Storm damage cash settlement amount disputed

FirmFinancial Firm (Unknown - Insurer)
Decided2018-02-15
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$1,671
Non-financial loss—
Amount claimed$18,700
SourceAFCA PDF

Summary

The FSP cash settled a storm damage claim for $6,108.35, and the applicant sought $18,700 based on his builder's quote. AFCA increased the FSP's scope allowance to $7,779.65 and ordered an additional insulation payment, but otherwise preferred the FSP's expert evidence.

Expert evidence was preferred on mould, gutter and ceiling repairability, but the likely insulation water damage required an additional allowance; the $1,671.30 shown is the balance after the prior $6,108.35 settlement, excluding the unquantified insulation amount.

Issues

Subjects and remedies

pay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 471174 Determination Page 1 of 4 Case number: 471174 29 January 2018 1 Overview 1.1 Dispute The financial services provider (FSP) partially accepted the applicant’s claim for damage following a storm and issued a cash settlement for $6,108.35. The applicant disputes the FSP’s settlement. This is because he believes the damage is more extensive. The applicant is therefore seeking payment based on an independent builder’s (LF) quote he obtained totalling $18,700. 1.2 Issues and key findings What is the extent of the FSP’s liability ? The extent of the FSP’s liability towards the claim is the following:  paying the sum of $7,779.65  paying a sum for replacing the insulation to the ceilings affected – this is to be based on a quote that the applicant could utilise  providing an allowance for the cost of repairing any damage to the render if this is damaged after the shutters are removed and reinstated 1.3 Determination This determination is substantially in favour of the FSP. The FSP sho uld settle the applicant’s claim in the manner set out in this Determination. Case No: 471174 Determination Page 2 of 4 2 Reasons for determination 2.1 What is the extent of the FSP’s liability ? Parties dispute the scope of works These relevant facts are not in dispute:  the event leading to the damage occurred on 29 December 2016  a claim was lodged on 31 December 2016  the FSP’s builder (RF) inspected the property on 11 January 2017 The difference in amounts is predominantly due to the following:  the FSP does not accept a roof gutter, insulation or wiring were damaged from the storm  the ceilings affected can be repaired and do not need to be replaced  there is no evidence of mould . The applicant says LF’s quote should be preferred as he inspected the damage shortly after the event. The applicant says there is evidence of mould and has provided photographs of stained carpet to support this. The applicant also says the FSP’s experts did not properly investigate the extent of damage. Having carefully reviewed the available information, I prefer the FSP’s p osition for the following reasons. No evidence of mould or that carpet was damaged from the storm The FSP engaged an expert (RX) to assess if there is any mould contamination. RX provided a report dated 9 February 2017 saying there was no evidence of this. LF’s quote says “Mould -Locate and isolate odour caused by mould and water damage”. LF’s quote is unclear about whether mould was located. Further, I note LF’s business is described as carpentry services. It is therefore unclear if his expertise is comparable to RX regarding identifying mould. The applicant provided photographs of stained carpet which he says supports his position there is mould. However, it is not apparent there is mould in the photographs. Further, RX specifically checked the carpet in the bedrooms. RX said there was no damage or mould. I also note LF’s and RF’s quote made no reference to any works required to the carpets. This contradicts the applicant’s evidence that the carpet was damaged from the storm or has mould. Given all this, I am not satisfied the evidence shows the carpet suffered damage from the storm or there is mould present in the property. Evidence does not show roof gutter damaged from storm LF says there is a gutter that needs to be removed and replaced. Case No: 471174 Determination Page 3 of 4 The FSP has provided evidence from a roofing company (LV) and its internal assessor (AS). Both agree there is no damage to the gutter. LV in particular did a detailed report about the roofing. Whilst LV identified the gutter that overflowed during the storm, LV did not say this was damaged. LF’s quote provides no reasoning as to why he was satisfied the gutter was damaged from the storm. I prefer LV’s evidence given their expertise and detailed report . Therefore, I am not satisfied the evidence shows the gutter was damaged from the storm. No allowance required for electricals The FSP said the electricals were tested and no damage identified. This was set out in a brief report by RF. The applicant questions the briefness of the report. However, he has provided no evidence t o refute RF’s testing or conclusion. LF’s quote is brief on this point. LF simply says “Isolate and Repair/replace all electrical fittings and fixtures subject to water damage”. This quote does not say testing was conducted. Neither does it specifically co ntradict RF’s report. Given this, I do not accept the FSP is liable to provide an allowance for electricals. Insulation would have likely been affected by water ingress The FSP has accepted the ceilings have been affected by the storm. However, the FSP says there is no evidence the insulation was affected. LF’s quote provides an allowance for “Remove and replace water damaged batts”. This indicates LF was satisfied there was water damage to the insulation. RF did not inspect the ceiling space. This is because RF did not agree the storm affected the ceilings. It does not appear AS inspected the ceiling space either. RX did inspect the ceiling space. However, RX’s report and analysis was limited to saying there was no evidence of mould. RX did not offer a n opinion or make an observation to say there was no water damage to the insulation. In my view, it is difficult to conclude ceilings affected by water ingress would not have damaged insulation. LF’s quote supports they were affected. Of the four experts e ngaged by the FSP, only one inspected the ceiling space (RX). RX’s evidence does not refute LF’s comment or the likely possibility the insulation was affected. Given this, I accept the FSP should pay for the cost to replace the insulation in the ceilings affected. Ceilings affected do not need to be replaced The FSP says the ceilings can be repaired. The FSP has provided evidence from RF and AS to confirm this is appropriate. LF’s quote does not refute this. The quote says “Repair/replace areas subject to d amage”. This appears to contemplate the ceilings can be repaired. Case No: 471174 Determination Page 4 of 4 Whilst the applicant maintains the ceilings cannot be repaired, this is not supported by any of the expert evidence. Therefore, I prefer the FSP’s position and accept the ceilings can be re paired. The amount allowed in RF’s scope of works should increase to $7,779.65 The FSP’s settlement was based on RF’s quote dated 16 January 2017. Barring the insulation, I am satisfied RF’s quote is based on an appropriate scope of works. However, for reasons to follow, it is appropriate to increase the amount allowed. RF’s quote and scope of works appeared to accompany its report following its inspection on 11 January 2017. However, the report noted the repair cost estimate to be $7,409.19 whilst the quote said $6,108.36. When presented with this discrepancy, RF said it was a typing error. This is difficult to reconcile as none of the numbers match. For instance, the typing error extended across all six digits. Further, RF’s quote provides no allowance for administration and 10% for builder’s margin. However, in a tax invoice document issued about a month later, RF allowed 15% builder’s margin and 2% administration. In addition, I note the following:  RF quoted for one hour of supervision despite the scope of works allowing for 50 hours of labour  it is not clear if RF is prepared to do the works for the applicant or that other builders could match their quote. Given all this, I consider it fair in all the circumstances to take into account RF’s initial quote with an appropriate margin of 5%. This is to factor the gaps highlighted above. This totals $7,779.65. FSP should provide an allowance for insulation and possible further damage RF’s scope of works does not include replacing the insulation to the ceili ngs affected. Therefore, the FSP is to pay an additional amount for this. The amount payable should be based on a quote that would have been available for the applicant. RF’s report and LF’s quote both recognise that there may be damage to the render upon removing and reinstating the shutters. If this occurs, the FSP is also to provide an allowance for this based on what it would cost the applicant to repair that damage.