Home / Financial Firm (Unknown - Insurer) / Determination 472555

Determination 472555

Storm damage to roof claim declined

FirmFinancial Firm (Unknown - Insurer)
Decided2017-11-30
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant claimed for roof damage after a September 2016 storm, which the FSP declined while accepting the fence damage. AFCA's panel found the roof collapse was caused by inadequate construction and excluded deterioration and workmanship, and dismissed the complaint.

Under the dominant or effective cause test the proximate cause was excluded construction and workmanship defects, not the storm, so the policy exclusions apply.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 472555 Determination Page 1 of 9 Case number: 472555 29 November 2017 1 Overview 1.1 Dispute The applicant held a home building insurance policy with the financial services provider (FSP), covering her home. The applicant lodged a claim after a storm event caused damage to her property. The FSP accepted the claim, but declined cover for the roof. The FSP says the roof damage occurred as a result of excluded events over time, and from faulty design or workmanship. The applicant disputes this decision and seeks to have the roof damage repaired under the claim. 1.2 Issues and key findings Is the FSP liable for the applicant’s claim? Whilst there is no dispute that the applicant’s property suffered some damage as a result of a storm event in September 2016, the panel is not satisfied that the applicant has established a claim under the terms of the policy for the damage to the roof. The panel is satisfied on the balance of probabilities that the proximate cause of the damage to the a pplicant’s roof was gradual deterioration and/or faulty workmanship and/or structural failure which is excluded under the terms of the policy. 1.3 Determination This determination is in favour of the FSP. The FSP was entitled to decline the applicant’s claim. Case No: 472555 Determination Page 2 of 9 2 Reasons for determination There has been a full exchange of material between the parties and each party has had the opportunity of addressing the issues that arise from the information exchanged. Due to the complexity of the issues in dispute, this matter has been referred to a panel for consideration. The determination is based on what is fair in all the circumstances, having regard to the relevant legal principles, terms of the policy, good industry practice including codes of practice and prior determinations where applicable. 2.1 Is the FSP liable for the applicant’s claim? Policy covers damage caused by storm There is no dispute that some damage was sustained to the applicant’s property as a result of the storm in or about September 2016. The FSP covered the damage to the applicant’s fence but this dispute arises as to the cause of damage to the applicant’s roof. The onus remains with the applicant to establish the damage to the roof was caused as a result of the insured event ‘storm’. Circumstances of the loss The applicant claims that on or about 7 September 2016, a storm damaged the western side fence and roof of her property. At the time of the storm, the occupants heard a loud noise just prior to observing ceiling damage. Other damage was reported to street trees and neighbouring fences. Contrasting expert reports A letter dated 22 April 1987 from ST engineer notes the residence was considered structurally suitable to support the proposed upper story extension. This letter does not confirm the adequacy of the roof following its construction. The applicant appointed ST to report on the cause of the roof damage. ST was unaware of the wind speed, but considered it likely the upper floor of the residence experienced significant winds. In ST’s view, there were no indications of shortcomings in the roof frame construction, but considered rotation of a steel beam inside the roof structure to be consistent with frame movement during a storm event. The roof had been designed in accordance with the buildi ng standards relevant at the time, based on engineering and architectural drawings. ST considered the effects of the storm caused the roof damage. The FSP appointed a builder BB to undertake make safe works at the property. BB considered the roof had failed due to the use of incorrect construction material and from poor workmanship. The FSP referred the BB and ST reports to an engineer NWC. NWC attended the site on 23 December 2016. Case No: 472555 Determination Page 3 of 9 Wind speed data at the closest weather station to the applicant’s property reported wind speeds on the day the damage, 7 September 2016, of 87km/hr. NWC noted similar wind speeds occurring in August and July 2016. The relevant wind loading code current at the time of construction required a design wind speed in accordance with the code of 144km/hr. That is the roof should have been able to withstand a wind speed of 144km/hr without structural failure. In summary, NWC concluded that whilst a structure appeared to have been designed in accordance with the relevant design standards, there were some structural deficiencies namely:  inadequate splicing of the under purlins along the southern side of the roof  inadequate connection between the underpurlins and struts  inadequate chocking of the base of the angled struts. NWC concluded that whilst the damage may have occurred during a storm on 7 September 2016, the underlying issues with the roof structure had contributed to the collapse. In its opinion, the inadequacies in the structure acted together over a period of time to cause the steel strutting beam to rotate and collapse. The deterioration of the nailed connections and the additional roof movement due to the inadequately spliced under purlins has eventually caused further collapse which has been exacerbated by the lack of chocking at the base of the angled struts. ST has provided a short response to the report on 19 January 2017. The response does not address the issues raised by NWC in relation to the inadequate structure of the roof. The applicant’s representative (AS) provided com ment in his capacity as a diploma qualified engineer. AS says he observed a large amount of rain and variable wind gusts from the west on the evening of the storm. He says he saw unusual rain fall patterns, where the rain would be moving sideways to a slightly vertical position. Later in the night these winds and rain would variably pulsate with greater intensity where the dividing fence and the roof structure at the applicant’s property were damaged by the storm event of that night. AS states variable tsunami wind gusts caused the roof failure. He says: My engineering judgement instinctively tells me that the following happened in succession. One the rafter cracked. Two the ridge cracked. Three the steel beam rolled. So if we see the insured primary damage event was the cracked deflected rafter. It did what it was designed to do. (Engineering 101 deflection before failure) The secondary events were the damage to the ridge board and then the rolled beam. In an email of 17 April 2017, AS says the splicing defect identified by NWC resulted from the make safe works undertaken by BB. He says if this was done, it ‘would demonstrate that the under purlin is adequately supported via spicing’. In the same email AS states the connection between the under purlins and struts was adequate prior to the storm event. He says BB removed supporting material during make safe works, and ‘hidden under insulation up to 4m away’, and confirmed by ST. AS states not all struts were shown in photographs, as these were removed by BB, or are unable to be found. AS states there were some angle struts in the roof Case No: 472555 Determination Page 4 of 9 structure but some struts were not angled ‘because a combination of design and building practices were used’. While agreeing with NWC regarding the spacing of beams, AS states no chocking was necessary. Proximate cause of the roof damage was the inadequate construction of the roof framing as identified by NWC The panel has considered the various reports provided. The panel finds the explanation provided by NWC is logical, considered and persuasive. Whilst the panel acknowledges the comments made by ST, ST has not adequately addressed the issues raised by NWC in response to that report and also acknowledges AS’s submission however whilst he has suggested a number of scenario, he has not provided any detailed reasoning for these conclusions. In the circumstances, the panel places greater weight on the report of NWC and is satisfied that the proximate cause of damage to the roof, that is the dominant or effective cause of the damage, was the inadequate construction of the roof, in particular the splicing of the underpurlins, the connection between the underpurlins and the struts and the inadequate chocking of the base of the angled struts. Proximate cause from excluded events The policy wording excludes loss or damage arising from certain events. These include: Loss, damage, injury or death arising from:  rust, corrosion, gradual deterioration, depreciation, wear or tear […]  mechanical, structural or electrical failure of an item […]  faulty design or workmanship. Based on the available expert opinions and the information exchanged, the panel is satisfied the proximate cause of the damage to the applicant’s roof structure was most likely due to gradual deterioration, structural failure and faulty workmanship. According, the FSP is entitled to rely upon the terms and conditions of the policy to refuse payment of the applicant’s claim for damage sustained to the roof. Case No: 472555 Determination Page 5 of 9 3 Supporting information 3.1 Supporting material Expert reports Provider Key points FSP’s expert (BB) Make safe report 28 Sept 2016  Attended site on 28 Sept 2016.  Observed water staining around windows in bedrooms, believed to be pre - existing, possibly due to loose cladding around frame.  External cladding considered loose around various parts of the building, with evidence of attempts to re - fixing and silicone joints between loose boards.  Inspection of roof space suggested roof timbers were undersized, and constructed of incorrect materials.  Roof frame had signs of poor workmanshi p, frame not constructed in accordance with the relevant standard. Cause of damage ‘We can confirm the cause of damage has occurred due to incorrect building materials, construction methods and poor workmanship, which has caused [t]he first floor roof fram e to fail where over time the roof frame has failed, causing movement of the roof structure, resulting in damage to the roof timbers and causing a section of the front roof to sag.’ FSP’s expert (BB) Report 30 Sept 2016 ‘The movement to the roof structure has been caused by the rolling of a strutting beam. It was found that this beam has been directionally point loaded with struts. With no bracing or counteracting forces acting upon the steel beam the weight of the roof has caused the failure. […] Under pu rlins to the roof were found to be inadequately installed with insufficient lapping of purlins insufficient strutting and laps to be unbolted. Strutting was in places found to be inadequate with spans exceeding the maximum distance and with inc orrect mater ial used[.] Ridge was noted to be cracked and collapsing at the scarf joint. This has been caused by inadequate strutting as all laps and joins are required to be strutted directly underneath. […] No storm related event was seen to of caused the deflection to the roof frame. It is found that the damages to the roof have been caused by extremely poor workman ship carried out displaying no discernible knowledge of any current construction method.’ (sic) Case No: 472555 Determination Page 6 of 9 Applicant’s expert (ST) Report 28 Nov 2016  Actual wind speed in the area was not known, but given the third story has surrounding views, it is likely significant winds were felt by the upper floor of the residenc e.  Rotation of the steel beam is consistent with movement of the roof frame during a storm event.  R idge beam failure results from overstressing the member due to the rotation of the steel roof beam.  No indications of any short - comings in construction of the roof frame.  Roof frame primarily constructed from timber framed wit h some steel strutting beams i nstalled.  Architectural and engineering drawings viewed on site, indicated the roof was designed in accordance with Residential timber - framed construction, Part 2 (AS 1684.2).  Steel beams are not covered as part of AS 1684.2, but the roof construction, inc luding steel beams, is covered by this standard. ‘AS 1684.2 provides guidance on the installation of strutting beams similar to the steel beam noted on site. AS 1684.2 requires all strutting beams wit h a height to width ratio exceeding three to be strutted at end points and at strut locations. The steel beam on site had a height to width ratio of two. With the additional top plate, the height to width ratio of the strutting beam was still below three. As such, although the beam was installed without restrai nt, this work was completed in accordance with the requirements of AS 1684.2. If not for the strong winds experienced during the storm, it is likely that the rotation of the beam would not have occurred and that the roof would still be performing in an acc eptable manner. […] The roof construction is consistent with the scope and int ent of AS 1684.2, and the use of a steel beam is a suitable alternative still within the intent of AS 1684. 2. The size of the beam, height to width ratio, is such that no strutti ng of the beam was required in accordance with AS 1684.2. The damage obs erved on site is consistent with strong winds from the storm event. There is no indication of short - comings in the construction of the roof frame.’ FSP’s expert (NW) Report 3 January 2017  Reviewed the BB and ST reports, and attended the site on 23 December 2016.  Damage involves rotation of steel strutting beam beneath the underpurlin above bedroom on the southern elevation of the roof.  At least one rafter above this underpurlin cracked and rafters separated at the ridge board.  Ridge board has cracked above the passageway wall and rafters deflected, causing the roof to spread and resulting in cracking at the passage ceiling.  Steel strutting beam does not support the ceiling joint s as is Case No: 472555 Determination Page 7 of 9 not restrained along the top or bottom flange.  Horiz ontal load on the top flange of the beam due to Struts between this beam and above underpurlin being angled at approx. 14 degrees.  Deflection and cracking of roof timbers due to strutting beam rot ating sideways and sagging of underpurlins.  Additional load trans ferred to the ridge board above passageway resulting in the ridge board joint above the passage wall snapping from the above strutting beam rotation/ underpurlin failure.  Roof construction com pliant with 1987 code, but should be able to withstand wind speed of 144 km/hr.  Defects identified include: o incorrect and inadequate splicing of underpurlin o inadequate connection between struts and underpurlin o inadequate chocking of the base angled struts . Cause of damage ‘In my opinion these inadequacies have acted together over a period of time to cause the steel strutting beam to rotate and collapse. This strutting beam has support ed the angled load from the struts for as long as possible; however, with the deterioration of the nailed connections and the additional roof movement due to the inadequately spliced underpurlins it has eventually collapsed. The lack of chocking to the base of the angled struts has enabled the beam to rotate and it is possible that a full collapse would not have occurred if adequat e chocking was in place. It is possible that there was some aged sag in the roof before the event and the strutting beam may have been leaning horizontally for some time. The old truss tie shown in pho to 7 to the collar tie above the passageway also suggests that there may have been some previous work done in this area of the roof. I have viewed elevations of the house provided by google maps but in my opinion these photos are inconclusive. Underlying c ause of damage: In my opinion the underlying cause of damage is inadequate construction of the roof framing in the form of; 1. Inadequat e splicing of the underpurlin along the southern side of the roof. 2. Inadequat e connection bet ween underpurlins and struts. 3. Inadequat e chocking of the base of angled struts. The wind forces on the 7/9/2016 may have caused some additional movement in the roof structure that acted as the final trigger for the collapse; however these forc es were significantly less than the design wind forces and in my view would not have caused the damage seen if the roof had been constructed correctly.’ Case No: 472555 Determination Page 8 of 9 Applicant’s representative (AS) Email 22 May 2017 ‘[…] My observations of the storm night on 7/9/2016 at [applicant’s property] was that there was a large amount of rain and variable wind gusts from the west. As darkness fell I remember looking from the top floor to the street lights on Cambridge street and saw very unusual rain fall where the rain would be moving sideways to a sli ghtly vertical position. Later in the night thes e winds and rain would variably pulsate with greater intensity where the dividing fence and the roof structure at [applicant’s property] were damaged by the storm event of that night. Which has been approved by [the FSP]. […] I believe that variable tsunami wind gusts that night during caused the failure of the roof. This roof is within its asset life and it is unfortunate a weather reading could not be measured at the apex of the roofline. As weather is a nat ural event and can vary so significantly with devastating results. Design and construction I the roof was designed and constructed in accordance with AS 1684.2 by a master association registered builder and can remember that there was adequate splicing of the underpurlin on the southern side and adequate connection between underpurlins and strut s when installing internal aerials. As is the other side, it was is mirrored with the same construction techniques. It can even be seen that the strutting beam has only vertical loads and because it has a widt h ratio of two no chocking is required. […] The engineer at [ST] found one piece 4m away under some fiberglass insulation. […] We can only refer the mirrored portion on the ot her side of the ridge board for a best guesstimate. Which has been designed and constructed in accordance with AS1684.2. Failure Events As the only qualified engineer on site at the time of failure I heard a crack, crack then a boom. My engineering judgement instinctively tells me that the following happened in succession. One the rafter cracked. Two the ridge cracked. Three the st eel beam rolled. So if we see the insured primary damage event was the cracked deflected rafter . It did what it was designed to do. (Engineering 101 deflection before failure) The secondary events were the damage to the ridge board and then the rolled beam . I believe that exclusions to the policy are inferring to the secondary events; where if the primary event did not occur due to the storm event the secondary events would not of incurred. In layman’s words - the raft er that was in the center of the roof w here the most flexing occurs during the storm event on 7/9/2017 broke causing its load to evenly disperse along its length causing secondary damage to the roof on either side of the rafter. Conclusion The claimable primary event occurred during the storm; where the primary damage event was the rafter; which was at a Case No: 472555 Determination Page 9 of 9 distance from the secondary disputed claimable damage. I see no reason why the claim bet ween [the applicant] and [the FSP] not be successful.’ (sic) 3.2 Proximate cause Case law establishes:  the proximate cause of loss is the dominant (or effective or operative) cause of the loss, whether or not the cause is last in time or the sole cause.  where several causes operate at the same time, each cause must be examined for the qualities of reality, predominance and efficiency as the active, efficient cause that sets a relevant chain of events in action.  If one cause results in harm in any case, and the other would not in the absence of the first, the first is the proximate cause.  a common sense approach is taken to determine proximate cause.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.