Determination 478291

Storm damage to storeroom retaining walls declined; delay in claim resolution

FirmFinancial Firm (Unknown - Insurer)
Decided2018-05-17
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$1,500
Amount claimed—
SourceAFCA PDF

Summary

Applicant claimed storm damage to storeroom walls, which the FSP declined as retaining walls excluded from cover. He also complained about claims handling. AFCA upheld the decline but ordered $1,500 non-financial loss compensation for the delay and reimbursement of his engineer's report cost with statutory interest.

The storm cover excludes loss to retaining walls, and the walls were established as retaining walls, while the unusual delay in resolving the claim justifies non-financial loss compensation.

Issues

Subjects and remedies

home or building damagenatural disasterpay compensationpay interestpay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 478291 Determination Page 1 of 7 Case number: 478291 10 April 2018 1 Overview 1.1 Dispute The applicant held a home building and contents policy with the financial services provider (FSP). The applicant claims the building was damaged in a storm and resultant flash flooding on 27 January 2016. This determination deals with the part of the claim which relates to the damage to the northern and western walls of the storeroom. The applicant also claims compensation for the stress and anxiety caused by the FSP’s claims handling. The FSP denies the claimed damage was caused by the storm. It says the damage was caused by gradual ground movement and faulty design which causes of damage are excluded under the policy. The FSP further contends the storeroom walls are retaining walls which are also excluded under the policy. 1.2 Issues and key findings Is the FSP liable for the damage to the storeroom walls? The available information establishes on the balance of probabilities the storeroom walls are retaining walls. As damage to retaining walls is excluded from cover, the FSP is not liable for the claimed damage to the storeroom walls. Is the applicant entitled to any compensation? The applicant is entitled to $1,500 compensation as the available information establishes the FSP took an unusual amount of time to resolve the situation which would have interfere d with the applicant’s expectation of enjoyment or peace of mind. Upon satisfactory proof of the cost, the applicant is also entitled to be reimbursed for the cost of his engineer’s report. 1.3 Determination This determination is mainly in favour of the FSP. Should the applicant accept this determination then, within seven days of acceptance, the FSP is to pay to the applicant $1,500 compensation. The applicant is to provide the FSP with proof of the cost of the engineer’s report. Upon receipt, the FSP is to immediately reimburse the applicant and pay statutory Case No: 478291 Determination Page 2 of 7 interest on the said sum from the date of payment by the applicant to his engineer to the date of settlement. Otherwise, the FSP is not required to take any further action in relation to the dispute. Case No: 478291 Determination Page 3 of 7 2 Reasons for determination 2.1 Is the FSP liable for the damage to the storeroom walls? Applicant has established a prima facie claim The applicant must establish on the balance of probabilities he has suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. In support of his claim, the applicant relies on an engineer who inspected the cracked northern and western walls of the storeroom on 3 July 2017. The applicant told the engineer there were no cracks before the storm event. The applicant also told the engineer the storm caused the downpipes in the area of the damage to overflow onto the lawn north and west of the storeroom. Because of the intensity of the storm, the applicant said the water was unable to drain away without significant ponding. The engineer reported the west and north wall of the storeroom have significant defects and are in danger of collapse. The FSP does not dispute there is significant damage to what it refers as the workshop below the balcony. For ease of reference, the damaged room will be referred to as the storeroom in this determination. However, the engineer says as the walls have remained in place since they were built in 1969 without failure, and as the further part of the west wall proximate to the storage area is undamaged, it is his opinion the damage was caused by soil moving because of excessive water which created additional pressure on the western and northern walls of the storeroom. It is not disputed there was significant rainfall on the day and it is not disputed water entered the claimed area. In the circumstances, the panel is satisfied the applicant has established a prima facie claim. FSP relies on its engineer’s o pinion and three policy exclusions Once so established, the onus shifts to the FSP to prove on the balance of probabilities an exclusion applies if it seeks to deny liability for the claimed damage. FSP relies on three policy exclusions. It says it is not liable to pay the claim because:  the storeroom walls (being retaining walls) were not designed or constructed properly with steel reinforcement to withstand the force exerted by the soil  the damage was caused by gradual ground movement over time  the storeroom walls are retaining walls. In support of its position, the FSP relies on the builder who attended the property not long after the claim was made. The builder said the most likely cause of damage was general movement given it had been happening over a long period of time. Although photographs are provided, nothing further of substance is provided by the FSP’s builder. The panel does not find the material provided by the builder persuasive. Case No: 478291 Determination Page 4 of 7 The FSP also relies on an engineer who inspected and photog raphed the property on 5 December 2016 and provided three reports. The essence of the FSP’s engineer’s opinion is the cause of damage is not the storm but inadequate design. The engineer says the inadequate design led to the failure of the retaining walls when trying to resist the normal lateral forces from soil and water pressure. The FSP’s builder discusses the fact the walls were not reinforced, were not waterproof, and were not connected to the roof slab above. He says the walls retained about 3 metres of soil yet used unreinforced masonry. He says had the walls been properly designed, the walls would have contained horizontal and vertical steel reinforcement and starter bars into the slab below and the slab above. The engineer also criticises the surface drainage immediately to the west of the storage room. He says this area should have been constructed in such a way so most of the water from the storm would have been prevented from saturating the ground next to the retaining walls. The engineer says even if the downpipes had failed thereby increasing the soil moisture, an adequately designed retaining wall would still have been able to resist the lateral forces on the wall from the soil and water pressure. Further, he says compliant surface drainage would have dealt with any overflow of stormwater from the failed downpipes in that drainage would have flowed away from the building rather than towards it. The FSP has not established the claimed damage was caused by inadequate design or ground movement Bo th the applicant’s engineer and the FSP’s engineer agree the storeroom walls have not been constructed as retaining walls to current practice. However, the applicant’s engineer points out the wall has been effective since 1969. Further, as the part of the western wall is not damaged, the applicant’s engineer says the volume of water was the likely cause of the damage particularly given the failure of the drainpipes near the damage during the storm event. The applicant has lived in the house since 2011. The applicant says the storeroom walls were not cracked or damaged before the storm. Although the FSP’s engineer relies on an image from 2012, the panel is not sufficiently persuaded by this evidence alone of previous movement. While both engineers agree the storeroom walls have not been constructed as retaining walls to current practice, the FSP’s engineer has not provided any evidence of the design standards which applied when the property was built in 1969. In the absence of compelling evidence of previous wall failure and the inadequate proof of non-compliance with design standards in 1969, the panel is not persuaded on the balance of probabilities the cracking damage to the northern and western walls of the storeroom were caused by inadequate design or ground movement. The damaged walls were retaining walls which are excluded from cover However, the FSP relies on a further policy exclusion. Case No: 478291 Determination Page 5 of 7 The FSP’s policy clearly and unambiguously states: ‘ Storm Not covered loss or damage to: - retaining walls’ T he panel accepts while the FSP’s policy covers loss or damage caused by storm, the policy does not cover loss or damage to retaining walls. The panel has carefully considered both engineers’ reports and the photographs provided by the parties. The FSP’s e ngineer noted the west and north walls of the storeroom were retaining about 3m of soil. Photographs show the soil retained by the walls. The applicant’s engineer makes similar observations. He says: ‘ The north and west walls are full masonry and are reta ining soil to the storeroom’s full height, which is approximately 2400mm. ’ The panel considers both engineers agree, and the photographs provided show, the walls retained soil. The available material establishes it was the pressure from the saturated soil against the walls which ultimately lead to the damage to the walls. The panel is satisfied the damaged walls in dispute are retaining walls. The panel accepts the policy does not cover loss or damage to retaining walls. In the circumstances the panel is satisfied the FSP is entitled to deny the claim for the damage to the north and west walls. 2.2 Is the applicant entitled to any compensation? Compensation payable in some circumstances The applicant complains about the FSP’s claims handling and seeks comp ensation for stress and anxiety. The FSP has not addressed the applicant’s complaint. Under paragraph 9.3 of the Terms of Reference, FOS may award compensation for non-financial loss where an applicant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind. The maximum amount of compensation for non-financial loss is $3,000. The FSP is to pay to the applicant $1,500 compensation The available material shows the claim was made in February 2016 and yet the FSP’s final decision was not made until April 2017. The panel considers this was unusual time taken to resolve the situation which would have interfered with the applicant’s expectation of enjoyment or peace of mind. Case No: 478291 Determination Page 6 of 7 The panel is satisfied it is fair in the circumstances the FSP pay to the applicant $1,500 compensation. The FSP is to pay the applicant’s engineer’s fee The panel assumes the applicant’s engineer charged the applicant a fee for his opinion. FOS may decide the FSP contribute to professional costs incurred by the applicant in the course of the dispute. FOS will not require the FSP to contribute more than $3,000 to these costs unless exceptional circumstances apply. Exceptional circumstances do not apply in this dispute. However, taking into account the complexity of the dispute and that the applicant genuinely required expert assistance in view of the expert opinion obtained by the FSP, the panel is satisfied it is fair in all the circumstances the FSP reimburse the applicant for the cost of his engineer’s report. The applicant is to provide the FSP with an invoice or other proof of the cost of the engineer ’s report. Upon receipt, the FSP is to immediately reimburse the applicant and pay statutory interest on the said sum from the date of payment by the applicant to his engineer to the date of settlement. Case No: 478291 Determination Page 7 of 7 3 Supporting information 3.1 FOS Approach As advised to the parties, FOS has considered it appropriate to expedite this dispute in accordance with the Operational Guidelines to the FOS Terms of Reference, due to the nature of the dispute. Accordingly, this dispute has not been the subject of a FOS recommendation and has proceeded directly to determination by a panel. The panel consists of an ombudsman and two panel members with extensive experience in insurance industry matters and consumer complaints. There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered for the purposes of this determination. This dispute has been decided on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome only. It is an accepted principle of general insurance law that an insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. 3.2 Relevant policy extracts The relevant policy extracts include those referred to in the FSP’s Notice of Response dated 8 May 2017 and the extract below. Both the policy document and the Notice have been exchanged with the applicant. Storm If loss or damage is caused by a storm. Not covered loss or damage to: - retaining walls 3.3 Other relevant material considered and relied on  Parties’ submissions, emails , claims lodgment call recording, expert reports, photographs and all attachments to all submissions.  Correspondence between the parties.