Home / Financial Firm (Unknown - Insurer) / Determination 475506
Determination 475506
Impact damage claim to business premises wall declined
Summary
A business sought cover for wall damage at its leased premises that its insurer declined. AFCA decided the applicant had not established an insured sudden event and the damage was gradual.
The applicant must show damage that was sudden and unforeseen from an insured event, and the evidence indicated repeated impacts over time, so the policy did not respond.
Issues
- Claim denial primary · not upheld“I am not satisfied the applicant has established that the damage was sudden and unforeseen... the FSP is entitled to deny the claim as the applicant has not established a claim within the terms of the policy.”
- Product terms interpretation secondary · not upheld“Policy defines damage as sudden and unforeseen; the damage occurred gradually over the tenancy, so the gradual deterioration exclusion would also apply.”
Subjects and remedies
small businessno remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Determination
Case No: 475506 Determination Page 1 of 4
Case number: 475506 9 May 2018
1 Overview
1.1 Dispute
The applicant held an enterprise business insurance policy with the FSP from 30
June 2016. On or about 15 July 2016, they lodged a claim for impact damage to the
northern wall of the insured property.
The FSP subsequently denied the claim and says:
the applicant has not established an insured event caused the damage
alternatively, the damage being caused by maintenance or defects related to
gradual deterioration.
This determination has been subject to a recommendation. The recommendation
was in favour of the FSP. A copy of the recommendation has been attached.
1.2 Issues and key findings
Has the applicant established a valid claim under the terms of the policy?
Whilst the damage sustained to the property most likely arose as a result of repeated
impact, I am not satisfied the applicant has established that the damage was sudden
and unforeseen. I am not satisfied the applicant has established that the damage
falls within the terms of the policy.
Is the FSP entitled to deny the claim?
The FSP is entitled to deny the claim as the applicant has not established a claim
within the terms of the policy. Further, on balance, the damage occurred gradually
and the exclusion for gradual deterioration woul d apply to defeat the applicant’s
claim.
1.3 Determination
This determination is in favour of the FSP.
The FSP is entitled to rely upon the terms and conditions of the policy to refuse
payment of the applicant ’ s claim.
Case No: 475506 Determination Page 2 of 4
2 Reasons for determination
There has been a full exchange of material between the parties and eac h party has
had the opportunity to address the issues that arise from the information exchanged.
This determination follows consideration of all of the information exchanged including
information provided following the recommendation. The determination is based on
what is fair in all the circumstances, having regard to the relevant legal principles,
terms of the policy, good industry practice including codes of practice and prior
determinations where applicable.
2.1 Has the applicant established a valid claim under the terms of th e
policy?
Applicant has the onus to establish a claim within the terms of the policy
As set out in the recommendation, the applicant ’ s policy provides cover for loss of
damage caused by a series of defined events during the period of cover. Included in
the defined events is cover caused by impact or accidental damage if not caused by
any of the insured events.
The policy includes the following definitions :
accidental - damage that is unexpected and unintended.
damage - sudden and unforeseen physical damage or destruction.
event - one incident or all incidents of a series consequent on or attributable to one source
or original cause.
If the applicant is to succeed in a claim for either impact damage or accidental
damage, the applicant must establish that the damage was sudden and unforeseen
and arose in one incident or a series of incidents due to one source.
No evidence damage was sudden
The damage to the wall was first reported by a new tenant. The applicant concedes
that the previous tenant had not brought its attention to the damage. Without
information from the previous tenant, it is not possible to identify when the condition
of the wall was first noticed.
Engineering reports suggest damage was not sudden
Whilst there is some dispute as to the actual cause of the damage, reports provided
by the respective experts support the finding that the damage was not sudden.
The applicant provided a report from SC, a building consultant. SC considered the
damage had been caused by impact with the masonry brick ties between the two
skins of brickwork being pushed through the mortar course of the internal skin
causing the instability. SC on questioning by the FSP considered that it appeared
that there may have been a number of impacts overtime that had led to the damage.
The FSP’s engineer MCS reported that the inner skin of the double brick wall was
leaning to the north and resting against the external skin. It described the wall as a
Case No: 475506 Determination Page 3 of 4
dado wall that had incurred movement and damage. MCS considered that the
brickwork appeared to have had a bench/workstation/racking previously placed
against the brickwork given the staining to the upper brickwork. It found an absence
of a specific impact mark or point.
In response to issues raised by the applicant’s representative, RD, an engineer, MCS
commented that the wall was not designed to be used as a restraint and was not
designed for impact loads. MCS considered that the damage was most likely caused
by the repeated and careless action of forklift drivers collecting pallets and pushing
them up against brickwork over a long period of time.
RD has raised issues with the qualifications of SC to make the comments as to the
cause of damage. RD notes that SC is not an engineer. RD also criticizes the
comments made or attributed to SC, a lthough it appears RD’s comments are more
directed to the report from MCS. MCS are appropriately qualified engineers and are
appropriately qualified to provide an opinion as to the likely cause of damage.
RD says that it is impossible to say based on the information available whether the
impact occurred over a long period of time. RD maintains however that there was a
discreet number of impacts that has caused the damage.
Evidence suggests damage occurred overtime
I accept and agree with the findings contained in the recommendation. The
information provided supports a finding that damage was not sudden but occurred
overtime due to the nature of the previous tenant’s business activity at the premises.
I note the applicant argues that as there has been impact damage to the wall, then
the policy should respond regardless of whether it was the single impact or multiple
impacts. I am not satisfied that the applicant has provided sufficient information to
establish this. I have considered the reports provided and prefer the findings
contained in the report from MCS. The report provides a detailed consideration of the
issues and addresses the concerns raised by RD.
I accept that the damage occurred as a result of multiple impacts over an extended
period of time, most likely due to repeated action of forklift drivers when collecting
pallets and pushing them up against the brickwork over a long period of time. I
accept that this combined with the wall being incorrectly used as a restraint has
contributed to the gradual deterioration of the wall overtime with the resultant
damage.
In the circumstances, I agree with the findings contained in the recommendation. I
am not satisfied that the applicant has established a claim that falls within the terms
of the policy.
2.2 Is the FSP entitled to deny the claim?
The FSP is entitled to deny the claim as the applicant has not established a claim
within the terms of the policy. Further, I am satisfied that the FSP has established
that most likely the damage occurred due to gradual deterioration of the property
during the normal course of business activities conducted by the previous tenant. I
Case No: 475506 Determination Page 4 of 4
accept in these circumstances that the FSP has established the application of a
relevant exclusion.
Recommendation
Case No: 475506 Recommendation Page 1 of 9
Case number: 475506 8 September 2017
3 Overview
3.1 Dispute
The applicant lodged a claim under its business insurance policy with the financial
services provider (FSP) for impact damage to a northern wall of the business
premises.
The FSP denied the claim on the basis the damage did not occur due to an event
insured under the policy. It says the damage occurred over time due to the nature of
the business activity at the premises.
The applicant repaired the damage and sought reimbursement of the cost of repairs.
3.2 Issues and key findings
Has the applicant established a valid claim under the policy?
The applicant has not established a valid claim under the policy because it has not
shown the damage was sudden or that an event or events occurred based upon the
definitions under the policy.
Is the FSP entitled to deny the claim?
The FSP is entitled to deny the claim because the applicant has not established it
has suffered a loss caused by a risk insured against under the policy.
3.3 Recommendation
This recommendation is in favour of the FSP.
The FSP is entitled to deny the applicant’s claim and is not required to do anything
further.
Case No: 475506 Recommendation Page 2 of 9
4 Reasons for recommendation
4.1 Has the applicant established a valid claim under the policy?
Policy covers impact and accidental loss or damage subject to exclusions
The applicant is required to show that, on the balance of probabilities, it has suffered
a loss caused by a risk insured against under the policy. This is known as a prima
facie claim.
If the applicant is able to establish a prima facie claim, then the onus shifts to the
FSP to show that, on the balance of probabilities, it is entitled to rely on an exclusion
under the policy or is otherwise entitled to deny the claim.
The policy provides cover for loss and damage to the property caused by specific
events during the period of cover. Two of the many insured events listed are loss or
damage caused by impact from vehicles or accidental damage if it was not caused
by any of the insured events.
The policy defines damage as sudden and unforeseen physical damage or
destruction and an event(s) as one incident or all incidents of a series consequent
on, or attributable to, one source or original cause.
Damage to North/rear wall occurred while the property was tenanted
The parties do not dispute the extent of the damage reported or that the damage was
unforeseen.
The applicant says the tenant who caused the damage did not bring the damage to
its attention until it vacated. It is therefore unable to prove when and how the loss
may have occurred to the subject wall.
It is unfortunate the applicant’s tenant did not notify it of the damage. As the
policyholder however, it is responsible for proving the terms of the policy cover the
damage it claims.
Although the applicant arranged for quotes to replace all three walls (North West,
North/central/rear and North East), it only seeks cover for the cost to repair the
North/rear wall.
Parties dispute whether damage was sudden
The FSP argues there is no damage as it was not sudden but sustained over time.
This means, the FSP does not consider either impact or accidental damage responds
to the applicant’s claim, as the claimed damage does not meet the definition of
damage under the policy.
On the balance of probabilities, the information from the parties’ experts (M and BC)
confirm the damage was not sudden.
Case No: 475506 Recommendation Page 3 of 9
The policy does not define sudden. FOS considers the ordinary dictionary meaning in
this case. The Macquarie dictionary defines sudden as happening, coming, made, or
done quickly, without warning or unexpectedly.
Evidence suggests damage occurred over time
The applicant submits that all the damage (if not a portion), was sudden and
unforeseen. This is because the racking against the wall that the forklift would have
been loading the goods onto, masked the damage. It later contended it had agents
regularly inspecting the premises, which supports the impacts occurred over a short
term period.
The applicant contradicts itself, as it admits the forklift racking would have hidden the
damaged walls or limited access to its agent to inspect these walls. This means, it is
possible and likely the damage occurred over time.
Also, the applicant’s own engineer (BC) could not definitely confirm how long the
damage had been occurring. This does not help the applicant show the damage was
sudden.
Finally, the FSP relies upon the report from its engineer (M) to say the lateral force
applied to the wall over time, caused the movement of the brickwork. M notes the
following indicate it is a long term issue:
the caulking between the emergency door frame and tapered brickwork
the missing emergency door frame
the painted yellow line within the gap between the brickwork and floor slab.
The information above supports the damage was not sudden. It appears it occurred
over time due to the nature of the tenant’s business activity at the premises.
Multiple impacts caused damage
Even if the conclusion the damage was not sudden is incorrect, the information
suggests the cause of the damage cannot be clearly determined as an event/events
or impact/impacts under the policy.
The policy defines event/events as one incident or all incidents of a series
consequent on, or attributable to, one source or original cause. The applicant says it
is impossible to tell how many impacts caused the damage because the conditions
were largely concealed before the tenant vacated.
However, the applicant argues it is clear there has been impact damage to the wall
that really could only have been caused by a vehicle impacting it. It says the FSP has
not denied there has been impact damage. As such, it believes the policy should
respond. It later contends the damage was most likely due to relatively few discrete
impacts and could not be reasonably caused by anything else.
The FSP relies upon the reports from its engineer and building consultants (M) to say
the damage was caused by movement, which occurred due to lateral forces over
time and not because of a single insured event. M says none of the walls show a
specific impact or impact point.
Case No: 475506 Recommendation Page 4 of 9
BC states the wall appeared to be damaged from a number of impacts. The applicant
later indicates BC is a construction management firm with no professional
competence to offer engineering opinions sought by the FSP.
The photographs show packaging boxes and forklift pallets placed up against the
brickwork, with markings on the brickwork. The markings suggest the racking has
pressed against wall more than once.
On the balance of probabilities, the damage cannot be considered to have occurred
from a single impact as admitted by the applicant. In all likelihood, during the period
of the tenancy, the applicant’s former tenant has impacted the wall with the racking,
when a forklift was used to place/remove items to/from the racking.
The applicant is unable to clearly show when this occurred or how many times this
occurred. This means, it has not established the damage resulted from an event or
events, as required under the policy.
Accordingly, the applicant has not establish a valid claim under the policy.
4.2 Is the FSP entitled to deny the claim?
Valid claim not established by the applicant
As the applicant has not established a prima facie claim (it has suffered a loss
caused by a risk insured against under the policy), then the FSP is entitled to deny
the claim.
As such, the FSP is not required to do anything further for the applicant’s claim.
Case No: 475506 Recommendation Page 5 of 9
5 Supporting information
5.1 Applicant
The applic ant is a business represented by its insurance broker. The applicant’s
owner is a structural engineer. Comments and submissions made by the owner and
broker are taken to be made by the applicant.
5.2 Other arguments
The parties have raised other arguments, which are not material to the outcome in
this recommendation. Accordingly, the following comments are given to provide
some clarity.
Defects and maintenance are not considered
Given the recommendation outlined above, it is unnecessary to make a conclusion
as to whether the damage was caused by a defect or maintenance issue. This is
because the applicant is first required to show the policy responds to the claimed
damage (which it does not). Only if the applicant is successful in establishing a valid
claim is the FSP then required to show an exclusion applies to deny the claim.
As the applicant has not established cover under the policy, it is not necessary to
move onto the exclusions (maintenance and defect issues) referred to by the FSP.
5.3 Reports
Record Key points
Applicant’s building
inspector (BC)
Building inspection report
21 - 06 - 2016
Inspected unstable masonry walls.
Double skin masonry infill panels to the north elevation of the building
are unstable and in danger of collapse.
Masonry brick ties between the two skins of brickwork have been
pushed through the mortar course of the internal skin due to impact
damage.
The internal masonry is positioned with the cavity housing the portal
frame steel frame flange to act as a bracing element.
There is no mechan ical fixing bet ween the portal frame and masonry
elements.
The external skin is continuous wit h control joints provided in line with
the portal columns.
The east and west walls around 70 met res in length are constructed
by the same method and display the s ame propensity for structural
failure.
Photographs show l oose and movable brickwork to the internal north,
internal wall 5 degrees out of plumb, displaced outer skin of brickwork
at a control joint, brick ties punching through mortar.
FSP’s engineer (M)
Report
The 3 separate brick dado wall panels have not incurred a specific
impact or impact point.
Case No: 475506 Recommendation Page 6 of 9
Record Key points
29 - 07 - 2016 A lateral force applied over several years caused the movement to the
inner skin of north brick wall, failure of the cavity ties causing them to
pr otrude and push the outer skin wall towards the North .
The wall was likely used for loading and/or restraint, possibly from a
racking or similar system placed adjacent to the wall.
The brickwork is practically free - standing and is not designed to be
used a s a restraint or to be pushed up against.
The unpaved area outside the Nort h side of the building may
exacerbate or result in future movement. This is because it has no
specific ground surface levels or stormwater drainage which will allow
water to pond an d absorb and weak en the underlying soils.
The caulking bet ween the emergency door frame and tapered
brickwork, the missing emergency door frame the painted yellow line
within the gap between the brickwork and floor slab indicate it is a
long term issue. [M ] thinks several years.
Periodic maintenance may have prevented further damage.
The wall will need to be demolished and reconstructed because the
brickwork is unstable.
Photographs show lateral movement of brickwork at articulation joint,
dislodged brickw ork, decay ed mortar and protruding cavity tie,
b rickwork has shifted and slid on the footing about 50 mm, caulking
between the brickwork and doorframe indicating pre - existing known
movement, staining to upper brickwork appears to be from a
bench/ workstatio n/racking placed against it, no specific impact mark
or point, emergency door frame to the Nort h West is missing, etc.
Applicant (RD)
Opinion
05 - 10 - 2016
As a practicing structural engineer and owner, M’s conclusion that the
primary cause of the damage was the wall was pushed outwards over
an indeterminate period of time seems reasonable.
More likely cause of impact was repeated loading and unloading of
pallets stacked high up against the wall.
Applicant’s building
inspector (BC)
Opinion
14 - 10 - 2016
Based on review of phot ographs BC took at the time of inspection, BC
considered:
a forklift/pallet/goods impacted the walls
the damage appears to have result ed from a number of impacts
it could not determine how long the damage had been occurring.
Applicant (RD )
Opinion
05 - 06 - 2017
RD is licensed to practice structural engineering in 6 states of the
USA.
The force required to push the inner skin so forcefully against the
outer skin as to bend the walls and cause the ties to jut through, is the
result of a specifi c action or actions, most probably by the tenant
loading crates or pallets and accidentally hitting the walls.
RD analysed the panels for all loads that would have been required by
the current code (AS/NZS 1170: 2011) and found them perfectly
satisfactory for self - weight in combination with wind loads.
BC is a construction management firm wit h no professional
competence to offer engineering opinions of the sort asked by the
FSP. Ie, BC’s opinion are not in its field of competenc e.
RD asked that any opinion by BC on the adequacy of the panels or
Case No: 475506 Recommendation Page 7 of 9
Record Key points
the frequency of impacts be discounted.
RD disagrees with BC that impacts occurred over a long period of
time. It is impossible to say based on the evidence available.
The impacts could be multiple or singular but the re was a discrete
number of them as everyone agrees this was not the result of a
creeping phenomenon.
Applicant (RD)
Brick Cavity Wall Analysis
undated (but attached with
above opinion)
The analysis conducted wit h modern engineering soft ware firmly
establishes that the panels were adequately designed for their
purpose and no components are overstressed.
This means, the wall was properly designed and there was no
previous deficiency prior to the impact event.
The design does not however, account for impact as this was not a
required load condition for a structure with this occupancy.
FSP’s engineer (M)
Report
09 - 06 - 2017
The applicant’s letter and statement does not provide any further
information or evidence to alter M’s views of the proximate cause of
the movement and damage.
Its previous comments do not infer that the brickwork was incorrectly
or inappropriately constructed.
Confirmed the FSP had not provided and it had not reviewed a ny
reports from BC.
Generally agreed with BC’s comments of 14 October 2016.
Agrees with the applicant’s comments that the unrestrained wall was
not designed to withstand continual and periodic impacts that has
subsequently led to the damage.
The action or actions of pallets or crates accidentally hitting the walls
over a long period of time is consistent with the damage viewed at the
property.
One single impact would not cause the movement and damage to the
full length of the wall panels and as separated by the portal frame.
The images supplied by the applicant outlining the location of the
pallet racking against the brick wall, and the forklift pallets stored
against the brickwork confirms and further reinforces M’s previous
findings.
5.4 Relevant policy sections
Section Wording
Cover for
Section 1A fire
and defined
events
About thi s section
This section of the policy covers physical loss of or damage to your property
from insured events listed in this section, including but not limited to events such
as fire, lightning and explosion.
Your insurance under this section
We will insure you for loss of or damage occurring during the period of insurance
to buildings, contents, stock or specified items, at your premises arising from an
insured event specified b elow.
Insured events
Case No: 475506 Recommendation Page 8 of 9
Section Wording
5. Impact
We cover loss or damage caus ed by impact from vehicles designed primarily for
use on land or their load.
10. Accidental damage
We will pay up to $250,000 or the total of the insured amounts for buildings,
contents, stock and specified items whichever is the lesser for accident al
damage.
Exclusions
under section
1A
This section does not insure:
2. Maintenance or defects
loss or damage caus ed by or arising out of:
a) rust or corrosion;
b) inherent or structural defects;
c) faulty design, materials or workmanship; or
d) developing flaws, gradual deterioration, normal upkeep of property, or
existing defects or lack of maint enance to property, unless you can show
you did not know about the deterioration, defect or lack of maintenance.
Yo u cannot claim for repairing the deterioration or defect or the
maintenance.
Exclusions
under section
1A (10)
Accidental
damage
We will not cover loss of or damage to property that is or could have been
insured under any other section, even if you have n ot selected the ot her section
or have had cover under the other section excluded or otherwise denied by us.
We will not cover you for loss or damage caus ed by:
1. any of the insured events 1 to 9. To avoid doubt, this includes any of the
insured events’ relat ed exclusions.
3. wear and tear, gradual deterioration, scratching, marring, developing flaws,
normal upkeep or any gradual caus e.
General
definitions
Unless defined differently in individual sections, these definitions apply to all
sections.
Accidental
Unex pected and unintended from your standpoint.
Damage or damaged
Sudden and unfores een physical damage or destruction.
Event or events
One incident or all incidents of a series consequent on, or attribut able to, one
source or original cause.
Loss/losse s
Sudden or unforeseen physical loss.
5.5 Timeline of key events
Date Action
30 - 06 - 2015 Policy started.
Case No: 475506 Recommendation Page 9 of 9
Date Action
21 - 06 - 2016 Applicant alleges is date of loss.
30 - 06 - 2016 Policy renewed.
15 - 07 - 2016 Applicant lodged claim.
26 - 07 - 2016 FSP authoris ed M to provide a report on the cause of damage and quote to
repair.
14 - 09 - 2016 FSP declined the claim, as the damage was not caused by an insured event
and the policy excludes damage caused by maintenance or defects.
27 - 09 - 2016 Applicant’s request for review.
06 - 10 - 2016 FSP’s review of the claim confirmed the denial.
02 - 11 - 2016 Applicant rec eived three quotes and a quote summary tendered to reinstate
all brickwork.
08 - 12 - 2016 Applicant advised it would undertak e the repairs needed because the wall
was a health and safety concern.
Applicant suggested FSP conduct any further assessment before the
repairs.
03 - 01 - 2017 Applicant sought IDR review.
13 - 02 - 2017 FSP IDR decision conf irmed denial because information did not support the
wall had moved due to a single impact from a vehicle.
24 - 03 - 2017 Applicant lodged dispute with FOS.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.