Denial of mould remediation and contents claim after water inundation
Summary
Applicants whose home was flooded in 2011 claimed mould remediation and contents losses after the FSP denied the claim. AFCA found the mould was caused by the inundation and the FSP's failure to remediate, and ordered payment of $150,460 plus GST for mould and contents remediation and $12,900 for non-salvageable contents.
Mould growth flowing from the insured water event and the insurer's failure to remediate was covered, and the insured had not failed to take reasonable precautions as the subjective test requires.
Issues
- Claim denial primary · upheld
“I am satisfied that the FSP is liable to meet the applicants' claim for the non-salvageable contents of $12,900 and for the remediation of the mould.”
- Repairs or contractors secondary · upheld
“The FSP did not attend any remediation works or assessment of possible development of mould when addressing the first contents claim.”
Subjects and remedies
home or building damagepay claim
Text of the determination
Determination
Case No: 472168 Determination Page 1 of 5
Case number: 472168 22 January 2018
1 Overview
1.1 Dispute
The applicants lodged a claim on their home and contents policy held with the
financial services provider (FSP) for contents damage after the property suffered
storm related damage on 25 December 2011.
The FSP recommended the applicant pump water out of the flooded basement and
settled the claim for damaged contents for $7,494.29. Approximately 12 months later,
the applicants lodged a further claim for damage to the building after noticing cracks
develop over a 12 month period. Determination 422112 was issued by the Service in
relation to that claim.
The determination was that the FSP repair the property based on a scope of works
provided. The claim was subsequently settled for $400,000 plus interest as the
assessed cost to repair the property exceeded the sum insured.
The settlement of the building claim left open the claim to further contents damage
and the remediation of damage caused by mould.
The applicants now seek settlement of the claim for the remediation of the mould
damage to the home plus compensation for damage to the contents. The applicants
say continued mould damage is due to the FSP’s negligence and mismanagement of
the claim.
The FSP has denied the claim and says:
there is no evidence of contents damage beyond the amount already paid.
there is no evidence of an insured event.
the spread of mould over the house over time was caused by the failure to
dispose of water damage contents.
the claim is excluded from cover as the policy excludes cover for toxic mould.
the applicants failed to take reasonable precautions to protect the contents
against loss or damage.
1.2 Issues and key findings
Is the FSP entitled to deny the applicants’ claim?
The FSP is not entitled to deny the applicants ’ claim because, on the balance of
probabilities:
the mould damage arose as a result of the inundation of the ap plicant’s property
on 25 December 2011.
the failure of the FSP to properly manage and remediate the water damage
caused the mould growth and proliferation.
Case No: 472168 Determination Page 2 of 5
the FSP has not established that the applicants have failed to take reasonable
precautions to avoid loss or damage to the contents.
What is the extent of the FSP’s liability?
The applicants have provided quotations for the cost to remediate the damaged
contents of $32,700 and non-salvageable contents of $12,900. The FSP is to pay the
applicants ’ claim for loss of contents for $45,600.
The FSP is to also pay the costs of remediating the mould damage as identified in
the quotation provided by the applicants of $117,760.
1.3 Determination
This determination is i n favour of the applicants.
The FSP is to pay the applicants the sum of $150,460 plus GST if applicable in
settlement of the claim for and remediation of the mould damage to the property and
contents.
The FSP is also requested to pay the applicants $12,900 for the non-salvageable
contents.
Case No: 472168 Determination Page 3 of 5
2 Reasons for determination
2.1 Is the FSP entitled to deny the applicants’ claim?
FSP aware of mould damage
When accepting settlement of the building claim, the applicants clearly informed the
FSP that acceptance of the offer left open the claim for damage to contents/mould.
A chronology of events from 21 November 2016 confirms that the applicants
informed the FSP on 8 December 2016 that they had obtained a hygienist report
confirming mould throughout the house.
The chronology identifies that the FSP requested its proposed builder come back
with recommendations.
The FSP contacted the applicant to advise that it believed the levels whilst elevated
were not extreme and a report would be obtained to confirm if there was further
possible leaks.
On 19 December 2016, the applicants informed the FSP of concerns not only with
the mould but also with the temporary accommodation at that stage being provided.
The FSP confirmed on 28 December 2016 that the FSP was treating the elevated
mould levels and the building repairs as separate claims.
Expert documentation establishes mould damage to the applicants’ property
The applicants ’ report from (EC) dated 29 November 2016 confirms the presence of
mould in the property and in particular mould in the basement.
The applicants also provided a report from (BHS) dated 13 January 2017. That report
identified that the basement area represented an unacceptable level of airborne
spores and that items in the basement should not be used or moved until suitable
decontamination. The report also concluded that other areas identified had low to
medium mould levels. BHS commented the personal contents were not considered to
be seriously affected at this stage but personal contents should be specifically tested
as required.
The FSP has relied on the report from BHS to maintain that only the basement area
has been affected and that the balance of the applicants’ home has not been
affected.
It has also relied on a report from (EHS) dated 6 February 2017. The EHS report was
limited to a visual inspection only and no air or surface testing for mould was
conducted. The applicants note that EHS failed to make any reference to the sub soil
or to remediation of the sub soil area.
Visible mould was identified by EHS who agreed with EC that the water event of
2011 may be affecting the indoor environment of the applicants’ home. EHS
considered the area continues to have rain ingress during periods of heavy rain.
The applicants provided a further report from EC addressing a number the issues
raised by the FSP. EC confirms that the development and spread of mould is
Case No: 472168 Determination Page 4 of 5
consistent with the inundation in December 2011. According to EC, it is very likely
that mould growth and proliferation would occur with water inundation not addressed
by a professional remediation team within 48 hours.
I accept the information establishes mould growth and proliferation had spread
beyond the basement and was affecting the entire house .
FSP did not attend to remediation of the mould damage
There is no dispute that the FSP did not attend any remediation works or assessment
of possible development of mould when addressing the applicants’ first contents
claim.
The FSP has not provided any reports to dispute the findings of EC. Rather the FSP
has maintained that the current inundation is due to the applicants’ failure to remove
the damaged contents.
The applicants have consistently stated that all damaged contents, of which they
were aware, were removed. There is no evidence to dispute this.
The applicants have consistently stated that the FSP was aware the filing cabinet
contained sensitive material and had sustained some damage. Despite this the FSP
failed to conduct any remediation of either the filing cabinet or its contents.
Mould growth and proliferation a direct result of water inundation
I accept based on the information provided that the development of mould was a
direct result of the inundation of the a pplicants’ property on 25 December 2011.
I also accept that the growth and proliferation of mould was a direct result of the
failure to conduct a proper assessment and remediation of the area by the FSP at
that time. I also accept the FSP failed to properly assess the potential growth and
proliferation of mould during the assessment of the building claim.
The FSP was aware, contrary to its arguments, that mould remediation was urgently
required prior to the resolution of the building claim.
If the FSP had closely read the report from EHS it would have been aware that no
assessment had been made of the house contents. If it had carefully read the report
from BHS it would have identified that whilst BHS indicated personal contents were
not considered to be seriously affected ‘ at that stage ’ that they should be specifically
tested as required. The FSP appears to have either misunderstood these reports or
ignored the reports at that time.
No evidence applicant failed to take reasonable precautions
The FSP has argued that the applicants failed to take reasonable precautions to
avoid loss or damage to its contents.
The relevant test to establish a failure to take reasonable precautions is a subjective
test. The FSP is required to establish that the applicant not only recognised the risk
of the mould infestation developing but deliberately courted that risk or acted
recklessly without regard to the risk.
Case No: 472168 Determination Page 5 of 5
There is no evidence in the information exchanged that the applicant was aware of
the risk of mould developing in the cellar. The applicant had not been made aware of
this risk by the FSP or by any of the assessors’ , engineers or builders who had
attended the property during the course of the dispute relating to the building.
It was not until the applicants, at the request of their doctor, arranged for a hygienist
to attend the property that they became aware of the possibility of the mould
infestation. At that time the applicant contacted the FSP.
The FSP has been aware that there was mould infestation at least in the basement
area of the property from receipt of the various expert reports. Close examination of
those reports indicates that further investigation should have been undertaken at that
time to prevent the growth and proliferation of the mould.
The FSP has not established the applicants failed to take reasonable precautions to
prevent the loss or damage to the contents.
Contents sum insured does not apply
The FSP notified the applicants that it was treating the claim for the damage to the
contents and mould remediation as a separate claim to the building claim.
It confirmed with the applicants that in the event that the remediation of the mould
was related to the inundation that it would cover the costs of the remediation and
contents.
As I have determined, the growth and proliferation of the mould has been caused by
the initial inundation and the FSP’s management of the claim. If the FSP had acted
promptly in its remediation of the mould then it is likely that the extent of the loss
would have been limited.
The applicants have provided a report together with a remediation quote from (BG).
The scope of works identified the required mould remediation works and considered
the recommendations made by EC.
The quote provides a detailed pricing schedule for a sum totalling $150,460 exclusive
of GST. Included within the quote is the remediation of contents totalling $32,700.
The applicants have separately provided a list of non-salvageable items totalling
$12,900.
The FSP has not provided any information to dispute the quote or estimate of non-
salvageable items. In the circumstances I accept the quotes provided are fair and
reasonable.
In the absence of any further information from the FSP, I am satisfied that the FSP is
liable to meet the applic ants’ claim for the non -salvageable contents of $12,900 and
for the remediation of the mould including the remediation of contents in the sum of
$150,460 exclusive of GST.