Storm damage cash settlement amounts for mould, repairs, security system and pergola; contents cover declined
Text of the determination
Determination
Case No: 476308 Determination Page 1 of 12
Case number: 476308 12 February 2018
1 Overview
1.1 Dispute
The applicants held a Home Building Insurance Policy with the financial services
provider (FSP). A claim was lodged on the policy after the property was damaged
during a storm on 27 December 2016.
The FSP accepted liability for the claim however a dispute has arisen as to:
whether the applicants had contents cover
the cost to complete mould remediation
repair costs
extent of liability for temporary accommodation
compensation for claims management.
1.2 Issues and key findings
Are the applicants entitled to cover for damage to the contents?
The panel is satisfied that the applicants did not hold contents cover at the time of the
loss. The panel is satisfied that the applicants were not misled by the FSP with
respect to this. Accordingly, the FSP ‟s liability is limited to the building damage .
Is the FSP’s cash settlement of the mould remediation fair in the
circumstances?
The panel accepts the applicants‟ quote for mould remediation is fair in the
circumstances and the FSP should settle the applicants‟ claim based on the
quotation obtained from ARC.
Is the FSP’s settlement of the repair costs fair in the circumstances?
The FSP has settled the applicants‟ repair costs for the main building for $19,304.59.
In the panel‟s view, the FSP should pay the applicants a further $15,000 to cover the
additional repair costs to the upstairs floorboards, upstairs ceiling and downstairs wall
cavities.
Case No: 476308 Determination Page 2 of 12
Is the FSP’s settlement for the cost of the external pergola fair in the
circumstances?
In the panel‟s view, the quotations obtained by the applicants for the replacement of
the pergola most likely represents betterment and are not justified under the terms of
the policy. The panel is satisfied that the FSP‟s offer of $3,364.90 to replace the
external pergola is fair in the circumstances.
Is the FSP’s offer to settle for the security system fair in the circumstances?
The FSP paid the applicants $1,500 to replace the damaged security system. In the
panel‟s view, the FSP should pay an additional $2,185 based on the applicants‟
quote of $3,685 for replacement of the security system.
Are the applicants entitled to compensation for non-financial loss?
The panel is satisfied that the applicants are entitled to compensation of $1,000 for
non-financial loss pursuant to paragraph 9.3 of the Terms of Reference due to the
level of service causing additional stress and inconvenience to the applicants.
Are the applicants entitled to further costs for temporary accommodation?
The panel is satisfied that the FSP has met its liability for temporary accommodation
costs in accordance with the terms of the policy. The panel is not satisfied the
applicants have justified any entitlement to further or on-going temporary
accommodation costs.
1.3 Determination
This determination is partially in favour of the applicants.
In addition to the compensation already paid to the applicants, the FSP must pay:
$18,157 for mould remediation services
$15,000 for repair costs including costs of repairs to the flooring, wall cavities
and upstairs ceiling
$2,185 to replace the security system
$1,000 compensation pursuant to paragraph 9.3 of the Terms of Reference as
compensation for non-financial loss
TOTAL: $36,342.
Case No: 476308 Determination Page 3 of 12
2 Reasons for determination
There has been a full exchange of material between the parties and each party has
had the opportunity of addressing the issues that arise from the information
exchanged.
Due to the complexities involved in this disp ute, the matter has been referred to a
panel for determination. In reaching this determination, the panel has taken into
account all information exchanged. The determination is based on what is fair in all
the circumstances, having regard to the relevant legal principles, terms of the policy,
good industry practice, including codes of practice and prior determinations where
applicable.
2.1 Are the applicants entitled to cover for damage to the contents?
Policy only covers the building
The FSP noted that the policy only covers the building. No cover was provided for
contents.
The applicants claim that when taking out the policy in approximately 2013 they had
requested the FSP provide contents cover.
According to the information provided, when purchasing the policy, the applicants
advised they were waiting for settlement to be confirmed and would call back to add
contents cover at a later time.
There was no evidence that the applicants contacted the FSP to arrange further
contents cover. The applicants provided no information that at any stage after
inception of the policy in 2013, they requested the FSP provide contents cover.
The schedule of insurance issued on 3 August 2016 and sent to the applicants
identifies that the policy covers home insurance for a sum insured of $479,800 for the
period 6 September 2016 to 6 September 2017. Optional cover was not selected.
The applicants have not disputed receiving the relevant policy documents. In the
circumstances, the panel accepts that the applicants were clearly informed that the
policy only covered the home building.
Claim is for damage to the home building
The schedule of insurance identifies the home sum insured of $479,800. According
to the certificate of insurance the home was owned and occupied by the applicants
and not used for business activity.
T he panel notes the comment by the FSP‟s assessor that the property appeared to
be a part commercial property. It is unclear from the information exchanged whether
the property had been used as a commercial building by the applicants or not. The
FSP however has made no allegation of any misrepresentation with respect to this.
The panel also notes that the policy identifies that the insured address was not
currently undergoing construction extension, alterations or renovations. The
Case No: 476308 Determination Page 4 of 12
information exchanged confirms the property was undergoing extensive renovations,
the front of the property (window area) was boarded up whilst internally the property
was undergoing substantial renovation.
Whilst there is no dispute that the property was undergoing renovation, it is unclear
from the information exchanged exactly when those renovations commenced.
The applicants claim the home was occupied by the family including grandchildren. It
is difficult from the photographs supplied to accept that a family including
grandchildren were living at the property. The property was sparsely furnished and in
the midst of substantial renovation. The panel notes however that the FSP has
accepted the applicants were entitled to temporary accommodation.
No dispute the property was damaged by an insured event
There is no dispute that the applicants‟ property was damaged by storm and that the
applicants have established a valid claim.
The issues in dispute relate to the settlement sum paid by the FSP. The FSP has
paid the applicants the following so far:
$6,043 for mould remediation throughout the ground floor only
$19,304.59 for repair costs
$3,364.90 for replacement of the pergola and sanding of the upstairs
floorboards
$2,051 damage to electrical lights
$1,500 for replacement of the security alarm
In addition, the FSP has paid temporary accommodation through to approximately
May 2017.
The applicants submitted three quotes which they say address the full extent of
damage suffered as a result of the storm, costing: $169,569.24 (JM), $165,980 (PB)
and $173,250 (MB). The applicants also submitted a separate quote for mould
remediation costing: $24,200 (prepared by ACR).
2.2 Is the settlement paid for the mould remediation fair in the
circumstances?
The applicants are unsatisfied with the $6,043 paid by the FSP to provide mould
remediation for the property and say:
this amount is only for the ground floor and does not remedy upstairs at all
there is insufficient consideration for replacing the water damaged insulation
behind the gyprock walls on the ground floor
the FSP did not properly provide for inspecting the space between the upstairs
floor and downstairs ceiling (which is a „hanging‟ ceiling).
Mould damage not properly assessed
The FSP has relied upon a report from (R) that identified:
Case No: 476308 Determination Page 5 of 12
water entered from upstairs, collecting contaminants from the roof and ceiling
space between the first and second floor
carpet, floorboards, skirting and wall gyprock were all affected
the gyprock is affected up to a height of about 600mm (but should be replaced
to a height of 1.2m)
the upstairs rooms (four) were all flooded, though the timber floorboards were
moisture tested and found to be dry
there does not appear to be any locations upstairs where water could res t and
pose a mould threat, but the floorboards present with excessive water stains.
In a revised quote dated 28 February 2017 R quoted $6,043 as the figure to
complete the mould remediation.
The FSP offered to have R complete the remediation. The applicants refused the
FSP‟s offer as they did not believe it was adequate to remediate the mould. The FSP
believes by refusing the FSP‟s access to complete the remediation, this has led to a
worsening of the mould at the property.
The panel accepts it is likely that the mould would have grown and proliferated during
the inspection of the property by R and the inspection by ACR. The panel however is
not satisfied that R had properly investigated the extent of the mould presence.
The panel accepts that the applicants were justified in preventing the commencement
of the remediation given it is likely that the provision of an inadequate service would
result in a recontamination of the property.
Applicants ’ quote preferred
The applicants provided their own quote from a mould expert (ACR) who says:
water travelled into the lower floor and wet three offices and one hallway
it is expected there is significant mould present on the inside of the plasterboard
wall linings and insulated wall cavities
the upstairs flooring has been damaged and there is mould present on the
underside
the walls on the second floor show signs of water entry into all four rooms.
The panel carefully reviewed the information and is satisfied ACR‟s quote is an
accurate reflection of the remediation work required to address the mould concerns
at the property. In particular the panel is persuaded by ACR‟s photographs and
moisture recordings of the upstairs rooms and is satisfied, R was wrong to dismiss
the possibility of mould growth in the upstairs rooms.
The panel notes ACR‟s quote includes (amongst other things):
removing the upstairs timber floorings and some sections of the upstairs ceiling
removing the mould affected insulation downstairs.
The panel is satisfied this labour is warranted given the findings in R‟s reports.
Based on ACR‟s quote of $24,200 for the mould remediation, the panel determines
that the FSP must pay the applicants a further $18,150 to satisfy its liability for this
part of the claim.
Case No: 476308 Determination Page 6 of 12
2.3 Is the settlement paid for the repair costs fair in the circumstances?
The FSP obtained a scope of works and settled the applicants‟ claim for repairs
required for $19,304.59. This did not include repairs to a veranda/pergola at the rear
of the property which had allegedly blown over during the storm .
Applicants’ builder quotes not consistent with the storm damage
The quotations provided by the applicants from JM of $169,569.24, PB of $165,980
and MB of 173,250 allegedly take into account all repairs required including mould
remediation.
The panel has considered these quotes and does not accept the quotes are limited to
the cost of damage sustained as a result of the storm. The property was undergoing
the extensive renovations prior to the storm. The quotes appear to include
completion of much of the renovation not damaged in the storm.
FSP liable for repairs to upstairs flooring, upstairs ceiling and downstairs wall
cavity
The applicants maintain the FSP has incorrectly declined cover for replacing the
upstairs timber floorings, some upstairs ceilings, the wet and mould affected
insulation downstairs and the external render to the building and other painting and
patching work.
The applicants provided two quotes for replacing the upstairs flooring costing
$12,540 and $15,066. The FSP maintains the flooring does not need to be replaced
and it previously had been prepared for carpeting. Other than sanding the floor, the
FSP maintains no other work is required.
The panel is not satisfied that the floorboards necessarily need replacing. Based on
the available information, it would appear that they could be renovated.
The panel accepts that some damage has occurred to the upstairs ceilings. It is also
likely damage occurred to the wall cavities downstairs and the insulation. It does not
appear to be any allowance for this work by the FSP. No quotes have been provided
for the downstairs insulation or replacing the wet insulation,
The panel is not satisfied that the applicants have established the external render
was damaged in the storm or that work is required to repair the rendering or repaint
the property as a result of the storm. The panel accepts that the damage to the
rendering is most likely due to wear and tear and gradual deterioration.
The panel has considered the available information relating to the further repair
costs. The panel determines it is fair in the circumstances that the FSP pay the
applicants a further $15,000 to cover the additional areas of repairs including repairs
to the upstairs floorboards, ceiling and downstairs wall cavities.
Case No: 476308 Determination Page 7 of 12
2.4 Is the settlement for the repair of the veranda/pergola fair in the
circumstances?
FSP prejudiced by the removal of the structure.
The FSP has settled the applicants‟ claim for the repair of the pergola for $3,364.90
based on a quote obtained from BE.
In contrast, the applicants have submitted quotes for the repair of the
veranda/pergola ranging from $17,595 to $24,320.
There is no evidence as to the condition of the pergola prior to the storm. The
applicants claim that the pergola was damaged during the storm and they had
removed it prior to the FSP attending the property.
The FSP‟s assessor attended the property within a week o f the claim being lodged.
The assessor was unable to assess the extent or cause of the damage.
The applicant has not explained why it was necessary to remove and dispose of the
structure in such a short period of time. They have not explained why they did this
without the FSP‟s authority.
PB‟s quote includes variations to the existing structure to accommodate the pergola.
Such variations amount to improvements going beyond the scope of cover. JM‟s
quote is based on the builder‟s visual assessment. There are no specific details
provided regarding the proposed replacement.
The panel accepts the applicants may be concerned about the quality of the FSP‟s
proposed replacement. However the FSP‟s liability is to place the applicants in the
position they were in prior to the loss. In the absence of being able to identify the type
of structure that was present prior to the loss, and given the extensive renovations
being conducted and general poor condition of the property, the panel accepts the
FSP has been prejudiced by the applicants ‟ conduct.
In the circumstances, the panel is of the view that it is fair to allow the FSP to settle
the claim for the replacement of the veranda/pergola for the sum of $3,364.90.
Is the FSP’s settlement for the security system fair in the circumstances?
The FSP paid the applicants $1,500 to replace the property‟s damaged security
system.
The applicants provided two quotes for replacements, costing $3,685 (with six
detectors and three smoke alarms) and $3,998.50 (with 10 motion detectors and five
smoke alarms).
The panel is not persuaded by the information before it that the applicants could
replace the security system with the $1,500 paid to them. The panel is satisfied the
quote for $3,685 is a fair estimate of the cost to the applicants to replace the system.
The FSP must pay the applicants a further $2,185 to replace the security system.
Case No: 476308 Determination Page 8 of 12
2.5 Are the applicants entitled to further compensation for temporary
accommodation?
The FSP has paid the applicants for temporary accommodation until at least mid-
April 2017.
Whilst the policy provides cover for temporary accommodation costs, it only does so
where the property becomes uninhabitable as a result of an insured event.
The property was undergoing extensive renovations at the time. It was sparely
furnished and appears to have been unoccupied during those renovations. The
applicants claim the family including grandchildren lived at the property. They claim
to have removed furnishings from the property after the event. No proof has been
provided to establish this.
If the panel accepts the property was inhabitable at the time of the storm then, it
would only be uninhabitable as a result of the mould issues .
T he FSP attempted to remediate in February 2017. According to the FSP, the FSP‟s
expert, the property would have been liveable if the remediation went ahead. The
applicants prevented this occurring.
The panel accepts that the applicants had the opportunity to undertake steps
necessary to make the home liveable within the period of temporary accommodation
previously provided by the FSP. The panel is satisfied the applicants are not entitled
in these circumstances for further payments of temporary accommodation.
2.6 Are the applicants entitled to compensation for non-financial loss?
FOS may award compensation for non-financial loss
Under the Terms of Reference, FOS may award compensation (up to $3,000) for
non-financial loss where an applicant suffers an unusual degree or extent of physical
inconvenience, time taken to resolve a matter or interference with their expected
enjoyment or peace of mind.
FOS adopts a conservative approach towards any award of compensation for non-
financial loss and expects applicants to be moderately robust and bear the usual
stress and inconvenience associated with a typical insurance claim.
The applicants are entitled to $1,000 compensation for non-financial loss
The applicants are dissatisfied with the manner in which the FSP managed the claim.
Among other things, the applicants say the FSP unreasonably delayed the
investigation of the claim, did not properly investigate the various components of the
claim, unreasonably delayed in providing scopes of work or providing updates and
were biased in their dealings.
While it is clear it has taken an extended period of time to res olve the applicant‟s
claim, the FSP was not solely responsible for the delays experienced. Some delay
results from the need to have multiple trades attend and provide reports. Other delay
Case No: 476308 Determination Page 9 of 12
results from the time of year during which the storm occurred and its severity, which
would have stretched the FSP‟s resources in the region.
Nevertheless, the panel believes the FSP could have managed the claim better.
In particular, the FSP should have arranged a re-inspection of the property following
the applicants providing their own mould inspection report to review its liability for
remediation upstairs.
The panel also believes the short term nature of the temporary accommodation
provided by the FSP would have contributed to the stress and inconvenience
suffered by the applicants and their family throughout the claim.
A review of the FSP‟s claim records confirm there were variou s gaps in contact and
the panel is satisfied this would have aggravated the circumstances further.
Having regard to these issues and the overall management of the claim, the panel
considers it appropriate the FSP compensate the applicants $1,000 for their non-
financial loss.
Case No: 476308 Determination Page 10 of 12
3 Supporting information
3.1 Policy terms
Event or incident
Means a single event, accident or occurrence which you did not intend or expect to happen.
Insured events
Means the insured events listed on pages 28 to 41. In addition, an ins ured event is always a
single event, accident or occurrence which you did not intend or expect to happen.
3.2 Expert reports
Record Key points
FSP’s assessor ( K )
Assessor Report
04 - 01 - 2017
Property currently renovation.
Following storm event on 28 December 2016 water entered
and caus ed staining to the floorboards upstairs.
Water run downstairs and caused damage to ceiling, walls
and lino floor under carpet.
Carpet ruined and removed by applicant.
Wind blew over veranda at rear of home, already removed by
applicant.
Carpet will be removed to prevent mould, but not replaced as
there is no contents cover.
Property condition noted as “very badly maintained”.
FSP’s builder (JR)
Roof Inspection Report
Undated
Attended the property on 8 January 2017 .
No storm o r impact related damage observed on the roof.
There is water ingress to the property on both levels, mostly
towards the front.
“It is my opinion the sole cause of the water ingress is due to
the lack of downpipes on the gutters and the fact there are no
ov erflow provisions.”
“The render on the wall also hits hard against the bottom of
the gutter, and if the gutter overflowed then there is nowhere
for the water to go apart from into the walls the ceiling”.
FSP ’s mould
remediator ( R )
Quotation
11 - 01 - 2017
Water leaking in through upstairs ceiling and a broken
upstairs window.
Water collected contaminants from the roof and ceiling space
between floors 1 and 2.
Carpet, floorboards, skirting and wall gyprock all affected.
Small sporadic mould growth observed o n the surface side of
gyprock walls.
Wet insulation assumed within wall cavity indicating high
probability of extensive mould growth within.
Approximately 12 ceiling tiles collapsed and saturated;
another 15 present with damage and water staining and will
require removal.
Recommend the removal of all skirtings, wall gyprock to a
height of 1.2m, affected ceiling tiles as well as the floor tiles in
room 2.
Upstairs consists of four rooms, all flooded. Walls are brick
with some structural cracking though unclear whether this is
claim event relat ed.
Section of ceiling collapsed in bathroom area.
No items appear to have held water upstairs or pose risk of
mould damage.
Case No: 476308 Determination Page 11 of 12
Extensive water staining to upstairs floorboards which creak
and appear bowed in some sect ions .
Upstairs wooden floor has a void before downstairs pressed
metal ceiling and it is unclear whet her water or mould
damage exists within. Recommended to cut inspection hole
to verify.
FSP’s builder (BE)
Builder Assessment Report
03 - 01 - 2017
Building undergoing major renovation work.
Shown water damage to the ceilings, floors and contents of
the ground and upper floor.
Water stains evident on the first level which will be sanded
back.
Informed a small veranda on the first floor landing collaps ed
during the storm and was removed.
Estimate offered in respect of cash settling the upstairs
floorboards and replacing the veranda : $3,364.90.
FSP’s assessor (M)
Reins pection Report
10 - 03 - 2017
Downstairs damaged confirmed as:
o water damage to vinyl flooring
o repair water affected walls in three rooms
o repair ceiling squares
o repair alarm system which is damaged by water
Not covered:
o replacing internal and external doors
o repairing walls and ceiling with pre - existing or poor
finishes before loss
Upstairs damage co nfirmed as:
o replace damaged veranda
o sand front bedroom timber floor ready for carpet to be
laid
o paint affected walls
o unclear whether ceiling should be replaced, no water
stains present so may be pre - existing
Not covered:
o removing all timber floors and repl acing timber joist
o patches and painting walls with pre - existing issues
o front render bubbled and cracked, not relat ed to loss.
Front render not accepted as if the damage does result from
the rain, it is due to faulty application, which the policy would
not cover.
Applicant advised it wasn‟t given sufficient time to set after
application.
Applicant advised he wants timber joist replaced under timber
floors on upstairs level as these are probably rotted from
water ingress. Builder confirmed if area is rotted i t is not
because of the event and is instead a maintenance and wear
and tear issue.
Applicant would like upstairs timber floors replaced as board
by door is cracking and rotting. This was confirmed as not the
result of a single event but due to water ingre ss over a period
of time as door not water guarded.
FSP’s assessor ( M )
Expert Report
21 - 03 - 2017
Rendering at front of home, declined. Not damaged as the
result of one event, render not applied correctly when
installed.
Replacement of glass panel accepted.
New wall linings and ceiling panels downstairs accepted.
Upstairs ceiling declined. No evidence of water entry
observed. Water ent ered property because gutters
overflowed and flooded wall cavities. No stains on ceiling.
New architraves, skirting and doors partially accepted.
Replace skirting to the extent required to facilitate mould
Case No: 476308 Determination Page 12 of 12
remediation. Doors and architraves not damaged.
Lightning downstairs accepted. Unclear if this is included in
the quote to replace ceiling squares.
Alarm system accepted, but do not agree a 16 sensor, 2
controller integrated system was what was already on site.
Shipping container declined, there is no contents cover.
Mould remediation accepted.
New flooring upstairs, including replacement of joist declined.
Agreed to sand the b oards back and hammer nails back
down. While some boards have rotted, this is the result of
wear and tear occurring over time. Timber joist, if damaged,
not damaged from a single event.
Allowance to place structa floor to stiffen existing structure
decline d. Not part of existing claim.
Pergola structure accepted and quoted at $3,364.90.
Quote based on this comes to $19,304.59.
FSP’s assessor (M)
Expert report
27 - 03 - 2017
New quote received, appears complete.
Quote for ceiling squares includes replacement lights.
Mould remediation will require 3 to 4 weeks temporary
accommodation.
3.3 Other documents relied upon
Written submissions from the applicant and the FSP.
Photographs of damage present at the insured premises.
Quotations provided by each party.