Home / Financial Firm (Unknown - Insurer) / Determination 471174
Determination 471174
Storm damage cash settlement amount disputed
Summary
The FSP cash settled a storm damage claim for $6,108.35, and the applicant sought $18,700 based on his builder's quote. AFCA increased the FSP's scope allowance to $7,779.65 and ordered an additional insulation payment, but otherwise preferred the FSP's expert evidence.
Expert evidence was preferred on mould, gutter and ceiling repairability, but the likely insulation water damage required an additional allowance; the $1,671.30 shown is the balance after the prior $6,108.35 settlement, excluding the unquantified insulation amount.
Issues
- Claim amount dispute primary · upheld
“I accept the FSP should pay for the cost to replace the insulation in the ceilings affected.”
- Inadequate claim investigation secondary · not upheld
“Having carefully reviewed the available information, I prefer the FSP's position.”
Subjects and remedies
pay claim
Text of the determination
Determination
Case No: 471174 Determination Page 1 of 4
Case number: 471174 29 January 2018
1 Overview
1.1 Dispute
The financial services provider (FSP) partially accepted the applicant’s claim for
damage following a storm and issued a cash settlement for $6,108.35.
The applicant disputes the FSP’s settlement. This is because he believes the
damage is more extensive. The applicant is therefore seeking payment based on an
independent builder’s (LF) quote he obtained totalling $18,700.
1.2 Issues and key findings
What is the extent of the FSP’s liability ?
The extent of the FSP’s liability towards the claim is the following:
paying the sum of $7,779.65
paying a sum for replacing the insulation to the ceilings affected – this is to be
based on a quote that the applicant could utilise
providing an allowance for the cost of repairing any damage to the render if this
is damaged after the shutters are removed and reinstated
1.3 Determination
This determination is substantially in favour of the FSP.
The FSP sho uld settle the applicant’s claim in the manner set out in this
Determination.
Case No: 471174 Determination Page 2 of 4
2 Reasons for determination
2.1 What is the extent of the FSP’s liability ?
Parties dispute the scope of works
These relevant facts are not in dispute:
the event leading to the damage occurred on 29 December 2016
a claim was lodged on 31 December 2016
the FSP’s builder (RF) inspected the property on 11 January 2017
The difference in amounts is predominantly due to the following:
the FSP does not accept a roof gutter, insulation or wiring were damaged from
the storm
the ceilings affected can be repaired and do not need to be replaced
there is no evidence of mould .
The applicant says LF’s quote should be preferred as he inspected the damage
shortly after the event. The applicant says there is evidence of mould and has
provided photographs of stained carpet to support this. The applicant also says the
FSP’s experts did not properly investigate the extent of damage.
Having carefully reviewed the available information, I prefer the FSP’s p osition for the
following reasons.
No evidence of mould or that carpet was damaged from the storm
The FSP engaged an expert (RX) to assess if there is any mould contamination. RX
provided a report dated 9 February 2017 saying there was no evidence of this.
LF’s quote says “Mould -Locate and isolate odour caused by mould and water
damage”. LF’s quote is unclear about whether mould was located. Further, I note
LF’s business is described as carpentry services. It is therefore unclear if his
expertise is comparable to RX regarding identifying mould.
The applicant provided photographs of stained carpet which he says supports his
position there is mould. However, it is not apparent there is mould in the
photographs. Further, RX specifically checked the carpet in the bedrooms. RX said
there was no damage or mould.
I also note LF’s and RF’s quote made no reference to any works required to the
carpets. This contradicts the applicant’s evidence that the carpet was damaged from
the storm or has mould.
Given all this, I am not satisfied the evidence shows the carpet suffered damage from
the storm or there is mould present in the property.
Evidence does not show roof gutter damaged from storm
LF says there is a gutter that needs to be removed and replaced.
Case No: 471174 Determination Page 3 of 4
The FSP has provided evidence from a roofing company (LV) and its internal
assessor (AS). Both agree there is no damage to the gutter. LV in particular did a
detailed report about the roofing. Whilst LV identified the gutter that overflowed
during the storm, LV did not say this was damaged.
LF’s quote provides no reasoning as to why he was satisfied the gutter was damaged
from the storm.
I prefer LV’s evidence given their expertise and detailed report . Therefore, I am not
satisfied the evidence shows the gutter was damaged from the storm.
No allowance required for electricals
The FSP said the electricals were tested and no damage identified. This was set out
in a brief report by RF.
The applicant questions the briefness of the report. However, he has provided no
evidence t o refute RF’s testing or conclusion.
LF’s quote is brief on this point. LF simply says “Isolate and Repair/replace all
electrical fittings and fixtures subject to water damage”. This quote does not say
testing was conducted. Neither does it specifically co ntradict RF’s report.
Given this, I do not accept the FSP is liable to provide an allowance for electricals.
Insulation would have likely been affected by water ingress
The FSP has accepted the ceilings have been affected by the storm. However, the
FSP says there is no evidence the insulation was affected.
LF’s quote provides an allowance for “Remove and replace water damaged batts”.
This indicates LF was satisfied there was water damage to the insulation.
RF did not inspect the ceiling space. This is because RF did not agree the storm
affected the ceilings. It does not appear AS inspected the ceiling space either.
RX did inspect the ceiling space. However, RX’s report and analysis was limited to
saying there was no evidence of mould. RX did not offer a n opinion or make an
observation to say there was no water damage to the insulation.
In my view, it is difficult to conclude ceilings affected by water ingress would not have
damaged insulation. LF’s quote supports they were affected. Of the four experts
e ngaged by the FSP, only one inspected the ceiling space (RX). RX’s evidence does
not refute LF’s comment or the likely possibility the insulation was affected.
Given this, I accept the FSP should pay for the cost to replace the insulation in the
ceilings affected.
Ceilings affected do not need to be replaced
The FSP says the ceilings can be repaired. The FSP has provided evidence from RF
and AS to confirm this is appropriate.
LF’s quote does not refute this. The quote says “Repair/replace areas subject to
d amage”. This appears to contemplate the ceilings can be repaired.
Case No: 471174 Determination Page 4 of 4
Whilst the applicant maintains the ceilings cannot be repaired, this is not supported
by any of the expert evidence.
Therefore, I prefer the FSP’s position and accept the ceilings can be re paired.
The amount allowed in RF’s scope of works should increase to $7,779.65
The FSP’s settlement was based on RF’s quote dated 16 January 2017. Barring the
insulation, I am satisfied RF’s quote is based on an appropriate scope of works.
However, for reasons to follow, it is appropriate to increase the amount allowed.
RF’s quote and scope of works appeared to accompany its report following its
inspection on 11 January 2017. However, the report noted the repair cost estimate to
be $7,409.19 whilst the quote said $6,108.36.
When presented with this discrepancy, RF said it was a typing error. This is difficult
to reconcile as none of the numbers match. For instance, the typing error extended
across all six digits.
Further, RF’s quote provides no allowance for administration and 10% for builder’s
margin. However, in a tax invoice document issued about a month later, RF allowed
15% builder’s margin and 2% administration.
In addition, I note the following:
RF quoted for one hour of supervision despite the scope of works allowing for
50 hours of labour
it is not clear if RF is prepared to do the works for the applicant or that other
builders could match their quote.
Given all this, I consider it fair in all the circumstances to take into account RF’s initial
quote with an appropriate margin of 5%. This is to factor the gaps highlighted above.
This totals $7,779.65.
FSP should provide an allowance for insulation and possible further damage
RF’s scope of works does not include replacing the insulation to the ceili ngs affected.
Therefore, the FSP is to pay an additional amount for this. The amount payable
should be based on a quote that would have been available for the applicant.
RF’s report and LF’s quote both recognise that there may be damage to the render
upon removing and reinstating the shutters. If this occurs, the FSP is also to provide
an allowance for this based on what it would cost the applicant to repair that damage.