Text of the determination
Determination
Case No: 472240 Determination Page 1 of 9
Case number: 472240 20 March 2018
1 Overview
1.1 Dispute
The applicants hold a landlord insurance policy with the financial services provider
(FSP) which provides cover for their investment property. The policy covers damage
caused by an accidental escape of water from a fixed pipe, tank, or other item.
The applicants lodged a claim on 23 February 2016 for damage caused by water
escaping from a burst hot water system (the insured event). The FSP accepted the
claim and offered to pay the applicants $11,404.49 for the cost of repairing water
damage to internal cabinets and floating floors at the property.
However, the applicants say the leaking water also inundated the foundations,
causing them to subside and the internal walls to crack (the disputed damage). The
FSP has denied liability for the disputed damage, on the basis it was not caused by
the insured event.
1.2 Issues and key findings
Is the FSP liable for the disputed damage?
The applicants have established a prima facie claim for damage caused by the
escape of water. The FSP has not shown that, on the balance of probabilities, the
disputed damage was caused by anything other than the insured event. Accordingly,
the FSP is liable for the disputed damage.
Are the applicants entitled to compensation?
The applicants are entitled to reimbursement of costs incurred in obtaining their
engineer’s report, together with partial reimbursement of their legal fees. They are
also entitled to compensation for loss of rent and non-financial loss.
1.3 Determination
This determination is substantially in favour of the applicants.
The FSP is required to settle the applicants’ claim for cracking damage to the internal
walls, in accordance with the terms and conditions of the policy.
To the extent that any part of the claim for building repairs is cash settled, the FSP is
to pay interest on the settlement amount at the rate determined under section 57 of
Case No: 472240 Determination Page 2 of 9
the Insurance Contracts Act 1984 (Cth) (the Act), for the period from 22 August 2016
until the payment date.
In addition, the FSP is required to pay the applicants:
the amount of $7,315 (less any payments already made) for costs incurred in
obtaining their engineer’s report, plus interest as outlined above
$3,000 as partial reimbursement of legal fees
$3,300 as compensation for loss of rent
$3,000 as compensation for non-financial loss.
Case No: 472240 Determination Page 3 of 9
2 Reasons for determination
2.1 Is the FSP liable for the disputed damage?
Applicants have established a prima facie claim
As outlined above, the FSP has accepted liability for internal water damage to the
property caused by the insured event. On this basis, the applicants have established
a valid (or prima facie ) claim under the policy.
Accordingly, the FSP is liable for the disputed damage unless it can show that, on the
balance of probabilities, it is entitled to rely on a policy exclusion or is otherwise
entitled to deny liability.
FSP ’s engineer initially advised damage was due to reactive clay soils
After the applicants lodged their claim, the FSP appointed an engineer (AA) to
inspect the property and determine the cause of the damage.
In his report dated 21 March 2016, AA concluded that the cracking to the internal
walls had not been caused by water leaking from the hot water system, but by
shrinking and swelling of the reactive clay soils due to seasonal changes in moisture
content.
AA recommended that the cracks be monitored and reinspected during drier weather
to determine whether the cracking had worsened or improved.
Applicants’ engineer says cracking was caused by insured event
The applicants disputed AA’s findings and engaged their own engine er (GE) to
inspect the property. GE also supervised the drilling of three boreholes to obtain soil
samples, which were later subjected to laboratory tests.
In his report dated 7 August 2016, GE advised that:
based on the tests conducted, the soil at the property was not reactive clay and
had little ability to shrink or swell
the nature and location of the cracking damage observed at the property was
not consistent with damage caused by shrinking and swelling of the foundation
soils
the soils in the area of the burst hot water service had a moisture content higher
than their plastic limit
the footings at the property had failed due to the inundation of the foundation
soils, causing the internal walls to crack.
FSP’s engineer retracted initial findings and proposed further investigations
After the FSP received GE’s report, it contacted AA and asked him to respond,
providing a more detailed explanation of his findings about the cause of damage.
After reviewing GE’s report, AA agreed that the foundation soils at the property were
not reactive clay soils. Accordingly, he retracted his original findings that the disputed
Case No: 472240 Determination Page 4 of 9
damage had been caused by the shrinking and swelling of the soils due to seasonal
moisture variations.
In an email dated 12 September 2016, AA acknowledged GE’ s view that the damage
had been caused by water saturating the soils under the slab. However, he
questioned whether a sufficient quantity of water would have leaked from the burst
hot water service to cause the damage observed.
AA recommended that further investigations be carried out to determine the cause of
the damage, including:
obtaining copies of the buildings plans, information about water and electricity
usage, and copies of property inspection reports
conducting CCTV investigations to identify whether there were any leaking
pipes
carrying out testing to determine the details of the slab, including its
permeability to water
excavating the footings to confirm the depth of the perimeter footings.
Further investigations were recommended but not carried out
The FSP advised AA it was willing for him to carry out further tests to more
accurately determine the cause of the damage.
However, it appears these tests were never carried out. In November 2016, AA
advised the FSP that the plumber had failed to inspect the pipes despite many
requests to do so.
The FSP requested a further report from AA as to the cause of the damage. It a lso
contacted the applicants to seek copies of water and electricity bills and property
inspection reports.
After a delay of several months, the applicants provided some of the water bills
requested (although not the account for the period during which the insured event
occurred). The applicants advised they were unable to provide copies of electricity
bills or property inspection reports.
In February 2017, the FSP again requested that AA provide a report responding to
the findings in GE’s report of August 2016.
However, it was not until the FOS Case Manager followed up in June 2017 that the
FSP realised this report had never been obtained. AA then provided a supplementary
report dated 13 July 2017.
FSP ’s engineer has not clearly identified an alternative cause of damage
In his supplementary report, AA advised that the damage appeared to have been
caused by inundation of the soils under the concrete slab.
AA said he did not believe that the inundation was caused by the insured event, for
the following reasons:
Case No: 472240 Determination Page 5 of 9
the soil samples obtained by GE showed that the soil was still wet six months
after the hot water service burst in February 2017, which was not consistent
with the wetness having been caused by a single event
the applicants had reported that the cracking occurred immediately after the
insured event. However, he would usually expect there to be a time lag between
the inundation of the soils and the softening of the soils (and resultant failure of
the footings .
However, AA was unable to provide a clear alternative explanation as to how the
inundation of the foundation soils had occurred. He listed the following possible
causes:
cracking to plumbing under the slab (which he noted could be confirmed by
CCTV testing of the pipework under the slab)
stormwater discharge from downpipes leading directly to the ground
overland stormwater flow from the main road at the front of the property.
FSP has failed to establish disputed damage was not caused by insured event
As outlined above, the FSP bears the onus of establishing that, on the balance of
probabilities, it is entitled to rely on a policy exclusion or is otherwise entitled to deny
liability for the disputed damage.
Having carefully reviewed the available information, the panel does not consider that
the FSP has satisfied its onus of proof in this regard.
Both parties’ engineers agree that the wall cracking was caused by the inundation of
the foundation soils. GE has identified the mechanism of inundation as being the
escape of water from the burst hot water service.
In contrast, AA has been unable to identify with any certainty the mechanism by
which the inundation occurred. Further, AA has not conducted any further testing
despite having been authorised to do so by the FSP.
In relation to the alternative causes suggested by AA, the panel notes that:
the existence of broken pipes could have been identified by CCTV testing,
which AA was authorised to carry out in September 2016 (almost a year before
he prepared his supplementary report)
the suggestion that the damage was caused by stormwater discharge from the
downpipes is inconsistent with the photographs included in GE’s report, which
confirm there was no cracking damage to the garage slab immediately adjacent
to the downpipes.
The panel acknowledges that limited information has been provided in relation to the
volume of water which escaped from the burst hot water service in February 2017.
However, the panel notes that the FSP confirmed in December 2016 that AA was
willing to provide a further report i n the absence of the additional information
requested from the applicants.
Further, it appears that the information which the applicants did provide was never
passed on to AA for his review.
Case No: 472240 Determination Page 6 of 9
In these circumstances, the panel considers that the alternative explanations
provided by AA are purely speculative. Accordingly, the FSP has not established that
the disputed damage was caused by anything other than the insured event.
FSP is required to settle claim for disputed damage
As outlined above, the FSP has previously agreed to cash settle the applicants for
$11,404.49 (net of the policy excess) for the cost of repairing water damage to
internal cabinets and floating floors. It is unclear whether this amount has been paid.
The FSP did not assess the cost of repairing the cracking damage to the walls (and
any related damage to the foundations). The quotations provided by the applicants
provide limited information about the extent of the damage.
The applicants have confirmed that the property has not been repaired.
In these circumstances, the panel considers the FSP should be required to settle the
claim in accordance with the terms of the policy (by, at its discretion, repairing the
damage or cash settling the applicants for the reasonable costs of the repairs).
To the extent that any part of the claim for building repairs is cash settled, the FSP is
to pay interest on the settlement amount at the rate determined under section 57 of
the Insurance Contracts Act 1984 (Cth) (the Act), from the time when it was
unreasonable for the FSP to have withheld payment.
In the circumstances, the Panel considers the relevant date to be 22 August 2016,
two weeks after the FSP received GE’s report.
2.2 Are the applicants entitled to compensation?
Applicants are entitled to reimbursement for costs of engineer’s report
Under the Terms of Reference, FOS may require a financial services provider to
contribute to the professional costs incurred by an applicant in the course of the
dispute.
However, FOS will not usually require a financial services provider to contribute more
than $3,000 to professional costs, unless exceptional circumstances apply.
The FSP has previously agreed to reimburse the applicants for fees of $6,468 paid to
GE for his report (although it is unclear whether this amount has been paid).
The applicants have provided an additional invoice for $847 for concrete cutting
required to enable GE to obtain a soil sample from the area near the hot water
service.
The panel considers GE’s repor t was of assistance in considering this dispute. The
concrete cutting costs were reasonably incurred for the purpose of enabling GE to
provide his report.
Accordingly, the FSP is required to reimburse the applicants for total costs of $7,315,
plus interest as outlined above.
Case No: 472240 Determination Page 7 of 9
Applicants are entitled to partial reimbursement for legal fees
The applicants seek reimbursement for legal fees of $11,600. This amount includes
costs which have not yet been incurred.
The FOS process is designed to be accessible to applicants without the need for
legal advice.
Accordingly, FOS considers that the reimbursement of legal fees is only appropriate
in limited circumstances (for example, where a dispute raises complex legal or
technical issues).
In the present case, the panel acknowledges that the applicants had made little
progress with their dispute for an extended period of time. Accordingly, it is
understandable they would seek to engage a solicitor.
However, the panel is not satisfied that the issues raised by the dispute are such as
would justify the provision of detailed legal advice.
On this basis, the panel considers the FSP should be required to pay the applicants
the amount of $3,000 as partial reimbursement of costs incurred in obtaining legal
advice.
Applicants are entitled to compensation for loss of rent
Under the Terms of Reference, FOS may require a financial services provider to
compensate an applicant for consequential financial loss (capped at $3,300) suffered
in connection with their claim.
The policy does not provide compensation for loss of rent. However, the applicants
say the FSP should be required to compensate them due to its failure to accept their
claim and repair the damage to the property.
The FSP’s claim records confirm that the loss adjuster (CL) who inspected the
property in February 2016 advised the tenants should vacate immediately due to the
risk that the walls would collapse.
The applicants say the property has remained vacant since that time as they have
been unable to access the funds to complete the necessary repairs.
The panel is satisfied that the applicants have suffered consequential financial loss
(loss of rent) due to the FSP’s failure to properly resolve their claim. Based on the
weekly rental of $295, the applicants’ loss exceeds the maximum of $3,300 which
can be awarded by FOS.
Accordingly, the FSP is required to pay the applicants the amount of $3,300 as
compensation for consequential financial loss.
Applicants are entitled to compensation for non-financial loss
FOS may award compensation for non-financial loss (capped at $3,000) where there
has been an unusual amount of physical inconvenience, time taken to resolve a
situation, or interference with an a pplicant’s expectation of enjoyment or peace of
mind.
Case No: 472240 Determination Page 8 of 9
As outlined above, there have been significant delays experienced during the course
of the claim. In particular, there was a delay of almost a year between AA reviewing
GE’s report and providing his supplementary report. The FSP has advised that the
delay was caused by a contractual issue with its external service provider.
The panel is satisfied that the applicants have suffered additional stress and
inconvenience due to the extended delays experienced during the claim process.
In the circumstances, the panel considers the FSP should be required to pay the
applicants the amount of $3,000 as compensation for non-financial loss.
Case No: 472240 Determination Page 9 of 9
3 Supporting information
3.1 FOS approach to this dispute
This dispute has not been the subject of a FOS recommendation. Due to the nature
of the dispute, it has been referred directly to a panel for determination, in line with
the Operational Guidelines to the FOS Terms of Reference. The panel consists of an
Ombudsman and two representatives with consumer and insurance experience.
The panel has decided this case based on what is fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous FOS decisions (which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other.
The panel has reviewed and considered all of the material provided by the parties.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, the panel has restricted its commentary to those issues that it
considers directly relevant to the outcome only.
During the course of this dispute, the applicants have been represented by a solicitor.
For the purposes of this determination, submissions made by the applicants’ solicitor
have been treated as if they had been made by the applicants themselves.