Determination 475520

Home insurance claim for burst pipe and foundation damage declined in full

FirmFinancial Firm (Unknown - Insurer)
Decided2018-05-22
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$12,000
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant claimed for burst-pipe and foundation damage to his home, and the FSP declined in full. AFCA found the east-side damage was caused by the leaking pipe and ordered a $10,000 cash settlement plus up to $2,000 towards the engineering report, rejecting the rest under the Wayne Tank principle.

The Wayne Tank principle defeats the claim only where excluded causes are equally proximate, and the dominant cause of the east-side damage was the pipe leak rather than excluded ground movement or workmanship.

Issues

Subjects and remedies

home or building damagepay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 475520 Determination Page 1 of 10 Case number: 475520 19 April 2018 1 Overview 1.1 Dispute The applicant held a home and contents insurance policy with the financial services provider (FSP). On 21 March 2016 he lodged a claim for damage sustained to his home as a result of a burst pipe underneath the home. The FSP subsequently declined the applicant’s claim and says the damage to the home was caused by:  settling, shrinkage and any movement of earth  faulty workmanship or design. Insofar as there may have been damage sustained by the leaking pipe, the FSP says given the ‘ Wayne T ank principle’ the relevant exclusions apply. 1.2 Issues and key findings Is the FSP entitled to decline the applicant’s claim ? There is no dispute that the damage sustained to the applicant’s property was accidental damage that falls within the terms of the policy. The panel is satisfied that the damage to the east side of the house was proximately caused by the leaking pipe. The panel is satisfied that the FSP is liable to meet the applicant’s claim for damage to the east side of the house. Otherwise the balance of the damage sustained to the applicant’s property was due to a combination of ground movement and faulty workmanship, which is excluded from cover. 1.3 Determination This determination is partially in favour of the applicant. The FSP is to settle the applicant’s claim for damage to the east side of the house in the sum of $10,000. No interest is payable on the cash settlement. Further, the FSP is to cont ribute up to $2,000 towards the cost of the applicant’s engineering expert report subject to the applicant providing relevant invoices. The FSP is otherwise entitled to decline the applicant’s claim in accordance with the terms and conditions of the policy. Case No: 475520 Determination Page 2 of 10 2 Reasons for determination There has been a full exchange of material between the parties and each party has had the opportunity of addressing the issues that arise from the information exchanged. Due to the complexities of the issues involved in this dispute, the matter has been referred to a panel for determination. In reaching this determination the panel has taken into account all relevant information including all expert reports provided by the parties. The determination is based on what is fair in all the circumstances, having regard to the relevant legal principles, terms of the policy, good industry practice including codes of practice and prior determinations where applicable. 2.1 Was the FSP entitled to decline the applicant’s claim ? Policy covers accidental damage The applicant’s policy is an accidental damage policy which provides cover for unforeseen and unintended damage. The onus is therefore on the applicant to establish the loss or damage to his property was accidental damage. Circumstances of loss The applicant says that the damage was sustained to his property over the summer of 2015/16 when a water pipe broke under his property. An invoice from D Plumbing dated 4 April 2016 covering the cost of repair of the burst pipe notes that there was a considerable amount of water that had been leaking under the house on the east side. A copy of the applicant’s water bill shows a significant spike in water usage in the January and April quarters of 2016. There is no dispute that a burst pipe leaked a significant amount of water under the applicant’s property over a period of time in early 2016. The applicant says he noticed cracks and damage appearing to the property after the leak was discovered and that the building movement and damage continued after the pipe was repaired. There is no suggestion the applicant knowingly caused or contributed to the property damage. The panel is satisfied the damage is accidental. In these circumstances, the FSP bears the onus of establishing, on the balance of probabilities, it is entitled to rely on an exclusion under the policy, or is otherwise entitled to deny the claim. FSP is required to demonstrate loss was excluded The FSP, in its Notice of Response has relied on policy exclusions relating to:  loss or damage as a result of, or caused by settling, or any movement of earth  loss or damage as a result of, or caused by faulty workmanship or design. Whilst it does not dispute that the leak from the burst pipe located underneath the east side of the house has exacerbated the damage to this area, the FSP says this Case No: 475520 Determination Page 3 of 10 did not cause the entire damage. It relies upon the Wayne Tank principle to argue that since ground movement and faulty workmanship or design were excluded from cover, it is entitled to deny payment of the claim in full. The onus is on the FSP to establish the application of the exclusions and the Wayne Tank principle. Property suffered damage in 2010/2011 There is no dispute that the applicant’s property was damaged during heavy rain in 2010/2011 at the end of a long drought. A claim was accepted by the FSP and cash settled. The FSP’s engineering report provided by HCE noted at that time that t here was significant cracking throughout the house, the floors were out of level and that an inspection of the concrete stumps identified gaps between the top of the stumps and the timber bearers, especially along the east side of the property. HCE concluded at that time that the damage and movement was typical of problems that occur due to differential settlement of the stumps associated with problems with the storm water drains. The panel notes HCE recommended at that time that when re-levelling is carried out, new stumps should be provided where there are out of level stumps, particularly with the rear north-east corner of the house. The applicant does not dispute the findings from 2011, nor does the applicant dispute that that claim was cash settled. The FSP provided a report from BP. BP identified substantial foundation movement on the north-east side causing cracking to the internal plaster. BP also identified that the previous relevelling of the property following the 2011 event was not compliant with relevant Australian Building Standards. HCE considered that the leaking pipe would have contributed to the damage to the east side of the house where the pipe was located but otherwise the house was subject to movement due to seasonal change as evidence by the repacking of the stumps. The panel notes HCE’s concern regarding the height of the timber packers used to pack the stumps following the 2011 claim. The applicant’s engineer, DCE considers that the movement of the applicant’s property is associated with the residual effects of the 2011 inundation, the abnormally moist soil as a result of the leaking pipes and the impact of tree roots. DCE also noted exceptionally large chocks had been used in relevelling the stumps in 2011 and some of the stumps were leaning. The panel has viewed the photographs provided of the sub-floor area and in particular, of the stumps. The panel notes that there are considerable gaps between some of the stumps, the chocks used to re-level some areas of the house appear oversized and some of the stumps are leaning. Case No: 475520 Determination Page 4 of 10 The panel accepts the comments by HCE that the use of large chocks or packers is not good practice. The panel also notes HCE’s comments that the previous restumping of the house did not appear to replace any of the leaning stumps. The panel accepts that, to the extent that any damage is associated with the re- levelling work carried out in 2011 or between 2011 and 2016, such damage would be excluded from cover due to faulty or defective workmanship. East side of the property damaged as a result of leaking pipe Whilst the reports from HCE and DCE differ, both engineers agree that the inundation caused by the leaking pipe under the east side of the property has affected the foundation material on the east side of the property at the very least. HCE in its supplementary report considered that the leak had affected the ensuite, walk in robe, main bedroom and bedroom 2 located on the east side of the house. Expert reports differ as to cause of the balance of the damage HCE and DCE differ however as to the cause of the balance of the damage. HCE, whilst acknowledging that it had not conducted any soil testing , considered the 2016 leaking pipe had not caused soil swelling to the affected west side of the house, but that soil shrinkage had occurred due to seasonal change. DCE on the other hand considered there were three influences affecting the floor movement, namely:  the bearing failure along the northern half of the eastern side of the building, caused by the leaking pipes and around the north-western and south-western corners of the house, likely due to the residual effects of the 2011 claim  soil swelling affecting the western side of the house likely due to residual effects of the 2011 claim  soil shrinkage, caused by the drying effect of tree roots. It is not necessary for the purpose of this dispute to determine which experts’ opinion is correct as both experts appear to agree that the impact affecting the north-western and south-western corners of the house and the western side of the house was not caused solely by the leaking pipe in 2016 but due to other causes which are excluded under the terms of the policy. Wayne Tank principle The Wayne Tank principle applies where there are two or more concurrent and equally proximate causes of damage, one of which may be an insured event and the others which may be excluded. In these circumstances, where the causes are of equal proximity, that is, are of equal effect, then the exclusion will apply to defeat the claim. Insofar as there are differing opinions from the engineers, the panel accepts that there are likely to be multiple proximate causes of damage to the western side of the house. Case No: 475520 Determination Page 5 of 10 The panel accepts that the Wayne Tank principle would apply to this damage as it is satisfied that most likely this damage was caused by a combination of factors, including faulty design and or workmanship and or ground movement, both of which are excluded from cover under the terms of the policy. The panel however is not satisfied that the Wayne Tank principle should apply to defeat the applicant’s claim with respect to damage to the eastern side of the property. The panel accepts that there may have been faulty design and workmanship involved in the re-levelling of that side of the house following the 2011 event. However, the panel is satisfied that the proximate, that is, the dominant or effective cause of the damage to the eastern side of the property was the saturation of the soil caused by the burst pipe on the eastern side of the property. The panel is satisfied that the reports from both HCE and DCE support such a finding. FSP to cash settle applicant’s claim for costs to repair eastern side of house The FSP has provided a quotation for the cost of repairs to the eastern side of the house from BP, totalling $7,300. The scope of works includes:  Re-level floor area by packing over the top of existing stumps .  Plaster repair and paint ceilings and walls affected by relevelling.  Remove and replace two SQM to the ensuite vanity units/back tiles .  Ensure doors are operational. The scope of works is designed to cover damage to the ensuite, walk in robe, main bedroom and front bedroom, in accordance with the findings of HCE. The panel is concerned as to the proposed method of packing over the top of the existing stumps given the comments made by both engineers with respect to the previous re- levelling of the property. In the panel’s view, it would be more appropriate that the existing stumps be replaced. The panel considers that a further allowance should be made to cover the potential costs of replacing the existing stumps on the eastern side of the property, to allow for the floor area to be re-levelled. The panel determines it would be fair in the circumstances for the FSP to pay the total sum of $10,000 to settle the applicant’s claim for damage to the eastern side of the property. No interest is payable on this amount. Applicant entitled to contribution towards costs of obtaining engineering report Under paragraph 9.4 of the Terms of Reference, FOS can determine that an FSP contribute up to $3,000 to professional costs incurred by an applicant in bringing a matter before FOS. Case No: 475520 Determination Page 6 of 10 The panel accepts that in the current dispute the applicant reasonably needed the assistance of the engineer. The report from DCE has been of assistance in resolving the issues in dispute and allowing the applicant to establish his case. In determining the extent of any contribution, FOS needs to determine what is fair in all the circumstances. Given the nature of this dispute, the panel is satisfied that it is fair that the FSP contribute up to $2,000 to the applicant’s costs of o btaining the engineering report from DCE, subject to the applicant providing copies of the relevant invoices. Case No: 475520 Determination Page 7 of 10 3 Supporting information 3.1 Expert reports Record Key points FSP’s expert ( H ) Report 7 - 04 - 2011  Floor levels suggested western side of house up to 20mm out of level  Levels suggested eastern side of house up to 80mm out  Subfloor area damp on eastern side  Inspection of concret e stumps showed gaps between top of stumps and timber bearers on eastern side  Out of level stumps to north - eastern side of property ‘ CONCLUSIONS The cracking and movement of the house, particularly along the e ast side, is typical of problems that occur due to differential settlement of the stumps. Differe ntial settlement can occur of the stumps due to changes in moisture content of the foundation material. […] Gaps were evident between the stumps and the bearers in several locations which would indicate that movement has been occurring of the stumps in these areas. Out - of - level was also evident of several of the stumps, however, in our opinion, this problem would be related to the method of construction an d installation of the stumps and not related to the water going underneat h the house. Therefore, in our opinion, the movement and problems occurring, particularly along the east side of the house, has resulted due to the problems with the stormwater drain at the front of the property. RECOMMENDATIONS […]  Re - levelling can be carried out of the existing stumps along the east side of the house. This re - levelling should be to only feather the levels into adjoining areas and should not be to re - level the house b ack to a zero datum.  Once re - levelling has been carried out then repairs can be carried out to the cracking and movement in the house prior to the effected [sic] areas being re - painted. We would also recommend that while re - levelling is being carried out o f the stumps new stumps should be provided where out - of - level is occurring in stumps, particularly to the rear north east corner of the house. […]’ FSP’s expert (B) Report 18 - 04 - 2016 ‘ Resultant Damage Upon inspection we found the North and eastern sides o f the house have substantial foundation movement causing cracking to the internal plaster linings and wall tiles dislodging in the ensuite. Case No: 475520 Determination Page 8 of 10 Cause of Damage The cause of the damage is believed to be from the water inundating the subfloor from these leaking pipes however we noticed that when the house was re - levelled during previous Insurance repairs oversized packing of the stumps has occurred which is larger than what is required under Australian Building Standards. Re - levelling of the home is not an option due to the already existing large packing. We are uncertain that the water has been the main contributor to this resultant damage and recommend a specialist be engaged to determine the cause of damage.’ [sic] FSP’s expert (H) Report 11 - 07 - 2016 ‘During ou r site inspection floor levels were taken on the house using the floor level at the chimney midway along the west wall. This showed that up to 30mm to 50mm out of level was occurring in the family room/meals area particularly at the north end. Out of level of up to 90mm was measured along the east side of the house. The greatest movement was occurring in the ensuite and walk - in robe as well as to the front bedroom in the south - east corner. Generally the remaining areas of the house showed levels between 20m m and 30mm. […] Several amount of timber packers have been used to re - level the stumps. In some cases gaps occur between the timber packers and timber bearers. In a large number of cases leaning and out of level was evident of the stumps and in some cases the lean was so great that the stumps were not supporting the bearers. Movement had also occurred of the timber packers. […] Previous problems have been occurring with movement in the house and it was indicated that re levelling was carried out of the hou se following our initial site inspection in 2011. It is not clear how level the house was made during this re - levelling. Our office is concerned regarding the height of the timber packers used to pack the stumps. Normally packing of stumps is between 30mm and 40mm. In this case most of the packers are around up to 120mm. In our opinion this is not good practice to have large packers. […] Considerable amount of out of level is also occurring of the timber stumps. This problem was obs erved during our initial site inspection and it would appear that the previous re - stumping of the house did not replace any of the leaning stumps. […] It should be noted that considerable amount of movement is occurring in the north - west corner and in our opinion this problem would be related to the dry summer and would not be related to the leaking water pipe as the water would not extend up to this area of the house as it is up hill from where the leak occurred. Therefore, in our opinion, the movement in the ensuite, walk - in robe, Case No: 475520 Determination Page 9 of 10 main bedroom and front bedroom in the south east corner has resulted due to the following factors.  The last summer being a very dry summer with long periods without rain.  The leaking water pipe on the east side of the house.  Inappropriat e re - levelling of the house since our initial site inspection. In our opinion the cracking to ot her areas of the house are not related to the recent leaking water pipe.’ Applicant’s expert (D) Report 4 - 07 - 2017  three types of influences affecting floor movem ent and damage to the building, being: i. Bearing failure along the northern half of the eastern side of the building caused by the leaking pipe and around the north western and south western corners of the house, likely residual effect of the 2011 claim. ii. Soil swelling affecting the western side of the hous e, also likely residual effect of the 2011 claim. iii. Soil shrinkage caused by the drying effect of tree roots from the large deciduous tree to the south east of the building.  Suggests H reports had wrong int erpretations and contradictions as a result of not preparing contour maps and soil tests  H report suggests dry climatic conditions caused floor movement around the north - west corner of the building whereas D’s soil testing showed the soil conditions to be very damp  H report did not identify a large tree to the sout h - east which D considered responsible for some footing movement  H’s report provides contradictory information  H states poor re - levelling practices caused building problems , whereas D suggests bear ing failure from the leaking pipe cause d floor movement and damage to the northern half of the eastern side of the building  H recommended the floor should be mainly re - levelled even though it had been identified that there were floor level differences of u p to 80 mm and the settlement offer given by the insurers was only sufficient for that purpose  H incorrectly classifi ed soil at the site  H failed to inform additional floor movement could be expected in the Highly Reactive soils  There is no indication dry seasonal conditions affected the site  A part from a corner affected by a tree, the site is moist to abnormal depth due to pipe leak and the residual effects of the 2011 claim  The applicant use d large chocks based on rec ommendations in the H report  H’s report was not supplied to the applicant at that time  The FSP’s settlement was issued with no instructions on what it was intended for, and was not sufficient to do re - stumping  Packing is not the cause of footing movement  The cause of footing movement is from the leaking pipe, residual effect s of the 2011 claim and a tree to the south east corner of the Case No: 475520 Determination Page 10 of 10 building FSP’s expert (H) Report 9 - 0 8 - 2017  Soil testing not undertak en, based on geological maps of area  Both D and H reports confirm large amount of sit e movement can occur in foundation material  No significant localised settlement obs erved at the property from tree during H’s inspections, and no reference to tree roots in D bore hole examination  Difference in levels bet ween 2011 and 2016 inspections diff ered by between 10mm to 15mm  Significant amount of out of level in 2011 and no significant change to 2016 except in robe and ensuite areas  Most large chocks were in place during 2011 inspection and no significant change to 2016  Uncertain what re - leveling w orks conducted as the sub - floor condition was similar from 2011 to 2016 inspections  D findings only based on inspection from June 2017, does not consider or explain influences from 2011  Soil testing was undertaken in winter when conditions can be damper  Damage is not due to bearing failure as no significant movement occurred bet ween 2011 to 2016, evidenced by a la ck of continuing movement in the footings . 3.2 Relevant policy wording Accidental Damage cover If you have chos en Accidental Damage Home Ins urance, we will cover your buildings or contents for accident al loss or damage. […] Exclusions to your cover Any cover we provide is subject to the following exclusions. […] We will NOT cover any loss or damage as a result of, or caused by • settling, shrinkage o r any movement of eart h […] • a defect in an item, structural defects, or faulty workmanship or design

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.