Home / Financial Firm (Unknown - Insurer) / Determination 470800

Determination 470800

Adequacy of cash settlement offer for water leak damage

FirmFinancial Firm (Unknown - Insurer)
Decided2018-06-14
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$396
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

After an earlier determination on a water leak claim, the FSP offered $25,000 in cash settlement, which the applicants rejected as insufficient. AFCA found the offer not fair, ordered the FSP to repair the home to an engineer's scope of works, and ordered $396 plus interest for a plumber's report, leaving underpinning undecided.

The FSP's discretion to cash settle must be exercised fairly, considering whether a cash settlement will adequately ensure the repairs can be completed.

Issues

Subjects and remedies

home or building damagepay compensationpay interestreassess claimrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 470800 Determination Page 1 of 13 Case number: 470800 6 June 2018 1 Overview 1.1 Dispute The applicants lodged a claim for damage caused by a leak in the bathroom in 2009, which the FSP agreed to cover by way of a cash settlement in 2011. This work was completed by the applicants’ builder in 2012. A second claim was lodged after new cracking was noticed in 2013. The FSP denied the claim. The claim was the subject of a FOS determination (421710) dated 27 July 2016 in favour of the applicants. The determination 421710 said the FSP must:  prepare and cost a scope of works and decide whether it will repair the damage or cash settle the damage based on the scope of works  pay the applicants $4,529.80 for their expert reports  pay the applicants statutory interest. A scope of works was prepared and a cash settlement offer was made. The offer was not accepted by the applicants because they say the repair quote did not take all matters into account. In the circumstances, the parties seek a decision about the adequacy of the repair quote and the settlement offer made by the FSP. 1.2 Issues and key findings Is the FSP’s settlement offer fair? The available material does not establish on the balance of probabilities the proposed settlement offer from the FSP is fair in all the circumstances. This is because the offer does not take into account a ll issues and factors including the nature of the repairs required and whether a cash settlement will adequately ensure the applicants are able to properly complete all repairs. A fair outcome is that the FSP arrange to repair the damage, with the engineer (MA) to project manage the work, if it is agreeable. 1.3 Determination This determination is substantially in favour of the applicants. If the applicants accept this determination, and upon the FSP being advised of acceptance, the dispute is to be settled promptly in accordance with the process Case No: 470800 Determination Page 2 of 13 outlined in the determination under the heading “mechanism for fair resolution of the dispute.” Alternatively, if the applicants do not want the FSP to undertake repairs, then the dispute is to be settled promptly in accordance with the process outlined in the determination under the heading “cash settlement option”. Within 14 days of acceptance of the determination, the FSP is to pay the applicants $396 for their plumber’s report plus statutory interest on $396 from the date the applicants paid for the report. Case No: 470800 Determination Page 3 of 13 2 Reasons for determination 2.1 Is the FSP’s settlement offer fair? This matter was previously the subject of FOS determination 421710 in relation to a claim for damage to the insured property caused by leaking water. The determination was in favour of the applicants as I was satisfied the material provided established on the balance of probabilities the damage to the insured property was caused by an insured event (escape of water) and not a policy exclusion (earth movement). The determination said the FSP was to prepare and cost a scope of works (SOW) and decide whether it will repair the damage or cash settle the damage based on the scope of works. The FSP was also to pay the applicants the cost of the expert reports and interest on that cost. After acceptance of the previous determination, the FSP paid the applicants’ expert report costs ($4,529.80) and interest ($279.07). This determination addresses the dispute which has arisen about the ambit of the SOW prepared and whether the FSP’s settlement offer of $25,000 is fair and sufficient to repair the claimed damage. The applicants say the FSP’s repair quote is insufficient After the determination, the FSP’s builder (PB) twice attended the property to undertake a scope of works. The FSP then engaged the applicants’ engineer (MA) to prepare a SOW and PB to quote to repair based on MA’s SO W. After discussion between the parties, a final quote was prepared by PB on 10 November 2016. This is relied on by the FSP and totals $21,845.23. The quote was compiled for cash settlement purposes because PB said he was unable to warrant repairs due to further settling of the property. The quote was valid for 30 days. The determination 421710 acknowledged the FSP could decide whether it would repair the damage or cash settle the damage. The FSP elected to cash settle the damage. Based on available material, the FSP eventually offered to pay the applicants $25,000 (inclusive of other items). This offer was made on 16 December 2016 and the FSP sent a cheque for $25,000 to the applicants on or about 6 January 2017. The offer and the cheque were not accepted. The applicants say the extent of work provided for in the quote is insufficient to repair their home. Examples of items they believe are not included (but should be) are:  wall tile replacement, painting, damaged cornices and floor tiles (and the extent of screed) in the bathroom  repair of all cracking evident in the family/kitchen open area and bedroom 2  replacement of cracked tiles, grout and waterproofing for the laundry Case No: 470800 Determination Page 4 of 13  the extent of tiling and grouting in the hallway and living area  alternative accommodation costs during repairs. The applicants say the amounts allowed for other items, such as the shower screen, are insufficient. The applicants are concerned PB is not prepared to undertake repairs. Further issues were raised in relation to further damage now evident in the laundry. Of great concern to the applicants is the cost of underpinning. The FSP will not commit to meet this cost saying it is outside the scope of the determination. The applicants say PB told them underpinning of the property is required. Further, the applicants submit MA does not say underpinning is not required but merely that it was not recommended at this stage. The applicants are concerned about this work and future engineering costs. The FSP’s quote not definitive as to required repairs and other contingencies The FSP says the scope of works and its offer of $25,000 is compliant with the determination and it is not required to pay anything more or take any further action. The FSP contends the applicants must repair the water leaks and once this is done the insured property can be left to settle. As the determination did not recommend any underpinning work, the FSP submits the scope and offer is compliant with the determination. In its final offer, the FSP said PB’s quote included all the items raised by the applicants. The FSP contends it is not liable for costs associated with delay in repairing leaking pipes. The FSP made some further allowances for some of the items raised by the applicants including builders warranty insurance and allowances for the shower screen and a skip bin. The FSP notes its quote from PB allows for cornice work and painting. It does not allow for “additional tile breakage” as it contends a “skilled professional” should be able to attend to this work without breaking tiles. Re-grouting was allowed but there was no consideration for expansion joints (which the applicants believe is necessary). No provision was made for “future movement” (or underpinn ing) as it could not be determined “at this point”. The applicants continue to assert there are numerous aspects of the SOW which have not been addressed in the PB quote. It does not appear MA was contacted to address the suitability of the PB quote. This may have been prudent given the previous determination and the preparation of the cost of repairs was reliant on MA’s SOW and findings. Having considered all of the available material, I am not satisfied the quote is definitive as to the stated repairs and the amount offered is sufficient to repair the damage. The quote does not address the prospect of additional or remedial work or other considerations as set out by MA in the SOW. Case No: 470800 Determination Page 5 of 13 It is apparent problems may arise in repairs and may continue and this is a concern in reviewing the quote, the SOW and all the material provided by the parties in order to ascertain an appropriate cash settlement. The FSP waived request for further excess There were submissions in relation to the application of a further excess. The applicants confirm this aspect of the dispute has resolved as the FSP waived its request for further payment of excess. In the circumstances, I will not address the issue further. Underpinning work (if any required) to be considered at a later date The applicants arranged for MA to inspect the insured property prior to the determination 421710. The FSP arranged for MA to inspect the insured property again after the determination. The FSP says no recommendations were made by MA in relation to underpinning the insured property. The FSP says MA recommends further work be undertaken at the property to address water leaks and the property should be left to “settle for a period of up to [two] years”. I accept MA made no specific provision for underpinning the property at this time. The specific note provided on its SOW from October 2016 stated: “Provision to be made to undertake further repairs in 2 to 3 years should further movement and cracking occur as the house adjusts.” Such a concern seems consistent with the cautious approach of PB, indicating the possibility of additional considerations at a later time. The FSP says no underpinning was required as part of the previous determination and the “available expert evidence” does not suggest it is requ ired. I accept I made no provision for underpinning in my original determination but this is not determinative of the issue as to whether it may be necessary in the future. Rather, the determination made findings in relation to causation and liability. There was insufficient information to make a determination about quantum. The determination simply required a SOW to be prepared, with the FSP to elect to repair the damage or cash settle the damage based on the SOW. The applicants consulted with several experts in relation to the cost of underpinning. An opinion from CU dated 14 January 2017 notes the property had: “… suffered significant settlement primarily around the exterior foundations of the building. I believe this is due to the highly reactive clay soils and an ongoing sewer pipe leak.” CU was of the view the building had to be underpinned “to stabilise the foundations so that all pipes can be fixed” and to avoid future movement issues. The cost of this work was estimated at $33,400 including GST. Unforeseen extra work may apply. Case No: 470800 Determination Page 6 of 13 A separate quote in August 2016 from LS to underpin the home was $65,450 including GST. The applicants also consulted with SR in August 2016. SR read the engineering and plumbing reports. SR provided two options to the applicants. Option 1, which was described as its recommended long-term solution, estimated the cost of underpinning the home at $132,834. Option 2, which it described as the least it considered needed to be done, was estimated at $42,579. The material provided by the applicants show if underpinning is necessary, the expense will be considerable. CU attributes the need for this work to the insured event. The FSP referred two quotes by underpinners to MA for consideration. MA provided a further response in May 2017, acknowledging the evidence of severe cracking and movement damage but suggesting underpinning is not appropriate until all leaks are repaired and the soils are returned to their normal moisture content. MA says the home can then be re-assessed until movement ceases and then a decision can be made about any additional work (including underpinning). Given MA is well aware of the movement of the site (which it considered “severe” in its original report) and attributed it to leaks from pipes under the home, it is apparent this expert was well versed with the history of the event and its effect on the property. In consideration of this, I am satisfied MA has the knowledge and expertise to comment and any offer made by the FSP or repairs done by the FSP at this time need not include the cost of underpinning. Having regard to all the available information, it is not certain if underpinning will be required in the future. Therefore, this determination makes no finding in relation to the need for underpinning or the cost of underpinning. Bathroom concerns to be addressed by new scope of works The applicants say the PB quote only allows for two replacement floor tiles in the bathroom when there are six in this area. They further contend the screed needs to be replaced on the entire bathroom floor. Wall tiles were cracked on the left of the window and under the tap area. The applicants say cornice cracking was not allowed for either. The applicants have a quote for a replacement soft line screen for $1,001. The FSP only offered $650 as noted (but not first included) in the quote from PB. The FSP says the additional amounts sought by the applicants was accepted and considered within the offer for $25,000 to resolve the matter. The applicants say they obtained quotes from bathroom experts which support their contentions the damaged tiles cannot be safely removed without damaging surrounding tiles. Copies of these quotes were not received. It is not in dispute the FSP’s quote did not allow for the removal of all ti les. Case No: 470800 Determination Page 7 of 13 In my view, this will be a contingency issue for the builder who repairs the damage. The way in which this work is done and the extent of it will need to be taken into account in preparation of any future scope of works and quote to repair. Other concerns to be addressed by new scope of works The applicants say there are also eight cracked floor tiles in the laundry. As with the bathroom, they consider the entire floor will need to be removed and re- waterproofed. They further consider many of the cracks provided for in the scope and quote have not been adequately catered for as they extend beyond the reported areas. The applicants say the FSP has not adequately addressed what it will do with the cracked tile grout throughout different areas of the home. They consider re-grouting will not be effective and expansion joints will be required. The FSP does not accept this. In my view, it is not uncommon that experts will have different views on such issues. Complete replacement might be ideal (from the appli cants’ point of view) but not necessarily required if the affected areas can be repaired. Again, I consider this will be a contingency issue for the builder who repairs the damage. The way in which this work is done and the extent of it will need to be taken into account in preparation of any future scope of works and quote to repair. New break in the laundry waste pipe caused by previous insured event The applicants also complain the FSP has not adequately addressed the policy response to the cost of repairs to the laundry waste pipe as identified by the applicants’ plumber in December 2016 on completion of external repairs. A report from the applicant s’ plumber (AL) dated 13 December 2016 notes “severe water loss” was taking place and was indicative of “recent breakage to the laundry wastepipe”. AL notes previous testing in September 2015 showed there was no break in this part of the laundry waste pipe. On this basis, AL was satisfied the break was recent. The applicants reject any suggestion their failure to repair the identified damage was their fault, noting the laundry pipe was not used since the other damage to it was identified in October 2015. The FSP was not prepared to accept the opinion of AL as he is a plumber not an engineer. The FSP had a number of arguments as to why it was not responsible for the new break but has provided no expert opinion. The FSP would not pay AL’s invoices. The FSP also say the applicants are responsible to repair the water leaks. Both AL and MA support the applicants’ claim the proximate cause of the new break in the laundry waste pipe is caused by the original previous leaking pipes. While AL is a plumber, the material provided shows he has made extensive examinations of Case No: 470800 Determination Page 8 of 13 the insured property over the years. I accept AL has expertise to comment. Further, AL’s opinion is supported by MA who is an engineer. While noting the various arguments made by the FSP, in the absence of expert opinion from the FSP, I accept the available expert material establishes the proximate cause of the new break in the laundry waste pipe was caused by the original previous leaking pipes. The FSP also submits even if there is a link between the new damage and previous escape of water, a policy exclusion applies. It argues it is not liable to cover damage as a result of subsidence but will only do so if the damage occurred within 72 hours of water escaping from a pipe. However, I do not consider the available information supports this argument. This is because the available material establishes the proximate cause of the new damage to the laundry waste pipe is because of the prior leaks and water damage. Therefore, the available material establishes the claim is to be considered under the insured event “water or liquid damage” and not under the insured event “landslide or subsidence”. On this basis, I consider the available material establishes on the balance of probabilities the new break is related to the original water leaks and should be included in any scope of works. The FSP’s policy covers the applicants as follows:  for the loss or damage caused by the new leak  the cost of finding where the water escaped from  the cost of repairing any damage which occurs while looking for the cause . The FSP’s scope of works should include these items. The FSP’s policy does not cover the cost of repairing the leaking pipe or pipes. Accordingly, I accept the FSP is not liable to pay the invoice dated 13 December 2016 in the amount of $1,727 as the invoice appears to be for the cost of repairing the leaking pipe or pipes. However, the FSP is liable to pay for the cost of the second invoice dated 13 December 2016 in the amount of $396 as it is for “plum bing investigation and testing to the laundry waste branch pipe”. The second invoice also includes the cost of providing a basic report and photographs for which the FSP is also liable. This is because FOS’s Terms of Reference provide the FSP is to contr ibute to the professional costs incurred by an applicant in the course of a dispute. As in the earlier determination, the applicants required expert opinion about the cause of damage and AL’s report was again of considerable assistance in making this determination. In the circumstances, I am satisfied it is fair the FSP pay the applicants $396 plus statutory interest on $396 from the date the applicants paid for the report. Case No: 470800 Determination Page 9 of 13 Mechanism for fair resolution of the dispute It is clear there is considerable angst between the parties and much of this now rests with the extent of work to be done to fairly repair the insured property. Ideally, the FSP would have attended to the repairs for the applicants and addressed the damage stipulated in the SOW prepared by MA. Had this been done, the scope for any further dispute and any further damage may have been considerably narrowed. While I accept the FSP has a discretion under the terms of the policy to elect to cash settle the claimed damage, this discretion must be exercised fairly. The FSP must take into account all reasonable factors including the nature of the repairs required and whether a cash settlement will adequately ensure the applicants are able to properly complete all repairs. In my view, given the information provided and the uncertainty surrounding the nature of repairs and likelihood of additional expenses been incurred during repair, I consider it would be unfair for the FSP to cash settle this dispute unless agreed by the applicants. I note the applicants would prefer the FSP undertake repairs. In the circumstances, I am not satisfied a cash settlement is a fair or the appropriate method of resolution of the dispute. Further, if the repairs are conducted by the FSP then there is a dual benefit and likelihood of a fair outcome. Firstly, by committing to repairs, the FSP has responsibility for the quality of the work and its successful implementation. Secondly, any shortfalls in the SOW and quote would likely be identified in the course of attending to the necessary work, therefore avoiding further dispute about the cost of repairs. It is clear from MA’s SOW that attending to the stated repairs will probably not resolve all issues at the property. It is strongly implied in this SOW there will be an ongoing concern for the health of the property, extending over the next few years whilst the building settles and the “house adjusts”. This means there is a strong probability the FSP will need to revisit whatever repairs are completed at a later point in time. It does not mean the FSP will have to attend to further work. This may not be necessary. However, I consider a further inspection after a period of settlement will be required. In my view, the fair outcome is for the parties to agree on a repairer to attend to the repairs, as required. This repairer may be PB if PB is prepared to do the work and if the parties agree. The repair work is to be done under the project management of MA (assuming MA is also agreeable), with the FSP to meet MA’s necessa ry costs. If MA is not agreeable to this, a suitable engineer, agreed upon in advance by both parties, may be used. In short, the FSP must undertake the necessary work to repair the home as per MA’s SOW at the instruction of MA (or by an engineer agreed by the parties) at the FSP’s Case No: 470800 Determination Page 10 of 13 expense. As MA prepared the SOW in October 2016, and as the damage caused by the recent break to the laundry wastepipe is to be addressed, MA is to re -attend the property to update the SOW. The new scope of the works to be under taken is completely at MA’s discretion and the parties are to agree MA’s (or the agreed engineer’s) expert opinion is final and not subject to appeal. The FSP must also indemnify the applicant for the loss or damage caused by the new leak in the laundry, the cost of finding where the water escaped from and the cost of repairing any damage which occurs while looking for the cause. MA is to update the SOW accordingly. MA should also be asked to provide an estimate of the time the applicants will be unable to live in the home so the FSP can indemnify the applicants pursuant to the policy terms and conditions in relation to alternative accommodation. The repair work will only require underpinning if it is deemed necessary by MA (or the agreed engineer). MA does not consider this necessary at the moment. However, if MA recommends underpinning be done at any point (and it is a result of the original pipe leaks that it becomes necessary), the FSP will be liable to indemnify the applicants for this. In the October 2016 SOW, MA describes work which needs to be done to locate the leaks remaining in the pipes, and to then assess the soil moisture content around the leaking pipes at the time of the pipe repair to ascertain if additional repairs can be in undertaken immediately or if they should be delayed to allow the soil to dry. This assessment should be done first at the expense of the FSP. The applicants are liable to repair all leaking pipes and this is to be done initially as well. The parties can then agree on a time frame for repairs to commence. After the repair of the pipes, and the completion of the repair work, the FSP must arrange inspections (at its expense) after an appropriate period determined by MA, to see if any further work is required. It appears PB may have had concerns about the levels of the home and MA should determine what work is required prior to or after repair, as the case may be. At this time, should MA deem it necessary for the FSP to attend to further repairs, it should then do so. Critical to the success of this repair work is the ability of the agreed chosen repairer (be it PB or otherwise) to work with MA (or the agreed engineer) and to the engineer’s specifications and scope of works. Alternative accommodation payable by FSP The applicants raised the issue of alternative accommodation expenses, noting there is only one bathroom in the home. Given the work in the bathroom represents a significant aspect of the required work, I accept the insured property will become unliveable for a period of time. Case No: 470800 Determination Page 11 of 13 The FSP’s policy provides for alternative accommodation if the buildings suffer damage and if the insured cannot live in the home as a result. The FSP accepts there is only one bathroom at the insured property and that it will be liable for alternative accommodation during repairs. The FSP said it was prepared to make a settlement offer once it had the FOS decision. But, there is insufficient information to assist the parties at this time with a specific amount. However, while repairs are being undertaken and while the applicants are unable to live in the home as a result of the repairs, the FSP must provide suitable alternative accommodation for the applicants pursuant to the policy terms and conditions. As previously stated in this determination, MA (or the agreed engineer) can assist the parties in reaching agreement on the cost of alternative accommodation. Cash settlement option if applicants do not want repairs undertaken by FSP Should the applicants not want repairs to be undertaken by the FSP, then the FSP is entitled to cash settle the applicants for the cost of repairs and alternative accommodation. As discussed above, the available material is not sufficient for a fair and accurate assessment of the cost of repairs and alternative accommodation. However, I am satisfied the probable cost of repairs and alternative accommodation exceeds $25,000. If the applicants prefer a cash settlement, then the FSP should arrange for MA and PB (or agreed engineer and builder) to prepare a fresh scope of works and quotation to repair to include:  all work specified in the MA SOW and PB quote relied upon by the FSP  any additional work required, as determined by MA (or an agreed engineer) after further inspection including the cost of repairs relating to damage caused by the new leak in the laundry  the cost of finding where the water in the laundry escaped from and the cost of repairing any damage which occurs while looking for the cause  any reasonable engineering expenses which may be incurred, as determined by MA (or an agreed engineer)  builder’s margin, GST and all usual associated repair costs  an additional amount of 20% on the total repair sum to account for all other potential costs, variations, contingencies and unseen expenses which may occur once repairs begin  an allowance for alternative accommodation expenses, based upon an estimated time repairs will result in the property being unlivable as agreed to by MA and PB (or the agreed engineer and builder). Any cash settlement, will not include the cost of underpinning. This cost (if any) will have to be assessed and costed at a future date. If MA and PB are not agreeable to continue to be involved, a suitable engineer and builder (agreed upon in advance by both parties) may be used by the parties. No payment of statutory interest will be required. Case No: 470800 Determination Page 12 of 13 Case No: 470800 Determination Page 13 of 13 3 Supporting information 3.1 FOS Approach As advised to the parties, FOS has considered it appropriate to expedite this dispute in accordance with the Operational Guidelines to the FOS Terms of Reference, due to the nature of the dispute. Accordingly, this dispute has not been the subject of a FOS recommendation and has proceeded directly to determination. There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered for the purposes of this determination. This dispute has been decided on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome only. It is an accepted principle of general insurance law that an insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. 3.2 Relevant policy extracts The relevant policy extracts are referred to in correspondence between the parties and in determination 421710. It is not in dispute the FSP provided the policy document to the applicants. 3.3 Other relevant material considered and relied on  Determination 421710.  Parties’ submissions and all attachments to submissions including emails, photographs, reports, quotes and scopes of works.  Correspondence between the parties.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.