Text of the determination
Determination
Case No: 477444 Determination Page 1 of 8
Case number: 477444 30 April 2018
1 Overview
1.1 Dispute
The applicant lodged a claim under her home insurance policy with the financial
services provider (FSP) for water damage to her property caused by a leaking vanity
hose in the upstairs en suite bathroom.
The FSP accepted the applicant’s claim and appointed its builder (MC) to repair the
damage to her property. During the repair process, a cracked floor tile was
discovered. The tile cannot be replaced as matching tiles are no longer available.
The FSP has offered to repair the tile. However, the applicant says the proposed
repair will not be effective. She wants the FSP to retile the entire area, in order to
ensure a uniform appearance.
The applicant has also raised concerns about the quality of the repairs undertaken to
date, as well as the delay in completing the outstanding repairs. She seeks
compensation for losses incurred as a result.
1.2 Issues and key findings
Is the FSP required to replace the floor tiles?
The available information establishes that the damage to the floor tile was caused by
the FSP’s builders (and not by the escape of water). The cracked floor tile cannot be
repaired and needs to be replaced.
The FSP is not entitled to rely on the policy limitations in respect of undamaged
areas, as the damage to the tile was caused by the actions of its contractors.
Accordingly, the FSP is liable for replacing all of the tiles in the downstairs area in
order to ensure a uniform appearance.
How should the dispute be settled?
The FSP is required to cash settle the applicant for the amount of $37,750 for the
replacement of the tiles and the outstanding repairs to the water damaged areas.
This amount includes an allowance for temporary accommodation.
The FSP is required to pay the applicant an additional amount of $1,000 as
compensation, due to the manner in which it handled her claim.
Case No: 477444 Determination Page 2 of 8
1.3 Determination
This determination is substantially in favour of the applicant.
The FSP is required to pay the applicant the amount of $37,750 in full and final
settlement of her building claim. The FSP is not required to pay interest on this
amount.
The FSP is required to pay the applicant an additional amount of $1,000 as
compensation for losses suffered due to its claims handling.
Case No: 477444 Determination Page 3 of 8
2 Reasons for determination
2.1 Is the FSP required to replace the floor tiles?
Damaged floor tile was discovered during repairs
After the applicant lodged her claim, the FSP’s builder (MC) attended the property
and prepared a scope of works for the repair of the damage caused by the water
leak.
MC’s scope of works included repairs to the upstairs en suite and repairs to the
dining room located immediately underneath, which had been damaged by the water
leaking from above. MC estimated the cost of these repairs at $7,610.21.
The initial scope of works prepared by MC in November 2016 did not include any
repairs to the floor tiles, as no damage to the tiles was observed at that time.
After the repairs commenced, a cracked floor tile was discovered adjacent to the
water affected skirting board in the dining room. The floor tile cannot be replaced as
matching tiles are no longer available.
After speaking with MC, the FSP initially advised the applicant that it would replace
all of the floor tiles in the downstairs area (to ensure a uniform appearance).
However, the FSP now says it is likely that the broken floor tile can be repaired, in
which case the tiles would not need to be replaced. The FSP says it is entitled to
attempt repairs rather than replace the tiles.
The applicant disputes the FSP’s position . She says the tile cannot be repaired
effectively and therefore the FSP should be required to replace all the floor tiles.
Cracked tile cannot be repaired effectively
Under the terms of the policy, the FSP may settle a claim for damage to the
applicant’s property by repairing the damaged item (rather than replacing it).
However, the FSP must ensure that any repairs it undertakes are adequate to restore
the home to the condition it was in before the damage occurred.
In the present case, the photographs provided show that a small, semi-circular
portion of the tile next to the skirting board has cracked and broken off. The cracked
piece was removed (apparently for the purpose of seeking an appropriate match).
The FSP intends to engage a specialist tile repairer (FC) to travel to the applicant’s
property (from interstate) and attempt to repair the tile.
The FSP has provided an email from FC, in which he states that, if the broken piece
of tile is available, he should be able to glue it back in, fill it and spray it (although
these repairs may leave a very faint line).
The approach proposed by FC is based on the broken piece of tile being able to be
reinserted into the gap remaining. However, a recent photograph provided by the
applicant shows that the tile has crumbled into several smaller pieces.
Case No: 477444 Determination Page 4 of 8
In these circumstances, I am not satisfied that the repair method proposed by FC is
likely to be effective to repair the tile to an appropriate standard.
Accordingly, the FSP is required to replace the broken tile.
FSP’s liability for replacing other tiles depends on how damage occurred
The applicant wants the FSP to replace all of the downstairs floor tiles to ensure a
uniform appearance. This includes the tiles in the hallway, family room, kitchen and
lounge room (as well as the dining room in which the cracked tile is located).
The terms of the policy provide that the FSP is not liable for replacing parts of the
home which have not been damaged by an insured event, in order to create a
uniform appearance.
In particular, the policy states that the FSP will only replace tiles in the part of the
home that was damaged and will not replace tiles in adjoining rooms.
The terms of the policy limit the FSP’s obligations in relation to the repair of damage
caused by an insured event (such as the escape of water from the vanity hose).
However, the applicant says that the cracking damage to the tile was not caused by
the escape of water, but by the failure of the FSP’s builder to undertake the repairs in
a proper and workmanlike manner.
Where the FSP’s contractors cause additional damage to the insured property during
the course of the repairs, the FSP is unable to rely on the policy limitations which
apply to the repair of damage caused by an insured event.
In these circumstances, the FSP is required to indemnify the applicant for the
damage caused by the actions of its contractors.
Accor dingly, the extent of the FSP’s liability to replace the floor tiles depends on
whether the damage to the tile was caused by the escape of water or by the actions
of the FSP’s builder.
FSP’s records reflect conflicting i nformation about cause of damage
As outlined above, the FSP initially agreed to replace all of the downstairs floor tiles.
The FSP did so because it considered the builder (MC) was responsible for the
damage to the cracked tile.
The FSP’s claim notes reflect that the tile cracked when MC tri ed to remove the
water damaged skirting as part of the claim-related repairs.
The FSP ’s consultant initially sought to have MC fund the cost of replacing the
downstairs tiles. However, MC refused to do so on the basis that the crack in the tile
occurred because the escaping water caused the skirting to s well, placing pressure
on the tile.
The FSP ’s consultant subsequently spoke with its building repairs supervisor (TN),
who advised that the tile should not have cracked, if the builder had taken sufficient
care when removing the skirting boards.
Case No: 477444 Determination Page 5 of 8
After further discussions with MC, the FSP’s consultant noted that an auditor would
need to re-attend the property and confirm the crack had been caused by the escape
of water, before he would be satisfied of this.
The FSP has provided a report prepared by MC in February 2017, when a variation
to the scope of works was prepared to cover the replacement of the downstairs tiles.
This report states that the tile cracked because of the swollen timber framing and
MDF skirting caused by the water leak. MC advised that the tile was subject to
pressure because the tiles had been laid right up to the skirting boards and then
grouted, leaving no expansion joint for movement.
FSP is liable for replacement of downstairs tiles
As outlined above, there is conflicting information about whether the damage to the
tile was caused by the escape of water or the actions of the FSP’s builder.
The FSP was advised by its building repairs supervisor that the damage was caused
by a lack of care on the part of the builder. The FSP did not obtain an independent
audit to determine the cause of the damage (as had been contemplated).
While the FSP obtained a further report from MC, this report was provided in a
situation where the FSP was seeking to hold MC liable for replacing the floor tiles (at
significant additional cost). Accordingly, it cannot be considered to be independent.
In these circumstances, I do not consider there was sufficient information to justify
the FSP departing from its original position that it would replace all of the downstairs
floor tiles (on the basis that this was required due to the actions of its builder).
Accordingly, the FSP is responsible for replacing all of the tiles in the downstairs
area, in accordance with the variation to the scope of works prepared by MC in
February 2017.
In her submissions, the applicant has raised concerns about the black polished tiles
in the hallway which she says were damaged by gyprock mix used by the FSP’s
contractors during the course of the repairs.
It is unclear whether the replacement of these tiles is included in the variation to the
scope of works. If the tiles will be replaced in any event, then the issue of whether
they have been damaged is no longer relevant.
Having carefully reviewed the available information (including the photographs
provided by the applicant), I am not satisfied that the black tiles were damaged by the
FSP’s contractors.
Accordingly, unless these tiles are included in the variation to the scope of works, the
FSP is not liable for their replacement.
Case No: 477444 Determination Page 6 of 8
2.2 How should the dispute be settled?
Claim should be cash settled
Under the terms of the policy, the FSP may settle a claim by repairing the damage to
the applicant’s home as new or paying her the reasonable cost of doing so. In the
present case, the FSP elected to repair the damage.
Once an insurer makes an election to repair the insured property (rather than to cash
settle the policyholder for the cost of the repairs), it is generally obliged to complete
the repairs in accordance with the terms of the policy.
However, particular circumstances may arise which make the conduct of repairs by
an insurer untenable. In such cases, it is appropriate that the insurer cash settle the
claim.
Having carefully reviewed the claim history, I consider the relationship between the
applicant and the FSP has broken down. The claim records reflect that the applicant
no longer has confidence in the ability of the FSP and its contractors to carry out the
repairs to an appropriate standard.
In these circumstances, I consider a cash settlement is the only feasible way to
resolve the claim in a manner which provides certainty and finality for both parties.
However, the amount of the cash settlement should be sufficient to allow the
applicant to engage her own contractors to undertake the necessary repairs.
FSP is required to pay applicant $37,750 for building claim
Based on the variation prepared by MC in February 2017, the cost of replacing the
downstairs floor tiles is $26,111.79.
However, the applicant also says that some of the repairs included in the original
scope of works for water damage prepared in November 2016 have not been
completed.
The applicant has provided a copy of the November 2016 scope of works marked up
to show which aspects remain outstanding, together with photographs of the partially
completed works.
The FSP has acknowledged that the repairs to the water damaged areas have not
been completed, due to the current dispute. The FSP has not disputed the
information provided by the applicant.
Based on the information provided, I consider the FSP should be required to cash
settle the applicant for the amount of $37,750.
This amount has been determined taking into account the cost of replacing the tiles
and completing the outstanding repairs to the water damaged areas, together with an
allowance for temporary accommodation while the replacement of the tiles is
completed.
The cash settlement amount also includes an allowance to reflect:
Case No: 477444 Determination Page 7 of 8
the additional risks assumed by the applicant due to the absence of the lifetime
guarantee
the passage of time (including any increase in costs since MC’s quotations were
provided).
Applicant is entitled to compensation of $1,000
Under the Terms of Reference, FOS may award compensation (capped at $3,300)
for consequential financial loss suffered by an applicant in connection with their
claim.
FOS may also award non-financial loss (capped at $3,000) where an applicant has
suffered an unusual degree or extent of physical inconvenience, time taken to
resolve the situation or interference with the applicant’s expectation of enjoyment or
peace of mind.
However, FOS adopts a conservative approach to the award of compensation for
non-financial loss. FOS expects applicants to be moderately robust and bear the
usual inconvenience associated with an insurance claim.
The applicant is dissatisfied with the manner in which the FSP has managed her
claim. Among other things, the applicant says the FSP and its contractors have
unreasonably delayed the repairs, provided conflicting information and failed to
respond promptly to her enquiries.
For the reasons outlined above, I have determined that the FSP is required to
replace the downstairs tiles, as it initially offered to do.
I am satisfied that the FSP’s change of position has delayed the repairs and has
caused the applicant and her family additional stress and inconvenience. The FSP’s
claim notes also reflect that its builder (MC) was unresponsive to calls and enquiries
and failed to provide regular updates.
In the circumstances, I consider the FSP should be required to pay the applicant the
amount of $1,000 as compensation for non-financial loss.
Case No: 477444 Determination Page 8 of 8
3 Supporting information
3.1 FOS approach to this dispute
This dispute was the subject of a recommendation issued on behalf of the Financial
Ombudsman Service (FOS) on 20 September 2017. The recommendation was
rejected by the applicant.
This dispute has been determined based on what is fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous FOS decisions (which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered (whether or not it is expressly referenced in this determination).
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.