Summary

The homeowner claimed $85,903.79 for storm and water damage and related costs after the FSP offered a $4,465.46 cash settlement. AFCA found the FSP liable for further storm damage, ordering a $38,000 building cash settlement with interest and $6,355 temporary accommodation, but rejected the roof, most bathroom and flooring claims and compensation for delay.

A building cash settlement is measured by the cost of repairing storm-caused damage only, excluding pre-existing defects and undamaged areas, with temporary accommodation paid as a policy benefit.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 476825 Determination Page 1 of 9 Case number: 476825 22 November 2017 1 Overview 1.1 Dispute The applicant lodged a claim under his home insurance policy with the financial services provider (FSP) after his property was damaged by a storm in October 2016. The FSP accepted the claim and offered to cash settle the applicant for $4,465.46 (less the policy excess) for the cost of repairing the storm damage. The applicant says the cash settlement offered by the FSP is manifestly insufficient to repair all of the damage to his home caused by the storm. He seeks a cash settlement of $85,903.79 for the building repairs, as well as additional amounts for temporary accommodation and storage costs. The applicant also seeks compensation for losses suffered as a result of the manner in which the FSP handled his claim. 1.2 Issues and key findings Is the FSP required to increase the cash settlement amount? The cash settlement amount for building repairs should be increased to $38,000 (plus interest) to accurately reflect the cost of repairing the damage to the property caused by the storm. The applicant is also entitled to temporary accommodation costs for the period while the repairs are completed. Is the applicant entitled to compensation? The FSP was not primarily responsible for the delay in finalising the claim. Accordingly, the applicant is not entitled to compensation. 1.3 Determination This determination is partly in favour of the applicant. The FSP is required to cash settle the applicant for a total of $38,000 for the building repairs, plus interest on the outstanding amount as set out in section 2.1 below. The FSP is required to pay the applicant an additional amount of $6,355 for temporary accommodation. Case No: 476825 Determination Page 2 of 9 2 Reasons for determination 2.1 Is the FSP required to increase the cash settlement amount? FSP has accepted liability for storm damage The applicant’s policy provides cover for damage to his property caused by a storm, subjects to the conditions set out in the policy. The FSP accepts that the applicant’s property suffered damage from a storm in October 2016, after rainwater entered the roof cavity above the kitchen. The applicant was advised by emergency services to poke holes in the ceiling to release the water. The FSP assessed the damage to the property and offered to cash settle the applicant for $4,465.46 for the cost of the necessary repairs. The FSP cash settlement was based on a scope of works and quotation prepared by its builder (PI) in July 2017. Parties disagree about the scope of repairs required The parties disagree about the extent of the damage caused by the storm in October 2016 and the scope of the repairs required. Based on the reports provided by its contractors, the FSP says the necessary repairs are limited to:  the replacement of the kitchen ceiling and painting of the kitchen walls  the repair of water damage to the plaster bulkhead at the doorway of the bathroom  the removal of water staining to the tile grouting in the kitchen and bathroom  the removal and replacement of the rear entry door  the replacement of sections of timber skirting and polishing of floorboards in the living area. The applicant says the reports prepared by th e FSP’s contractors do not accurately reflect the damage to the property caused by the storm. In particular, the applicant says there is extensive water and mould damage to the kitchen, bathroom and toilet, as well as damage to the roof and the living room floor. He has provided reports and quotations from his contractors, which estimate the total cost of repairing the damage at over $85,000. I have carefully reviewed the reports and other information provided by the parties for the purpose of determining the extent of the damage to the property caused by the storm. FSP is not liable for roof repairs The FSP’s roofing plumber (C) reported that the shallow box gutter on the corrugated iron roof had overflowed when it became blocked with debris during the storm. The Case No: 476825 Determination Page 3 of 9 overflowing water entered the roof space through areas of unsealed flashing at the end of the gutter. In his report, C recommended that the flashings be sealed and the drainage system be improved to better deal with overflow from the roof gutter. The recommended changes included removing the existing downpipe, extending the box gutter past the rear of the property and installing a sealed rain head and downpipe spreader. The applicant disputes the findings of the FSP’s roofing plumber. He has provi ded a report from his builder (HS), which states that the roof was damaged during the storm. HS says the weight of water and tree debris bowed the gutter and moved the flashing in the area near the downpipe. Having carefully reviewed the available information, I am not satisfied that the applicant’s roof was damaged by the storm. The close up, colour photographs taken by the FSP’s builder (A) clearly show the issues with the roof identified by the roofing plumber (C) – namely, the shallow valley gutter and unsealed flashing. There is no evidence of any damage of the kind which might be expected to have been caused by the storm (for example, impact damage from flying debris). I am satisfied that the issues with the roof which resulted in water entry existed prior to the storm. Accordingly, the FSP is not liable for the cost of these repairs. Contractors disagree about cause of damage to kitchen cabinets The FSP has accepted liability for repairing water damage to the kitchen ceiling and walls and cleaning the tile grouting. However, the applicant also seeks cover for the cost of replacing the kitchen cabinets, range hood and kitchen sink. The rainwater which entered the roof cavity during the storm collected in the area above the kitchen ceiling, causing the ceiling to bow and sag until the applicant drilled holes to release the water. When the applicant lodged his claim, he advised the FSP there was water damage to the kitchen cabinetry. He has since provided copies of photographs taken during the storm that show significant volumes of water dripping onto the tops and sides of the kitchen cabinets and running across the tiled flooring. The applicant’s builder (HS) says the water affecting the cabinets caused the wooden framework and doors to swell, resulting in separation of the glue and cracking of the plastic laminate covering. Photographs taken by various contractors confirm that the laminate has cracked in a number of places. The FSP’s first builder (A) reported that, although cracking was present, the cabinets did not appear to be water affected and were free from stains. A reported that there was a musty smell coming from the kitchen cabinets, which indicated that water may have travelled behind the plaster lining of the wall. A recommended that further investigations be undertaken to determine the cause of the moisture issues affecting the kitchen. However, he concluded that the storm - Case No: 476825 Determination Page 4 of 9 related damage was limited to the ceiling and that the damage to the cabinets was caused by wear and tear which pre-existed the storm. Any further investigations by the FSP were delayed for an extended period of time while the applicant sought a cash settlement of his claim based on his builder’ s report. However, subsequent tests in May 2017 did not identify any plumbing issues affecting the kitchen. The FSP’s restoration contractor (CR) inspected the property in May 2017 and reported that the water entering the kitchen had caused the skirtings a nd kitchen cabinets to swell. However, the FSP’s second builder (PI) agreed with A that the damage to the kitchen cabinets pre-existed the storm. FSP is liable for damage to kitchen cabinets and range hood Having carefully reviewed the available information, I am satisfied that the storm caused additional damage to the kitchen which is not reflected in the cash settlement offered by the FSP. In particular, the nature of the damage to the kitchen cabinets (swelling and cracking) is consistent with that which would be expected in circumstances where the cabinets were exposed to water. This damage was confirmed by the FSP’s restoration contractor (CR) as well as by the applicant’s builder (HS). Tests carried out by the FSP’s contractors have failed to identify any alternative cause of the damage to the kitchen cabinets. Further, the FSP’s builders have provided limited support for their conclusion that the damage to the cabinets pre- existed the storm. For the reasons outlined above, I consider the FSP is liable for the cost of replacing the kitchen cabinets. The applicant has provided a quotation of $24,313 from his kitchen supplier (GG) for these works. The applicant’s builder (HS) advised that the range hood required replacement due to leaking water from the ceiling entering the exposed motor. There is no information to suggest that the FSP’s builders inspected the range hood. The reported damage to the range hood is consistent with the nature of the water entry which occurred during the storm. Accordingly, I consider the FSP is liable for the cost of replacing the range hood ($808). However, I do not consider the FSP should be liable for the cost of replacing the taps and sink, as there is insufficient information to suggest that these items were damaged by the storm. FSP is liable for some (but not all) of additional damage to bathroom and toilet The applicant says the water which entered through the kitchen during the storm flowed into the nearby bathroom and toilet, damaging the walls, skirtings and flooring. Case No: 476825 Determination Page 5 of 9 The applicant seeks cover for the cost of a full bathroom renovation, including replacing all of the fixtures and fittings (at an estimated cost of approximately $40,000). The applicant’s builder (HS) says that the walls, floor tiles and fittings of the bathroom have absorbed dirty water from the storm and need to be replaced. The FSP has accepted the cost of repairing damage to the plaster bulkhead between the kitchen and the bathroom and cleaning the grouting of the bathroom tiles. However, based on the reports provided by its contractors, the FSP says there is no additional storm- related damage to the bathroom and toilet areas. The FSP’s builder (PI) identified water damage to the bathroom vanity and the skirting in the toilet area but considered this damage pre-existed the storm. Based on the available information, I consider it likely that the lower part of the vanity and the skirtings were affected by water during the storm. The FSP’s contractors have not provided an adequate explanation for their conclusion that the damage to these areas were pre-existing. Accordingly, it is appropriate that the cash settlement amount include an allowance in respect of this additional damage to the bathroom and toilet. However, I am not satisfied that the damage to the bathroom caused by the storm is such as to require the extensive works outlined in the quotations provided by the applicant’s suppliers. Accordingly, the FSP is not liable for the bulk of these amounts. FSP is not liable for additional repairs to flooring The FSP accepted liability for the cost of sanding and polishing timber flooring in the living room at an estimated cost of $990. However, the applicant has provided a quotation for $5,350 from his flooring repairer. The applicant’s quotation inc ludes the costs of sanding and polishing flooring in the hallway and three bedrooms as well as the living room. However, there is no information to suggest that these areas were damaged during the storm. The FSP is not liable for the cost of repairing areas of the property which were not damaged by the storm. The FSP is not required to sand and polish floors in other rooms of the property to ensure a uniform appearance. As outlined above, the FSP has also accepted liability for the cost of cleaning the tile grouting in the kitchen and bathroom. The applicant seeks cover for the cost of replacing the water affected tiles throughout the kitchen, bathroom and flooring area. The applicant’s builder (HS) says water seeped under the tiles, resulting in mould growth. However, I am not satisfied that the tiles required replacement as a result of the storm. The report and photographs provided by the FSP’s builder (A) who inspected the property in October 2016 do not support this conclusion. Case No: 476825 Determination Page 6 of 9 The FSP’s restoration contractor (CR) who attended in May 2017 advised that the tiles were salvageable and the damage could be addressed by cleaning the grouting. To the extent that the damage has worsened during the period of approximately six months while the claim was delayed, I am not satisfied this was primarily due to the FSP’s actions. After the applicant disputed the FSP’s initial assessment and provided his own builder’s report, the FSP sought to have its contractors attend the property to investigate the discrepancies between the two reports and provide an updated quotation. However, the applicant declined to allow the FSP’s contractors to attend despite the need for this being explained over the phone and in writing on several occasions. FSP is liable for costs of mould remediation The applicant seeks cover for total costs of $3,857.43 for mould treatment and post - remediation verification, as well as the use of containment filters and air scrubbers while the storm-related repairs are carried out. The applicant’s builder (HS) and mould specialist (MD) have advised that there is mould present to the kitchen and bathroom. The FSP’s restoration contractor (CR) also noted possible mould growth between the wall cavities, although laboratory tests proved inconclusive. The initi al assessment of the property carried out by the FSP’s builder shortly after the storm noted a musty smell and possible moisture issues from water travelling behind the plaster wall linings in the kitchen (such as would give rise to mould growth). In these circumstances, and given the nature of the water entry to the property, I consider the FSP should be liable for the costs of the relatively limited mould remediation measures proposed by the applicant’s contractors. Cash settlement for building repairs should be increased to $38,000 The applicant’s policy states that the FSP will settle a claim for building damage by repairing the damage or paying the applicant the cost (to the FSP) of doing so. For the reasons outlined above, I consider the FSP should be required to increase the cash settlement amount to make allow for the cost of repairing additional items of damage which were caused by the storm. In addition to the items outlined above, I consider it is appropriate to include an allowance for further damage identified during the course of repairs (as is not uncommon in claims of this nature), as well as any other unforeseen items. However, I am not satisfied that the cash settlement for the items for which the FSP has already accepted liability should be increased. The fact that the applicant has provided higher quotations from his own repairers does not establish that the quotations provided by the FSP’s contractors are inadequate. Case No: 476825 Determination Page 7 of 9 Having regard to the factors outlined above, I consider it is fair in all the circumstances that the cash settlement for the building repairs be increased to $38,000. The FSP is required to pay interest on this amount at the rate calculated in accordance with section 57 of the Insurance Contracts Act 1984, from 1 June 2017 until the payment date. Applicant is entitled to payment for temporary accommodation The applicant’s policy provides for the payment of reasonable temporary accommodation costs if he is unable to live in his property due to damage resulting from an insured event. The applicant seeks temporary accommodation costs for the period while the repairs to his property are carried out (which he estimates to be approximately 5 to 7 weeks, based on advice from his builders). The applicant has provided a quotation of $205 per night for short-term temporary accommodation for himself and his family, in a serviced apartment located near his home. As outlined above, I am not satisfied that the FSP is liable for all of the repairs outlined in the reports and quotations prov ided by the applicant’s builders. Nevertheless, given the extent of the repairs to the kitchen and the mould remediation required, it is reasonable that some allowance be provided for temporary accommodation benefits. In the circumstances, I consider the FSP should pay the applicant the amount of $6,355 representing one months’ worth of temporary accommodation benefits at the quoted rate. The FSP is not required to pay interest on this amount as it is based on current rates. I am not satisfied the nature a nd extent of repairs requires the applicant’s contents items to be placed in storage away from the property. Further, I am satisfied that the increase in the building settlement amount includes sufficient provision for the costs of moving furniture to undamaged rooms at the property. Accordingly, the applicant is not entitled to any additional amount for storage costs. Case No: 476825 Determination Page 8 of 9 2.2 Is the applicant entitled to compensation? FOS may award compensation for financial and non-financial loss Under paragraph 9.3(c) of the Terms of Reference, FOS may award compensation (capped at $3,300) for consequential financial loss suffered by an applicant in respect of a claim. FOS may award an additional amount (capped at $3,000) for non-financial loss where an applicant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind. The applicant is dissatisfied with the manner in which the FSP handled his claim. Among other things, he says the FSP used insufficiently qualified contractors, failed to respond promptly to his enquiries and unnecessarily delayed the resolution of his claim. The applicant says the delay in resolving his claim has resulted in the mould issues at the property worsening, affecting the health of his family. He says he has also incurred additional financial costs due to the need to make alternative arrangements while the property remained unrepaired. Applicant is not entitled to compensation For the reasons outlined above, I am not satisfied that the delays in resolving the applicant’s claim have been primarily caused by the FSP. The bulk of the delays (and further damage) occurred due to the applicant’s reluctance to allow the FSP’s contractors to re -attend his property between November 2016 and May 2017. Had the applicant consented to the attendance of a restoration specialist (as the FSP sought to arrange in October 2016), it is likely that the mould issues at the property could have been addressed at an early stage. I acknowledge that the applicant had concerns about the abilities of the FSP’s contractors due to his experiences during a prior claim in 2012. However, having carefully reviewed the correspondence between the parties, I am satisfied that the FSP attempted to address the applicant’s concerns in a reasonable manner and progress his claim. Accordingly, I am not satisfied the circumstances justify the award of compensation. Case No: 476825 Determination Page 9 of 9 3 Supporting information 3.1 FOS approach to this dispute FOS has considered it appropriate to expedite this dispute in accordance with the Operational Guidelines to the Terms of Reference, due to the nature of the dispute. Accordingly, this dispute has not been the subject of a FOS preliminary view and has proceeded directly to determination. This dispute has been determined based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice, and previous FOS decisions (which are not binding). There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues which are considered directly relevant to the outcome only. 3.2 Terms of policy Subject Terms Settlement of claims If we agree to pay a claim for loss, theft or damage to the building, we will decide if we will:  repair damage to the building  rebuild the building  pay you what it would cost us to repair or rebuild the building … If we repair (or pay you what it would cost us to repair), we will at our option do so on a ‘new for old’ basis or repair to a similar condition to what the building was in before the loss or damage occurred … Repairing or rebuilding damaged parts We will only repair o r rebuild the parts that are damaged in the incident covered by your policy … When we will repair or rebuild undamaged parts If we cannot match the mat erials with the undamaged parts, we will pay extra to create a uniform appearanc e when:  floor coverings are damaged (including tiles) we will pay extra to replace continuously joined undamaged floor coverings of the same material in the same room, stairs, hallway or passageway* where the damage occurred.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.