Claim declined for partial ceiling and roof collapse after January 2016 storm, attributed to structural defect or faulty design

FirmFinancial Firm (Unknown - Insurer)
Decided2018-04-09
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$115,500
Non-financial loss—
Amount claimed$116,300
SourceAFCA PDF

Summary

The applicant's storm-damaged roof and internal damage claim was declined by the FSP as a structural defect. AFCA found the storm caused the collapse, ordered $115,500 for storm and resultant internal damage plus interest, and ordered reimbursement of the applicant's engineering report costs.

Once the applicant established a valid storm claim, the FSP had to prove the structural defect exclusion applied, and its engineer's evidence did not do so.

Issues

Subjects and remedies

home or building damagepay claimpay compensationpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 476468 Determination Page 1 of 9 Case number: 476468 3 April 2018 1 Overview 1.1 Dispute The applicant lodged a claim with his financial services provider (FSP) following the partial collapse of his property‟s ceiling after a storm in January 2016. The FSP refused the claim and says the cause of loss was structural defect or faulty design, which the policy excludes from cover. The applicant disagrees and says:  there was no structural defect or faulty design  the FSP caused further damage due to inadequate make safe steps  the FSP managed his claim poorly. 1.1 Issues and key findings What is the FSP’s liability for the claim? The FSP should pay for the damage caused by the roof‟s collapse because:  the loss or damage was caused by storm, which the policy covers  the evidence does not show the loss was caused by a structural defect or faulty design. The FSP should also pay for any resultant internal damage because:  the evidence shows this was linked to the roof‟s collapse  there is no evidence to show the applicant failed to mitigate his situation. Is the applicant entitled to compensation or reimbursement? The FSP‟s handling of the claim was reasonable in the circumstances and does not warrant an award of non-financial loss. The applicant‟s expert reports were persuasive. The FSP is to reimburse the applicant the cost of these reports. 1.2 Determination This determination is in favour of the applicant. The FSP must pay the applicant $115,500 plus interest. The FSP is also to reimburse the applicant‟s expert report fees. Case No: 476468 Determination Page 2 of 9 2 Reasons for determination 2.1 What is the FSP’s liability for the claim? Applicant must first establish a valid claim The applicant‟s policy covers loss or damage caused by certain events (insured events). It is an accepted principle of insurance law that when making a claim, the initial burden of proof is with the applicant to show, on the balance of probabilities, an insured event caused the claimed loss (called a prima facie or valid claim). If the applicant can do so, the burden of proof shifts to the FSP to show, on the balance of probabilities, a policy exclusion applies. Circumstances of the claim The applicant‟s property was affected by a severe storm on or around 29 January 2016. The rear roof of the property partially collapsed and damage was sustained to the gutters, walls, fascia, windows and a glass sliding door. The applicant lodged the claim with the FSP on 4 February (through his broker), after which a “make safe” was completed on 11 February 2016. The applic ant alleges further damage to the property resulted from the inadequate provision of the make safe. Specifically, that it resulted in ongoing water entry into the property‟s interior causing further damage. The FSP appointed a builder (P) and later an engineer (HCE) to identify the cause of the ceiling collapsing. Both concluded the roof collapsed during the storm event, as a result of „structural defect, faulty design or faulty workmanship‟. The FSP refuses cover on this basis. The applicant has a valid claim It follows from the reports provided by P and HCE the roof collapsed during the storm. The applicant also provided:  newspaper articles and reports from the Bureau of Meteorology to confirm the dates and severity of the storm  several submissions from his own engineer (GNA) confirming the wind gusts during the storm directly led to the partial collapse. Based on this, the applicant can demonstrate a valid claim under the terms and conditions of the policy. To refuse the claim, the FSP must now show, on t he balance of probabilities, the cause of the applicant‟s loss is excluded by the policy. The FSP says the collapse resulted from the inadequate support of the roof‟s ridge beam, owing to the design of the roof at the time of its construction. This is based on HCE‟s conclusion. Therefore, the loss falls within the policy exclusion for structural defect or faulty design. The applicant refutes this and is relying on GNA‟s evidence. Case No: 476468 Determination Page 3 of 9 FSP not entitled to rely upon exclusions for structural defect or faulty design Upon carefully reviewing the information provided by both engineers, the Panel is not satisfied the FSP‟s evidence shows the roof collapsed due to a structural defect or faulty design for the following reasons. First, HCE‟s evidence is unclear as to whe ther he attributes the cause of the collapse to defects or workmanship based on its time of construction. HCE‟s initial report referred to a lack of propping and the joint not being adequately connected. However, the report did not link these to specific b uilding standards applicable to the roof‟s construction. Upon later considering these standards, HCE identified issues with the lack of fixings to the ceiling joists and the absence of fish plates. However, HCE did not then say these factors were the cause of the damage. Instead, later in the report, HCE said more stringent requirements were applied for coupled roofs due to previous problems occurring where these roofs collapsed under normal loads. This implies the problem would have still occurred even if these fixings were applied. Second, whilst GNA accepts there was an absence of fish plates, he did not accept this had caused the collapse. GNA also disagreed with HCE‟s conclusion there was a lack of fixings because:  there was a photograph which showed the ends of the ceiling joist which had been installed and nailed to the rafters  if the roof had not been installed with these fixings, it would not have withstood for 40 years under normal wind loads. This evidence is persuasive, particularly the second point. Further, the Panel notes HCE‟s comment about the absence of fixings was equivocal given he said “suggests that the rafters were not fixed to the ceiling joists …” Third, HCE did not accept GNA‟s conclusion the roof was subject to greater winds based on weather observations recorded from Melbourne Airport in February 2016. This station is more than 40km away from the applicant‟s property. Further, the applicant says the damage likely occurred during a fairly severe storm on 29 January 2016. GNA also notes that observations from a weather station does not reflect local conditions. These factors substantively rebut HCE‟s evidence. The FSP, in its submissions, did refer to weather observations in late January to support HCE‟s comments. A copy of this was n ot provided. Further, according to the FSP, “No Recording” was made for 29 January 2016. Given there is no dispute that a severe storm occurred on that day, there is no basis to conclude the property was not subject to strong winds. Fourth, the applicant has continually said that if the roof was not designed to withstand normal wind loads, then it does not explain how it managed to withstand other storms in the previous 40 years. There is particular force to this argument that is not addressed in HCE‟s repo rts. Given the above, the Panel is not persuaded HCE‟s evidence shows the cause of the roof‟s collapse was due to a structural defect or faulty design. Case No: 476468 Determination Page 4 of 9 FSP must pay the applicant $82,800 for event related damage plus interest The only available quote for repairs was provided by the applicant for $82,800. This was dated 19 February 2016. As the property has since been demolished, no other quote is able to be obtained. Whilst the quote is not itemised, the contents appear to reflect the damage caused by the storm and the steps necessary to rectify the same. Therefore, the FSP must pay the applicant $82,800, less any applicable excess, plus interest. Interest is payable pursuant to section 57 of the Insurance Contracts Act 1984 (the Act) from 8 March 2016, bei ng the date the FSP denied the claim, until payment is made. FSP is not liable for resultant internal damage to the property The applicant says internal damage resulted from the FSP‟s failure to make the site safe on 11 February 2016. The FSP refutes this. Regardless, if internal damage has occurred subsequent to the make safe, then the FSP would be liable for this because:  there is no dispute the damage occurred relatively contemporaneous to the make safe – the applicant says it occurred shortly after the make safe and confirmed this in an email to the broker dated 23 March 2016  it is clear this additional damage is causally connected to the storm that resulted in the roof collapse  there is no evidence to say the damage occurred due to the applicant faili ng to mitigate the situation. The applicant has provided a quote for the internal damage totalling $33,500. This was dated 20 July 2016. There is no evidence to say this does not reflect the cost of repairing the internal damage that subsequently occurred. Given this, and the lack of any evidence showing the internal damage could have been avoided by the applicant, the FSP is liable to reimburse this sum. Further, the FSP is to pay interest on this amount from 19 August 2016, being the last day this quote was valid to, until payment is made. Interest is to be calculated pursuant to section 57 of the Act. 2.2 Is the applicant entitled to compensation or reimbursement? Applicant not entitled to compensation Under paragraph 9.3 of the Terms of Reference (TOR), FOS may direct an FSP to compensate the applicant for their non-financial loss, when an applicant experiences an unusual degree of stress, physical inconvenience or time taken to resolve a claim. Compensation is limited to $3,000 per claim. An award of compensation will not follow if the evidence shows the FSP reasonably handled the claim. Case No: 476468 Determination Page 5 of 9 Consideration of the claim history shows the following:  8 February 2016 – broker lodges the claim with the FSP  11 February 2016 – FSP‟s trades attend and provide the make safe  19 February 2016 – HCE inspects the property  8 March 2016 – FSP mails initial denial letter to broker  23 March 2016 – broker advises the FSP of the applicant‟s make safe concerns  30 March 2016 – the FSP advises the applicant he will need to provide a report  1 April 2016 – FSP follows up with the broker to confirm what damage was caused by the FSP‟s trades  5 April 2016 – FSP follows up with the broker to request photographs  7 April 2016 – broker informs the FSP there was damage to a couple of ceilings  8 April 2016 – FSP calls broker to discuss issues  12 May 2016 – Broker responds with the applicant‟s concerns  13 May 2016 – FSP emails the broker and says the applicant has not yet provided any evidence of resultant damage from the make safe; the broker agrees to follow up with the applicant  4 July 2016 – applicant provided a letter setting out his concerns – this was scanned by the FSP on 22 July 2016  28 July 2016 – FSP responds to broker addressing the applicant‟s letter and again discusses the need for the applicant to provide his own report  11 November 2016 – applicant writes to the FSP setting out his concerns  22 & 23 November 2016 – FSP and broker discuss the applicant‟s letter. Given the above, the Panel does not accept the FSP unreasonably handled t he claim. The claim was reviewed and a decision made within less than two months. The FSP also responded to the applicant‟s correspondence relatively promptly through his authorised agent, the broker. This was reasonable. Regarding the make safe, there i s no expect evidence to support the applicant‟s assertion that they were inappropriate. Given all this, the Panel is not satisfied an award of non-financial loss is warranted in these circumstances. FSP must reimburse the applicant the cost of GNA’s submi ssions FOS may decide the FSP should contribute to the legal or other professional costs incurred by the applicant during the course of the dispute. Unless exceptional circumstances apply, FOS will not require an FSP to contribute more than $3,000. The rep orts and letters provided by the applicant‟s engineer, GNA, were particularly relevant to reaching a decision in the applicant‟s favour. The reports were well explained and presented logical and plausible conclusions. Further, given the technical nature of the issue and the amount of times GNA was engaged to respond to HCE, the Panel considers exceptional circumstances apply. Therefore, any amount payable should not be capped by $3,000. Accordingly, the FSP is to reimburse GNA‟s costs for providing these r eports subject to the applicant producing all the invoices charged . Case No: 476468 Determination Page 6 of 9 3 Supporting information 3.1 Policy terms What is covered Your buildings and/or your contents as set out in your schedule are covered if they are destroyed, lost or damaged. They are only covered if your own them, or are liable for them. We will cover your buildings and your contents (as applicable) for loss or damage from the events listed below;  …  Storm, rainwater, hail or wind. This includes storm, rainwater, hail, or wind damage to gates, fences or walls that are entirely or partly at the situation. The following exclusions applies to the whole of your policy unless otherwise stated. We will not pay for loss, damage or liability arising from:  …  water enters your buildings because of structural defect, faulty design or faulty workmanship when your buildings were constructed… 3.2 Expert submissions Record Key points FSP’s engineer (HCE) A Report on Site Inspection 22 - 02 - 2016  Inspection carried out for the purpose of determining roof separation.  The building is approximately 40 years old. The applicant built the home through a builder.  The roof collapsed over the family room, allegedly as a result of storm damage.  Roof framing is conventional with a ridge beam and rafters nailed to the ridge beam. The ridge beam spans approximately 13m.  Approximately directly above the rear of the family room there is a joint of the ridge beam but no support or connection is provided. Collapse occurred at this juncture.  The ridge beam collapsed at the j oint, pulling away from the rafters, with horizont al displacement of the end of the rafters over the side walls, and horizontal displacement of the top of the side walls.  At the family room, the east side wall has moved to the extent the brick wall veneer collapsed.  No internal propping installed along the length of the ridge beam.  A long diagonal prop is evident from the north end of the ridge beam, which is at the rear gable end.  The collapse which occurred is typical of problems arising from inadequate c onstruction of the roof framing.  No internal propping present along the span of the ridge beam and the joint of the ridge beam was not adequately connected. Case No: 476468 Determination Page 7 of 9  As normal loads were applied onto the ridge beam, it collapsed due to inadequate construction and c aused horizontal displacement on the side walls.  These problems are not related to storm damage. Applicant’s engineer (GNA) Inspection Report 07 - 10 - 2016  The section of the gable roof on the east side of the ridge has detached from the connection to the central ridge plat e, displacing approximately 300mm towards the east.  The only fixings of the rafters to the ridge plate, and also to the side wall top plate, appear to be nails (photos provided).  “I believe the wind uplift on the downward slope (east side ) of the roof, has lift ed the roof from connection to the ridge plate and displaced the roof laterally.”  “I believe that the wind force required to lift the roof was in excess of the design wind force as det ermined in accordance with the wind loading code, which was relevant at the time of construction.” HCE Letter 12 - 04 - 2017  GNA concluded the wind force required to lift the roof was in excess of the design wind force relevant at the time of construction, lifting the roof from connection to the ridge plate and displacing the roof laterally.  Maximum wind gust rec orded in February 2016 was 56km/hr, which is not a strong wind and would not exceed the wind loading criteria for a building constructed in 1975.  Maintains the collapse results from inadequate construction of the roof, leaving it unable to withstand normal loads.  “We note that the failure method of the roof framing indicates a collapse of the roof framing, and not an uplift…”. GNA Inspection Report 02 - 06 - 2017  Have now reviewed information submi tted by HCE.  Roof framing consists of timber battens, long span rafters and ridge plate combined with horizontal ceiling joists to form a gable end coupled roof.  The style is typical of roofs built during the era (1975).  The ridge plate in this system does not carry any vertical load and does not rely on props for support.  “I believe the construction of the roof framing was standard acceptable practice at that time, and would have complied with the building regulations prevailing at that time.”  The wind uplift on this section of the roof was the lee side for the prevail westerly wind, and in accordance with the relevant Australian Standard Loading Code for Wind Forces (AS1170 Part 2 – 1973) would have been considerably less than the combined weight of the conc rete tiles and the timber framing.  “I believe that excessive wind uplift on the downward slope (east side) of the roof, has lifted the roof from the connection to the ridge plate, pulling the skew nails from the rafters out of the sides of the ridge p late and displaced the whole east section of the roof laterally.”  “If the roof had simply collapsed (as they claim), then the ridge plate would have dropped straight down vertically, Case No: 476468 Determination Page 8 of 9 pulling the rafters straight down vertically, pulling the raft ers straigh t down with them, and there would be no applied lateral force to cause the whole section to move laterally away from the ridge plate.” HCE Letter 20 - 07 - 2017  Have now reviewed a copy of the approved drawings of the residence and a copy of the engineer‟s co mputations for the roof framing.  The approved drawings do not specify the roof framing over the rear section of the residenc e which is where the collapse occurred.  The engineer‟s computations for the roof framing are for the front of the property and not f or the rear section where the collapse occurred.  In the absenc e of information for the collapsed sections, this normally infers the roof framing is a conventional roof framing including coupled roof framing, to be constructed according to AS1684 – National Timber Framing Code - this requires ceiling joists fixed to act as ties between the feet of pairs of opposing raft ers.  Site inspection did not appear to reveal any fixing of the ceiling joists to the rafters. Movement occurred at the ends of the rafters o ver the top plate of the east side wall whic h suggests the rafters were not fixed to the ceiling joists as required for a couple roof.  “On this basis, it is our opinion the roof framing was not constructed in accordance with the Australian Standard at the time the hous e was constructed.”  “We retain our opinion that the collapse that has occurred of the roof is a result of inadequat e construction of the roof framing to withstand normal loads applied to the roof. It is also our opinion thes e problems are not related to storm damage.” GNA Inspection Report 21 - 08 - 2017  A response to the HCE letter dated 20. 06.2017.  HCE claims movement occurred at the end of the rafters over the top plate of the east side because there was no fixing of the ceiling joists to the rafters, henc e the rafters and ceiling joists could not form a “coupled roof”.  This claim is incorrect as photos clearly show the ends of the ceiling joists were installed and nailed to the sides of the rafters.  If the ceiling joists and rafters were not i nstalled in a manner which achieved a “c oupled roof” the framing would not have been structurally sound and could not have lasted 40 years.  “It is my opinion that the claim that the roof framing collapse occurred as a result of inadequate construction, is incorrect, since the roof framing was installed such that the ceiling joists and rafters were loc ated and connected forming the triangulation required to support the roof loads…the roof was structurally sound for in excess of 40 years.”  “It is my opinion t hat the rafters on the east side were pulled Case No: 476468 Determination Page 9 of 9 away from the side of the ridge plate by a substantial wind uplift forc e, for some distance along the ridge plate section, and well away from the splice.”