Home / Financial Firm (Unknown - Insurer) / Determination 472168

Determination 472168

Denial of mould remediation and contents claim after water inundation

FirmFinancial Firm (Unknown - Insurer)
Decided2018-02-07
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$163,360
Non-financial loss—
Amount claimed$163,360
SourceAFCA PDF

Summary

Applicants whose home was flooded in 2011 claimed mould remediation and contents losses after the FSP denied the claim. AFCA found the mould was caused by the inundation and the FSP's failure to remediate, and ordered payment of $150,460 plus GST for mould and contents remediation and $12,900 for non-salvageable contents.

Mould growth flowing from the insured water event and the insurer's failure to remediate was covered, and the insured had not failed to take reasonable precautions as the subjective test requires.

Issues

Subjects and remedies

home or building damagepay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 472168 Determination Page 1 of 5 Case number: 472168 22 January 2018 1 Overview 1.1 Dispute The applicants lodged a claim on their home and contents policy held with the financial services provider (FSP) for contents damage after the property suffered storm related damage on 25 December 2011. The FSP recommended the applicant pump water out of the flooded basement and settled the claim for damaged contents for $7,494.29. Approximately 12 months later, the applicants lodged a further claim for damage to the building after noticing cracks develop over a 12 month period. Determination 422112 was issued by the Service in relation to that claim. The determination was that the FSP repair the property based on a scope of works provided. The claim was subsequently settled for $400,000 plus interest as the assessed cost to repair the property exceeded the sum insured. The settlement of the building claim left open the claim to further contents damage and the remediation of damage caused by mould. The applicants now seek settlement of the claim for the remediation of the mould damage to the home plus compensation for damage to the contents. The applicants say continued mould damage is due to the FSP’s negligence and mismanagement of the claim. The FSP has denied the claim and says:  there is no evidence of contents damage beyond the amount already paid.  there is no evidence of an insured event.  the spread of mould over the house over time was caused by the failure to dispose of water damage contents.  the claim is excluded from cover as the policy excludes cover for toxic mould.  the applicants failed to take reasonable precautions to protect the contents against loss or damage. 1.2 Issues and key findings Is the FSP entitled to deny the applicants’ claim? The FSP is not entitled to deny the applicants ’ claim because, on the balance of probabilities:  the mould damage arose as a result of the inundation of the ap plicant’s property on 25 December 2011.  the failure of the FSP to properly manage and remediate the water damage caused the mould growth and proliferation. Case No: 472168 Determination Page 2 of 5  the FSP has not established that the applicants have failed to take reasonable precautions to avoid loss or damage to the contents. What is the extent of the FSP’s liability? The applicants have provided quotations for the cost to remediate the damaged contents of $32,700 and non-salvageable contents of $12,900. The FSP is to pay the applicants ’ claim for loss of contents for $45,600. The FSP is to also pay the costs of remediating the mould damage as identified in the quotation provided by the applicants of $117,760. 1.3 Determination This determination is i n favour of the applicants. The FSP is to pay the applicants the sum of $150,460 plus GST if applicable in settlement of the claim for and remediation of the mould damage to the property and contents. The FSP is also requested to pay the applicants $12,900 for the non-salvageable contents. Case No: 472168 Determination Page 3 of 5 2 Reasons for determination 2.1 Is the FSP entitled to deny the applicants’ claim? FSP aware of mould damage When accepting settlement of the building claim, the applicants clearly informed the FSP that acceptance of the offer left open the claim for damage to contents/mould. A chronology of events from 21 November 2016 confirms that the applicants informed the FSP on 8 December 2016 that they had obtained a hygienist report confirming mould throughout the house. The chronology identifies that the FSP requested its proposed builder come back with recommendations. The FSP contacted the applicant to advise that it believed the levels whilst elevated were not extreme and a report would be obtained to confirm if there was further possible leaks. On 19 December 2016, the applicants informed the FSP of concerns not only with the mould but also with the temporary accommodation at that stage being provided. The FSP confirmed on 28 December 2016 that the FSP was treating the elevated mould levels and the building repairs as separate claims. Expert documentation establishes mould damage to the applicants’ property The applicants ’ report from (EC) dated 29 November 2016 confirms the presence of mould in the property and in particular mould in the basement. The applicants also provided a report from (BHS) dated 13 January 2017. That report identified that the basement area represented an unacceptable level of airborne spores and that items in the basement should not be used or moved until suitable decontamination. The report also concluded that other areas identified had low to medium mould levels. BHS commented the personal contents were not considered to be seriously affected at this stage but personal contents should be specifically tested as required. The FSP has relied on the report from BHS to maintain that only the basement area has been affected and that the balance of the applicants’ home has not been affected. It has also relied on a report from (EHS) dated 6 February 2017. The EHS report was limited to a visual inspection only and no air or surface testing for mould was conducted. The applicants note that EHS failed to make any reference to the sub soil or to remediation of the sub soil area. Visible mould was identified by EHS who agreed with EC that the water event of 2011 may be affecting the indoor environment of the applicants’ home. EHS considered the area continues to have rain ingress during periods of heavy rain. The applicants provided a further report from EC addressing a number the issues raised by the FSP. EC confirms that the development and spread of mould is Case No: 472168 Determination Page 4 of 5 consistent with the inundation in December 2011. According to EC, it is very likely that mould growth and proliferation would occur with water inundation not addressed by a professional remediation team within 48 hours. I accept the information establishes mould growth and proliferation had spread beyond the basement and was affecting the entire house . FSP did not attend to remediation of the mould damage There is no dispute that the FSP did not attend any remediation works or assessment of possible development of mould when addressing the applicants’ first contents claim. The FSP has not provided any reports to dispute the findings of EC. Rather the FSP has maintained that the current inundation is due to the applicants’ failure to remove the damaged contents. The applicants have consistently stated that all damaged contents, of which they were aware, were removed. There is no evidence to dispute this. The applicants have consistently stated that the FSP was aware the filing cabinet contained sensitive material and had sustained some damage. Despite this the FSP failed to conduct any remediation of either the filing cabinet or its contents. Mould growth and proliferation a direct result of water inundation I accept based on the information provided that the development of mould was a direct result of the inundation of the a pplicants’ property on 25 December 2011. I also accept that the growth and proliferation of mould was a direct result of the failure to conduct a proper assessment and remediation of the area by the FSP at that time. I also accept the FSP failed to properly assess the potential growth and proliferation of mould during the assessment of the building claim. The FSP was aware, contrary to its arguments, that mould remediation was urgently required prior to the resolution of the building claim. If the FSP had closely read the report from EHS it would have been aware that no assessment had been made of the house contents. If it had carefully read the report from BHS it would have identified that whilst BHS indicated personal contents were not considered to be seriously affected ‘ at that stage ’ that they should be specifically tested as required. The FSP appears to have either misunderstood these reports or ignored the reports at that time. No evidence applicant failed to take reasonable precautions The FSP has argued that the applicants failed to take reasonable precautions to avoid loss or damage to its contents. The relevant test to establish a failure to take reasonable precautions is a subjective test. The FSP is required to establish that the applicant not only recognised the risk of the mould infestation developing but deliberately courted that risk or acted recklessly without regard to the risk. Case No: 472168 Determination Page 5 of 5 There is no evidence in the information exchanged that the applicant was aware of the risk of mould developing in the cellar. The applicant had not been made aware of this risk by the FSP or by any of the assessors’ , engineers or builders who had attended the property during the course of the dispute relating to the building. It was not until the applicants, at the request of their doctor, arranged for a hygienist to attend the property that they became aware of the possibility of the mould infestation. At that time the applicant contacted the FSP. The FSP has been aware that there was mould infestation at least in the basement area of the property from receipt of the various expert reports. Close examination of those reports indicates that further investigation should have been undertaken at that time to prevent the growth and proliferation of the mould. The FSP has not established the applicants failed to take reasonable precautions to prevent the loss or damage to the contents. Contents sum insured does not apply The FSP notified the applicants that it was treating the claim for the damage to the contents and mould remediation as a separate claim to the building claim. It confirmed with the applicants that in the event that the remediation of the mould was related to the inundation that it would cover the costs of the remediation and contents. As I have determined, the growth and proliferation of the mould has been caused by the initial inundation and the FSP’s management of the claim. If the FSP had acted promptly in its remediation of the mould then it is likely that the extent of the loss would have been limited. The applicants have provided a report together with a remediation quote from (BG). The scope of works identified the required mould remediation works and considered the recommendations made by EC. The quote provides a detailed pricing schedule for a sum totalling $150,460 exclusive of GST. Included within the quote is the remediation of contents totalling $32,700. The applicants have separately provided a list of non-salvageable items totalling $12,900. The FSP has not provided any information to dispute the quote or estimate of non- salvageable items. In the circumstances I accept the quotes provided are fair and reasonable. In the absence of any further information from the FSP, I am satisfied that the FSP is liable to meet the applic ants’ claim for the non -salvageable contents of $12,900 and for the remediation of the mould including the remediation of contents in the sum of $150,460 exclusive of GST.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.