Text of the determination
Determination
Case No: 476825 Determination Page 1 of 9
Case number: 476825 22 November 2017
1 Overview
1.1 Dispute
The applicant lodged a claim under his home insurance policy with the financial
services provider (FSP) after his property was damaged by a storm in October 2016.
The FSP accepted the claim and offered to cash settle the applicant for $4,465.46
(less the policy excess) for the cost of repairing the storm damage.
The applicant says the cash settlement offered by the FSP is manifestly insufficient
to repair all of the damage to his home caused by the storm. He seeks a cash
settlement of $85,903.79 for the building repairs, as well as additional amounts for
temporary accommodation and storage costs.
The applicant also seeks compensation for losses suffered as a result of the manner
in which the FSP handled his claim.
1.2 Issues and key findings
Is the FSP required to increase the cash settlement amount?
The cash settlement amount for building repairs should be increased to $38,000
(plus interest) to accurately reflect the cost of repairing the damage to the property
caused by the storm. The applicant is also entitled to temporary accommodation
costs for the period while the repairs are completed.
Is the applicant entitled to compensation?
The FSP was not primarily responsible for the delay in finalising the claim.
Accordingly, the applicant is not entitled to compensation.
1.3 Determination
This determination is partly in favour of the applicant.
The FSP is required to cash settle the applicant for a total of $38,000 for the building
repairs, plus interest on the outstanding amount as set out in section 2.1 below. The
FSP is required to pay the applicant an additional amount of $6,355 for temporary
accommodation.
Case No: 476825 Determination Page 2 of 9
2 Reasons for determination
2.1 Is the FSP required to increase the cash settlement amount?
FSP has accepted liability for storm damage
The applicant’s policy provides cover for damage to his property caused by a storm,
subjects to the conditions set out in the policy.
The FSP accepts that the applicant’s property suffered damage from a storm in
October 2016, after rainwater entered the roof cavity above the kitchen. The
applicant was advised by emergency services to poke holes in the ceiling to release
the water.
The FSP assessed the damage to the property and offered to cash settle the
applicant for $4,465.46 for the cost of the necessary repairs. The FSP cash
settlement was based on a scope of works and quotation prepared by its builder (PI)
in July 2017.
Parties disagree about the scope of repairs required
The parties disagree about the extent of the damage caused by the storm in October
2016 and the scope of the repairs required.
Based on the reports provided by its contractors, the FSP says the necessary repairs
are limited to:
the replacement of the kitchen ceiling and painting of the kitchen walls
the repair of water damage to the plaster bulkhead at the doorway of the
bathroom
the removal of water staining to the tile grouting in the kitchen and bathroom
the removal and replacement of the rear entry door
the replacement of sections of timber skirting and polishing of floorboards in the
living area.
The applicant says the reports prepared by th e FSP’s contractors do not accurately
reflect the damage to the property caused by the storm.
In particular, the applicant says there is extensive water and mould damage to the
kitchen, bathroom and toilet, as well as damage to the roof and the living room floor.
He has provided reports and quotations from his contractors, which estimate the total
cost of repairing the damage at over $85,000.
I have carefully reviewed the reports and other information provided by the parties for
the purpose of determining the extent of the damage to the property caused by the
storm.
FSP is not liable for roof repairs
The FSP’s roofing plumber (C) reported that the shallow box gutter on the corrugated
iron roof had overflowed when it became blocked with debris during the storm. The
Case No: 476825 Determination Page 3 of 9
overflowing water entered the roof space through areas of unsealed flashing at the
end of the gutter.
In his report, C recommended that the flashings be sealed and the drainage system
be improved to better deal with overflow from the roof gutter. The recommended
changes included removing the existing downpipe, extending the box gutter past the
rear of the property and installing a sealed rain head and downpipe spreader.
The applicant disputes the findings of the FSP’s roofing plumber. He has provi ded a
report from his builder (HS), which states that the roof was damaged during the
storm. HS says the weight of water and tree debris bowed the gutter and moved the
flashing in the area near the downpipe.
Having carefully reviewed the available information, I am not satisfied that the
applicant’s roof was damaged by the storm.
The close up, colour photographs taken by the FSP’s builder (A) clearly show the
issues with the roof identified by the roofing plumber (C) – namely, the shallow valley
gutter and unsealed flashing.
There is no evidence of any damage of the kind which might be expected to have
been caused by the storm (for example, impact damage from flying debris).
I am satisfied that the issues with the roof which resulted in water entry existed prior
to the storm. Accordingly, the FSP is not liable for the cost of these repairs.
Contractors disagree about cause of damage to kitchen cabinets
The FSP has accepted liability for repairing water damage to the kitchen ceiling and
walls and cleaning the tile grouting. However, the applicant also seeks cover for the
cost of replacing the kitchen cabinets, range hood and kitchen sink.
The rainwater which entered the roof cavity during the storm collected in the area
above the kitchen ceiling, causing the ceiling to bow and sag until the applicant
drilled holes to release the water.
When the applicant lodged his claim, he advised the FSP there was water damage to
the kitchen cabinetry. He has since provided copies of photographs taken during the
storm that show significant volumes of water dripping onto the tops and sides of the
kitchen cabinets and running across the tiled flooring.
The applicant’s builder (HS) says the water affecting the cabinets caused the wooden
framework and doors to swell, resulting in separation of the glue and cracking of the
plastic laminate covering. Photographs taken by various contractors confirm that the
laminate has cracked in a number of places.
The FSP’s first builder (A) reported that, although cracking was present, the cabinets
did not appear to be water affected and were free from stains. A reported that there
was a musty smell coming from the kitchen cabinets, which indicated that water may
have travelled behind the plaster lining of the wall.
A recommended that further investigations be undertaken to determine the cause of
the moisture issues affecting the kitchen. However, he concluded that the storm -
Case No: 476825 Determination Page 4 of 9
related damage was limited to the ceiling and that the damage to the cabinets was
caused by wear and tear which pre-existed the storm.
Any further investigations by the FSP were delayed for an extended period of time
while the applicant sought a cash settlement of his claim based on his builder’ s
report. However, subsequent tests in May 2017 did not identify any plumbing issues
affecting the kitchen.
The FSP’s restoration contractor (CR) inspected the property in May 2017 and
reported that the water entering the kitchen had caused the skirtings a nd kitchen
cabinets to swell.
However, the FSP’s second builder (PI) agreed with A that the damage to the kitchen
cabinets pre-existed the storm.
FSP is liable for damage to kitchen cabinets and range hood
Having carefully reviewed the available information, I am satisfied that the storm
caused additional damage to the kitchen which is not reflected in the cash settlement
offered by the FSP.
In particular, the nature of the damage to the kitchen cabinets (swelling and cracking)
is consistent with that which would be expected in circumstances where the cabinets
were exposed to water. This damage was confirmed by the FSP’s restoration
contractor (CR) as well as by the applicant’s builder (HS).
Tests carried out by the FSP’s contractors have failed to identify any alternative
cause of the damage to the kitchen cabinets. Further, the FSP’s builders have
provided limited support for their conclusion that the damage to the cabinets pre-
existed the storm.
For the reasons outlined above, I consider the FSP is liable for the cost of replacing
the kitchen cabinets. The applicant has provided a quotation of $24,313 from his
kitchen supplier (GG) for these works.
The applicant’s builder (HS) advised that the range hood required replacement due
to leaking water from the ceiling entering the exposed motor. There is no information
to suggest that the FSP’s builders inspected the range hood.
The reported damage to the range hood is consistent with the nature of the water
entry which occurred during the storm. Accordingly, I consider the FSP is liable for
the cost of replacing the range hood ($808).
However, I do not consider the FSP should be liable for the cost of replacing the taps
and sink, as there is insufficient information to suggest that these items were
damaged by the storm.
FSP is liable for some (but not all) of additional damage to bathroom and toilet
The applicant says the water which entered through the kitchen during the storm
flowed into the nearby bathroom and toilet, damaging the walls, skirtings and flooring.
Case No: 476825 Determination Page 5 of 9
The applicant seeks cover for the cost of a full bathroom renovation, including
replacing all of the fixtures and fittings (at an estimated cost of approximately
$40,000).
The applicant’s builder (HS) says that the walls, floor tiles and fittings of the bathroom
have absorbed dirty water from the storm and need to be replaced.
The FSP has accepted the cost of repairing damage to the plaster bulkhead between
the kitchen and the bathroom and cleaning the grouting of the bathroom tiles.
However, based on the reports provided by its contractors, the FSP says there is no
additional storm- related damage to the bathroom and toilet areas. The FSP’s builder
(PI) identified water damage to the bathroom vanity and the skirting in the toilet area
but considered this damage pre-existed the storm.
Based on the available information, I consider it likely that the lower part of the vanity
and the skirtings were affected by water during the storm. The FSP’s contractors
have not provided an adequate explanation for their conclusion that the damage to
these areas were pre-existing.
Accordingly, it is appropriate that the cash settlement amount include an allowance in
respect of this additional damage to the bathroom and toilet.
However, I am not satisfied that the damage to the bathroom caused by the storm is
such as to require the extensive works outlined in the quotations provided by the
applicant’s suppliers. Accordingly, the FSP is not liable for the bulk of these amounts.
FSP is not liable for additional repairs to flooring
The FSP accepted liability for the cost of sanding and polishing timber flooring in the
living room at an estimated cost of $990. However, the applicant has provided a
quotation for $5,350 from his flooring repairer.
The applicant’s quotation inc ludes the costs of sanding and polishing flooring in the
hallway and three bedrooms as well as the living room. However, there is no
information to suggest that these areas were damaged during the storm.
The FSP is not liable for the cost of repairing areas of the property which were not
damaged by the storm. The FSP is not required to sand and polish floors in other
rooms of the property to ensure a uniform appearance.
As outlined above, the FSP has also accepted liability for the cost of cleaning the tile
grouting in the kitchen and bathroom.
The applicant seeks cover for the cost of replacing the water affected tiles throughout
the kitchen, bathroom and flooring area. The applicant’s builder (HS) says water
seeped under the tiles, resulting in mould growth.
However, I am not satisfied that the tiles required replacement as a result of the
storm.
The report and photographs provided by the FSP’s builder (A) who inspected the
property in October 2016 do not support this conclusion.
Case No: 476825 Determination Page 6 of 9
The FSP’s restoration contractor (CR) who attended in May 2017 advised that the
tiles were salvageable and the damage could be addressed by cleaning the grouting.
To the extent that the damage has worsened during the period of approximately six
months while the claim was delayed, I am not satisfied this was primarily due to the
FSP’s actions.
After the applicant disputed the FSP’s initial assessment and provided his own
builder’s report, the FSP sought to have its contractors attend the property to
investigate the discrepancies between the two reports and provide an updated
quotation.
However, the applicant declined to allow the FSP’s contractors to attend despite the
need for this being explained over the phone and in writing on several occasions.
FSP is liable for costs of mould remediation
The applicant seeks cover for total costs of $3,857.43 for mould treatment and post -
remediation verification, as well as the use of containment filters and air scrubbers
while the storm-related repairs are carried out.
The applicant’s builder (HS) and mould specialist (MD) have advised that there is
mould present to the kitchen and bathroom. The FSP’s restoration contractor (CR)
also noted possible mould growth between the wall cavities, although laboratory tests
proved inconclusive.
The initi al assessment of the property carried out by the FSP’s builder shortly after
the storm noted a musty smell and possible moisture issues from water travelling
behind the plaster wall linings in the kitchen (such as would give rise to mould
growth).
In these circumstances, and given the nature of the water entry to the property, I
consider the FSP should be liable for the costs of the relatively limited mould
remediation measures proposed by the applicant’s contractors.
Cash settlement for building repairs should be increased to $38,000
The applicant’s policy states that the FSP will settle a claim for building damage by
repairing the damage or paying the applicant the cost (to the FSP) of doing so.
For the reasons outlined above, I consider the FSP should be required to increase
the cash settlement amount to make allow for the cost of repairing additional items of
damage which were caused by the storm.
In addition to the items outlined above, I consider it is appropriate to include an
allowance for further damage identified during the course of repairs (as is not
uncommon in claims of this nature), as well as any other unforeseen items.
However, I am not satisfied that the cash settlement for the items for which the FSP
has already accepted liability should be increased. The fact that the applicant has
provided higher quotations from his own repairers does not establish that the
quotations provided by the FSP’s contractors are inadequate.
Case No: 476825 Determination Page 7 of 9
Having regard to the factors outlined above, I consider it is fair in all the
circumstances that the cash settlement for the building repairs be increased to
$38,000.
The FSP is required to pay interest on this amount at the rate calculated in
accordance with section 57 of the Insurance Contracts Act 1984, from 1 June 2017
until the payment date.
Applicant is entitled to payment for temporary accommodation
The applicant’s policy provides for the payment of reasonable temporary
accommodation costs if he is unable to live in his property due to damage resulting
from an insured event.
The applicant seeks temporary accommodation costs for the period while the repairs
to his property are carried out (which he estimates to be approximately 5 to 7 weeks,
based on advice from his builders).
The applicant has provided a quotation of $205 per night for short-term temporary
accommodation for himself and his family, in a serviced apartment located near his
home.
As outlined above, I am not satisfied that the FSP is liable for all of the repairs
outlined in the reports and quotations prov ided by the applicant’s builders.
Nevertheless, given the extent of the repairs to the kitchen and the mould
remediation required, it is reasonable that some allowance be provided for temporary
accommodation benefits.
In the circumstances, I consider the FSP should pay the applicant the amount of
$6,355 representing one months’ worth of temporary accommodation benefits at the
quoted rate. The FSP is not required to pay interest on this amount as it is based on
current rates.
I am not satisfied the nature a nd extent of repairs requires the applicant’s contents
items to be placed in storage away from the property. Further, I am satisfied that the
increase in the building settlement amount includes sufficient provision for the costs
of moving furniture to undamaged rooms at the property.
Accordingly, the applicant is not entitled to any additional amount for storage costs.
Case No: 476825 Determination Page 8 of 9
2.2 Is the applicant entitled to compensation?
FOS may award compensation for financial and non-financial loss
Under paragraph 9.3(c) of the Terms of Reference, FOS may award compensation
(capped at $3,300) for consequential financial loss suffered by an applicant in
respect of a claim.
FOS may award an additional amount (capped at $3,000) for non-financial loss
where an applicant has suffered an unusual degree or extent of physical
inconvenience, time taken to resolve the situation or interference with their
expectation of enjoyment or peace of mind.
The applicant is dissatisfied with the manner in which the FSP handled his claim.
Among other things, he says the FSP used insufficiently qualified contractors, failed
to respond promptly to his enquiries and unnecessarily delayed the resolution of his
claim.
The applicant says the delay in resolving his claim has resulted in the mould issues
at the property worsening, affecting the health of his family. He says he has also
incurred additional financial costs due to the need to make alternative arrangements
while the property remained unrepaired.
Applicant is not entitled to compensation
For the reasons outlined above, I am not satisfied that the delays in resolving the
applicant’s claim have been primarily caused by the FSP.
The bulk of the delays (and further damage) occurred due to the applicant’s
reluctance to allow the FSP’s contractors to re -attend his property between
November 2016 and May 2017.
Had the applicant consented to the attendance of a restoration specialist (as the FSP
sought to arrange in October 2016), it is likely that the mould issues at the property
could have been addressed at an early stage.
I acknowledge that the applicant had concerns about the abilities of the FSP’s
contractors due to his experiences during a prior claim in 2012.
However, having carefully reviewed the correspondence between the parties, I am
satisfied that the FSP attempted to address the applicant’s concerns in a reasonable
manner and progress his claim.
Accordingly, I am not satisfied the circumstances justify the award of compensation.
Case No: 476825 Determination Page 9 of 9
3 Supporting information
3.1 FOS approach to this dispute
FOS has considered it appropriate to expedite this dispute in accordance with the
Operational Guidelines to the Terms of Reference, due to the nature of the dispute.
Accordingly, this dispute has not been the subject of a FOS preliminary view and has
proceeded directly to determination.
This dispute has been determined based on what is fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice, and
previous FOS decisions (which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues which are
considered directly relevant to the outcome only.
3.2 Terms of policy
Subject Terms
Settlement of
claims
If we agree to pay a claim for loss, theft or damage to the building, we will decide
if we will:
repair damage to the building
rebuild the building
pay you what it would cost us to repair or rebuild the building …
If we repair (or pay you what it would cost us to repair), we will at our option do so
on a ‘new for old’ basis or repair to a similar condition to what the building was in
before the loss or damage occurred …
Repairing or rebuilding damaged parts
We will only repair o r rebuild the parts that are damaged in the incident covered
by your policy …
When we will repair or rebuild undamaged parts
If we cannot match the mat erials with the undamaged parts, we will pay extra to
create a uniform appearanc e when:
floor coverings are damaged (including tiles) we will pay extra to replace
continuously joined undamaged floor coverings of the same material in the
same room, stairs, hallway or passageway* where the damage occurred.