Home / Financial Firm (Unknown - Insurer) / Determination 472611
Determination 472611
Insurer limited strata water-damage claim and refused cost of remedying the deck that caused the leak
Summary
The applicant's strata water-damage claim was accepted for resultant damage only, and the insurer disputed the deck repair cost. AFCA decided the insurer must settle $2,959 less the $2,500 excess, and could not consider an earlier unclaimed repair cost.
The policy excludes rectifying defective workmanship and the resultant damage invoice was accepted as the insurer did not show it did not reflect the costs.
Issues
- Claim denial primary · not upheld
“The FSP was entitled to limit its liability for the claim to the resultant damage caused by the water ingress.”
- Claim amount dispute secondary · upheld
“It is required to settle the claim for the resultant damage in the amount of $2,959, less the policy excess.”
Subjects and remedies
home or building damagepay claim
Text of the determination
Determination
Case No: 472611 Determination Page 1 of 4
Case number: 472611 24 August 2017
1 Overview
1.1 Dispute
The applicant is a beneficiary of a strata insurance policy held by the owner’s
corporation (OC) at her residence, and underwritten by the financial services provider
(FSP).
On or around 22 February 2017 a claim was lodged under the policy for damage to
the applicant’s property due to water ingress.
The FSP accepted the claim and advised the applicant it would cover the resultant
damage to her unit from the water ingress, subject to the policy excess. However, it
would not cover the costs incurred in remedying the leak.
1.2 Issues and key findings
Was the FSP entitled to limit its liability for the claim?
The FSP was entitled to limit its liability for the claim because the available evidence
shows the deck required replacement in circumstances which are not covered by the
policy terms.
What is the applicant entitled to in settlement of her claim?
The applicant has presented an invoice in the amount of $2,959 for the resultant
damage. The applicant is entitled to settlement of this amount, less the applicable
policy excess.
1.3 Determination
This determination is substantially in favour of the FSP.
The FSP was entitled to limit its liability for the claim to the resultant damage caused
by the water ingress. It is required to settle the claim for the resultant damage in the
amount of $2,959, less the policy excess.
Case No: 472611 Determination Page 2 of 4
2 Reasons for determination
2.1 Was the FSP entitled to limit its liability for the claim?
Policy covers accidental damage
The policy is an accidental damage policy providing cover for accidental damage
sustained to the applicant’s buildings.
It is accepted law that the initial onus is held by the applicant to establish she has
suffered loss as a result of an event that is covered by the terms of the policy. This is
known as a prima facie claim.
It is only once the applicant has established a prima facie claim that the onus shifts to
the FSP to establish the basis on which the FSP says it is entitled to deny the claim,
including the application of any exclusions from cover.
The term ‘accidental damage’ is not defined in the terms of the policy. Therefore it is
given its normal meaning which means ‘damage that is unintended and unexpected’.
The parties agree the resultant water damage to the property is covered by the policy
terms. However, a dispute has arisen between the parties as to the extent of the
FSP’s liability for the costs incurred in remedying the source of the water ingress.
Policy excludes rectification of defective or faulty materials or workmanship
The policy provides it will not pay for the cost of rectifying faulty or defective materials
or workmanship. The FSP seeks to rely on this exclusion to deny any liability for the
work done to the deck, which was the source of the water ingress.
The FSP has provided a copy of notes from the applicant’s broker, of a discussion it
had with the applicant’s builder (HB). These notes say HB advised the following
issues were present with the deck:
incorrect installation of flashings allowing water to enter.
insufficient spreader to roofline from downpipe allowing water to pool
incorrect installation of deck.
Whilst the notes of the conversation are not evidence, the applicant has not
challenged any of these statements.
In reviewing the quote and invoice provided by HB, it says the following:
Repaired holes left by screws across roof structure.
Added downpipe spreader to exiting downpipe.
Siliconed existing flashing to stairwell roof.
Replaced flashings (where necessary) around perimeter of roof line.
Replaced joists 90 x 45 mm treated pine.
Replaced decking 90 x 19 treated pine decking (80 m2 in total).
Supplied and repaired (plastered) ceiling in downstairs lounge room and stair well.
Supplied and painted all ceiling repairs (chalk USA).
Accordingly, there is nothing contained within the material from HB which suggests
the deck suffered any damage which was accidental in nature. Rather, it required
Case No: 472611 Determination Page 3 of 4
removal and rebuilding due to the manner of its original construction, which was
allowing water to enter the roof and ceiling below.
Therefore, even if I were to accept the deck was damaged, as the policy specifically
excludes the cost of rectifying faulty or defective workmanship, the FSP has no
liability for the replacement deck costs.
FSP required to settle the resultant damage costs
HB has presented a separate invoice for the costs of the resultant damage, in the
amount of $2,959.
The FSP notes the document includes components for the repair of the roof and to
extend drainpipes under the deck, which is says should form part of the decking
replacement costs.
However, as the party challenging the breakdown, the onus rests with the FSP to
demonstrate the invoice does not accurately reflect the costs of the resultant
damage. It has not done so.
Accordingly, I accept the invoice from HB of $2,959 reflects the costs to repair the
resultant damage. The FSP is therefore to settle the applic ant’s claim on this amount,
less the policy excess of $2,500. The policy clearly states than an excess of $2,500
will be applicable to a claim for water damage.
In the circumstances, an award of interest is not appropriate.
Applicant did not lodge a claim for earlier water ingress incident
The applicant also seeks a further $2,000 in respect of repairs she undertook in May
2015 to try and arrest the water ingress to the property.
However, the applicant has never lodged a claim in respect of this incident.
FOS’s Terms of Reference set out the type of disputes that may be considered by
FOS. FOS can consider a dispute that arises from a contract or obligation under
Australian law. That is, a claim must be lodged as no obligation is owed under the
contract until the policy is claimed on.
As there was no claim lodged for the earlier incident, FOS cannot consider that
aspect of the applicant’s dispute.
Case No: 472611 Determination Page 4 of 4
3 Supporting information
3.1 FOS approach to this dispute
A full exchange of the relevant information has taken place between the respective
parties and each party has had the opportunity of addressing any issues raised.
All of the provided material has been reviewed and considered. The parties have
raised numerous issues in their submissions to the Service. For the p urpose of this
determination, commentary is restricted to only those issues considered relevant to
the outcome.
3.2 Relevant Terms of Reference
4.2 Type s of Di spute s that can be considered by FOS
FOS may only consider a Dispute bet ween a Financial Services P rovider and an Applicant:
a) either:
(i) that arises from a contract or obligation arising under Australian law;
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.