Home / Financial Firm (Unknown - Insurer) / Determination 469340

Determination 469340

Storm and mini-tornado claim settlement amounts; excluded pool, shed and landscaping damage

FirmFinancial Firm (Unknown - Insurer)
Decided2018-10-09
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$48,299
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

A homeowner disputed the settlement of two storm claims and sought cover for wall, pool, shed and landscaping damage. AFCA ordered an extra $5,000 for wall damage and $400 for an air conditioner, with no cover for the other items and no compensation.

The FSP accepted partial liability for storm-caused wall cracking, but the pool, shed, landscaping and extra contents were not shown to be storm-caused or covered, and the policy excludes living material and gradual deterioration.

Issues

Subjects and remedies

pay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 469340 Determination Page 1 of 10 Case number: 469340 29 August 2018 1 Overview 1.1 Dispute The applicant lodged a claim under his home and contents insurance policy with the financial services provider (FSP) for damage to his property following a storm in February 2011. The FSP accepted liability for water damage to the applicant’s rear shed an d various items stored in the shed. The FSP also accepted liability for 50% of the costs of repairing cracking damage to the walls of the applicant’s home and replacing his damaged septic system. However, the FSP declined cover for landscaping costs. The applicant says the cash settlement amount paid by the FSP is insufficient to repair all of the damage to his home and contents caused by the storm in February 2011. In addition to the areas previously assessed by the FSP, he says the storm also damaged his swimming pool, pool shed and additional contents items. The applicant also disputes the amount of the cash settlement paid by the FSP following a separate claim for damage caused by a mini-tornado in February 2012. The applicant is also dissatisfied with the manner in which the FSP has managed his claims. He says the FSP has deliberately sought to minimise its liability and has provided poor service during the claims process. 1.2 Issues and key findings Should the settlement amount for the 2011 claim be increased? The cash settlement amount should be increased by $5,000 to reflect the cost of repairing 50% of the damage to the external walls, which the FSP has accepted was caused by the storm in February 2011. The applicant’s refusal to allow the FSP’s builder access to prepare a quotation has made it more difficult to assess the amount of the FSP’s liability. However, the FSP has not been prejudiced to the full amount of the claim. The information provided by the applicant is not sufficient to establish that the storm caused any other damage to his building or contents which has not already been provided for in the cash settlement amount. Case No: 469340 Determination Page 2 of 10 Is the settlement amount for the 2012 claim fair and reasonable? The cash settlement amount for the 2012 claim should be increased by $400 to reflect the damage to the evaporative air conditioner. In all other respects, the cash settlement amount is fair and reasonable. Is the applicant entitled to compensation? The applicant is not entitled to compensation as the FSP managed the claims reasonably overall. 1.3 Determination This determination is partially in favour of the applicant. The claim records indicate that the applicant returned the cheques previously issued by the FSP in settlement of both claims. Accordingly, the FSP is required to cash settle the applicant for the following amounts in full and final settlement of his claims:  $25,004.61 for the 2011 storm claim (including the additional amount of $5,000 referred to above), and  $23,294 for the 2012 mini-tornado claim (including the additional amount of $400 referred to above). The FSP is not required to pay interest on these amounts. Case No: 469340 Determination Page 3 of 10 2 Reasons for determination 2.1 Should the settlement amount for the 2011 claim be in creased? Applicant says cash settlement does not cover all damage caused by storm The applicant’s policy provides cover for damage to his property caused by the insured events listed in the policy, including damage caused by storm and rainwater (including rainwater run-off). The FSP accepts that the property was affected by a severe storm on or around 4 February 2011. During the storm, rainwater run-off inundated the sheds and garage at the rear of the property and water ponded around the main building. As outlined above, the FSP cash settled the applicant for damage to his home and contents items caused by the storm in February 2011. The total cash settlement of $20,004.61 paid by the FSP included the amount of $7,224.93 for building damage, comprising:  $6,603.59, being 100% of the cost of replacing paneling and insulation to the rear shed and 50% of the costs of replacing the damaged septic system, and  $621.14, being the cost of replacing uninstalled, corrugated iron roof sheets which were stored at the property. The applicant says the cash settlement amount does not cover all of the damage to his home and contents caused by the storm in February 2011. The applicant says the FSP should be liable for 100% of the damage to the septic system and external walls. He also seeks cover for the following additional damage which he says was caused by the storm:  cracking and movement damage to various parts of the property  movement damage to the pool, pool shed and rear shed  storm damage to landscaping, and  damage to additional contents items stored in the rear shed. The applicant has provided a quotation from his builder (UB) which estimates the total cost of repairing the damage at over $300,000. FSP accepted liability for 50% of damage to external walls The contractors who inspected the applicant’s property shortly after the storm confirmed there were several cracks to the external brick veneer walls, particularly in the areas of the carport and enclosed garage. There was also some cracking to the internal wall linings. The engineer (GA) appointed by the FSP concluded that the damage had been caused by differential movement of the stiffened raft footing due to changes in the moisture content of the highly reactive clay foundation soils. Floor level surveys carried out by GA showed differential movement of up to 38 millimetres. In his report, GA found that the storm in February 2011 had contributed to the damage observed. GA advised that stormwater run-off had ponded on the property Case No: 469340 Determination Page 4 of 10 and soaked into the foundation soils, causing subsidence around the perimeter of the raft footing and heave at deeper soil depths. However, GA considered that the damage had also been caused by longer term factors affecting the property, including the drying effects of nearby trees and the overflow of waste from the septic tank. GA attributed 50% of the cracking and movement damage to the storm in February 2012 and 50% to longer-term factors. Based on GA’s report, the FSP accepted liability for 50% of the damage. The FSP denied liability for the remaining 50% because the policy excludes cover for gradual deterioration, soil movement and the actions of trees. However, the cash settlement paid by the FSP in February 2012 did not include any amount for the costs of repairing cracking damage to the external walls of the home, as the FSP had not yet obtained a quotation for these repairs. Applicant disputes FSP’s decision regarding external walls In March 2012, the FSP sought to arrange for its builder to attend the property to provide a quote for the repairs to the external walls. However, the applicant denied the FSP access to the property because he was dissatisfied with its decision to deny liability for 50% of the damage. The applicant advised that he would obtain his own engine er’s report. Over the following 16 months, the FSP contacted the applicant regularly to confirm whether he had obtained an engineer’s report. However, after the applicant failed to provide a report, the FSP closed the claim in July 2013 (pending the provision of additional information). The applicant contacted the FSP on several occasions during 2014 and 2015 but did not provide an engineer’s report disputing GA’s findings. In February 2017, the applicant lodged a dispute with FOS. He subsequently provided a copy of a report from his engineer (CT). Additional information does not refute GA ’ s findings During the course of the FOS dispute, both the applicant and the FSP engaged engineers to carry out a further inspection of the property. The FSP’s engineer ( PB) inspected the property in May 2017, while the applicant ’s engineer (CT) attended in September 2017. Having carefully reviewed the additional reports provided, the panel is not satisfied that either report establishes that GA’s initial findings were inc orrect. The applicant disputes GA’s findings that 50% of the damage to the external walls was caused by other factors affecting the property (such as the overflow from the septic tank and the drying effects of nearby trees). Case No: 469340 Determination Page 5 of 10 The applicant says the damage to the downpipe that caused the septic tank to overflow occurred when he disconnected it during the storm, to prevent further flooding. However, the photographs included in GA’s report lend support to his conclusion that the bottom section of the downpipe had rotted. The FSP’s second engineer (PB) considered it plausible that stormwater ponding at the site in February 2011 had caused subsidence which had contributed to the cracking damage observed (together with other factors including seasonal c hanges and construction methods). However, PB noted that the period of over six years which had elapsed prior to his inspection made it difficult to establish a definitive link between the storm and the damage to the external walls of the property. For his part, the applicant’s engineer (CT) did not attribute the damage to the storm in February 2011. He considered the damage had been caused by factors including:  differential movement caused by seasonal changes in the moisture content of the reactive clay foundation soils,  the use of footings which, although compliant at the time of construction, did not meet current standards, and  the drying effects of some of the trees (although to a lesser extent). In these circumstances, the panel considers that the report prepared by GA in June 2011 most accurately reflects the cause of the damage to the external walls. FSP is required to cash settle applicant for $5,000 for damage to walls The FSP accepts the findings in GA’s report (that is, 50% of the damage was caused by the storm). However, the FSP says it should not be required to cash settle the applicant for this portion of the damage because it has been prejudiced by his failure to allow its builder to prepare a quotation for the necessary repairs. By the time the FSP’s second engineer (PB) inspected the property in May 2017, he was unable to distinguish the damage caused by the storm from subsequent damage caused by ongoing differential movement at the property. Accordingly, the FSP says it is unable to accurately determine the extent of its liability for the damage to the walls. The applicant’s failure to allow the FSP’s builder access to the property is a breach of his obligations under the policy. However, the panel is not satisfied that the FSP has been prejudiced to the full amount of the claim. The FSP’s assessor (PA) estimated the cost of repairing the damage to the carport wall as $1,500 in March 2011. The FSP’s engineer (GA) subsequently confirmed there were cracks and separation gaps in several other external walls. GA considered the cracks could be repaired, with only a small amount of the brickwork needing to be replaced. Case No: 469340 Determination Page 6 of 10 In these circumstances, the panel is satisfied that the FSP has some liability for the cracking damage caused by the storm, even though determining the extent of that liability may be difficult. Having regard to the factors outlined above, and taking into account the passage of time, the panel considers it is fair in all the circumstances that the FSP pay the applicant the amount of $5,000 as a contribution to the repair of the damage. In determining this amount, the panel has had regard to the passage of time. Accordingly, the FSP is not required to pay interest. FSP is not required to increase payment for septic system As outlined above, the FSP’s engineer (GA) concluded that the collapse of the effluent trench which forms part of the septic system had been caused by overloading from rainwater during the storm, due to the rotted downpipe at the corner of the house. The applicant has provided a quotation from his plumber (ML) for the replacement of the septic system. However, ML’s quotation does not provide any information about the cause of the damage and therefore does not refute GA’s findings. Under the terms of the policy, the FSP is not liable for damage caused by wear and tear, deterioration or corrosion. However, the FSP accepted liability for 50% of the costs of replacing the septic system. The panel is satisfied that the cash settlement paid by the FSP was reasonable in the circumstances. Accordingly, the FSP is not required to increase the amount paid for the damage to the septic system. FSP is not liable for damage to pool and pool shed The applicant says his above ground pool and the nearby pool shed have sunk by approximately 50 millimetres. He considers this damage was caused by the storm in February 2011. The FSP’s claim records reflect that the applicant did not mention the damage to the pool and pool shed when he first lodged his claim. These areas of the property were not inspected by the assessor (PA), builder (JL) or engineer (GA) when they inspected the property during the early stages of the claim process. As outlined above, the applicant disputed several aspects of the FSP’s settlement of his claim for damage arising from the storm in February 2011. However, he did not raise the issue of the pool and pool shed until several years later. Further, although the applicant’s second claim (for the mini-tornado in February 2012) involved damage to the pool liner and pump, the applicant did not seek cover for further damage to the pool at this time. When the FSP’s second engineer (PB) attended the property in May 2017, he observed that there were several large trees around the swimming pool which were likely contributing to the settlement (downwards movement) in this area. Case No: 469340 Determination Page 7 of 10 However, as noted above, PB considered too much time had passed since the storm in February 2011 for him to be able to determi ne the cause of the damage. In these circumstances, the panel is not satisfied that the damage to the pool and pool shed were caused by the storm. The length of time which passed before the applicant disputed these items has contributed significantly to the difficulty in determining the cause of the damage. For the reasons outlined above, the FSP is not liable for the damage to the pool and pool shed. FSP is not liable for damage to rear shed The applicant says the storm also caused heaving damage to the concrete floor of a large, aluminium shed at the rear of the property. As outlined above, the cash settlement paid to the applicant included an allowance for the cost of replacing insulation and internal panelling to the rear shed. The damage to the shed was confirmed by the FSP’s contractors during the early stages of the claim. However, there is no indication in the reports provided that there was evidence of damage to the floor of the shed at that time. In these circumstances, the panel is not satisfied that the damage to the rear shed was caused by the storm in February 2011. Accordingly, the FSP is not liable for this damage. FSP is not liable for landscaping costs The applicant seeks cover for the costs of repairing damage to the lawn and gardens beds at the property caused by the storm in February 2011. The applicant’s policy provides cover for damage to the insured ‘building’. However, the policy expressly states that the ‘building’ excludes lawns, trees, shrubs, plants, garden beds or any other living material. The cover for contents also excludes these items. As the applicant’s lawn and garden beds are not covered under the policy, the FSP is not liable for the cost of repairing any damage to these items caused by the storm in February 2011. FSP is not required to increase settlement amount for contents The cash settlement paid by the FSP for the storm in February 2011 included an amount for $13,800 for damage to contents items (including carpets). During his initial attendance at the property in M arch 2011, the FSP’s assessor (PA) prepared a list of water damaged contents items. The applicant provided quotes for the repair or replacement of the damaged items, which the FSP used to determine the cash settlement amount. Case No: 469340 Determination Page 8 of 10 The applicant seeks payment for additional contents items which he says were damaged by the storm. However, the panel is not satisfied that the information provided by the applicant is sufficient to establish damage to additional items. Accordingly, the FSP is not required to increase the contents settlement amount. 2.2 Is the settlement amount for the 2012 claim fair and reasonable? FSP cash settled claim for $22,594 based on applicant’s quotations In March 2012, the applicant lodged a separate claim with the FSP for damage to his property caused by a mini-tornado the previous month. When the applicant lodged his claim, he advised that there was water damage to the interior of his home caused by wind driven rain. The applicant also advised of damage to a rear timber fence, garden shed, evaporative air conditioner, swimming pool pump/motor and spare building materials (packing sheets). The FSP denied the applicant’s claim for water damage to the home, based on a report from its assessor (CL) which advised that water had entered through a deteriorated window frame over an extended period of time. However, the FSP accepted the applicant’s claim for the remainder of the damage and asked him to provide quotations for the repair or replacement of the relevant items. The FSP followed up the applicant on several occasions. However, when the applicant did not provide the quotations, the FSP closed the claim in May 2013. In October 2015, the FSP reminded the applicant that the quotations were outstanding. In or around December 2016, the applicant provided quotations for all items other than the evaporative air conditioner. In February 2017, the FSP cash settled the claim for the total value of the quotations provided by the applicant ($22,894), less the policy excess ($300). Cash settlement should be increased by $400 Based on the information provided, the panel is satisfied that the cash settlement amount for the 2012 storm is fair and reasonable, subject to the following comment. The claim records show that the cash settlement amount did not include payment for an evaporative air conditioner which the FSP had accepted was damaged by the storm. The applicant did not provide a quotation for the replacement of the air conditioner and rejected the FSP’s offer of $400 on the basis this amount was insufficient. The FSP agreed to reconsider its offer subject to the applicant providing a quotation. However, he has not done so. In the circumstances, the panel consider s that the FSP’s offer of $400 for the air conditioner was reasonable. Accordingly, the FSP is required to pay this amount to the applicant (if it has not already done so). Case No: 469340 Determination Page 9 of 10 The panel is not satisfied that the applicant has shown that the cash settlement amount is insufficient in any other respect. 2.3 Is the applicant entitled to compensation? Applicant is not entitled to compensation FOS can award compensation (capped at $3,000) for non-financial loss where an applicant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind. However, FOS adopts a conservative approach to the award of compensation for non-financial loss. FOS expects an applicant to bear the usual stress and inconvenience associated with an insurance claim. The applicant is dissatisfied with the manner in which the FSP handled his claim. He says the FSP has deliberately sought to minimise its liability during the claim process. However, having reviewed the claim records, the panel is satisfied that the FSP managed the claim reasonably overall. The FSP based its claims decisions on information provided by the applicant during the early stages of the claim process, as well as causation reports provided by appropriately qualified consultants. The FSP offered to review its decision in the event the applicant provided additional information in support of his claims. However, the applicant did not provide any further information for several years. The FSP cash settled the applicant for the damage caused by the 2011 storm claim once all relevant information was received (other than a quotation for the repair of the external walls, which the applicant did not agree to facilitate). The FSP cash settled the applicant for the 2012 mini-tornado claim once he provided quotations for the repair or replacement of the damaged items. The applicant declined to accept the cash settlement amounts paid, even though the FSP advised him that he would still be able to dispute the settlement amount. In these circumstances, the FSP is not responsible for any subsequent delay in payment. The FSP is not required to reimburse the applicant for fees incurred in obtaining a report from his engineer (CT). CT’s report was of limited value due to the time which had passed since the 2011. In any event, he did not conclude that the cracking and movement damage had been caused by the storm. Case No: 469340 Determination Page 10 of 10 3 Supporting information 3.1 FOS approach to this dispute This dispute has not been the subject of a FOS recommendation. Due to the nature of the dispute, it has been referred directly to a panel for determination, in line with the Operational Guidelines to the FOS Terms of Reference. The panel consists of an Ombudsman and two representatives with consumer and insurance experience. The panel has decided this case based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions (which are not bi nding). There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. The panel has reviewed and considered all of the material provided by the parties. While the parties have raised numerous issues in their submissions, for the purposes of this determination, the panel has restricted its commentary to those issues that it considers directly relevant to the outcome only. 3.2 Terms of policy Subject Terms Cover for insured events - storm You are covered for damage or loss to your home building occurring during the period of cover and caus ed by the following events : …  Storm and rainwater including stormwater runoff from areas surrounding the site, or water escaping from any water main, drain, pipe, street gutter, guttering or surface. General exclusions You are not covered under any section of the policy for damage, loss, cost or liability caused by or arising from or involving …  wear and tear, rust, deterioration or corrosion  soil movement or settlement  subsidence or landslide unless caused by the insured event of earthquak e  the moving, shifting or dislodging of any swimming pool or spa and their covers and liners, or any septic tank or other inground structure unless caused by the insured events of earthquake or impact … Cover for building What do we cover as the building? The building is the dwelling and other structures at the site used for domestic or residential purposes … The building excludes … hedges (whether or not they form a fence), lawns, trees, shrubs, plants, flowers, garden beds or any other living material. Cover for contents The contents we do not cover include … hedges (whether or not they form a fen ce), lawns, trees, shrubs, indoor and outdoor plants, flowers, garden beds or any other living material …