Home / Financial Firm (Unknown - Insurer) / Determination 472328
Determination 472328
Water leak claim declined as long-term stump deterioration; policy cancelled and claim delayed
Summary
The insurer declined a water leak claim for stump damage it said was long-term deterioration, and cancelled the policy. AFCA agreed the claim could be declined but found the cancellation wrongful and the handling delayed, ordering reinstatement, premium waiver, record correction and $500 compensation.
A general exclusion only allows a claim to be declined; a policy can be cancelled under section 60 of the Insurance Contracts Act only where the policy expressly provides for that act or omission.
Issues
- Claim denial primary · not upheld
“The FSP is entitled to deny the applicant's claim because the deteriorated and rotten stumps were the proximate cause of the damage.”
- Delay secondary · upheld
“The FSP has delayed the handling of the applicant's claim and is to pay $500 compensation for delay and lack of communication.”
- Policy cancellation or underwriting secondary · upheld
“The FSP was not entitled to cancel the applicant's policy; a general exclusion gives rise to a right to decline a claim, not to cancel.”
Subjects and remedies
home or building damagecorrect recordsdebt waiver or reductionpay non financial lossreinstate policy or contract
Text of the determination
Determination
Case No: 472328 Determination Page 1 of 9
Case number: 472328 23 January 2018
1 Overview
1.1 Dispute
The applicant lodged a claim with the financial services provider (FSP) for damage to
her home from a water leak in 2016. The home had stump damage, cracking and
movement.
The FSP declined the claim because it says the predominant cause of the damage is
the poor condition of the stumps. The FSP says the stumps have been deteriorating
for some time. The FSP cancelled the po licy because it says it has a right to do so
when the applicant has failed to repair previous damage or maintain her home.
The applicant disputes the FSP’s right to decline the claim and cancel the policy. The
applicant also says the FSP delayed in finalising her claim which caused additional
damage.
The case analyst provided the parties with a recommendation on the issues in
dispute. The recommendation was in favour of the FSP.
As the applicant did not accept the recommendation, the dispute has been referred to
me for determination.
1.2 Issues and key findings
Is the FSP entitled to decline the applicant’s claim ?
The FSP is entitled to decline the applicant’s claim because the information shows
the stumps have been deteriorating, rotting and subsiding for some time. The leak,
the subject of this claim, was not the proximate cause of the damage.
Was the FSP entitled to cancel the applicant’s policy ?
The FSP was not entitled to cancel the applicant’s policy. A general exclusion only
gives rise to a right to decline a claim. It does not give the FSP a right to cancel the
policy under the Insurance Contracts Act 1984 (ICA).
Did the FSP delay in processing the applicant’s claim?
The FSP has delayed the handling o f the applicant’s claim . The FSP is to pay to the
applicant $500 compensation for the time taken to resolve the claim.
Case No: 472328 Determination Page 2 of 9
1.3 Determination
This determination is partly in favour of the applicant.
The FSP is entitled to deny the applicant’s claim . However, it must reinstate the
applicant’s policy up to the end of the policy term, waiving the premium owed.
The FSP must also remove the cancellation from the applicant’s claim history and
any third parties to whom it has communicated the cancellation.
Should the applicant accept this determination, the FSP is to pay to the applicant
$500 compensation within seven days of acceptance of the determination.
Case No: 472328 Determination Page 3 of 9
2 Reasons for determination
2.1 Is the FSP entitled the decline the applicant’s claim ?
I have decided this case on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions. I have taken into
account all the material submitted by the parties, both before and after the
recommendation. I am satisfied the documentation I have relied on has been
provided to both parties.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.
No new material provided after the recommendation
The case analyst issued a recommendation in favour of the FSP. The
recommendation stated the FSP was entitled to decline the claim and was not
required to take any further action. The applicant rejected the recommendation
advising some of the stated facts are incorrect. The applicant provided no new
material after the recommendation.
The policy provides cover for water leaks
The applicant held a home and contents insurance policy with the FSP. The policy
responds to loss or damage which arises from insured events listed in the policy.
Cover is subject to both specific and general exclusions.
Relevant to this dispute, the policy provides cover for the loss or damage caused by
water leaking or escaping from an item such as pipes, gutters and drain pipes.
T he parties do not dispute there was a water leak under the applicant’s house in
2016. The applicant has therefore established an insured event has occurred.
The FSP must establish, on the balance of probabilities, the claimed loss is not
covered or is excluded under the policy.
The FSP says the damage has been occurring for some time
The FSP denied the applicant’s claim because it says the damage to the house has
been occurring for some time and is not a direct result of the claimed water leak in
2016.
Specifically, the FSP says the majority of the stumps are in poor condition and have
rotted through prior to the 2016 leak occurring. The FSP says the damage has been
present since 2013 and most likely for some time before the policy was purchased.
The FSP relies on policy exclusions to deny the claim
The policy contains general exclusions which apply to all sections of the policy. The
exclusions relied on by the FSP to decline the claim are as follows:
Case No: 472328 Determination Page 4 of 9
What we don’t cover
Loss, damage, injury or death arising from:
rust, corrosion, gradual deterioration, depreciation, wear or tear
tree roots.
Maintaining and occupying your home
We don’t cover loss, damage, injury or death arising from:
previous damage that has not been repaired
…
you not maint aining your home in good repair and condition. This means your home must
be watertight, structurally sound, secure and well maintained.
The information shows gradual deterioration and poor condition of stumps
The applicant lodged two previous claims for water leaks in 2013. The reports from
these claims identified long term problems with the house stumps, the level of the
floor and drainage.
The FSP organised its building service to attend the applicant’s property in 2013 to
identify the cause of the damage for the two earlier claims. The building service
provided several reports.
The building service report of 15 October 2013 identified the following:
stumps under the kitchen had already been packed
approximately 100mm down the side of the stumps, rotting can be observed
stumps under kitchen area in poor condition prior to the event and require
replacement
the sewer pipe was leaking under the bathroom.
The building service report dated 16 October 2013 stated:
the sewer appears to have been blocked for some time
the property displays noticeable unevenness of floor levels
the unevenness has clearly existed for many years
the stumps throughout, display advanced rot
none of the damage could be attributed to the localise pipe leak near the wall of
the bathroom
stump damage was due to very long term rot.
The applicant says she replaced 21 of the stumps under the property as required.
The information provided shows the FSP cash settled the applicant in 2013. Its scope
of works refers to the replacement of 20 stumps under the kitchen area. The
information provided shows stumps were replaced, but replaced under the bathroom
and second bedroom.
In any event, while there is a dispute as to which stumps were required to be
replaced, this is irrelevant to the outcome of this dispute. This is because the
information provided shows all of the stumps were aged and deteriorating in 2013.
Because not all of the stumps were replaced, it remains that the stumps as a whole
were and are in poor condition and show signs of gradual deterioration and rot.
Case No: 472328 Determination Page 5 of 9
The proximate cause of the damage is not the water leak
It is well-established law, the proximate cause is the effective, dominant or operative
cause. The courts have said if one cause would not have resulted in the harm in the
absence of the other cause, then the other cause is the proximate cause giving rise
to the damage.
On the information provided, I do not accept the water leak in 2016 was the effective
cause of the damage the applicant now seeks to be repaired. While it is not disputed
the water leak was present, the extent of damage would not have occurred had the
stumps not been in such poor condition. This means the deteriorated and rotten
stumps were the proximate cause of the damage.
The damage claimed as a result of the 2016 leak in the kitchen is therefore excluded
from cover.
2.2 Was the FSP entitled to cancel the applicant’s policy ?
The FSP must have a right to cancel a policy
For the cancellation to be valid the FSP must have had a right to cancel the contract
of insurance in accordance with section 60 of the ICA.
The FSP relies on section 60 (2) of the ICA which states:
(2) Where:
(a) …
(b) the effect of the contract is to authorise the insurer to refuse to pay a claim, either in
whole or in part, by reason of an act or omission of an insured or of some other person;
And after the contract was entered into, such an act or omission has occurred, the insurer
may cancel the contract.
However to rely on section 60(2) (b) the above must also be provided for in the
policy. This means the policy must inform the applicant that a certain act or omission
will allow the FSP to cancel the policy.
This can be seen in conditions of cover. For example, the applicant’s policy states:
Buildings we don’t ins ure
We don’t insure:
boarding houses or hostels
hotels or mot els
commercial buildings
exhibition or display homes
commercial farm buildings
We will refuse a claim and cancel your policy if your home is or becomes any of these
things.
This means it is a condition of cover that the applicant does not use her property for
the above purposes. If she does, the FSP has a right to cancel the policy.
The FSP’s policy states there may be cases where the FSP needs to cancel the
policy. However, the FSP’s policy d oes not specifically set out what these cases
Case No: 472328 Determination Page 6 of 9
might be. Without further explanation, I am not satisfied a general exclusion gives
rise to a right to cancel the policy.
A general exclusion does not give rise to a right to cancel the policy
The FSP has said the act or omission it relies on to cancel the policy is the
applicant’s failure to repair previous damage and failure to maintain her home in
good repair. The policy does not specifically advise these acts or omissions allow the
FSP to cancel the policy.
The policy only states the failure to repair previous damage or the failure to maintain
the home in good repair gives the FSP a right to decline cover for damage which has
arisen as a result. The general exclusions only apply to specific damage which was
caused by the failure to repair previous damage or maintain the home in good repair.
If the applicant had other damage to her property which was caused by an insured
event the policy would still be active and she would have a right to claim for that
damage.
In all the circumstances of this dispute, I do not accept the FSP was entitled to cancel
the applicant’s policy.
The FSP must amend its records
The FSP is to cause the cancellation to be expunged from its records and the
records of any organisation with whom it has communicated any reference to the
cancellation on behalf of the applicant.
Given the policy was cancelled only a few months prior to the end of the policy term, I
consider it fair in all the circumstances, the FSP reinstate the policy to the end of the
term being 8 May 2017. The FSP is to waive the premium owed from the date of
cancellation to 8 May 2017. The FSP is to ensure it has removed the cancellation
from its records and communicate this to any third parties the cancellation has been
communicated to. The reason for this action is to remove the prejudice the applicant
has suffered as a result of the incorrect cancellation.
2.3 Did the FSP delay in processing the applicant’s claim?
The applicant says the FSP delayed which caused further damage
The applicant says:
the FSP took five months to inform her it declined the claim
during this time her house significantly cracked and moved
she could have organised for the repair process to be started herself which
would have minimised the damage, and
she holds the FSP responsible for additional damage caused while it was
assessing her claim.
Case No: 472328 Determination Page 7 of 9
There was delay in processing the claim
The available information shows the applicant lodged the claim in September 2016
however, it was accidently joined to a previous claim the applicant had. The FSP
then actioned the damage under its own claim in October 2016.
The FSP arranged for the claim to be assessed by its building service. The building
service wanted in an engineer to inspect and advise about the cause of the damage.
The engineer attended in December 2016.
In February 2017, the applicant received a letter advising the claim was declined and
the policy would be cancelled.
There are no standard timeframes set down for the processing of claims. However,
FSP’s are required to operate in accordance with the General Insurance Code of
Practice (Code).
The Code provides the following time frames for assessing and deciding the outcome
of a claim:
notifying the customer of the decision to accept or decline the claim within 10
business days of receiving the claim,
responding to routine requests about a claim within 10 business days.
FOS considers these time frames to represent good industry practice.
The FSP’s consulting engineer prepared a report dated 18 January 2017. In the
report, the consulting engineer advised he had attended the property on 15
December 2016. If an FSP is required to organise expert inspections and reports in
order to assess the claim, it is usually accepted the claim will take longer to finalise.
However, I note there was delay and miscommunication before the consulting
engineer attended the property. Additionally, there is no valid reason provided for the
delay of either the FSP’s conduct or the delay between the consulting engineer’s
attendance at the property and the date of its report.
I accept the Christmas period intervened. However, I also accept the FSP’s claims
process took longer than what is recommended in the Code. I do not accept the
delay was just because of the need for the reports. The FSP does not appear to have
taken steps to update the applicant during this time.
The information provided does not establish delay caused damage
The applicant alleges during the time it took the FSP to assess the claim, further
damage was caused which she could have prevented. However, the applicant has
not provided information to establish further damage.
Given the history of the damage and the condition of the stumps, on the information
provided, I do not accept the FSP is liable for any further damage which may have
occurred while it was processing the claim.
Case No: 472328 Determination Page 8 of 9
FOS can award compensation for delay
However, FOS can award compensation for non-financial loss where there has been
an unusual amount of physical inconvenience, time taken to resolve a situation, or
interference with the applicant’s expectation of enjoyment or peace of mind.
In assessing whether to award compensation for non-financial loss, FOS expects
applicants to be moderately robust, bear the normal degree of inconvenience
experienced when a problem occurs, and take reasonable steps to minimise the
inconvenience suffered.
In the circumstances of the claim, I consider it fair the FSP compensate the applicant
$500 for its delay and lack of communication leading up to its assessment of the
claim.
Case No: 472328 Determination Page 9 of 9
3 Supporting information
3.1 FOS approach
It is an accepted principle of general insurance law that an insured bears the onus to
establish on the balance of probabilities that they have suffered a loss caused by an
event to which the policy responds. This is known as a prima facie claim. Once so
established, the onus shifts to the insurer to prove on the balance of probabilities that
an exclusion applies if it seeks to deny or limit its liability for the loss.
3.2 Relevant policy extracts
The relevant policy extracts are referred to in the parties’ submissions , the
recommendation and in the FSP’s Notice of Response dated 28 April 2017. Both the
policy documents and the Notice have been exchanged with the applicant.
3.3 Other relevant material considered and relied on
Parties submissions, emails, reports, photographs and all attachments to all
submissions
The FSP’s expert reports including its consulting engineer’s report dated 18
January 2017 and its building services reports from 2013.