Home / Financial Firm (Unknown - Insurer) / Determination 470445
Determination 470445
Storm damage claim partly denied under policy exclusions
Summary
The applicants claimed storm damage to their home after the FSP denied the claim under exclusions for workmanship, maintenance, rust and mould, and wear and tear. AFCA found part of the storm damage covered and ordered the FSP to pay $8,500 plus interest.
The applicants established accidental storm damage, and the FSP did not establish that exclusions applied to the internal water damage to walls and floor, though mould damage was excluded.
Subjects and remedies
home or building damagenatural disasterpay claimpay interest
Text of the determination
Determination
Case No: 470445 Determination Page 1 of 7
Case number: 470445 17 April 2018
1 Overview
1.1 Dispute
The applicants held a home building and contents policy with the financial services
provider (FSP).
On 20 June 2016, they lodged a claim for damage sustained to the property following
a storm in early June 2016.
The FSP says that the damage developed overtime due to underlying issues with the
roof and not the storm. FSP denied the claim based on the general exclusions
relating to defective or faulty workmanship, maintenance, wear and tear and rust
mould.
The applicants whilst acknowledging ongoing issues with mould prior to the storm,
say water entered the property as a result of the storm.
1.2 Issues and key findings
Have the applicants established a claim within the terms of the policy?
The policy is an insured events policy including optional accidental damage. Given
the available information I am satisfied that the applicants have established part of
the damage sustained during the storm was accidental damage within the terms of
the policy.
Has the FSP established the application of an exclusion?
I am satisfied that the damage resulting in mould was likely due to gradual
deterioration due to wear and tear and/or defective or faulty workmanship.
Otherwise, I consider it fair that the FSP be liable for the damage to the flooring and
settle the claim as set out under section 2.2 of this determination.
1.3 Determination
This determination is partially in favour of the applicants.
The FSP is to pay the applicants $8,500, representing 50% of the assessed internal
damage plus interest calculated in accordance with section 57 of the Insurance
Contracts Act from 23 December 2016 to date of payment of the claim.
The FSP is otherwise entitled to deny the balance of the applicants’ claim in
accordance with the terms and conditions of the policy.
Case No: 470445 Determination Page 2 of 7
2 Reasons for determination
There has been a full exchange of material between the parties and each party has
had the opportunity of addressing the issues that arise from the information
exchanged.
This dispute was subject to a recommendation. The recommendation was in favour
of the FSP. Following the recommendation, the applicants submitted a further report
from AH, a builder, dated 21 September 2017.
The FSP has not responded to the report.
This determination follows consideration of all of the information, including
information provided following the recommendation. It is based on what is fair in all
the circumstances, having regard to the relevant legal principles, terms of the policy,
good industry practice including codes of practice and prior determinations where
applicable.
2.1 Have the applicants established a claim within the terms of the
policy?
The applicants have the onus to establish a claim within the terms of the policy
The applicants’ policy is an insured events policy that includes advanced cover for
accidental damage subject to a number of limitations and exclusions.
The onus is therefore on the applicants to establish the damage was accidental, that
is, that the damage was caused by an incident which the applicants did not intend or
expect.
Once the applicants have established this, the onus shifts to the FSP to establish the
application of any exclusion it seeks to rely upon to avoid payment of the claim.
Circumstances of the loss
The applicants acknowledge that mould had developed on the ceiling and walls of
the home in the years prior to the storm. They say however that wa ter had never
come through the ceiling into the home in the manner it did in the storms in June
2016.
The applicants say the home was inundated during storms whilst they were away
between 3 and 7 June 2016. There was a further storm on 19 June 2016 which again
resulted in water entering the home via the ceiling.
The FSP does not dispute that there were storms around this time nor does the FSP
dispute that water entered the applicants’ property during these storms . The FSP’s
builder AB concedes wind driven rain entered the property during the storm event.
In the circumstances, I am satisfied that the applicants have established a claim
within the terms of the policy for the accidental damage arising from the storms.
Damage arising from the storm would be unintended and unexpected.
Case No: 470445 Determination Page 3 of 7
2.2 Has the FSP established the application of an exclusion?
The FSP relies upon exclusions contained within the terms of the policy relating to:
defective or faulty workmanship
maintaining your home or contents
rust and mould
wear and tear.
Expert reports differ as to cause of damage
Photographs provided with the report from CC, the FSP’s assessor, show mould to
both the ceiling and walls in the bedrooms, lounge and dining room. CC had attended
the property on 4 July 2016, approximate ly four weeks after the storm.
I accept that it is unlikely the mould would have developed in the manner it has if it
was caused purely by the storm.
The FSP relied upon a report from AB a builder, which concluded that the cause of
water ingress was faulty/defective roof requiring maintenance and wind driven rain
from the recent storm.
AB concluded that the roof was in poor condition due to the porous tiles and the
incorrect set out of the tiles. I note AB says the house and tiles are 10 to 12 years
old. According to the applicant the house and tiles are about 30 years old. AB found
that water was able to blow in under the tiles and as the sarking was sagging, this
allowed the water to track behind the paper causing mould and the staining to the
roof.
AB has not commented on the roof maintenance. The applicants say maintenance
had been performed in 2013. AH, the applicants ’ builder confirmed the roof
maintenance performed in 2013 included relaying the tiles, new sarking, roof battens,
re-bedding and re-pointing.
The applicants provided a report from CM. The report is detailed and disputes a
number of findings contained in the FSP’s report. CM considered the roof tiles to be
in good condition with some small cosmetic chips which can not cause any leaks.
Photographs of the roof support a finding that the damage to the tiles could be
described as cosmetic. CM found the roof tiles were not porous. Again the
photographs supplied indicate the tiles were in reasonable condition apart from the
cosmetic cracking.
CM noted that whilst there is an odd small bend in the roof battens that they were
within Australian standards. He removed the roof tiles above the area that was
leaking and did not find any water penetration. CM considered the water was flowing
down the inside of the valley iron and damming up and throwing over the valley iron
into the roof cavity during the storm.
The applicants provided a subsequent report from AH dated 21 September 2017. It is
apparent that AH had not inspected the roof prior to the repairs being completed. AH
considered the tile roof to be in very good condition and that it would have been in
very good condition prior to the extreme weather event which caused damage in their
Case No: 470445 Determination Page 4 of 7
area. In his opinion the roof valleys had overflowed during the storm causing the
internal damage.
Having considered the reports as a whole, I accept that there is some evidence of
pre-existing damage to the roof and that this may have caused water to ingress into
the roof cavity over time, resulting in dampness and the development of mould.
However, I accept that during the storm, rain entered the building through cavities
created by the force of the wind resulting in water entering the property. I accept that
this was not as a result of wear and tear, a defect in design or workmanship or lack of
maintenance.
FSP to meet 50% of the cost of completing internal repairs
The FSP has provided two quotations to complete the internal repairs. The
quotations do not include the repair of the roof. I accept that insofar as there are
repairs required to the roof that such repairs were not required due to the storm.
Insofar as there is internal damage, I accept that some of the internal repair required
was due to the mould which was not caused by the storm. I accept however that
there was damage sustained to the walls and to the floor as a result of the water
inundation and accept that the FSP is liable to meet the costs of such damage.
The quotations provided by the FSP are from AB for $14,996.15 and from BCB for
$16,967.92. Neither quote refers to repairs to the roof. Both quotes include repairs to
the mould damage area.
I have considered the quotes and believe it is fair in the circumstances that the FSP
pay the applicants $8,500 representing approximately 50% of the quote provided by
BCB in order to cover the costs to repair damage to the walls and floor sustained as
a result of the storm. It is fair in the circumstances given the age of the quote that
interest be paid from 22 December 2016 to date of payment of the claim.
Case No: 470445 Determination Page 5 of 7
3 Supporting information
3.1 Relevant policy terms
Page 19
2. Your cover
Insured events
We cover loss or damage to your home or contents that is caused by certain events. We call them
insured events. For us to cover you for loss or damage caused by an insured event, the event must
happen:
• At the insured address; and
• During the period of insurance.
We don’t cover some situations, events and type s of loss or damage to your home or contents.
Those exclusions are set out in thi s section under each of the insured events.
We describe the ins ured events on pages 19-29. Under each insured event, we show:
Yes What we cover
No What we don’t cover – that is, the exclusions that apply
to the cover we provide for the insured event.
Limits $ Any dollar limits that apply
…
Page 26
Storm
A storm has very strong winds and may also involve heavy rain, hail or snow. For example, a cyclone.
A storm is not just continuous bad weat her on its own.
Yes A storm causes loss or damage to your home or contents.
No Loss or damage caused by:
The general exclusions shown on pages 61-63.
Limits $ Up to $500 for covers and liners for swimming pools and spas for each claim.
$ Up to the general limits shown on pages 69 and 71.
Pages 51-52
Advanced cover
Under this benefit, we cover you for accidental damage and motor burnout.
Accidental damage is loss or damage caused by an event or incident which you didn’t intend or expect.
…
The general exclusions shown on pages 61-63.
…
Pages 61-63
3. General exclusions
What we don’t cover
This section outlines the general things we don’t cover under your policy. They are known as general
exclusions.
General exclusions
These general exclusions apply to all of the cover we provide under your policy.
We don’t cover you under your policy for loss or damage to your home or contents or for legal
liability which is caused by or ari se s in connection with any of the following i tems, events or
circum stances:
...
Case No: 470445 Determination Page 6 of 7
Defective or faulty workmanship
Maintaining your
home or contents
Rust and mould
Wear and tear
Any inherent or built - in defect or defective or
faulty workmanship, design or manufacture.
You don’t maintain your home and contents
in good condition.
Rust, corrosion, rot, mould or gradual
deterioration caused by light, air, the
climate, (which includes wind, rain or sand)
or the passage of time.
Wear and tear through normal use.
3.2 Key points from expert material
Record Key points
FSP’s expert (CC)
Loss adjustor
4 July 2016
States that the a pplicants have advised that there has been an
issue with mould build up on all surfaces within the dwelling over
the last two years, which would indicat e elevated mois ture levels.
Further that the a pplicants clean the mould from the surfaces but it
redevelops
States that t he a pplicants advised that there is insulation in the
ceiling cavity that may be absorbing and retaining any water
ingress res ulting in the mould developing.
There are eleven photos attached to the report some of which
show that the house sits above the ground. They also show
extensive mould in the ceiling and upper parts of the some walls
FSP’s expert (AB)
Building company
7 July 2016
Refers to the property and the roof as being in poor condition
The number of downpipes meets the requirements of the current
plumbing code
There is evidence of water ingress via the roof which has ent ered
via flashings.
The cause of the water ing ress to the property is due to a faulty /
defective roof requiring maintenance and wind driven rain from a
recent storm event.
There is incorrect set out of the concrete roof tiles on all sides of
the roof. The set out should be 345 mm however it ranges f rom
310 – 355 mm.
States the concrete roof tiles are back to bare concrete which can
allow water to seep through the tiles.
States there are approximately 30 broken tiles on the roof.
The concrete roof tiles have 900 mm centres with no APB allowing
the sarking to sag. This is allowing the water to track in behind the
paper causing mould / staining to the roof.
There are battens that were not nailed straight which coincides
with the roof not being set out correctly.
States the roof was re - point ed awhile ago however the contractor
did no poke to weep holes in the ridge capping.
States there are signs of maintenance repairs to the roof and the
Case No: 470445 Determination Page 7 of 7
maintenance / patching has not failed.
Water is able to blow in under the lap of the tiles.
There are photos attach ed to the report which show roof tiles and
sections of the roof.
FSP’s expert (CC)
Loss adjustor
25 July 2016
Refers to AB’s report which they say confirms their view that the
mould that is present has been occurring for a long period of time
and is a res ult of defects with the roof cladding and construction.
Applicant s ’ expert (CM)
Roofing company
25 November 2016
T he concrete Monier roof tiles were in good condition, were not
porous and the damage t o the tiles was merely cosmetic.
T he set out of the roof tiles on the front and back main fac e of the
roof was 342 mm which is stated to be 1 mm below the maximum
set out required by roof tile companies .
T he set out of the roof tiles on the side faces of the roof r anged
between 310 mm and 320 mm.
T he sarking although rolled a bit tight was in good condition.
U pon removal of tiles there was no evidence of water penetration
above areas of the hous e that were leaking and no traces of water
running down the sarking in those areas.
Water was flowing into the roof cavity by flowing down the inside of
the valley iron, damming up and then flowing over the valley iron
into the roof cavity.
T here were only weep holes on the one side of the top ridge.
Applicants’ expert (AH)
21 September 2017
We believe your t ile roof was in very good condition prior to the
extreme weather event that was the cause of so muc h destruction
around your geographical location there at Rosemount.
As a result of that extreme weather, your roof valleys overflowed
and the damage that the n occurred was unavoidable.
We have known CM and dealt with him over the past 32 years and
we fully agree with his report.
We note that AB’s report includes a number of inconsistencies we
believe from our builders’ perspective.
The house and roofing is cl oser to 30 years old, not the 10 to 12
years old stated in the report.
Even though the roof tiles appear to be in poor condition ( due to
the lashing they endured during the extreme weather event and
years of being in place on the roof), they are in fact in quite good
condition, made even more so as a result of maint enance work you
have performed on them in early 2013.