Home / Financial Firm (Unknown - Insurer) / Determination 475139

Determination 475139

Cash settlement amount for storm tree damage to home, including building movement, council requirements and engineer fees

FirmFinancial Firm (Unknown - Insurer)
Decided2018-07-17
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$55,225
Non-financial loss—
Amount claimed$77,845
SourceAFCA PDF

Summary

After falling trees damaged their home, the applicants disputed the FSP's cash settlement. AFCA found the building movement repairs, council requirement costs and engineer fees payable with statutory interest, but refused further temporary accommodation costs.

A cash settlement must make fair allowance for the transferred risk, and the FSP's preferred engineer evidence was outweighed by the applicants' engineer's computations.

Issues

Subjects and remedies

home or building damagepay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 475139 Determination Page 1 of 13 Case number: 475139 12 July 2018 1 Overview 1.1 Dispute The applicants lodged a claim under their home insurance policy with the financial services provider (FSP), after their home suffered damage due to falling trees in October 2016. The FSP accepted the claim and offered a cash settlement for several items including building repairs, temporary accommodation, temporary fe ncing and whitegoods. The applicants say the FSP’s offer is not acceptable. The case manager provided the parties with a recommendation on the issues in dispute. The recommendation was substantially in favour of the applicants. As the FSP did not accept the recommendation, the dispute has been referred to me for determination . 1.2 Issues and key findings Is the amount offered by the FSP for building repairs fair? The FSP’s settlement of the building repairs claim is not fair because the FSP’s offer did not include additional repairs identified by the applicants’ engineer . The settlement should be increased by $33,750 for building movement repairs. Is the FSP required to pay for the applicants’ engineer’s reports? It is fair the FSP pay for the applicants’ engineers reports both before and after the recommendation. This is because the dispute raised complex issues and the applicants genuinely required expert assistance. Further, the applicants’ engineer’s opinion assisted in making the determination. Is the FSP’s offer for temporary accommodation fair? The offer is fair because the damage occurred on 9 October 2016 and pursuant to the policy terms, the FSP is not obliged to pay any further accommodation costs beyond 8 October 2017. Are the applicants entitled to any further payment? On the information provided, the settlement offer of $2,400 for temporary fencing is fair. However, if further amounts have been incurred as temporary fencing has remained in place since the parties agreed on the sum of $2,400, then the parties are Case No: 475139 Determination Page 2 of 13 encouraged to settle this item pursuant to the policy terms and conditions. If the parties are unable to agree, this item can be brought back to FOS. Is FSP obliged to pay the cost of Council requirements? The FSP is obliged to pay the cost of Council requirements because local council requirements and the bushfire management statement place certain obligations on building works in relation to the removal of trees and vegetation. Even if the applicants had repaired the damaged home, the Council requirements would have applied as at least 50% of the home was damaged. Although the bushfire management overlay says there may be an exemption from applying for a permit in some circumstances, nonetheless, the overlay says a homebuilder must also check with the local council to confirm if exemptions apply. The available material from the local council indicates exemptions would not have applied. 1.3 Determination This determination is substantially in favour of the applicants. If the applicants accept this determination, then within seven days of acceptance, the FSP is to make the following payments to the applicants:  $33,750 for building movement repairs  $2,400 for temporary fencing (unless a further amount has been paid since this sum was agreed)  $3,520 for engineer’s fees  Statutory interest on $3,520 from the date of payment until the date of settlement  $15,554.84 for the cost of Council requirements  Statutory interest on $15,554.84 from the date of payment until the date of settlement If further amounts have been incurred as temporary fencing has remained in place since the parties agreed on the sum of $2,400, then the parties are encouraged to settle this item pursuant to the policy terms and conditions. If the parties are unable to agree, this item in the dispute can be brought back to FOS. If the applicants’ engineer invoiced the applicants for the cost of reports provided after the recommendation, then, upon proof of the cost of those reports, the FSP is to also reimburse the applicants for those reports. Statutory interest is to be paid from the date the engineer was paid for those reports until the date of settlement. Case No: 475139 Determination Page 3 of 13 2 Reasons for decision I have decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. I have taken into account all the material submitted by the parties, both before and after the recommendation. I am satisfied the documentation I have relied on has been provided to both parties. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome only. New material and new submissions provided after the recommendation After the recommendation was rejected, both parties made further submissions and provided new material. Where relevant, the new submissions and material will be referred to in this determination . The applicants raised a new issue in relation t o the cost of Council requirements. 2.1 Is the amount offered by the FSP for building repairs fair? Some items settled and paid after the recommendation It is not in dispute the applicants’ home was damaged when trees fell on the home in October 2016. The dispute is in relation to the extent of the damage and the settlement offer made by the FSP. After the recommendation, the issues about compensation for non-financial loss, the refrigerator, freezer and carpet were settled and paid. The determination will not address those issues. Remaining issues in dispute As for the issues remaining in dispute, the parties’ positions are summarised below: Item FSP Applicants Building repairs $199,502.20 (paid after the recommendation). A further $33,750 for movement damage. Temporary accommodation up to and including 8 October 2017 Paid the policy limit. A further amount because of delays. Temporary fencing $2,400* $2,400 temporary fencing. Engineer’s report costs $Nil $3,520 Council requirements (issue raised after the recommendation) $Nil $15,554.84 Case No: 475139 Determination Page 4 of 13 The FSP increased the allowance for temporary fencing for an additional six months. After the recommendation, the FSP said as a temporary fencing will remain in place until the final determination, no payment was required for the fencing at that time. After the recommendation, the FSP paid $3,770 for temporary accommodation costs to reflect the lease end date of 3 November 2017. Parties’ engineers provided reports regarding further impact damage The available material shows the damaged building was inspected by assessors and engineers for both parties. Meetings were held on site. Scopes of work were discussed and costed. As a r esult, the applicants’ builder provided a quote at the end of February 2017 to undertake repairs in the amount of $199,509.20. This amount was accepted by the FSP. The disputed amount relates to further damage the applicants allege was caused to other parts of the house because of the impact of the trees. Both before and after the recommendation, the applicants obtain reports from an engineer (JC). The applicants’ engineer is a consulting structural engineer with over 40 years of experience. The engineer inspected and photographed the property on 31 January 2017. He also obtained photographs of the site before the tree fell. He inspected under the house and noted many of the stumps were leaning. He provided structural computations. On visual inspection, he noted signs of movement, cracking of plaster and signs of distortion in the floors. As a result, the applicants’ engineer concluded as the trunk impacted first, his calculations show the force of the tree at initial impact caused a lateral movement which resulted in the building moving in relation to the ground at stump level. He says this is why many of the stumps are leaning. He also comments the soils in the region will not sustain such bearing capacities and the stumps would have moved because the soil cannot provide sufficient strength to resist this lateral movement. The FSP’s engineer is a civil engineer who inspected and photographed the home on 28 October 2016. He described and photographed the damage to the western end of the house which bore the brunt of the tree impact. He observed the distortion in the floor in the lounge and kitchen but says in his opinion the misaligned floor in the kitchen and lounge room is not related to the impact events. Initially, he does not say why he holds this opinion. Later, he expands on his opinion saying he does not accept this part of the applicants’ claim because of what he observed and also because he thought the plasterboard walls would contain wider cracks. Rather, he thought the cracks he observed were aged in appearance. When he reviewed the applicants’ engineer’s report he expanded on what he saw in his inspection. He agrees the floor is misaligned but says the applicants’ engineer’s report does not demonstrate “a plausible theory” regarding how the tree im pact caused the claimed damage. Case No: 475139 Determination Page 5 of 13 He agrees many of the stumps are not vertical and says the sample of three stumps relied on by JC is too small to justify the theory the house moved. Rather, he says the rotation was caused by dilapidation and seasonal ground movement. Applican ts’ engineer’s opinion more persuasive However, considering both engineers’ opinions, I prefer the opinion of the applicants’ engineer. This is because JC’s opinion is based not only on his observations but also on a subfloor inspection, comparison with pre-impact photographs and, particularly, engineering computations. I agree with the observation made by the applicants’ engineer that the essence of the FSP’s engineer’s opinion was heavily weighted to his opinion only. JC makes sever al rebuttals but I am particularly persuaded by the observation the FSP’s engineer has not addressed JC’s calculations. In all the circumstances, I am satisfied the amount offered by the FSP is inadequate. It is also fair in the circumstances the further claimed amount is paid Further, I am satisfied a further amount should be paid because it is fair in the circumstances. The material provided establishes the FSP decided at an early stage to cash settle the claim because of pre-existing damage caused by termites. I note JC says the amount of termite infestation within the structure was minimal. The FSP’s policy provides it is entitled to decide whether it will repair the damaged property, replace the damaged property or pay the insured the amount it would cost the FSP to repair or the replace the property to “as new” condition. I accept the FSP has the discretion to decide whether it will repair or cash settle a claim. However, the discretion must be exercised fairly and consistently with the principles o f utmost good faith. It needs to be considered alongside the insured’s circumstances. Therefore, a cash settlement offer must make appropriate allowances for flagged risks, contingencies and variations which can occur once repairs begin. A cash settlement must make a fair allowance for the transferred risk to ensure the offer is enough to return an insured property to its pre-loss condition. The FSP is to pay the further amount claimed of $33,750 to the applicants I note the quote provided by the applica nts’ builder dated 20 March 2017 in the amount of $33,750. The FSP says there is insufficient evidence to support the amount claimed. The FSP relies on comments made by its engineer in a report which was not exchanged until after the recommendation. I acknowledge the FSP has said should additional damage be discovered during repairs which were not previously assessed, the FSP would assess the damage. The available material shows the applicants have not repaired home but will rebuild it. Case No: 475139 Determination Page 6 of 13 While I accept the issue in the relation to the main beam has not been resolved to the FSP’s satisfaction, the dispute regarding these extra costs has been “live” between the parties since the beginning of last year. The FSP has had ample opportunity to further assess the ap plicants’ claim but has not done so. In the circumstances, on the information provided, I am satisfied it is fair the amount claimed of $33,750 is paid by the FSP to the applicants. This is because I prefer the opinion of the applicants’ engineer about th e cause of damage, I have taken into account reliance on an opinion which was not exchanged until after the recommendation and I consider that a discretion to cash settle must always be exercised fairly. As the builder has not been paid for these repairs, as repairs were not undertaken, the FSP is not obliged to pay statutory interest. 2.2 Is the FSP required to pay for the applicants’ engineer’s reports? The FSP is to pay for the applicants’ engineer’s reports FOS may decide the FSP contribute to the professional costs incurred by an applicant during a dispute. In considering whether the FSP is required to pay for the applicants’ engineer’s report costs, I consider what is fair in the circumstances. This dispute raised complex issues and the applicants genuinely required expert assistance. Further, the applicants’ engineer’s opinion assisted me in making the determination. In these circumstances, I am satisfied it is fair the FSP pay to the applicants $3,520 fo r the engineer’s first report. The FSP is also to pay statutory interest on $3,520 from the date the engineer was paid until the date of settlement. The applicants’ engineer provided reports after the recommendation. If the engineer invoiced the applicants for the cost of these reports, then, upon proof of the further cost of these reports, the FSP is to also reimburse the applicants for their engineer’s reports provided after the recommendation. Statutory interest is also to be paid from the date the engineer was paid for these reports until the date of settlement 2.3 Is the FSP’s offer for temporary accommodation fair? FSP not obliged to pay beyond 12 months from the date the damage occurred The material provided after the recommendation indicates the FSP updated the temporary accommodation costs to reflect the lease end of 3 November 2017 and increased the amounts already paid to the applicants by $3,770. The FSP says previous payments included the full allowance of the temporary accommodation benefit up to and including 8 October 2017. During the dispute, the applicants required the FSP pay $22,620 for temporary accommodation because the repairs would not be completed until March/April 2018. Case No: 475139 Determination Page 7 of 13 The applicants also say due to the overall delays caused by the FSP their expectations are rent should be paid up until this determination. The FSP’s policy provides the additional benefit of temporary accommodation costs when it insures the home. The benefit will be paid if the FSP agrees to pay the claim and if the home is not fit to live in following damage caused by an insured event. It is not in dispute the home is not fit to live in. However, the FSP relies upon the policy limitation which says it is not obliged to pay temporary accommodation costs beyond the reasonable time it takes to rebuild or repair the damage or beyond 12 months from the date the damage occurred, whichever period is shorter. The damage occurred on 9 October 2016. Pursuant to the policy terms, the FSP is not obliged to pay any further accommodation costs beyond 8 October 2017. The available material shows the FSP appointed an assessor, an engineer and a builder by the end of October 2016. A scope of works was prepared and costed by the end of December 2016. When the parties could not agree, further site inspections took place. Further scopes of works and further offers ensued. Essentially the dispute remained unresolved, and delay occurred, because of the disagreement regarding the applicants’ claim to be indemnified for the building moveme nt damage. While I found the applicants’ engineer’s opinion more persuasive, I do not consider the FSP’s position and reliance on its own engineer’s opinion was unreasonable. In all the circumstances, on the information provided, I am satisfied the applicants are not entitled to any further payment for temporary accommodation costs. 2.4 Are the applicants entitled to any further payment? The FSP is to pay for temporary fencing (amount to be agreed) In April 2017, the applicants required the settlement amo unt to include $2,400 for temporary fencing. The FSP accepted this item. After the recommendation, the FSP said as the temporary fencing will remain in place until the determination, no payment was required for fencing at that stage. No further information was provided about this item after the recommendation. On the information provided, the settlement offer of $2,400 for temporary fencing is fair. However, if further amounts have been incurred as temporary fencing has remained in place since the parties agreed on the sum of $2,400, then the parties are encouraged to settle this item pursuant to the policy terms and conditions. If the parties are unable to agree, this item in the dispute can be brought back to FOS for further determination. Case No: 475139 Determination Page 8 of 13 2.5 Is the FSP obliged to pay the cost of Council requirements? Local council requirements and the bushfire management statement place certain obligations on building works After the recommendation, the applicants said they were notified by local council there were now other requirements if they were to obtain necessary permits. The applicants claim a total of $15,554.84 made up of the following:  Bushfire management statement $1,250  Arborist tree report $900  Vegetation report $227.50  Quotation for the supply of native veget ation credits $8,177.34  Estimated cost of removal of trees $5,000 The applicants claim under the additional benefit for removal of debris and extra costs of rebuilding. Included is cover for building application fees regarding rebuilding or repairing the home. The policy says the most the FSP is required to pay for any one insured event is up to 10% of the home sum insured ($28,537.50). The FSP noted there is a current planning permit in relation to a proposed new development at the insured site for the construction of new home. It says the costs claimed are associated with the earthworks and necessary vegetation removal cost to facilitate the new construction. It submits it has adequately indemnified the applicants for the repair costs of the damaged home. It submits it was never asserted by the applicants the damaged home could not be repaired. However, the FSP says if the applicants incur these costs because of the repair of the damaged home in its current location it will review the claimed costs. In response, the applicants met with the statutory planner at the local council to verify if these costs would be incurred if they repaired the damaged home. Relying on material provided regarding the Council’s requirements, the applicants assert this i s not merely “repairs and routine maintenance to an existing building” which may not require a permit. The applicants assert reinstating the home would have still incurred a planning permit because of the Council’s requirements. In this regard, the applicants rely on material from the local council which describes “significant damage” to the home, material from their builder which says, “more than 50% of the house would need to be repaired” and material from the FSP’s builder saying, “the property is a total loss.” The FSP says the response from the council is unclear. It says if these costs were required if the damaged home was repaired, then they would have been identified by one of the many builders, consultants or engineers who provided reports to the parties about the repair of the damaged home. Relying on extracts from Council website, the FSP says the location of the new building is different to the location of the damaged home. Therefore, it says certain Case No: 475139 Determination Page 9 of 13 trees are of notable consideration in relation to construction of the new home which are not in the immediate vicinity of the damaged home. The FSP submits these costs would not have been incurred if the location and size of the home had not been changed. The FSP reiterates if these costs are to be incurred with rebuilding the damaged home in its current location or a new home with the same footprint as the damaged home then it will review the costs. The applicants also rely on the bushfire management statement which says there needs to be 32m of defendable space. They say had they repaired the damaged home, they still would have incurred the cost of removing the trees to create defendable space (and may have incurred more costs because of the density of south facing vegetation). They say the costs could not have been identified by anyone previously because the bushfire management statement only came into effect on 3 October 2017. The FSP says if a homeowner could extend an existing property up to 50% in size without requiring a planning permit under the bushfire management overlay, then the rebuild of the existing home would not attract the requirements of a planning permit and the associated costs. The applicants say this was an unusual application as more than 50% of the house was to be repaired due to severe tree damage. Therefore, this is not classed as an extension but a reconstruction of a damaged home which was not liveable. The FSP also relies on amounts it has already allowed when it accepted the applicants’ quotation for repairs. However, ha ving considered the preliminaries in the applicants’ quotation, I am satisfied the only possible relevant item is the planning application in the small sum of $180. At least 50% of the home was damaged by tree impact Having reviewed the available material, I accept local council requirements and the bushfire management statement place certain obligations on building works in relation to the removal of trees and removal of vegetation. I accept the bushfire management statement came into effect in October 2017. I also accept the applicants would require a permit even if they repaired the existing home as the repairs are not “routine maintenance.” I am also satisfied even if the applicants had repaired the damaged home, the Council requirements would have applied as I accept at least 50% of the home was damaged. This is not only because of the material relied on by the applicants as set out above but also because the original sum insured was $285,375 and the FSP accepts nearly $200,000 is required to repair the damaged home. Although the bushfire management overlay sets out that an exemption from applying for a planning permit may apply if there is an extension to an existing home less than 50% of the existing floor area, nonetheless, the overlay says a homebuilder must also check with local council to confirm if exemptions apply. Case No: 475139 Determination Page 10 of 13 Having considered the available material from the local council, I am not satisfied exemptions would have applied. Having considered the photographs and aerial views of the property, I accept trees would have had to have been removed in any event. The FSP is to pay to the applicants $15,554.84 and interest The FSP has not challenged the quantum of the amount claimed by the applicants. In the circumstances I am satisfied it is fair the FSP pay to the applicants $15,554.84. Statutory interest is also to be paid from the date these amounts were paid until the date of settlement. Case No: 475139 Determination Page 11 of 13 3 Supporting information 3.1 FOS Approach It is an accepted principle of general insurance law that an insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. 3.2 Relevant policy extracts The relevant policy extracts are referred to in the recommendation a nd in the FSP’s Notice of Response dated 12 April 2017. Both the policy document and the Notice have been exchanged with the applicants. Term Key points Definitions insured event - any of the listed events in Part 1 of this PDS (on pages 8 to 11) against which you are covered for damage, destruction or theft. Insured events Impact at the home caused by:  any motor vehicle, aircraft, watercraft or spac e debris  an object falling from an aircraft or motor vehicle  a falling tree or branch  an aerial, mast or satellite dish which breaks or collapses  a n animal or bird. We will also pay the reasonable cost of removing the item that caused the damage to your home. Removal of debris and extra costs of rebuilding when we insure your home and/or contents When your home is damaged by an insured event we will pay the reasonable and necessary costs involved to:  remove home debris caused by the damage  demolish the home or any  parts deemed to be uns afe and unrepairable  secure the home if it is not habitable. We will also pay for:  reasonable fees for the se rvices of an architect, surveyor or engineer if necessary  building application fees in connection with rebuilding or repairing the home. The most we pay for these costs is shown in Part B . We will pay up to:  10% of the home sum insured, or  10% of your con t ents sum insured We will pay this amount in addition to your total sum insured. Temporary accommodation costs when we insure your home and/or If your home is not fit to live in following loss or damage by an insured event, a nd we have agreed to pay your claim, then we will pay the cost of reasonable and appropriate temporary accommodation for you, your family and your household pets, while your home is being repaired or rebuilt. If you are a tenant, we will pay the cost of reasonable and approp riat e Case No: 475139 Determination Page 12 of 13 contents temporary accommodation for you, your family and your pets, while your home is being repaired or rebuilt. We will deduct your us ual rental expenses from the amount we pay. The most we pay for these costs is shown in Part B What is not insured: Temporary accommodation costs:  beyond the reasonable time it takes to rebuild or repair the part of your home that was damaged, or beyond 12 months from the date the damage occurred, whichever period is shorter.  if we determine that your home is habit able  if you do not need to pay for alternate accommodation  if you were not living in the home, unit, townhouse, apartment or villa at the time of the loss or damage  if you do not intend to repair or rebuild the home. We will cease to pay these costs if you delay the claim or any reinstatement work. We will pay up to:  10% of the home sum insured, or  10% of your cont ents sum insured The amount we pay will be bas ed on the weekly rentable value of your home, or your weekly rental expense under your current l eas e agreement when you are a tenant. We will pay this amount in addition to your total sum insured. How we settle claims If we agree to pay a claim for loss, theft or damage to your home, contents or personal effects, we will decide whether to:  repair the damaged property to the same standard, specification or quality as it was when it was new, or  replace the damaged property with the nearest equivalent property available, or  pay you the amount it would cost us to repair or replace the property to "as new" condition. The cost to us is:  the retail price of an item less any trade discount we are entitled to, or  the cost to us to repair or replace the property, allowing for any trade discount we are entitled to. We reserve the right to choose the repairer or supplier to be used. When it is not possible to repair or rebuild your property with original materials, we will use the nearest available equivalent to the original materials. We will pay to repair or replace internal blinds or curtains, ca rpets or other floor coverings but only in the same room, hallway or passageway where the loss or damage occurred. When an item is part of a pair, set, system or collection we will only pay for repair or replacement of the item that has been lost or damag ed. The most we will pay is the value that the item has as a proportion of the combined pair, set, system or collection. We will not pay:  to rebuild or repair undamaged property in order to achieve a match with repaired or replaced property  any additional costs to replace materials that are not damaged  for any decrease in the value of any pair, set, system or collection. Case No: 475139 Determination Page 13 of 13 3.3 Other relevant material considered and relied on  Parties’ submissions, emails , photographs, FSP claim file notes, floor plan, parties’ engineers’ reports, assessors’ reports, scopes of works, quotations, invoices, costings of repairs, material from local Council, bushfire management statement and all attachments to all submissions both before and after the recommendation.  Correspondence between the parties.