or not altered or
modified, or of any reservoir, canal or dam.
b. caused by action of the sea, high water, tidal wave or tsunami;
c. caused by:
• soil movement including erosion, landslide, mudslide or subsidence,
• shrinkage or expansion of earth or land, or
• hydrostatic pressure;
d. to gates, fences and retaining walls;
e. to swimming pool and spa covers, their liners or their solar domes;
f. to the external paintwork or other exterior coatings of the buildings caused by rainwater;
g. caused by water seeping, percolating or otherwise penetrating into the buildings as a result of:
• structural defects,
• faulty design of the buildings,
• faulty workmanship in the construction of the buildings, or
• your failure to adequately maintain the buildings;
h. caused by wind, rainwater, hail or snow entering the buildings through an open window or door or
any opening not made by the storm, unless the loss or damage is caused by run-off;
Case No: 478308 Determination Page 6 of 6
i. caused by water entering your buildings through an opening made for the purpose of alterations,
extensions, renovations or repairs.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.