Text of the determination
Amended
Determination
Case No: 476223 Amended Determination Page 1 of 10
Case number: 476223 21 February 2018
1 Overview
1.1 Dispute
The applicant lodged a claim upon her home building insurance policy held with the
financial services provider (FSP) for water damage caused by a burst pipe.
The FSP accepted the claim and decided to cash settled it. The applicant disputes
the FSP’s offer of settlement. She is not satisfied the offer adequately covers the
repairs required to reinstate the property to its pre-loss condition.
The applicant also seeks compensation for various financial and non-financial losses
due to the manner in which the FSP managed her claim.
1.2 Issues and key findings
Which product disclosure statement (PDS) applies to the claim?
The FSP was not obliged to ensure the applicant received its notices, documents or
other information. The applicant’s insurance broker arranged the insurance and the
broker is responsible for providing the applicant with the relevant policy documents.
The FSP has, however, agreed to consider the earlier PDS. The PDS provided to the
applicant in 2014, therefore applies to the claim.
Is the FSP’s offer of settlement fair and reasonable?
The FSP should pay an additional amount to adequately ensure:
the applicant is able to properly complete all repairs
the cash settlement covers all reasonable contingencies
cover for items that have not been fully addressed in the FSP’s scope of works.
Has the FSP handled the claim appropriately?
On the balance of the information exchanged, the FSP has handled the claim
appropriately and promptly.
What if any is the additional amount to be paid by the FSP to finalise its
obligations under the policy?
The FSP is to pay the applicant the additional amount of $45,000.
Case No: 476223 Amended Determination Page 2 of 10
1.3 Determination
This determination is substantially in favour of the FSP.
Within 14 days of the applicant accepting this determination, the FSP should pay the
applicant $45,000 in full and final settlement of the claim and the dispute.
The FSP is not required to pay interest on this amount.
The FSP is required to pay an additional amount of $1,500 towards the cost of
reports obtained by the applicant.
The FSP is not required to do anything further beyond this payment, to finalise its
obligations under the claim and in respect to this dispute.
Case No: 476223 Amended Determination Page 3 of 10
2 Reasons for determination
There has been a full exchange of material between the parties and each party has
had the opportunity of addressing the issues that arise from the material exchanged.
Whilst all of the information exchanged has been considered, only that information
relevant to the final outcome will be referred to within this determination.
This determination follows consideration of all of the information exchanged and is
based on what is fair in the circumstances, having regard to the relevant legal
principles, terms of the policy, good industry practice and where applicable, prior
determinations.
2.1 Which product disclosure statement (PDS) applies to the claim?
Broker received policy documents
The applicant says the last product disclosure statement (PDS) she received from
her broker was in 2014. That is, she has not received the current PDS which applies
to the claim. The broker accepts this was its error.
The parties do not dispute the applicant’s broker was sent a copy of the cu rrent PDS.
The FSP submits that under section 71 of the Insurance Contracts Act 1984 (Cth)
(the Act), it is not responsible for providing the applicant with the PDS as she used a
broker and the PDS was sent to the applicant’s broker.
Under section 71 of the Act, the FSP is not required to give notice, documents or
information to the applicant in the circumstance where an insurance broker was
acting for the applicant.
I accept the FSP’s position is correct. There is no information to show the broker was
acting under a binder for the FSP when arranging the insurance renewal. This means
the broker was an agent for the applicant.
FSP agrees to consider dispute under the PDS sent in 2014
Regardless, the FSP agrees to rely upon the terms and conditions of the policy the
applicant received in 2014. It says the current PDS does not alter its position.
This means the applicant has not suffered any prejudice (although it did cause her
some confusion).
I will consider the dispute with reference to the PDS sent to the applicant in 2014.
2.2 Is the FSP’s offer of settlement fair and reasonable?
Parties disagree about the cost of repairs and scope of works
There is no dispute between the parties that the insured building was damaged as a
result of a sudden burst pipe on 30 January 2017.
Case No: 476223 Amended Determination Page 4 of 10
The dispute is about the cost of repairs and the scope of works required to rectify the
damage.
The applicant initially disputed the FSP’s decision not to conduct repairs but to cash
settle. She has since accepted that a cash settlement would provide her with the
money required for her to arrange repairs to her satisfaction.
The dispute relates to the amount of the cash settlement.
The FSP has offered to settle the applicant’s claim
The FSP has made several offers to settle the applicant’s claim, the most recent of
which is in the amount of $45,000, made up of:
the cost of building repairs $24,078.65
reimbursement of electrical costs $200.75
additional ex gratia payment $500.00
additional contingency allowance $20,220.60 (which includes an allowance of
$2,750 for temporary accommodation)
The applicant has advised that the FSP has reimbursed the electrical costs.
Cash settlement needs to consider all reasonable factors
In calculating an appropriate cash settlement amount it is necessary to consider all
reasonable factors, including:
the nature of repairs required
whether the cash settlement will adequately ensure the applicant is able to
properly complete all repairs
whether the cash settlement will adequately cover all reasonable contingencies
with an allowance for the same and variations.
Applicant says FSP’s expert’s quotes and reports omits items
The applicant says the quotes from the FSP builders (JL and BB) are incomplete
because they were formulated before the FSP’s engineer’s report (SC, in March
2017). She argues the quotes and report omit the following:
labour costs (JL’s initial quote)
itemised costs (BB’s quote)
contingency costs for the replacement of floorboards
shower recess needs to be removed but not noted (SC’s report)
undulations in the floor are not noted (SC’s report).
Although the applicant made submissions to say the FSP’s quotes are insufficient,
she acknowledges she has not been able to provide any estimate for the above. The
applicant admits her quotes and scopes do not assist as they do not cover all the
works the applicant seeks to be covered.
There is also no (or little) basis for the applicant’s other assertions for the
discrepancy. For example, the applicant alleges labour costs are generally three
times the cost of materials, hence the original JL quote cannot be correct. There is no
information to support this.
Case No: 476223 Amended Determination Page 5 of 10
Regardless, FOS considers each case on its own merits. For the following reasons, I
consider the FSP’s calculation largely accu rately represents the extent of the FSP’s
obligations and liability to reinstate the damage to the property under the policy.
FSP’s engineer is qualified to provide appropriate scope of works
The applicant argues an engineer’s expertise was not necessary in her dispute
because it did not involve a structural problem but is about cosmetic repairs.
The FSP correctly indicates the builders the applicant engaged were not licensed
domestic builders. This means they would not be able to conduct the works they
have quoted for. Further, the applicant did not provide them with the scope of works
developed by the FSP’s engineer to refer to or comment on.
Having considered all of the exchanged material, I accept the FSP’s engineer is
qualified to provide a scope of works and has correctly determined the building works
required.
FSP’s calculated cost to reinstate appears appropriate
The information shows JL and BB provided quotes after the FSP’s engineer (SC )
provided his revised scope of works (SOW).
I accept the FSP’s advice that JL was unable to change the date in the quotes but
provided the final quote reflecting a total of $20,580.92, on 12 May 2017.
I accept that this amount, along with an additional $3,497.73 (calculated by the FSP’s
assessor, CV) is sufficient to adequately reinstate the applicant’s property to the
condition it was in before the burst pipe. This is because the FSP took steps to
arrange for SC to review and make corrections to the quotes (eg, adding insulation
omitted from his SOW). Furthermore, the FSP offered a contingency to reflect any
discrepancies and possible additional repairs required.
I acknowledge the copy of BB’s quote provided to the applicant was not itemised.
However, this is of no consequence as the FSP did not rely upon this quote (which
was lower than that of JL’s) to determine its final cash settlement offer.
Applicant’s builder’s quotes do not completely assist the applicant
The applicant seeks a 10% contingency based upon her estimated costs to reflect
additional works that may be necessary. This is for works not covered in her own
builder’s quotes and because she says the FSP’s builders provided for a ‘patch job’
instead of full restoration. She estimates this amount to be $8,000 with some of the
major costs as follows:
possible issues to the floor if sanding should breach the tongue and groove
a shower recess with rod and shower curtain
replacement of skirting boards (FSP proposed to re-use water affected timber)
replacement of doorframes, door surrounds and dado boards to the
bedroom/bathroom upstairs (and painting).
In addition, the applicant’s builders also suggest repairs for the following:
some straw stalks dislodged in the ceilings (from the FSP’s blower/dry ers)
Case No: 476223 Amended Determination Page 6 of 10
detached hessian wall paneling at the base to the skirting board in kitchen.
However, despite the applicant’s own SOW, her builder’s quotes do not include some
of the works identified by the FSP’s experts. For example, neither PL nor AB advise
the laminate on the overhead beam requires replacement on the ground floor. Thus,
her builder’s quotes do not completely assist her.
FSP not required to repair the property to a better standard than before
The policy clearly states the FSP will not pay an y amount to improve the applicant’s
home to a better standard, specification or quality to its original or renovated
condition. That means the bathroom replacement outlined in PL’s report is not
necessary.
There is no information to show the shower unit was damaged during the burst pipe
event or should be included in the repair works. That is, the FSP is not required to
replace the shower or any bathroom fittings, tapware, etc, which have not been
damaged.
There is no information to suggest the repair methods suggested by JL will not
adequately rectify the damage to the floorboards, door area and dado boards.
Further, SC noted no structural related damage occurred. That is, the bowing along
the staircase or slight undulating ground floor was pre-existing.
I accept the skirting boards should be replaced in the bathroom as they were water
affected. However, on balance, there is no (or little) gap between the skirting boards
and carpet in the upstairs bedrooms, so there is no requirement for new skirting
boards.
I accept the FSP should make an allowance to tidy the straw batten ceilings in the
upstairs bedrooms and the detached hessian panel in the kitchen.
As to the beading at the top of the stairwell, it appears to be covered under JL’s
quote (albeit under the ground floor entry and not staircase).
FSP’s offer made after considering applicant’s quotes and reviewing its own
The FSP provided the offer after providing the quotes from its own builders and the
applicant’s builders to SC to review and comment. Th is shows the decision to make
its final offer of settlement was considered with expert input.
After the applicant disputed an earlier settlement offered, the FSP’s assessor (CV)
reviewed each matter the applicant raised about the FSP’s builder’s quotes. Hi s
explanations were sound and logical. For example, he advised the raw costs
contained in JL’s quote did not include builder’s margin and GST (which add 26.5%
when compounded).
He also explained he had not exchanged with the applicant six pages f rom BB’s
quote because it was pro forma contract documentation (to avoid confusion with
irrelevant information).
In summary, I am satisfied the FSP has made the offer with due consideration of the
applicant’s concerns and expert advice.
Case No: 476223 Amended Determination Page 7 of 10
Further quotes from the app licant’s builder
More recently the applicant has provided three new quotes, all with substantially the
same content, but referring to three different quoted amounts, $96,228, $83,690.20
and $76,082.
The quote for the amount of $96,228, is said to be preliminary, the quote for
$83,690.20 is said to be final and the quote for $76,082, was said to be the
$83,690.20, less GST.
Having reviewed all of the exchange material, I prefer the quotations provided by the
FSP and its representatives.
Transfer of risk is captured by allowance for contingencies
The applicant seeks $3,400 for forfeiting the lifetime guarantee provided by the FSP
to repairs it authorised, arranged or paid for. She says the responsibility of ensuring
quality workmanship has passed onto her. That is, the FSP makes a saving on this.
I accept there should be a fair allowance for the transfer of risk to the applicant.
However, this is captured in the FSP’s additional allowance for contingencies and
variations as detailed above. Hence, the additional $3,400 sought would be an
overlap of the payment for this purpose.
The applicant also seeks $3,400 for her oversight and management of the repair
process. However, JL’s quote provides for this cost by way of a s ite
foreman/supervisor. Accordingly, the app licant’s costs to oversee and manage her
repairs are fairly covered in the repair quote.
$2,750 for temporary accommodation during repairs is fair and reasonable
The parties do not dispute that the applicant is entitled to cover for the cost of
temporary accommodation during the time taken to complete the repairs.
The policy provides cover for such reasonable costs whilst the applicant is unable to
live in the property if it is her principal place of residence.
The applicant seeks $2,400 (calculated at a rate of $600 per week for four weeks).
The FSP offered $2,750 (based upon $550 per week for five weeks). The FSP
confirms that this amount is included within its contingency allowance.
The FSP’s offer in regard to temporary accommodation appears fair and reasonable.
By her own admission, the applicant advised she received a quote of above $300 a
week for the rental of her property in March 2017. The FSP allowed a rate of $550
per week given the off-peak season at the time (winter 2017).
The FSP allowed an additional week of temporary accommodation and its allowance
is reasonable.
Case No: 476223 Amended Determination Page 8 of 10
FSP’s $500 offer is fair to cover further furniture removal and storage
The applicant has sought a provision for the cost to move and store the furniture
whilst repairs occur. However, she did not provide a quote to support any amount
sought for this.
The policy provides for such cover if the applicant had cover for her contents. Given
the applicant did not have contents cover at the time of loss, the FSP is not
responsible for such costs. Further, the FSP made an ex-gratia offer to the sum of
$3,000 for contents (and has already paid $2,500 in progressive payments).
In the interest of resolving the dispute, the FSP’s offer to pay the applicant the
additional $500 is reasonable.
Discussion
Having reviewed all of the exchanged material, I am satisfied that the FSP’s latest
offer is fair and reasonable, with an appropriate allowance for contingencies.
Upon acceptance of this determination by the applicant, the FSP is to pay the
applicant $45,000 (less the reimbursement of the electrical costs).
Payment of this amount to the applicant, finalises the FSP’s obligations to the
applicant under the policy and in respect to the claim.
2.3 Has the FSP handled the claim appropriately?
Applicant is dissatisfied with how the FSP managed the claim
The applicant is dissatisfied with the manner in which the FSP has handled her claim.
Namely, she says the FSP’s actions as follows, warrants an award of compensation
to her for non-financial loss :
FSP mismanaged the claim
time taken to resolve the claim
FSP offered settlement amounts falling short of actual reinstatement costs
emotional and financial distress (supported by a medical report from her GP)
time taken to resolve the reimbursement of claimed costs
confusion and distress due to references to wording in a different PDS
disrespect of her knowledge, evidence and opinion about her home
physical inconvenience of living in temporary accommodation for two months
physical inconvenience of moving prop erty around to show assessor’s damage
physical inconvenience of belongings being in the garage
physical inconvenience of living in the property during the cold season (without
plaster/insulation on the ceilings and inability to move furniture to live upstairs)
physical inconvenience of not being able to have visits from children
managing the works and assessing the scopes of work.
FSP’s handled the claim appropriately
I have carefully reviewed all of the information exchanged including the
correspondence between the applicant and the FSP and FOS.
Case No: 476223 Amended Determination Page 9 of 10
It is clear the applicant’s relationship with the FSP’s assessor (CV) became strained.
It is noted there were times CV’s authorisation of payments were not actioned
promptly. However, as payments were eventually made, the applicant has not
suffered any quantifiable prejudice, but rather inconvenience.
On the balance, I accept that the information shows CV acted appropriately and
promptly and attempted to resolve matters and address the applicant’s queries
throughout the claim process. For example, the CV at times sent four emails to the
applicant on the same day in response to her questions and concerns.
FSP made ex gratia payments for uninsured contents
Further, the FSP has paid the applicant beyond its policy req uirements.
The FSP initially provided the applicant with a $2,500 ex gratia allowance to assist
her with her uninsured contents (subject to the applicant taking out cover moving
forward). This amount was increased by $500 in an attempt to resolve the dispute.
The ex gratia allowance was for some costs which were not covered under the policy
and paid outside the scope of cover (eg, for the removal and storage of contents).
The applicant argues she felt the FSP’s contractor (S) led her to believe she had to
remove the items immediately. Even if this is correct, the cost to do so is the
applicant’s responsibility, as she did not opt for contents cover under the policy.
Thus, the FSP’s suggestion to the applicant to get contents cover was appropriate,
given this uninsured risk has caused her loss in this instance.
2.4 Is the applicant entitled to any other amounts?
Applicant seeks maximum compensation for non-financial and financial losses
The applicant initially sought compensation to the equivalent of the minimum wage
on a weekly basis dated back to 20 April 2017. She estimated this date based upon
the forfeiture for the sale of her property.
She later sought $50,000 to compensate her for such losses but has since accepted
FOS’s maximum compensation limits for non -financial loss ($3,000) and financial
loss ($3,300).
Applicant seeks compensation for financial loss
The applicant contends the FSP’s actions and the time taken has cau sed her to
suffer the following financial losses:
miscellaneous costs to communicate with the FSP and FOS
the lost opportunity for the sale of her property during an active market
reimbursement of energy used to power drying equipment
removal and storage costs for furniture once works commence.
Claimed event inconvenienced the applicant
Having reviewed all the information exchanged, I am satisfied in the circumstances of
this claim and this dispute that non-financial loss compensation is not appropriate.
Case No: 476223 Amended Determination Page 10 of 10
On balance, the applicant’s stress and anxiety stemmed from the claimed event
itself, rather than the FSP’s actions.
For example, the uncertainty of where she would be staying and changes to
temporary accommodation arrangements caused her some distress.
The applicant also became confused because the FSP referred to the current PDS
(with 114 pages) but she referred to an earlier PDS (with 50 pages) the broker
provided to her in 2014. However, this is clearly not a result of the FSP’s actions as
her broker admitted she failed to provide the applicant with the current PDS at the
relevant time of renewal.
Applicants generally incur miscellaneous costs to support their claim
The applicant sought compensation for various miscellaneous costs (eg, printing,
internet fees, postal costs, USBs, paper, fuel for travel between home and temporary
accommodation and two parking fines).
These miscellaneous costs appear to stem from the claimed event itself, rather than
the FSP’s actions. The policy does not provide cover f or these costs. Accordingly, the
FSP is not responsible for the costs.
Forfeiture of the sale of the property is too remote
Although the applicant claims for the lost opportunity to sell her property, she later
said this delay may be beneficial as house prices had gained. However, the sale
would have avoided the need for her to carry out repairs.
Such losses are too remote and are not covered by the terms of the policy.
Accordingly, the FSP is not responsible for compensating the applicant for this.
Applicant seeks reimbursement of costs of reports and quotes
The applicant seeks reimbursement $2,500 and $600 for the building inspections,
reports and scope of works from AB and PL. However, she only provided tax invoices
from PL amounting to $2,255 and $660 from AB.
The reports did not completely assist the applicant and FOS in the resolution of the
dispute. However, the costs were in an effort to present expert information to respond
to an argument raised by the FSP. On that basis, the FSP should pay an additional
amount of $1,500 towards these costs.