Home / Financial Firm (Unknown - Insurer) / Determination 471270
Determination 471270
Denial of water damage claim and inadequate make-safe after storms
Summary
The applicant claimed for water damage from two storms, with the FSP denying all liability on the basis of faulty roof flashing. AFCA found the first-storm damage was excluded but the FSP's inadequate make-safe contributed to second-storm damage, and ordered a $10,000 contribution against a $59,402 claim.
Faulty workmanship is excluded as the proximate cause of the first storm damage, but once an insurer undertakes make-safe works it is responsible for completing them correctly.
Issues
- Claim denial primary · upheld
“The FSP is not liable for the first storm damage, but its make safe repairs were inadequate, so it must contribute to damage caused by the second storm.”
- Delay secondary · not upheld
“I do not consider that the FSP's delay in informing the applicant of AR's findings was unreasonable.”
- Repairs or contractors secondary · upheld
“The make safe works carried out by the FSP's contractors were inadequate and contributed to water entering during the second storm.”
Subjects and remedies
home or building damagenatural disasterpay compensation
Text of the determination
Determination
Case No: 471270 Determination Page 1 of 4
Case number: 471270 26 March 2018
1 Overview
1.1 Dispute
The applicant lodged a claim under her home insurance policy with the financial
services provider (FSP) for water damage to her home following a storm in January
2017.
The FSP’s contractors attended the property to inspect the damage and carry out
make safe works. A second storm occurred approximately one week later, causing
further damage to the applicant’s home and contents.
The FSP denied liability for all of the damage, on the basis that it had been caused
by rainwater entering through the roof due to faulty workmanship.
However, the applicant considers the FSP is responsible for the damage caused by
the second storm. She says the FSP should have advised her of the issues with the
roof earlier. The applicant also says the FSP’s make safe works were inadequate.
The case manager provided the parties with a recommendation on the issues in
dispute. The recommendation was partly in favour of the applicant. A copy of the
recommendation is attached to this determination.
1.2 Issues and key findings
Were the findings of the recommendation correct?
The findings contained in the recommendation were correct and are adopted in this
determination. The FSP has not provided any additional submissions following the
recommendation.
Is the FSP liable for the damage to the property?
The FSP is not liable for the damage caused by the first storm. However, the
available information establishes that the FSP’s ma ke safe repairs were inadequate,
which contributed to the damage caused by the second storm.
In these circumstances, it is fair that the FSP contribute to the costs of repairing the
damage caused by the second storm.
1.3 Determination
This determination is partly in favour of the applicant.
The FSP is required to pay the applicant the amount of $10,000.
Case No: 471270 Determination Page 2 of 4
2 Reasons for determination
2.1 Were the findings in the recommendation correct?
I have decided this dispute based on what is fair in all the circumstances. I have had
regard to the relevant law, good industry practice, codes of practice and previous
FOS decisions.
In reaching my decision, I have taken into account all the material submitted by the
parties, both before and after the recommendation. I am satisfied that the
documentation I have relied on has been provided to both parties.
I am satisfied that the case manager’s recommendation contains an accurate
summary of the dispute, the issues to be determined, any applicable paragraphs of
the Terms of Reference and any relevant law.
2.2 Is the FSP liable for the damage to the property?
FSP is not liable for damage caused by first storm
The applicant’s policy provides cover for damage caused by a storm, subject to the
exclusions set out in the policy. The policy excludes cover for damage caused by
faulty design or workmanship.
The available information establishes that rainwater entered the applicant’s property
during a storm on 6 January 2017. Accordingly, the applicant has established a valid
(or prima facie ) claim for storm damage.
In order to be entitled to deny the applicant’s claim, the FSP must show that the
proximate cause (that is the dominant, effective or operative cause) of the damage
was faulty design or workmanship.
The roofer (AR) appointed by the FSP to inspect the damage concluded that water
had entered the property due to the defective manner in which the tile apron flashing
had been installed.
AR advised that no provision had been made at the end of the flashing under the
valley to alleviate rainwater build-up and overflow. He noted that the issue had been
exacerbated by the build-up of leaf debris in the valley and apron flashing, which
restricted the drainage of water towards the rear gutter.
The scope of works prepared by the applicant’s builder (M C) also referred to the fact
that the flashing to the underside of the valley had not been installed correctly and
required rectification to prevent the entry of wind-driven rain.
On this basis, I am satisfied that the proximate cause of the water entry to the
applicant’s property during the first storm was the faulty design and workmanship of
the roof.
Accordingly, the FSP is not liable for the water damage caused by the first storm.
Case No: 471270 Determination Page 3 of 4
Available information establishes make safe was not completed correctly
The applicant says the manner in which the FSP handled her claim resulted in
additional damage to her property caused by the second storm.
In particular, the applicant says that the FSP failed to promptly advise her of the
issues with the roof identified by its builder (AR) and the make safe completed by AR
was inadequate.
Having reviewed the claim history, I do not consider that the FSP’s delay in informing
the applicant of AR’s findings was unreasonable. There was a relatively short time
between the date the FSP received the roof report and the second storm.
However, the available information indicates that the make safe works carried out by
the FSP’s contractors were inadequate.
The report provided by the FSP’s builder (BS) includes several close -up, colour
photographs of the applicant’s roof.
From these photographs, it appears that the roofer (AR) removed a number of the
terra cotta roof tiles abutting the metal roof over the extension, presumably to identify
the cause of the water entry. AR tarped this section of the roof and also removed
some (but not all) of the leaf debris.
As outlined in the Recommendation, the applicant’s builder (MC) reported that the
majority of the water damage to the property during the second storm occurred as a
result of the roof tiles having been positioned incorrectly and the tarpaulin having not
been properly secured. The photographs provided appear to show the replaced terra
cotta tiles positioned off centre.
The FSP’s builder (BS) has responded to the concerns raised by the applicant that
the make safe failed to remove all of the leaf debris on the roof. However, neither the
FSP nor its contractors have responded to the issues raised in MC’s report .
In the absence of any such response, I am satisfied that the manner in which the
make safe was completed contributed to water entering the applicant’s house during
the second storm.
The FSP says the make safe works were carried out as a goodwill gesture and the
proximate cause of the water damage during the second storm was the incorrectly
installed flashing.
However, once the FSP undertakes make safe works, it is responsible for ensuring
those works are completed correctly.
While the incorrectly installed flashing was the initial cause of water entry, the
available information establishes that the manner in which the FSP’s contractors
undertook their investigations (and completed make safe works) contributed to the
additional damage caused.
FSP is required to contribute to damage caused by second storm
The applicant contacted the FSP several days after the second storm to advise that
additional water damage had been caused to her home and contents items. Among
Case No: 471270 Determination Page 4 of 4
other things, the applicant says there was damage to floorboards, Turkish rugs,
furniture and electrical appliances.
It is difficult to determine with certainty the extent of the additional damage resulting
from the second storm.
The applicant has provided photographs of some water-affected items, as well as
letters from suppliers confirming water damage to some electrical items. However, it
is not clear that all of the items have been damaged to the extent that replacement is
required.
The scope of works provided by the applicant’s builder (MC) ind icates there was
water damage to the ceilings, cornices, skirtings, floorboards and downlights. The
FSP also spoke with MC, who advised the damage had occurred due to water
entering through the tarped area.
The difficulty of identifying the extent of the additional damage caused by the second
storm is partly due to the fact that the FSP’s builder (BS) appears not to have carried
out a thorough inspection of the property when he attended following the first storm.
BS’s report states there was ‘no internal da mage’, even though the FSP’s restorer
(LF) confirmed otherwise.
However, the applicant has also declined the FSP’s request to conduct a further
assessment of the property following the second storm. This has limited the FSP’s
ability to substantiate the damage claimed.
The applicant’s builder has estimated the repair costs at $27,170. The applicant is
seeking over $50,000 (including the cost of replacing various contents items).
Having regard to the factors outlined above, I consider it is fair in all the
circumstances that the FSP pay the applicant the amount of $10,000 in respect of the
damage claimed.
In determining this amount, I have taken into account the issues experienced by the
applicant during the claims process (particularly the FSP’s failure t o complete an
electrical make safe, for which it has subsequently accepted responsibility).
Recommendation
Case No: 471270 Recommendation Page 1 of 6
Case number: 471270 8 September 2017
3 Overview
3.1 Dispute
The applicant lodged a claim for water damage to her home as a result of a storm
event with the financial services provider (FSP). Before a claims decision was made,
a second storm occurred, which caused more damage. After the second storm event
the FSP denied the claim saying the damage to the property was not a result of
either storm event, but due to faulty workmanship issues with the roof.
The applicant accepts the storm water entered her home due to issues with the roof,
however she believes the FSP should have done more to advise her of this before
the second storm event occurred. She says:
had she been aware of the issues with the roof, she could have arranged for it
to be repaired before the second storm hit
the make safe performed by the FSP’s cont ractor in response to the first storm
was not adequate.
The applicant is seeking $59,402 for repairs to the property and damaged contents
items. The FSP maintains it is not liable for the claimed loss.
3.2 Issues and key findings
Is the FSP liable for the claimed loss?
The FSP is not liable for the damage caused by the first storm event. However the
available information establishes the FSP’s make safe repairs were inadequate,
allowing damage to occur during the second storm.
In these circumstances, it is fair the FSP pay the applicants $10,000 as a contribution
to the damage.
3.3 Recommendation
This recommendation is partly in favour of the applicant.
If both parties accept this recommendation, within a further 14 days of both parties’
acceptance, the FSP is required to pay the applicant $10,000.
Case No: 471270 Recommendation Page 2 of 6
4 Reasons for recommendation
4.1 Is the FSP liable for the claimed loss?
Both parties accept water entered the home due to defective roof flashing
On receipt of the claim, the FSP appointed a roofing expert (AR) to inspect the
damage. AR noted there was no provision at the end of the flashing under the valley
to alleviate water over-spillage. He also noted a build-up of leaf debris in the valley
and corresponding apron, which was contributing to the spillage.
AR did not note any storm related damage to the roof. He considered the damage
was consistent with defective tile apron flashing. AR provided the FSP with a report
on 11 January 2017 confirming this.
The applicant does not disagree with AR’s position that the proximate cause of the
damage was defective roof flashing. However, she considers the FSP should have
informed her of the issues as soon as it became aware so that she could have
arranged the necessary repairs before the second storm hit.
The applicant also considers the make safe performed by the FSP’s contractors in
response to the first storm event was inadequate. She believes this was responsible
for water entering the property as a result of the second storm event.
Applicant says FSP did not handle claim with due care
The applicant says the FSP did not act with due care in response to her claim. She
says she contacted the FSP by way of phone and email on numerous occasions
seeking urgent assistance (particularly with electrical issues), but this was to no avail.
I note the applicant eventually arranged an electrical make-safe herself, which the
FSP reimbursed her for.
The applicant’s main issues relate to the:
inadequacy of the make safe following the first storm event
FSP's delay in advising her of the claim denial, which did not occur until 24
January 2017.
The applicant says had the FSP brought the roof defect to her attention when it
became aware (11 January 2017), she could corrected the defect prior to the second
storm event on 19 January 2017. The applicant says she suffered significant
unnecessary loss from the second storm event as a consequence.
FSP says it acted reasonably in the circumstances
The FS P says it acted upon the applicant’s claim as soon as it was received. It
appointed a building consultant (BS) and a restorer (LF) to make safe the roof and
any electrical issues, and install drying machines inside of the property respectively.
Whilst the FSP did not arrange an electrical make safe, the FSP placed a tarp on the
roof.
Case No: 471270 Recommendation Page 3 of 6
LF attended the property on the day the applicant lodged the claim to install drying
equipment in the home. However the applicant removed the dryers as she was
concerned about the electrical faults within the property due to the water entry and
the humid weather. She also says LF provided no instructions for how the equipment
was to be used.
The FSP says it was not made aware of the roof defect until it received its building
consultant’s report on 18 January 2017. It says the applicant was notified of the issue
in a telephone conversation which took place on that same date. Furthermore, the
FSP notes BS’s advice that the applicant was made aware of the defect by the
roofing specialist who inspected the damage on 10 February 2017.
The FSP said it does not accept any liability for damages occurring during or after the
make safe, as the cause of the damage to the property is consistent with a
workmanship issue. It says it is the applicant’s responsibility to ensure the property is
water tight as outlined in the policy wording.
Documentation suggests damage to property due to inadequate make safe
I accept the FSP notified the applicant of the claim denial within a reasonable time
frame after becoming aware of the roof defect. I note this happened on 24 January
2017 rather than 18 January 2017 as claimed by the FSP. In any event, 24 January
2017 is still within the timeframe allowed for claims decisions by the General
Insurance Code of Practice (10 business days).
The applicant provided a builder’s report (MC) in support of her position that the
FSP’s make safe was inadequate. MC clearly notes water penetration occurred
during the second storm due to the incorrect installation of the tarp and incorrect
positioning of roof tiles.
Despite FOS providing a copy of MC’s report to the FSP, it failed to provide anything
to the contrary.
I note the FSP has argued it is not liable for the damages occurring during or after
the make safe but that would only apply where the make safe was adequate. In this
case, the make safe was noted to be insufficient. As the damage from the second
storm may have been avoided (or at least lessened) with an appropriate make safe,
the FSP needs to take some responsibility for the additional damage suffered.
I appreciate the applicant did not permit the FSP to reinspect the property after the
second storm and this prevented it from properly assessing the loss. The applicant
has claimed for a number of items which she says suffered irretrievable damage.
However there is no documentation to show these items could not be repaired or that
the damage arose solely as a result of the second storm event.
I am satisfied the applicant suffered some additional water damage to the internal
parts of the home as a result of the FSP’s inadequate make safe repairs. Given this,
it must contribute towards her repair costs. I am unable to determine a figure with
complete accuracy, however an amount of $10,000 (also taking into account the
claims issues experienced by the applicant) seems fair and reasonable in the
circumstances.
Case No: 471270 Recommendation Page 4 of 6
Case No: 471270 Recommendation Page 5 of 6
5 Supporting information
5.1 Key documents
Record Key points
FSP’s Restorer ( LF )
Report
06 - 01 - 2017
Met with the insured on 6 January 2017.
It was evident that there was an escape of water.
Recommend builder’s report be obtained.
Assessed the floorboards and took moisture readings – a positive
reading was rec eived.
Installed a drying system to assist with drying the floors and to prevent
se condary damage to the remaining contents.
Treadmill was working and unaffected. Will reassess on next visit.
Affected areas = open plan lounge/dining and kitchen.
FSP’s Roof Specialist
(AR)
Report
11 - 01 - 2017
Single level terracotta tiled roof approx. 4 5 - 50yo with metal deck rear
extension approx. 1yo.
Water entry into kitchen ceiling cavity consistent with defective tile
apron flashing.
No provision at the end of the flashing situated under the valley to
alleviate water over spillage.
Extensive leaf debris build up in the valley and corresponding apron
flashing has also restricted water out - flow towards rear gutter causing
back spillage.
Make - safe carried out whilst on site including removal of leaf debris
and tarp coverage of the affected roof area.
Overall condition of the original roof is fair consistent with age related
wear/tear.
Trim deck metal roof extension is in good new conditi on but
installation of apron flas hing is defective with poor workmans hip.
There is no evidence of storm damage to the roof.
FSP’s Building
Consultant ( BS )
Report
12 - 01 - 2017
Could not view damage as roof already tarped from make - safe.
Insured advised there was no internal damage to the property.
Arranged roof report which identified defective tile apron flashing.
Need to replace flashing.
Recommend denial as no resultant damage.
App’s Builder (MC)
Quote
25 - 01 - 2017
Quotation based on visual inspection only.
The main water penetration was caused by the tarp not being secured
properly and the tiles not positioned correctly.
Tarp was re - secured properly whilst on site.
$27,170 incl GST. Quote allows for repairs to roof as well as internal
damage.
FSP’s Building
Consultant ( BS )
Email to FSP
10 February 2017
Roofer went out to make safe – tarped roof.
Leaf blowing is not part of make safe – whole roof was covered in
leaves. Provide d courtesy service out of good will in the area tarped.
Cleared the valley as far as he could – didn’t have enough power.
He advised insured of building defect on roof – advised her the defect
is the gable flashing isn’t turned where it should be and that she
Case No: 471270 Recommendation Page 6 of 6
should contact her builder.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.