Determination 474014
Storm water damage to timber floors declined under faulty design exclusion
Summary
The applicant's home was flooded by storm water in December 2014 and the FSP denied the claim for the timber floors as caused by faulty design. AFCA found the storm was the cause of the main water entry and ordered the FSP to settle the claim per the builder's quotation, with interest if cash settled.
The FSP bears the onus to prove an exclusion, and its engineer's conclusion rested on incorrect timing assumptions, so the faulty design exclusion did not apply to the main water entry.
Issues
- Claim denial primary · upheld
“I am not satisfied that the FSP has established that the water entry to the southern end of the property was caused by faulty design or workmanship.”
- Inadequate claim investigation secondary · upheld
“The key findings in IC's report were based on incorrect assumptions about when the gap was closed off.”
Subjects and remedies
home or building damagepay claimpay interest
Text of the determination
Determination
Case No: 474014 Determination Page 1 of 7
Case number: 474014 28 February 2018
1 Overview
1.1 Dispute
The applicant lodged a claim under his home insurance policy with the financial
services provider (FSP) for water damage to the timber floors at his property,
following a storm in December 2014.
The FSP denied the claim on the basis that the damage was not caused by the storm
but by faulty design and workmanship, which is excluded from cover under the policy.
The applicant disputes the F SP’s decision and seeks cover for the cost of replacing
the timber floors (estimated at approximately $113,000).
1.2 Issues and key findings
Is the FSP liable for the damage to the floors?
Based on the available information, the applicant has established a prima facie claim
for damage to the timber floors caused by water entry during the storm in December
2014.
The FSP has not established that the water entry to the southern end of the building
(which resulted in the bulk of the damage) was caused by faulty design and
workmanship.
Accordingly, the FSP is liable for the damage to the timber floors .
1.3 Determination
This determination is in favour of the applicant.
The FSP is required to settle the applicant’s claim in accordance with the terms of the
policy and the scope of works and quotation provided by its builder (JL) in January
2015.
If the claim is cash settled, the FSP is to pay interest on the settlement amount at the
rate calculated in accordance with section 57 of the Insurance Contracts Act 1984
(Cth) from 3 April 2017 until the payment date.
Case No: 474014 Determination Page 2 of 7
2 Reasons for determination
2.1 Is the FSP liable for the damage to the timber flooring ?
Policy provides cover for storm damage subject to exclusions
The applicant has the onus of establishing that, on the balance of probabilities, he
has suffered a loss caused by an event insured against under the policy. This is
known as a valid (or prima facie ) claim.
If the applicant is able to establish a prima facie claim, then the onus shifts to the
FSP to show that, on the balance of probabilities, it is entitled to rely on an exclusion
under the policy or is otherwise entitled to deny the claim.
The applicant’s policy provides cover for the insured events listed in the policy,
subject to the conditions and exclusions set out in the policy. The insured event of
storm includes cover for damage caused by the sudden, excessive run-off of water
as a direct result of a storm in the local area.
Applicant has established a prima facie claim for storm damage
The applicant says his home was inundated with water as a result of intense rainfall
during a storm on 7 December 2014. He says rainwater banked up against the rear
walls to a height of 70 to 80 centimetres, before entering the rumpus room at the
southern end of the property.
The applicant has provided photographs and video footage which show the floors at
the property covered in water during the storm. The FSP’ s engineer (IC) confirmed
that the timber floors had suffered water damage.
On this basis, I am satisfied that the applicant has established a prima facie claim
under the policy for storm damage to his property.
In these circumstances, the FSP is required to show that, on the balance of
probabilities, it is entitled to rely on a policy exclusion to deny the applicant’s claim .
FSP seeks to rely on exclusion for faulty design and workmanship
The FSP says it is not liable for the damage to the timber flooring because the policy
excludes cover for damage caused by faulty design and workmanship.
The FSP says the water damage to the floors occurred due to the design of the home
– in particular, the fact that the floors were below the external ground levels and there
was insufficient drainage.
In order to be entitled to deny the claim on this basis, the FSP is required to show
that the proximate cause of the damage was the faulty design of the home.
It is well established at law that the proximate cause of a loss is not necessarily the
first (or the last) or the sole cause of the loss. It is the effective or dominant or
operative cause.
Case No: 474014 Determination Page 3 of 7
In any particular case, the proximate cause of the loss is a question of fact to be
determined based on the surrounding circumstances. Where there are several
causes operating, each must be examined for the qualities of predominance and
efficacy in relation to the resultant damage.
FSP’s building consultant says damage was caused by faulty design
After the applicant lodged his claim, the FSP appointed a builder (JL) to inspect the
damage. JL attended the property on 9 December 2014 (two days after the storm)
and confirmed there was water damage to the floors in the rumpus room and store
room.
When the applicant expressed concern that the damage was worsening, the FSP
arranged for JL to re-attend on 15 January 2015, together with a flooring expert.
The flooring expert confirmed that the damage extended to other areas of the
flooring. He recommended that the flooring should be replaced throughout the entire
open plan area on the ground floor.
Following his second inspection, JL raised concerns that the damage may have
occurred due to the manner in which the house had been designed. He also noted
that a section of the lounge room floor had previously been removed and replaced.
JL advised that, since his initial inspection in December 2014, the applicant had
taken steps to improve the drainage at the rear of the house. However, JL
considered the issues arising from the external ground levels and lack of drainage
required further investigation.
After reviewing JL’s report, the FSP appointed a building consultant (IC) to determine
the cause of the damage to the timber floors.
IC concluded that during the storm, water had entered the property through the
southern wall of the games room due to inadequate site drainage.
In his report, IC advised that:
the rumpus room and adjacent areas were susceptible to drainage issues, due
to these areas having been constructed by cutting into the sloping earth of the
site
the relative height of the concrete slab (as compared to the surrounding earth)
meant there was a risk that water would build up around the southern end of the
building to heights above the floor level of the rumpus room.
IC observed that, despite this risk, the existing drainage arrangements would
generally have been sufficient to cope with ordinary rainfall events , as the external
tiles were graded away from the building and stormwater run-off could discharge into
the drainage system around the swimming pool.
However, IC noted that building works had been undertaken to close off a small gap
which previously existed between the cladding of the corner of the house and the
wall of the external pool room.
IC considered that the closing off of this gap meant that it was no longer possible for
stormwater run-off to discharge onto the paving beside the pool. This meant that the
Case No: 474014 Determination Page 4 of 7
water was effectively dammed, allowing it to build up above the height of the bottom
plate and inundate the floors.
As well as the water damage to the floors at the southern end of the property, IC
identified an additional area of damage at the northern end of the dining room.
IC concluded that this damage had been caused by water entering through the wall
where the external cladding had been removed and a section of the external
concrete block wall had been demolished. The applicant has subsequently advised
that these changes were undertaken in October 2014, in preparation for the
construction of an alfresco area.
Key findings in IC’s report were based on incorrect assumptions
As outlined above, IC concluded that the water entry to the southern end of the
property had occurred because the gap between the house and the pool room had
been closed off, with the result that the pre-existing drainage arrangements were no
longer adequate.
The photographs included in IC‘s report confirm that the relevant area had been
blocked off with steel framing and covered with blue board.
When IC inspected the property in February 2015, he assumed that the gap had
been closed off before the storm on 7 December 2014.
However, the applicant has provided a report from his builder (ST) which states that
these works were not carried out until several days after the storm. The applicant has
also provided an invoice from a sub-contractor which refers to the installation of blue
board sheeting in the days following the storm.
Following the issue of the FOS Recommendation, the FSP provided further
comments from IC in which he challenged the timeline of the works as being illogical.
However, in doing so, IC acknowledged that he had not reviewed the supporting
documents provided by the applicant.
The information provided by the ap plicant’s builders indicates that the closing off of
the gap could not have been responsible for the inundation to the southern end of the
property which occurred during the storm.
The FSP has not provided any information which directly contradicts the timeline
provided by the applicant and his builders. Given the FSP’s builder (JL) inspected the
property on 9 December 2014, he should have been able to confirm the condition of
the property at that time.
However, the FSP has not provided a copy of JL’s repo rt from that date and/or any
photographs which may have been taken during his inspection.
FSP cannot rely on policy exclusion for faulty design
As outlined above, the FSP’s building consultant (IC) considered the closing off of the
gap was the key factor which rendered the existing drainage arrangements
inadequate.
Case No: 474014 Determination Page 5 of 7
In circumstances where the applicant has shown these works were not undertaken
until after the storm, it is not appropriate to rely on IC’s conclusion that the damage to
the timber flooring was caused by faulty design.
In additional submissions provided by the FSP following the FOS Recommendation,
IC advised that:
his inspection of the property in February 2015 revealed significant issues,
including timber decay, termite activity and grossly inadequate site design
he considered the property was subject to ongoing drainage issues (as
demonstrated by the fact that it had been sold four times in twelve years)
the fact that the applicant had taken steps to improve the drainage after the
storm in December 2014 confirmed that the drainage was inadequate prior to
that time.
I have carefully considered the additional submissions provided by the FSP.
However, I am not satisfied that the views expressed by IC accurately reflect his
initial findings following his site inspection in February 2015 (as reflected in his report
prepared at the time).
Further, the fact that the applicant took steps to improve the drainage does not of
itself establish that inadequate drainage was the proximate cause of the loss.
For the reasons outlined above, I am not satisfied that the FSP has established that
the water entry to the southern end of the property was caused by faulty design or
workmanship.
However, having carefully reviewed the available information, I do consider that the
damage to the northern end of the dining room was caused by faulty design and
workmanship (namely, the removal of the wall cladding and external block wall).
The photographs included in IC’s report confirm that there was advanced decay to
the bottom plate and studs in this area, consistent with exposure to the elements
over a period of time.
The water damage to the timber floorboards at this location is consistent with water
having penetrated into the timber framing and flooring through the exposed area.
FSP is liable for replacement of flooring
For the reasons outlined above, the FSP is not entitled to deny the claim for damage
to the timber flooring as a result of water entering through the southern end of the
property during the storm.
The reports provided by the FSP’s consultants confirm that, while the damage was
initially localised to the rumpus room and store room, it subsequently spread along
the passage way and into the dining room. IC noted that, once water had penetrated
the framing, it would be taken up by the flooring.
The FSP’s flooring contractor recommended that the entire flooring to the ground
floor open plan area be replaced.
Case No: 474014 Determination Page 6 of 7
This is consistent with the ‘matching’ provisions of the applicant’s policy, which
provide that the FSP will replace all of the flooring in the part of the house that is
damaged (but will not replace flooring in adjoining rooms).
On this basis, I am satisfied that, the damage caused by water entering through the
southern wall was sufficient to necessitate the replacement of the flooring throughout
the ground floor area.
Accordingly, the FSP is liable for the replacement of all of the flooring (even though
the additional water damage to the far northern end of the dining room was caused
by factors which are excluded from cover under the policy).
The FSP obtained a scope of works and quotation for the replacement of the flooring
from its builder (JL) in January 2015. In May 2017, the applicant confirmed that these
documents had been reviewed by his builder and remained appropriate.
On this basis, I consider the FSP should be required to settle the claim in accordance
with JL’s quotation (by appointing a builder to undertake the repairs or cash settling
the applicant for the amount of the quotation).
If the claim is cash settled, the FSP is to pay interest on the settlement amount at the
rate calculated in accordance with section 57 of the Insurance Contracts Act 1984
(Cth) from 3 April 2017 until the payment date.
Case No: 474014 Determination Page 7 of 7
3 Supporting information
3.1 FOS approach to this dispute
This dispute was the subject of a recommendation issued on behalf of the Financial
Ombudsman Service (FOS) on 17 July 2017. The recommendation was rejected by
the FSP.
This dispute has been determined based on what is fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous FOS decisions (which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered (whether or not it is expressly referenced in this determination).