Home / Financial Firm (Unknown - Insurer) / Determination 473109

Determination 473109

Scope of fire-damaged concrete slab replacement

FirmFinancial Firm (Unknown - Insurer)
Decided2018-06-14
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$192,353
Non-financial loss—
Amount claimed$189,924
SourceAFCA PDF

Summary

After a house fire, the applicant disputed the FSP's cash settlement, which repaired only part of the concrete slab, and claimed extra temporary accommodation. AFCA ordered the FSP to pay the quoted slab replacement cost plus up to $3,000 professional costs, and rejected the accommodation claim.

The weight of expert evidence showed the slab needed removal and replacement to restore its pre-fire condition, and the FSP's engineer did not address council approval risks.

Issues

Subjects and remedies

home or building damagepay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 473109 Determination Page 1 of 11 Case number: 473109 5 June 2018 1 Overview 1.1 Dispute The applicant lodged a claim with the financial services provider (FSP) after his home was severely damaged by fire on 4 July 2014. The FSP accepted the claim and on 24 July 2015 the applicant signed a deed of release for the building damage for $460,000 The release was subject to a condition that if the applicant noticed the concrete slab has more damage than the engineer had originally advised that the FSP would review this and give consideration to additional payments. The FSP accepts that there is additional damage but says only the rumpus room slab needs to be replaced. The applicant says that the entire slab needs to be replaced. He has provided a quotation from his builder CR of $189,353.21. The applicant also says the FSP failed to pay $571 for temporary accommodation that had previously been agreed to. 1.2 Issues and key findings Is the FSP liable to replace the concrete slab? The panel is satisfied the FSP is liable to meet the costs of replacing the concrete slab as quoted by the applicant in the sum of $189,353.21. Is the FSP liable to pay additional temporary accommodation? No, the panel is satisfied the FSP has met its obligations with respect to the temporary accommodation. Is the applicant entitled to professional costs? The applicant is entitled to be paid for the professional costs incurred in the course of this dispute pursuant to Paragraph 9.4 of the Terms of Reference. 1.3 Determination This determination is in favour of the applicant. The FSP is to pay the applicant $189,353.21 to cover the cost of removing and replacing the slab as per the quotation provided by CR. Further the FSP is to contribute up to $3,000 towards the professional costs incurred by the applicant in the course of this dispute pursuant to paragraph 9.4 of the TOR subject to the applicant providing the relevant invoices. The FSP is not liable for the additional temporary accommodation claimed. Case No: 473109 Determination Page 2 of 11 2 Reasons for determination There has been a full exchange of material between the parties and each party has had the opportunity of addressing the issues that arise from the material exchanged. Due to the complexities involved in this disp ute, it has been referred to a panel for determination. This determination follows consideration of all of the information exchanged and is based on what is fair in the circumstances, having regard to the relevant legal principles, terms of the policy, good industry practice and where applicable, prior determinations. Whilst the panel has considered all of the material exchanged, only that material relevant to the final outcome will be referred to within the determination. 2.1 Is the FSP liable to replace the concrete slab? Initial settlement did not include replacement of the concrete slab There is no dispute that the applicant‟s property was severely damaged by fire on 4 July 2014. The FSP accepted the claim and paid the applicant temporary accommodation payments for the period 3 July 2014 to 17 July 2015 totalling $34,636 and contents damage of $156,903.75. On 24 July 2015 the applicant signed a deed of release with respect to the building damage for $460,000. A note attached to the release provides that the release is subject to a condition that if the insured notices the slab has more damage than the engineer had originally advised, the FSP is to review the position and give consideration to „additional payments‟. The FSP‟s cash settlement was based on a quote by its engineer SE who indicated that the only area of the house that needed repair to the concrete slab is a rumpus room. He proposed repair method was to grind 25mm (a later depth of 30mm is mentioned) of the surface of the damage slab and to re-lay a reinforced concrete section on top of the ground down slab. Expert evidence differs regarding extent of damage to the slab The applicant disputes this repair solution recommended by SE on two counts namely:  His expert advice from his engineer AB does not support the FSP‟s repai r method.  He believes the entire concrete slab needs replacement. He has provided expert evidence in support of this. There is no doubt that the concrete slab contains cracking right throughout the slab but more severe cracking is evident in the rumpus room where the heart of the fire occurred. Photos provided clearly show that the rumpus room has an obvious scorch mark on the slab in addition to visible cracking. Case No: 473109 Determination Page 3 of 11 SE in a report on 20 January 2016 commented in relation to the damage to the slab that „as the cracks are unlikely to extend significantly below the surface‟ and further „… on polished floor area remove top 30mm. This is deemed to be acceptable as the assumed depth of steel reinforcement will be below this level.‟ There is no suggestion in these comments that SE had conducted any further testing nor do these statements present a compelling argument in support of the FSP‟s position that it should not replace the slab. The report appears to rely on the assumptions made as to the depth of the steel reinforcements. In a later report dated 17 August 2017 SE agreed the rapid cooling effect on the concrete slab in the rumpus room after the fire or during the firefighting operations is likely to have induced thermal shock and this would have contributed to some of the visible cracks on the surface. However, SE considered the low thermal diffusivity of the concrete would limit this thermal cracking to the surface. Repairs were required to the fire damage side in the rumpus room but SE did not believe the remaining parts of the slab had been directly affected by the fire. T he applicant‟s engineer AB conducted a visual inspection of slab on 23 October 2015 along with hammer testing. He observed extensive cracking in the foundation slab in addition to some blackening of the concrete. Consistent with SE, AB considered it very likely that a proportion of the visible cracking was due to thermal effects when the slab surface cooled after the fire and/or during the firefighting operations. AB also considered it likely there would have been general slab contraction cracking as the overall foundation element cooled after the fire. However, AB considered once a crack had been initiated within concrete, the tensile strength across that crack would be zero, and general slab movements would therefore be concentrated at these locations. The extensive cracking in the rooms adjacent to the main fire area was likely to be problematic for rigid floor coverings such as tiles due to a high risk of reflective cracking. AB believed the removal and replacement of the concrete slab in all affected areas is the only definitive method of ensuring the slab crack performance was returned to its pre-fire condition. This view is supported by opinions provided by the applicant from his builder CR and architect builder BJ. CR in a report dated 14 February 2018 considered it was inevitable that there would be damage from the intense heat to the underground services and concrete reinforcement. He considered these would have expanded fracturing the slab and compromising the integrity of the building central supporting structure. BJ in a report on 16 April 2018 also considered the slab would require replacement due to the serious challenges associated with performing a rebuild on the existing slab. BJ said this was because:  there is extensive cracking and scorch stains apparent in several places,  there is heat damage to the damp proof plastic throughout,  the cracks will provide entry points for termites,  there is deterioration and the concrete appears brittle in parts, Case No: 473109 Determination Page 4 of 11  the existing plumbing will be heat damaged,  council approval to rebuild on the existing slab will be an issue,  he would not be able to provide the necessary required guarantees. Evidence indicates slab requires removal and replacement The panel prefers the opinion of AB, CR and BJ over SE. The panel is persuaded given the concrete slab forms the foundation of the building, by AB‟s opinion that the only definitive method of ensuring the concrete slab performance is returned to pre-fire condition is to remove and replace the concrete slab. The panel is satisfied the weight of the expert evidence indicates the slab requires replacement. These reports highlight the possible damage to the services contained within the slab and the risk of Council approval not being given to rebuild in circumstances where the slab has been subject to a significant fire event. SE does not appear to have considered potential issues with Council approval. Additionally, the FSP has provided no new evidence to question the applicant‟s most recent reports. T he FSP‟s own builder, CS, based its quote on the consultant‟s scope of works noting “should additional repairs be required further costs will apply”. Additionally, CS no ted there was “a probability Council requirements may alter Engineering, which will require changes to the original design and building method on which this quote is based”. Given the significant financial risks to the applicant, including the likelihood the concrete slab will not be considered safe to rebuild on by Council, the FSP should bear the cost of the removal and replacement of the slab. CR provided costings on all the works he considered necessary, which included:  Removal of fire damaged house foundation and rejuvenation of trenches in accordance with Council Development Act = $71,819.00 incl GST.  Excavation of footings and reinstate original foundation, installation of underfloor services, connecting into the mains junctions in accordance with Council Development Act = $66,182.71 incl GST.  Reinstatement of paths and driveway due to demolition and use of heavy traffic machinery = $28,462.50 incl GST.  Demolition and disposal of fire damaged house structure from site = $22,889 incl GST. The applicants quotes for the removal and replacement of the slab including ancillary costs total $189,353.21. These were not disputed by the FSP. The panel notes the applicant‟s property was insured for $708,004 at the time of the fire. By paying this additional amount on top of the $460,000 already paid, the cash settlement amount remains under the total sum insured. Case No: 473109 Determination Page 5 of 11 2.2 Is the applicant entitled to compensation for professional costs? Paragraph 9.4 of the Terms of Reference that FOS may determine an FSP contribute up to $3,000 towards professional costs incurred by an applicant in relation to the dispute. The applicant has incurred professional costs in obtaining the reports in support of his claim. The panel is satisfied that these reports were necessarily obtained in order to assist the applicant in the dispute and assess the extent of the applicant‟s loss. In the panel‟s view, it is fair that the FSP contribute up to $3,000 to the applicant‟s costs in obtaining those reports subject to the applicant providing the releva nt invoices. 2.3 Is the FSP liable to pay additional temporary accommodation costs? The applicant has claimed $571 by way of temporary accommodation costs, but has provided little information as to the basis of that claim. The applicant associates the payment with an additional two weeks rental costs over and above the policy term due to delays in the FSP paying the agreed settlement in 2015. According to the applicant he was to be paid temporary accommodation until the settlement monies were paid. The applicant supports his claim by reference to his bank records showing the late payment of the $460,000 and a subsequent payment of $1,000, He admits he has no record of the actual agreement to continue to pay the temporary accommodation. The FSP has paid the applicant temporary accommodation expenses from 3 July 2014 to 17 July 2015 in the sum of $34,636. The policy limits temporary accommodation to 12 months. The payments exceed the policy limit. Based on the available information, unless there was a specific agreement between the parties for an additional payment over and above the $34,636 (which has not been disclosed to FOS by either party), then the panel is satisfied that the FSP has met its liability with respect to payment of temporary accommodation costs in accordance with the terms and conditions of the policy. Case No: 473109 Determination Page 6 of 11 3 Supporting information 3.1 Key documents Record Key points FSP’s engineer (FM) Report 08 - 12 - 2014  Based on the results of the hammer test the concrete at the centre of the lounge has been damaged as a result of the fire.  Approximately 2.0m2 of concrete has been affected and will require repair.  The pavers have been damaged during installation of the t emporary shoring. When the shoring is removed, it is likely the drill holes can be repaired. However, if the surface has chipped, it is probably the paving will require replacement.  The cracking to the top courses of the retaining wall are not as a result of ex pansion caused by the fire. These cracks have been caused by differential movement between the exposed top two courses and the sheltered masonry at the south fac e of the wall. FSP’s Builder (CS) Quote 29 - 04 - 2015  $424,462.05  Damage has occurred to all rooms at this property where ceilings, walls and timbers are smoke and fire affected, requiring repair work.  Quotation based on the attending consultants scope of works and should additional repairs be required further costs will apply.  There is a proba bility Council requirements may alter Engineering, which will require changes to the original design and building method on whic h this quote is based.  We have allowed for the professional cleaning of all surfaces in our quotation, however should these area s not respond to cleani ng additional costs will apply. FSP’s engineer (SE) Report 20 - 01 - 2016  Based report by AB dated 10 December 2015 I am of the  understanding that a fire event occurred within the dwelling of [address]  E xtensive cracking over the founding concrete slab was subsequently attribut ed to thermal effects of the fire.  AB discussed the problematic issue that the tensile strength has reduced to zero across various cracks in the slab. With reference to their photograph one and two, all crack ing is of a hairline nature. Whilst at surfac e the tensile strength will be zero, just below surface the slab will offer full tensile capacity. As the cracks are unlikely to extend significantly far below the surface, the degree to which the cracks can ope n up is negligible as it is a function of the crack depth.  As per AB , all new ceramic tiled floor coverings can be installed on the proviso that a suitable flexible mortar bed is adopted. It is essential to note that all tiled floor coverings must be inst alled wit h control joints at approved centres as Case No: 473109 Determination Page 7 of 11 outlined in Australian Standard AS 3958.1: Guide to the installation of ceramic tiles.  Discussion was then made about the polished concrete floor areas. To obtain an appearance that is similar to the conditi on of the slab prior to the fire event it is required that the top section of the slab be removed. AB recommended the top 30mm be removed. This is deemed to be acceptable as the assumed depth of steel reinforc ement will be below this level. An approved epo xy bonding agent may then be applied wit h a new high strength concrete topping slab. It is important that the new topping slab be installed with control joints at centres approved by the concret e contractor. Typically these joints are installed at 3.0m cen tres or across doorways. Isolation joints must also be installed where necessary.  The Insured must be made aware that it is impossible to guarantee that minor hairline cracking may not occur in the future, even with the installation of control and isolati on joints.  Referenc e was also made by AB to the possibility of the introduction of a defined grouting process during the polishing process. This method is deemed to carry the greater  risk of failing to prevent the appearance of cosmetic cracking and is the refore not considered to be an appropriate method of repair. FSP’s engineer (SE ) Report 17 - 08 - 2017  Conc rete loses residual strength when exposed to temperatures in excess of 300 degrees and is unlikely to possess any useful structural strength if it has been subjected to temperatures above 500 degrees.  Conc rete is also a poor (low) thermal conductor so high temperatures will initially be confined to the surface layer with the interior concrete remaining cooler. The internal temperature of a concrete slab would eventually increase for elements exposed to a fire for a long duration.  A change in concrete c olour and surface spalling is also indicative of a concrete surface that has been exposed to high temperatures.  In the main fire affected area (the rumpus room), the charring of the timbers, minor changes in concrete colour and minor localised spalling on the surface of the conc rete indicate the concrete slab in this area ex perienced temperatures in excess of 300 degrees during the fire event which will have affected the concret e slab. Hammer tests carried out by engineer F also confirm the strengt h of the concret e in the middle of the room has been affected relative to the rest of the slab in the rumpus room.  Agree with App‟s engineer AB that the rapid cooling effect on the concrete slab in the rumpus room after the fire or during the firefighting operati ons has also likely to have induced thermal shock on the slab thus contributing to some of the visible cracks on the surfac e. However, the low thermal diffusivity of the concrete would limit this thermal cracking to Case No: 473109 Determination Page 8 of 11 the surface.  The concrete floor in the rumpus room has been directly affected by the fire event but not the rest of the property as the temperatures in the roof level would have been more than 300 degrees but substantially less at the slab level given the lack of fire damage to timbers and othe r flammable items at floor level. Strength of the concrete slab other than rumpus room has not been reduced by effects of fire.  Would have expected to see cracking in floor tiles or joints if entire slab affected by thermal shock.  Extensive cracking in th e slab is not attributable to the fire event. Cracking mainly due to long term shrinkage of the concrete, however, due to the extent of the cracking also have concerns around quality of the original slab design and construction.  Conc rete repairs are requi red to the fire damaged slab in the rumpus room. The type of repair would include a patch repair to the slab in the middle of the room and surface concrete repairs to the rest of the slab in the rumpus room. The slab would have had some cracking prior to t he fire event and therefore there is a risk of cracking re - appearing in the repaired rumpus room slab.  With regard to the rest of the house, the slab has not been directly affected by the fire event and therefore no fire repairs are required.  The concrete floor slab in the rumpus room has been directly affected by the fire event resulting in fire damage to the surface of the slab and additional cracking due to thermal shock.  However, the extensive cracking in the ground floor slab in the rest of the proper ty is not attributable to the fire event but is due to long term shrinkage of the concrete which has been exacerbated by the poor quality of the original slab design and construction. Applicant’s engineer ( A B) Technical memo 04 - 03 - 2016  Property impacted by fire which has affected the concret e slab. Previous engineering assessment concluded severe fire damage had occurred.  Following removal of floor coverings in adjacent rooms extensive cracking was observed in the foundation slab in add ition to some blackening of the concrete in a local area.  Visual inspection of slab on 23/10/15 along with hammer testing.  Very likely that a proportion of the visible cracking is due to thermal effects as the slab surface cooled after the fire and/or dur ing the firefighting operations, where water is likely to have rapidly cooled the surface compared to the lower concret e layers.  Also likely to have been general slab contraction cracking as the overall foundation element cooled after the fire.  No substan tial reductions in concrete strength were apparent Case No: 473109 Determination Page 9 of 11 from the limited investigation between rooms a further distance from the main area of the fire area compared to rooms adjacent to the main fire area.  Once a crack has been initiated in concrete the concre te‟s tensile strength across the crack is zero and general slab movements will therefore be concentrated at these locations.  Extensive cracking in the rooms adjacent to the main fire area are likely to be problematic for rigid floor coverings such as tiles due to a high risk of reflective cracking. Additional measures to accommodate slab movements therefore recommended.  Cracking likely to remain highly visible in polished concrete – options available to minimis e but will not provide high level of confidenc e that reflective cracking would not continue.  Removal and replacement of the concrete slab in all affected areas is the only definitive method of ensuring the slab crack performance is returned to an as - built condition. FSP’s engineer (SE ) Report 23 - 11 - 2017  For the purposes of the rest of this report we have assumed the slab in the rumpus room (c onverted garage) was built in accordance with the preliminary recommendations .  The reference to F72 is for mes h reinforcement which comprises of 6.75mm diamete r steel wire at 200mm cent res in each direction. This mesh is now known as SL72 and is typically specified as top reinforcement in 100mm thick slabs in stiffened rafts up to 18m long.  Repairs that involve removing the top 30mm of concrete will expose the F 72 mesh and will therefore compromise the overall structurally integrity of the slab as it will be very difficult to place new mesh and bond into the remaining concrete.  The work required to carefully remove 30mm of concrete will also be considerable and after further consideration we recommend that the damaged slab in the rumpus room is removed and replaced with a new slab to AS2870 Residential Slabs and Footings.  The new slab should be bonded to the existing slab with a dowelled movement joint. App’s builder (C R ) Quote/report 14 - 02 - 2018  Owner engaged to collate relevant information to assist in providing expert costing and building advice, collaborating council correspondence and mandatory authorizing documents ensuring reparation in accordance with Council‟s approval procedures.  The removal of the existing fire damaged house foundations will require alternative method of desconstruct which may not meet BCA or NCC performanc e requirements, the Act or regs.  Owner has expressed concern that stability of foundation has been weakened due to the intensity of the fire, which is showing signs of excessive structural fracturing of the slab face. Case No: 473109 Determination Page 10 of 11  Inevitability of unfavourable damage from the intense heat to the extent of damaging the underground services and co ncrete reinforcement, which would have expanded, fracturing the slab, compromising the integrity of the buildings central supporting structure thus leaving owner unaware of plausible ramifications.  Report takes into account the required procedures needing submission to council so the owner is compliant with council requirements within this particular application and circumstance.  Quote: removal of fire damaged house foundation and rejuvenation of trenches in accordance wit h Council Development Act $71,819 .00 incl GST.  Quote: excavate footings and reinstate original foundation, install underfloor services, connecting into the mains junctions in accordance with Council Development Act $66,182.71 incl GST.  Quote: reinstate pat hs and driveway due to demolition and use of heavy traffic machinery $28,462.50 incl GST.  Quote: demo and disposal of fire damaged house structure from site: $22,889 incl GST. App’s architect builder (BJ) Letter 16 - 04 - 2018  A full rebuild on the existing slab would provide serious challenges .  Cracking is extensive and scorch stains apparent in several places.  The damp proof plastic will be heat damaged throughout.  The cracks will provide ent ry for termites.  The reinforcement will have some deterioration and the concrete appears brit tle in parts.  Existing plumbing will be heat damaged and evidence of melted motor vehicle parts show the intensity of the fire in some areas.  Believe council approval to rebuild on the existing slab will be an issue.  Would not be able to provide the neces sary required guarantees should a rebuild be constructed on the existing slab. FSP’s Product Disclosure Statement (PDS)  Page 82 – How we settle a claim Building claims If we agree to pay your claim, we will decide whet her to:  Repair or rebuild the damage d part of your building  Replace your building  …  Pay you the amount we determine to be the reasonable cost of repairing or rebuilding the lost or damaged part of your building up to the sum insured stated on your certificate of insurance. Case No: 473109 Determination Page 11 of 11 3.2 Other matters The applicant‟s submission prepared by CR included damage caused to a neighbouring property as a result of fire damaged items lifting off in a subsequent storm event. The applicant has been advised these issues will not be considered as part of the current dispute (as they were not noted when the dispute was lodged) and that he will need to raise these separately with the FSP.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.