Home / Financial Firm (Unknown - Insurer) / Determination 472655
Determination 472655
Cyclone Marcia and leaking pipe movement damage claim partly declined as ongoing soil movement
Summary
The applicants claimed for movement damage to their home after Cyclone Marcia and a leaking pipe. The FSP accepted part of the damage and offered $3,769.01, which was declined. AFCA found the cyclone and leak were the proximate cause, ordered the claim accepted subject to a scope of works, and ordered up to $3,000 towards expert report costs.
Storm and escaped water were the dominant cause of movement within 72 hours, and the FSP's experts did not establish an exclusion.
Issues
- Claim denial primary · upheld
“The FSP is not entitled to decline the applicants' claim as the applicants have established a claim within the terms of the policy for damage related by storm and the escape of water from a pipe.”
- Inadequate claim investigation secondary · upheld
“I note that all experts arranged by the FSP were not by qualified engineers. Whilst engineers may have written some reports, they did not carry out inspections.”
Subjects and remedies
home or building damagenatural disasterpay claimpay compensationreassess claim
Text of the determination
Determination
Case No: 472655 Determination Page 1 of 7
Case number: 472655 4 April 2018
1 Overview
1.1 Dispute
The applicants lodged a claim under their countrypak policy with the financial
services provider (FSP) for damage as a result of Cyclone Marcia.
The claim has been assessed liability partially accepted as the FSP did not agree all
damage was a result of the Cyclone event and consider ongoing soil movement is
the cause of movement to the insured property.
The applicants dispute the FSP’s de cision and say the evidence does not establish
an exclusion to the claim.
The case manager issued a recommendation in respect of issues in dispute partially
in favour of the FSP. The applicants have provided further supporting information.
The applicants are represented in the dispute. For the sake of brevity, all authorised
parties will be referred to collectively as “the Applicant”.
1.2 Issues and key findings
Is the FSP entitled to decline the applicants claim?
The FSP is not entitled to decline the applica nts’ claim as the applicants have
established a claim within the terms of the policy for damage related by storm and
the escape of water from a pipe.
I consider Cyclone Marcia and an identified leaking pipe are the proximate cause of
the movement damage to the insured property.
Is the FSP liable to pay for the applicant’s expert reports ?
P’s report was important to the findings and in these exceptional circumstances the
FSP should reimburse the applicant up to $3000 for its preparation.
1.3 Determination
This determination is in favour of the applicant.
A scope of works is to be obtained for movement damage to the home and settled
within the terms and condition of the policy.
An additional excess is required to be paid for damage from the leaking pipe.
Upon presentation of the invoice the FSP is to reimburse up to $3000 for P’s report.
Case No: 472655 Determination Page 2 of 7
2 Reasons for determination
2.1 Is the FSP entitled to decline the applicants’ claim?
I have decided this case on its merits, having regard to the relevant law, good
industry practice and previous FOS decisions. I have taken into account all the
material submitted by the parties, both before and after the recommendation. I am
satisfied that the documentation I have relied on has been provided to both parties.
The case manager issued a recommendation partially in favour of the FSP.
The FSP rejected the recommendation.
The applicants’ have the onus on establishing a valid claim
The applicants are required to show that, on the balance of probabilities, they have
suffered a loss caused by a risk insured against under the policy. This is known as a
valid or prima facie claim.
If the applicants are able to establish a prima facie claim, then the onus shifts to the
FSP to show that, on the balance of probabilities, it is entitled to rely on an exclusion
under the policy or is otherwise entitled to deny the claim.
The applicants’ policy provides cover for loss or damage caused by events listed in
the policy (including the insured event of storm and escape of liquid), subject to the
conditions and exclusions set out in the policy.
The insured event of storm states that the policy does not provide cover damage
caused by earth movement (including subsidence), unless damage is caused by
landslide or subsidence that occurs within 72 hours of cessation of the event.
In addition to the cover for damage caused by the listed events, the policy also
provides cover for accidental loss or damage (being loss or damage which occurs
without intent). This is also subject to conditions and exclusions in the policy.
The applicants ’ lodged a claim for damage to the insured property as a result of
Cyclone Marcia and further damage from a leaking pipe. The FSP accepted some
damage but not all.
On this basis, I accept the applicants’ have established a valid claim f or storm
damage and a leaking pipe.
Accordingly, the FSP bears the onus of establishing, that on balance of probabilities,
it is entitled to rely on a policy exclusion to decline all or part of the applicants’ claim.
Coverage of the policy
The applicants’ policy provides cover for subsidence if it occurs within 72 hours of the
cessation of the event, and is contributed to or is caused by one of the following
events:
Storm, rainwater or wind.
Earthquake, subterranean fire, or volcanic eruption.
Explosion.
Case No: 472655 Determination Page 3 of 7
Liquid that escapes from a fixed pipe or something attached to a pipe, fixed gutter, fixed
tank or drain.
The applicants say damage to the home was evident approximately 48 hours after
the cyclone passed.
The onus is now on the FSP to establish an exclusion applies, or is otherwise
covered.
Circumstances of loss
The applicants’ property was inundated by rain water from Cyclone Marcia.
Approximately 200mm of rain fell within 48 hours and photos provided by the
applicants ’ establish a significant amount of rain fell on their property.
A water tank situated on the eastern side of the home was also effected by
associated winds from the cyclone, dispersing water from the tank contributing to the
damage.
The FSP offered to settle the applicants for internal damage to the rumpus room
caused by the cyclone and water tank to the value of $3,769.01. The applicants ’
declined this offer and are seeking for all movement damage caused by the cyclone
and leaking pipe to be accepted.
FSP’s liability depends on cause of damage
The effect of the policy provisions is that the FSP will only be liable for damage to the
applicants’ home resulting from subsidence, if the damage was caused by the
cyclone and/or leaking pipe and occurred within 72 hours of the cessation of the
event.
The applicants say movement within the home was noticed approximately 48 hours
after the cyclone event.
The FSP accepts some damage occurred to the home from the cyclone, however,
consider the movement to the home has been ongoing.
Conflicting opinions’ on the cause
The FSP had several consultants attend the insured property to determine the extent
of its liability with multiple reports submitted.
The FSP rely on the following submitted reports:
(S) Three reports submitted
There soil is highly reactive
It is apparent that two significant movement events have occurred during the life
of the building, both corresponding to heavy rainfall events. Other less significant
has occurred over the life of the building.
The concrete slab has failed to adequately accommodate the soil type
(M) Three reports submitted
Slab construction is waffle type design
Case No: 472655 Determination Page 4 of 7
The cracking to the building of the foundation soils on the eastern side is from
prolonged and excessive water due to cyclone damaged tank and cyclone related
rains exasperating the situation.
There have been two events where the eastern end of the building has subsided,
the first in 2000 where the building had initial settlement and again 2015 where
the building subsided on the eastern side after the cyclone and associated
rainfall.
(M) Desk assessment engineer
The slab should not have been built on reactive soil.
Waffle slabs should not be built in cyclone prone areas
(N) Three reports submitted
The residence is constructed on a concrete raft slab
The designers of the house have opted to install an expansion joint to combat
movement.
The residence is expected to move at that location
The rainfall associated with Cyclone Marcia was not overly high
Unless severe corrosion occurs adjacent a buildings footing structure (which has
not occurred) ground moisture levels effect the movement of footings occur over a
period of time.
The effects of moisture typically occur over a period of weeks to months and
slowly change
I note that all experts arranged by the FSP were not by qualified engineers. Whilst
engineers may have written some reports, they did not carry out inspections.
The reports submitted by the FSP all state the soil content is reactive. The FSP does
not consider the rain event caused the movement damage to the home. It is of the
view, it is an ongoing problem due to the type of slab the home is built on.
N states the home is built on a raft slab. All other reports say the slab type was
waffle.
Applicants’ evidence
The applicants have provided reports by two e ngineers ‘U’ and ‘P’.
U says in its report:
Waffle pod slab
Due to the recent cyclone over the area and flooded ground, the building has due
to water removing soil support and creating voids shifted and sunk. This has
caused cracking and gaps in the building
There is movement in the building with differential movement/settlement of up
50mm
Flooding can cause settlement as the clay foundation loses shear strength when
it becomes waterlogged and moisture can cause loss of support under footings.
After the recommendation, the applicants had P attend the property and the following
was noted:
There have been 3 cases where movement has occurred
Case No: 472655 Determination Page 5 of 7
2000 significant rain and flooding resulted in movement in the main
section of the house and potentially the rumpus room
2015 Cyclone Marcia in movement in the rumpus
2015 busted water pipe resulted in movement to the main section of the
house
I believe that the inundation of groundwater, possible combined with a water leak,
has resulted in the material being saturated to such a point that it approached its
liquid limited and subsequently failed.
It is acknowledged the soil is highly reactive, however, I am persuaded more by the
applicants’ version of events and reports submitted by engineers.
In considering the whether the FSP has identified an exclusion to the claim, I am
satisfied the one constant throughout the inspections, it is agreed the insured
property has been built on reactive soil.
The FSP, in its attempt to establish an exclusion applies, have submitted reports by
engineers and building consultants, however no inspection was carried out by an
engineer. Whilst I have considered the information, I am persuaded by the
experience of an engineer, rather than a building consultant.
The FSP says its reports are thorough and logical in their explanation of the cause of
damage to the home, however there is no evidence to establish the damage did not
occur within the 72 hours after the cessation of the event.
The applicants’ report by P supports the applicants’ version of events.
The FSP says it considers there is faulty workmanship or a structural defect in design
to the slab. The reports provided by the FSP has not established this.
Proximate cause
The applicant carries the onus to establish that the loss and damage suffered arises
from an event which is covered under the terms and conditions of the policy.
It is well established that the proximate cause is not necessarily the first or the last or
the sole cause of the loss. The proximate cause is the effective or dominant or
operative cause of the loss.
The applicants say that the movement damage to the home was caused by the
cyclone event and additionally a burst pipe under the slab.
The FSP disagree and rely on fact the home was built on reactive soil. The slab the
home was built is not considered appropriate for cyclone prone areas.
The applicants’ state that the home has only moved on three occasions. These being
a rain event in 2000, Cyclone Marcia and after the leaking pipe.
Case No: 472655 Determination Page 6 of 7
I have carefully reviewed all the reports by the parties and consider the applicants’
reports to be more persuasive with the engineers attending the site.
The FSP has provided many reports, however the reports are from two building
consultants with a desktop report conducted by an engineer who did not attended an
onsite inspection.
The FSP then appointed an engineer ‘N’ for a more conclusive opinion. However, as
raised by applicants the representative of N was not an engineer and the reports
provided were written by someone else.
The FSP is to accept the claim
I am satisfied, on the balance of probabilities that the cyclone event is the dominant
or effective cause of the movement to the home.
I am also of the view, the leaking pipe identified by the applicant has have also
contributed to the movement of the home.
I am not satisfied the damage to the home has been an ongoing event and the
movement has occurred within 72 hours after the cessation of the cyclone or leaking
pipe.
It is acknowledged the soil is highly reactive, and on balance, I am satisfied the
cyclone event, along with the escape of water from the tank and an identified leaking
pipe are the proximate cause of the movement damage to the property.
The FSP is to accept damage for movement to the home.
As the reports are lacking in detail as to the extent of the movement to the home, a
further inspection is required to establish a scope of works and quotes provided.
Case No: 472655 Determination Page 7 of 7
3 Supporting information
3.1 Material considered and relied upon
Parties’ submissions, emails, reports, photographs and all attachments to all
submissions both before and after the recommendation.
3.2 Case law and proximate cause
Case law establishes:
The proximate cause of the loss is the dominant or effective or operative cause of
loss whether or not that be the last in time of the sole cause.
If there are several causes operating contemporaneously, each must be
examined for the qualities of reality, predominance and efficiency as the efficient
cause that sets a relevant chain of events in action. If o ne cause would have
caused harm in any case, and the other would not have done so in the absence,
the first is the proximate cause.
A common sense approach is taken to determine proximate cause.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.