Text of the determination
Determination
Case No: 476789 Determination Page 1 of 3
Case number: 476789 15 January 2018
1 Overview
1.1 Dispute
The applicant lodged a claim under his home insurance policy with the financial
services provider (FSP) after his house was damaged during a storm in 2008.
The FSP accepted the claim and repairs were carried out. The applicant contacted
the FSP again in January 2017 and raised concerns about the quality of those
repairs. He believes the FSP is liable for rectification of that work.
The FSP inspected the damage and ultimately said it would not cover rectification
under the FSP’s home repair guarantee. That was because , the FSP says, it did not
arrange and authorise the repairs in 2008, the applicant did.
The applicant contends he engaged a tradesperson on the suggestion of the FSP
because the FSP had not been able to arrange a repairer.
The case manager provided the parties with a recommendation on the issues in
dispute. The recommendation was in favour of the FSP. A copy of the
recommendation is attached to this determination.
1.2 Issues and key findings
Were the findings of the recommendation correct?
The findings contained in the recommendation were correct and are adopted in this
determination. Further submissions provided after the recommendation have been
considered.
Does the applicant’s additional submission change the outcome ?
The applicant’s additional submission after the issue of the recommendation does not
change the outcome.
1.3 Determination
This determination is in favour of the FSP.
I agree with the case manager’s reasons for the recommendation and the
recommended outcome.
The FSP is not required to take any further action.
Case No: 476789 Determination Page 2 of 3
2 Reasons for determination
2.1 Were the findings in the recommendation correct?
I have decided this case on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions. I have taken into
account all the material submitted by the parties, both before and after the
recommendation. I am satisfied that the documentation I have relied on has been
provided to both parties. For the purposes of this determination, I will deal with only
those points considered relevant.
I am satisfied the case manager’s recommendation contains an accurate summary of
the dispute, the issues to be determined, any applicable paragraphs of the Terms of
Reference and any relevant law.
2.2 Does the applicant’s additional submission change the outcome ?
FSP paid for 2008 repairs
In 2008, a storm event caused a tree to bring down the power supply line to the
applicant’s property. This power disruption also caused the spoilage of food.
The applicant sourced an electrician to carry out the repairs, which the FSP paid for
under the policy at the time. He contends the FSP had arranged and authorised the
repairs.
In 2017, the applicant noticed the repairs of 2008 required rectification and he
obtained a quote for the work that would be required. The FSP declined to carry out
the rectification work.
The dispute is a bout the applicant’s contention th e FSP should be liable for the
rectification work, because the policy provides a life-long warranty for repairs it has
arranged and authorised.
Insufficient evidence FSP arranged and authorised repairs
There is limited available material that relates to the time of the applicant’s 2008
claim for destroyed food and damage to his house. That material comprises the
FSP’s file notes relating to the time of the claim. However, t he information was
insufficient to confirm, on balance, the applicant’s posi tion the FSP had arranged and
authorised the repair work. What it does show is that the FSP agreed to accept the
2008 claim, and then apparently settled the repairer directly after receiving the
invoice from the applicant. That effectively amounts to a cash settlement of the claim.
That means I am not satisfied the applicant has established an entitlement to the life-
long warranty under the policy in relation to the home repairs carried out in 2008.
FSP not liable for 2017 claim
The FSP considered whether to carry out rectification work in response to the 2017
claim. However, an assessment revealed compliance issues with the property and
Case No: 476789 Determination Page 3 of 3
the FSP ultimately refused the claim, which I am satisfied it was entitled to do, for the
reasons set out in this determination and in the recommendation.
While this change of position is likely to have disappointed and possibly also
inconvenienced the applicant to some degree, I do not consider the FSP acted
unreasonably in the circumstances, nor is it established that this caused specific
detriment to the applicant.
Applicant’s objection to recommendation does not change the outcome
The applicant has provided no compelling information that supports his contention
the FSP had arranged and authorised the repair work.
Nine years have elapsed since the applicant lodged his original claim. The FSP has
limited material from the time of the 2008 claim. However, the FSP’s brief file notes
from that period indicate there was contact between the parties on 4 April 2008, 7
April 2008, 13 May 2008 and 14 May 2008.
The file note from 4 April 2008 merely indicated the applicant would be providing a
list and costs with respect to the destroyed food. The 7 April 2008 file note said the
FSP sent a cheque to the applicant for the destroyed food.
The note also stated the applicant advised the FSP he had found an electrician who
has rectified the power line which had come away from the fascia board. The note
further added the applicant would send the invoice once received. The file note dated
14 May 2008 indicated the FSP paid the electrician’s invoice.
The letter the applicant provided from the local electricity provider merely states it
attended the applicant’s property on 4 and 5 April 2008. Neither this nor the copy of
the applicant’s letter to the FSP at about that time adds anything of substance in
support of the applicant’s contention the FSP arrang ed and authorised the repairs.
So there remains insufficient information to reasonably conclude the FSP arranged
and authorised repairs in 2008.
That means the FSP is not liable for rectification of the work done at the time, or any
further damage arising from that work.
Recommendation
Case No: 476789 Recommendation Page 1 of 5
Case number: 476789 26 June 2017
3 Overview
3.1 Dispute
This dispute arises from an insurance policy held by the applicant with the financial
services provider (FSP).
The applicant lodged a claim after his home was damaged by a storm in 2008. The
FSP accepted the claim, and repairs were completed at that time.
In January 2017 the applicant contacted the FSP and raised concerns with the
quality of repairs from the 2008 storm. The FSP inspected the damage, and
subsequently declined cover under its home repair guarantee, saying the damage
was caused by poor workmanship.
The applicant says he engaged trades at the FSP’s instruction, as the FSP was
unable to arrange repairs. The applicant says the FSP should accept liability for the
failed repairs, and seeks to have the repairs made good under the policy.
3.2 Issues and key findings
Was the FSP entitled to decline the a pplicant’s claim?
The FSP was entitled to decline the applicant’s claim, as it did not arrange and
authorise repairs for the 2008 claim.
3.3 Recommendation
This recommendation is in favour of the FSP.
The FSP is not required to take any further action with respect to the claim.
Case No: 476789 Recommendation Page 2 of 5
4 Reasons for recommendation
4.1 Was the FSP entitled to decline the applicant’s claim?
Policy provides guarantee for works arranged and authorised by FSP
The onus is on the applicant to establish, on the balance of probabilities, he has
suffered a loss caused by a risk insured against under the terms of the policy. This is
called a valid, or prima facie claim. Only once the applicant establishes such a claim
does the onus shift to the FSP to establish an exclusion applies to defeat the claim.
The parties agree the applicant’s property was damaged by a storm event in 2008.
The parties additionally agree the FSP covered the claim.
The dispute before this Service considers whether repairs undertaken to the property
at that time, accepted as being of a poor quality, are the responsibility of the FSP.
The applicant’s policy provides a guarantee covering workmanship and materials, as
outlined in Section 3.1 below. In order for the FSP to be responsible under this
guarantee, it needs to be shown the FSP:
arranged the repairers
authorised the repairs.
Therefore, as the claiming party seeking a remedy under the policy, the onus is on
the applicant to establish the FSP both arranged and authorised repairs to his
property.
History of claim
The applicant says the storm which led to his property damage was extensive,
covering southern Tasmania. He says due to the extent of damage, the FSP could
not provide its preferred trades.
The applicant says he was instructed to find an electrician if he could. On locating a
private electrician, the applicant says he was provided with a claim number for the
electrician to invoice the FSP directly.
The FSP says the information available to it is restricted, due to the passage of time.
The FSP says its claim notations, while limited, suggest the applicant contacted the
FSP on 7 April 2008 to confirm repairs had been undertaken and completed. The
relevant claim notations have been included in Section 3.2.
The FSP’s notations suggest the applicant was going to send the electrician’s invoice
once he received it. A further notation of 13 May 2008 suggests the FSP contacted
the applicant at that time, was aware of the invoice, and issued payment to the
repairer directly on 14 May 2008.
Information suggests applicant engaged trades prior to FSP contact
This Service requested a copy of the invoice from both the applicant and the FSP.
Due to the passage of time, neither party was able to supply this information. It is
Case No: 476789 Recommendation Page 3 of 5
accepted however, that as the claim was lodged some nine years prior, the
information falls outside the statute of limitations.
While acknowledging the period of time which has passed, the parties agree the
trades who conducted the 2008 claim repairs were engaged by the applicant.
The information, however, is insufficient to demonstrate whether instruction was
provided by the FSP to engage trades, or whether the applicant engaged trades
initially, and then lodged the claim. The information also does not confirm to whom
the invoice was addressed, whether to the applicant directly, or to the FSP.
Looking at the time the invoice was provided, based on the available
contemporaneous information, it would appear the applicant first received the
invoice, and this was then in turn provided to the FSP. The claim system notations
suggest the date payment was raised was relative to the applicant’s contact about
receiving an invoice.
The applicant says the FSP paid the trades directly, and that the trades contacted
him sometime after the fact seeking payment for their works. The applicant says he
contacted the FSP at this time, and was notified of a payment reference number and
date, which he then provided to the trades.
Insufficient evidence FSP arranged and authorised repairs
Having considered the available material I do not consider there is sufficient
information supporting the applicant’s view. This is because the FSP’s
contemporaneous notations suggest the applicant contacted the applicant on the day
works were completed, and once again when he received the invoice. Aside from the
date the claim was lodged, there is little information to demonstrate the applicant
made any contact with the FSP at any other times.
The differing versions, in my view, are nothing other than an innocent error on the
part of the applicant. Statements or notations made closer to the date of an incident
tend to more accurately reflect what most likely occurred or was discussed.
That is, on the balance of probabilities, records made at the time of, or immediately
following contact will be more accurate than statements made some nine years after
the event.
In light of the available material, particularly given the contemporaneous notations
suggesting the electrician sent the invoice directly to the applicant, and the
applicant’s statement he e ngaged trades directly, I consider it more likely the
applicant, rather than the FSP, arranged and authorised repairs.
Supporting this view, the contemporaneous information suggests the claim was
lodged on 4 April 2008, and repairs were completed by 7 April 2008, a passage of
three days. Having reviewed these dates more closely, I note 4 April 2008 was a
Friday, and 7 April 2008 a Monday.
It would appear the passage of time between claim lodgement and repair was one
business day. The applicant’s dispute to this Service states he “eventually tracked
someone to do the job”, suggesting the applicant invested some time undertaking
Case No: 476789 Recommendation Page 4 of 5
this task. This recollection does not appear to be supported by the dates recorded
contemporaneously by the FSP.
FSP not liable for claim
Having carefully considered all the available material, and for the reasons outlined
above, I am not satisfied there is sufficient evidence demonstrating the FSP arranged
and authorised repairs for the 2008 storm claim.
Rather, the information suggests, on the balance of probabilities, the applicant
engaged trades to undertake the work, and lodged a claim proximate to this time.
While the FSP agreed to accept the claim and settled the repairer directly, this of
itself is not sufficient to demonstrate the FSP arranged the trades and authorised
repairs to go ahead.
Accordingly, as the applicant has the onus to establish an entitlement to a policy
benefit, and as the information does not establish this obligation has been fulfilled,
the FSP was entitled to decline liability under its home repair guarantee.
I acknowledge the FSP appeared to accept liability for rectification works, and then
later retracted this offer. It would appear that the FSP’s builder, on attending the site
to conduct repairs, identified compliance issues with the property which required
upgrade works. It would appear the FSP revised its assessment at this time, resulting
in the FSP ultimately refusing the claim.
Having regard to the sequence of events, I appreciate the concern and interference
with the applicant’s expectation of the claim outcome. However, there is insufficient
information which demonstrates the applicant was placed in a detrimental position as
a result of the FSP’s actions.
Rather, the information suggests the FSP’s ultimate claim decision was made within
acceptable timeframes, as provided by the relevant Code of Practice.
For the reasons outlined above, I accept the FSP is not required to undertake any
further works at the applicant’s property.
Case No: 476789 Recommendation Page 5 of 5
5 Supporting information
5.1 Relevant policy wording
“ The [FSP] Home Repair Guarantee
The quality of workmanship and the materials used in any repair or rebuilding of your home and
contents that we arrange and authorise will be guaranteed for the life of the property.
If you are concerned about the quality of the repair or rebuilding of your home building, you must
call us on [FSP telephone number]. We will arrange with you to inspect the repair or rebuilding and
we will arrange any necessary rectification work.
You must n ot authorise any rectification work without our written authority.”
5.2 Relevant claim notations
Date Claim notation
4 April 2008 IO WILL GET LIST/COST TOGETHER FOR DESTROYED FOOD.
7 April 2008 INTRO CALL COMPLETED
MR IO CALLED 1.38
- ADVISED [FSP represent ative] [Cas e Manager], 100 [excess] ON BUILDING
- IO ADVISED 200 WORTH OF FROZEN FOOD HAS BEEN SPOILT ALL UP
HAVE OFFSET 100 OF THIS FOR 100 [excess]
SENT [cheque] FOR 100.00
- IO ADVISED THAT ELECTRICIAN HAS FIXED THE ELECTRICAL FITTING THAT
HAS COME AWAY FROM THE FACIA BOARD WHEN THE TREE IMPACTED THE
POWER LINE. ELECTRICIAN QUOTE 350. 00 FOR THIS – IO WILL SEND IN
INVOICE ONE [sic] TO HAND
13 May 2008 CALLED IO AND [confirmed]
- IO HAS RECEIVED [cheque] FOR $100. 00
- IO RECIEVED [sic] INVOICE FO R $350 ELETRICAL [sic] WORK AND WILL POST.
- ONCE RECIEVED [sic] [please] PAY AND FINALISE CLAIM.
- IO HAPPY WITH ALL WORK DONE.
14 May 2008 RE ABOVE HAVE PAID AND FINALISED