Claim denied for storm-related internal water damage under exclusions

FirmFinancial Firm (Unknown - Insurer)
Decided2018-05-24
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicants claimed for internal water damage after a June 2016 storm, and the FSP denied it relying on policy exclusions for rust, deterioration and maintenance. AFCA found the FSP could not establish the exclusions and ordered the internal damage indemnified with interest from 29 July 2016.

The insurer bears the onus to prove an exclusion applies on the balance of probabilities, and its expert evidence did not establish that it did.

Issues

Subjects and remedies

natural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 470519 Determination Page 1 of 6 Case number: 470519 18 May 2018 1 Overview 1.1 Dispute The financial services provider (FSP) denied the applicants’ claim for water damage to their investment property following a storm. The FSP says the loss fell within a number of policy exclusions. The applicants dispute this as they say the claim should be covered given it was caused by a significant storm. 1.1 Issues and key findings Can the FSP deny the claim? The FSP cannot deny the claim because:  the evidence shows the damage resulted from a storm  the FSP cannot establish any of the exclusions it is relying upon. 1.2 Determination This determination is in favour of the applicants. The FSP is required to indemnify the applicants for the internal damage sustained from the storm. If the FSP cash settles the claim, the FSP is to pay interest on any sum paid pursuant to section 57 of the Insurance Contracts Act 1984 (the Act). Interest is payable from 29 July 2016 until payment is made. Case No: 470519 Determination Page 2 of 6 2 Reasons for determination 2.1 Can the FSP deny the claim? FSP is relying on a number of exclusions The FSP is relying upon the following policy exclusions to deny the claim: “What we don’t cover Loss, damage, injury or death arising from: … rust, corrosion, gradual deterioration, depreciation, wear and tear. … We don’t cover loss, damage, injury or death arising from:  faulty design or workmanship  …  you not maintaining your home in good repair and condition. This means your home must be watertight, structurally sound and well maintained.” The FSP has the onus of proving any of the exclusions apply. The standard of proof is the balance of probabilities. Water entry occurred from at least two points The FSP has relied on three experts to supports its position. E is a construction company, P is a plumbing company and IM is an engineer. It appears E’s report dated 10 June 2016 includes P’s findings. This is because P’s report was addressed to E and completed the day before. According to the available experts, water entry occurred through two to three areas. This included one or both balconies located on the first and second floor of the residence. The other entry point was on the ground floor near the study. Having carefully considered this expert evidence, I do not accept the FSP has shown the water damage falls within the above policy exclusions for the following reasons. Experts do not agree as to the cause of damage First, the experts do not agree as to the cause of damage. For the water entry via the balcony, E and P say the waterproofing membrane failed. IM says the ingress occurred due to gaps between the top surface of the first-storey floor tiles of the balcony and the sliding door. IM also referred to a possible concrete slab rebate being absent as being the cause of loss. For the ground floor entry, E says this was due to debris and soil blocking the dish drain to the rear of the house. IM attributes this to the following:  several gaps at the interface between the sliding door and stone pavers  transfer of moisture from the sandstone and internal wall of the study  water seeping through the study room’s northern wall . Case No: 470519 Determination Page 3 of 6 Experts did not appear to account for the claimed event Second, neither expert appears to have taken into consideration the event being claimed. For instance, the FSP has referred to the storm occurring in March 2016. However, when lodging the dispute, the applicants have referred to a significant storm event that occurred between 3 and 7 June 2016. This has been described as an “East Coast Low” catastrophe event by the Insurance Council of Australia. The applicants’ position is relatively consistent with the followin g:  the claim was lodged on this date  their agent reported water damage in an email on 6 June 2016. Therefore, I accept on balance the event being claimed was the significant storm between 3 and 7 June 2016. However, it does not appear the experts took this relevant factor into account when considering the issue. In particular, IM’s report specifically refers to the event occurring in March 2016. IM does not particularise the defects Third, I am not persuaded by IM’s opinion the cause of damage was due to construction defects. IM only refers to the Australian Standards regarding an observation that “suggests the absence of a rebate between the second-storey balcony and the internal concrete slab”. In terms of there being an absence of rebate, I do not accept this is established. This is evident by IM’s wording by saying there is a suggestion of such an absence. Further:  this absence does not account for the water entry into the study area  IM does not explain how the other water entry points were due to construction defects based on the building standards at the time. In addition, the property was constructed within the last 10 years and passed all relevant inspections. Evidence does not show the applicants failed to maintain the home Fourth, E says all of the issues are maintenance related. This includes the ground floor entry and the balcony. However, the applicants’ ledger report shows regular maintenance was undertaken to the property. This includes sealing one of the balconies and clearing gutters. This refutes the FSP’s assertion that the property was not maintained. In support of its position, the FSP has referred to previous works to the balcony. This, the FSP says, is evidence that there were maintenance issues with the waterproofing. Case No: 470519 Determination Page 4 of 6 I do not accept this. No evidence was obtained by the contractor who had sealed the balcony to ascertain if:  the applicants were informed of a possible issue that required addressing, and  the applicants failed to do so. F SP’s other arguments do not assist The FSP has also referred to the fact the damage did not result from a single incident. I am not persuaded by this. The evidence shows the damage resulted from the significant storm in June. This is a single event. Therefore, after careful consideration of all the evidence and arguments, I am not satisfied the FSP has shown on the balance of probabilities that the applicants’ loss falls within any of the policy exclusion. Accordingly, the FSP is liable to accept the internal water damages. Further, if the FSP decides to cash settle the claim, it is required to pay interest on the sum pursuant to section 57 of the Act. Interest is payable from 29 July 2016, the date it denied the claim, until the amount is paid. For the s ake of clarity, I note the FSP’s liability does not extend to the balconies as there is nothing to suggest they were damaged from the storm. Case No: 470519 Determination Page 5 of 6 3 Supporting information 3.1 Expert reports Record Key points FSP’s builder (E) Assessment Report 10.06. 2016.  Extensive damage to timber floors, ceilings, walls on two levels.  Water entered through rear wall of the house. There is a dish drain at the rear full of debris – this led to water penetrating the rear wall as it does not have a waterproof membrane.  Water also entered beneath both balconies where the wat erproof membrane for each failed.  Both balconies have been leaking for some time.  Evident someone tried to re - seal balconies. FSP’s plumber (P) Inspection Report 09.07. 2016.  Upstairs balc ony failed testing. Membrane failure evident and has been an issue for a long time.  Upstairs balc ony was re - sealed some three years previously – this was only a temporary remedy; it needed to be re - tiled and then waterproofed.  Second floor balcony failed testing. Membrane fa ilure evident but hard to determine if the sliding door unit flashing also failed, or only issue is where the waterproofing meets the door. FSP’s engineer (IM) Report 19.12. 2016.  Building constructed in 2012.  One reported instance of water entry from seco nd - floor balcony previously.  During storm in March 2016, tenants reported water entry in the lounge room located on second floor, and in study located on ground floor.  Grout joints on third story balcony sealed in January 2014 and about August 2016.  Plasterboard wall lining blistered at approximately mid - height, at base of wall and along window sill in the study.  Weepholes on northern wall of third - story balcony partially blocked by balcony tiles.  Water staining evident along study room sliding door head.  Tiled balc onies have inadequate falls permitting water to pond on the surface of the tiles.  The combination of water ponding on balcony tiles and wind - driven rain have caused storm wat er to seep into the gaps under the sliding door and into the inter nal floorboards.  The location of water damage within the lounge room and study room is consistent with the location of gaps underneat h the sliding doors.  Available evidence suggests an abs ence of a rebat e between the second - story balcony and the internal c oncret e slab.  During rainstorms and when wind direction is favourable, water can find a pathway through gaps underneath the sliding door sill and into the floorboards.  “We are of the opinion that the observed damage is caused by Case No: 470519 Determination Page 6 of 6 construction defects and no t a single weather event”. FSP’s builder (E) Email 27 April 2016  The water ingress into the property from the rear wall was caused by a large build - up of debris, rocks and soil blocking the dish drain to the rear wall of the house.  The broken stormwater p ipe would have nothing to do wit h the water entry.  The water seeping through the wall would be from the same issue.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.