Home / Financial Firm (Unknown - Insurer) / Determination 468349

Determination 468349

Storm roof leak claim declined; faulty internal repairs

FirmFinancial Firm (Unknown - Insurer)
Decided2018-02-08
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$2,703
Non-financial loss$750
Amount claimed—
SourceAFCA PDF

Summary

The applicant claimed storm damage to her home roof and ceiling, and the FSP initially accepted then declined the claim and its internal repairs were faulty. AFCA found the storm was not established so the claim could be declined, but ordered the FSP to cash settle $2,702.70 for the repairs and pay $750 for stress and inconvenience.

The insured must establish on the balance of probabilities that a storm within the policy definition occurred, and the FSP is liable for the cost of its own non-compliant repairs and the resulting inconvenience.

Issues

Subjects and remedies

home or building damagepay compensationpay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 468349 Determination Page 1 of 5 Case number: 468349 31 January 2018 1 Overview 1.1 Dispute The applicant lodged a claim with the financial services provider (FSP) for internal and roof damage to her home which she says was caused by a storm event. The FSP initially accepted liability for the internal damages and organised for repairs. Not long after repairs had been completed the applicant advised the FSP that water was still leaking from the roof and the repairs of the FSP were non-compliant. The FSP reinspected the damage and advised the applicant that the claim should not have been accepted at all. The FSP declined the claim because it says:  the applicant has not established an insured event caused the damage  even if the applicant can establish a valid claim it is excluded from cover  the cause of the damage was: structural or design faults, faulty workmanship, wear and tear and lack of maintenance. The applicant maintains the damage was caused by a hea vy wind event followed by a heavy rain event. The policy responds to storm damage. 1.2 Issues and key findings Is the FSP entitled to decline the claim? The FSP is entitled to decline the claim. The applicant has not sufficiently established that the damage was caused by a ‘storm’ event as defined by the policy. Is the FSP liable for any other repairs or compensation? The FSP is liable for its inadequate internal repairs. The FSP’s contractor quoted the repairs to be $2,702.70. The FSP should cash settle the applicant this amount. The FSP should also compensate the applicant a further $750 for the handling of the claim and the issues with the manhole. 1.3 Determination This determination is substantially in favour of the FSP. The FSP is not required to action the claim however it must compensate the applicant $3,452.70 within 14 days of acceptance of this determination. Case No: 468349 Determination Page 2 of 5 2 Reasons for determination I have decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. I have taken into account all the material submitted by the parties, both before and after the recommendation. I am satisfied that the documentation I have relied on has been provided to both parties. The caseworker issued a recommendation in favour of the FSP. The recommendation found the FSP is entitled to decline the claim however it is required to attend to the remaining internal damage. The applicant rejected the recommendation because she says her house does not have structural or design faults and there was a storm that caused the damage. 2.1 Is the FSP entitled to decline the claim? Applicant has the burden of establishing an insured event The applicant holds a home insurance policy with the FSP. The policy responds to loss or damage which arises from insured events listed in the policy. Cover is subject to both specific and general exclusions. Relevant to this dispute the policy provides cover for loss or damage caused by a storm. When making a claim under an insurance policy, the burden of proof begins with the insured to show on the balance of probabilities the claimed loss results from an event insured against by the policy. This is known as establishing a ‘valid claim’. The applicant must therefore establish that a storm occurred on the date of the claimed loss. The parties disagree about what caused the damage The applicant says high winds occurred on 30 September 2016 followed by heavy rains on 15 October 2016. The applicant says she had no issues with her roof until these two events when her roof leaked causing internal ceiling damage. On the other hand the FSP says there is no evidence of storm damage. The FSP concludes that there was no leak or roof opening caused by a storm. The FSP says the damage was instead caused by structural or design faults, faulty workmanship, wear and tear or lack of maintenance. This means the applicant not only has to establish that a storm occurred, she has to establish the storm included a violent wind and/or rain, hail or snow of unus ual volume. The information does not establish a ‘storm’ as intended by the policy The policy defines storm as:  A violent wind including a tornado or named cyclone or  Rain, hail or snow of an unusual volume, force or duration Case No: 468349 Determination Page 3 of 5 The FSP’s second assessment o f the damage advised that rain water may have been overflowing from the gutter because a number of areas of the roof converge at one gutter point. Additionally, there are no spreaders or downpipes to disperse the water flow. The FSP’s assessor also identif ied earlier silicone repairs and patching. The report did not identify any damage which would have been caused by a storm itself. There is no information that a storm impacted on the applicant’s property in October 2016. The FSP provided weather data reports from the Australian Bureau of Meteorology (BOM) for the months of September 2016 and October 2016. The reports show the highest wind recorded in September 2016 was a westerly wind of 65 km/h on 30 September 2016 at 2:47pm. There was no accompanying rainfall. The highest rainfall was recorded on 8 September 2016 at 30.8mm. The applicant says there was no damage to the roof or property that day. The applicant says there was heavy rainfall on 15 October 2016. The BOM data reports states there was 0mm of rainfall on 15 October 2016 and on 16 October 2016. The applicant has not provided any documentation to dispute this. The applicant has not established an insured event occurred The applicant has not established that there was a storm or that there was a violent wind and/or rain, hail or snow of unusual volume on the day she says the loss occurred. The applicant has not established a claim that falls within the terms of the policy. The FSP is therefore entitled to decline the claim. 2.2 Is the FSP liable for any other repairs or compensation? Non-compliant repairs of the FSP The applicant says the FSP cut a manhole into her ceiling and then it kept dropping debris onto her couch. Additionally the manhole cover kept falling out onto her and the baby when sitting on the couch. The FSP has accepted liability for the faulty repairs and says it will rectify the internal repairs once the issue with the roof have been repaired. There is no reason the FSP needs to wait for the roof to be repaired. The applicant has been asked for an update on the internal repairs and she advised she has merely taped the manhole so no more debris and water can fall down. Given the internal repairs have not yet been rectified, I consider it fair and reasonable to cash settle the applicant the cost of repairs the FSP has accepted liability for. The FSP’s assessor provided a scope of works and quotation for the internal repairs after its initial acceptance of the claim. The builder quoted $2,702.70. The FSP is to cash settle the applicant this amount. Case No: 468349 Determination Page 4 of 5 Non-financial loss FOS can award compensation for non-financial loss where there has been an unusual amount of physical inconvenience, time taken to resolve a situation, or inter ference with the applicant’s expectation of enjoyment or peace of mind. In assessing whether to award compensation for non-financial loss, FOS expects applicants to be moderately robust, bear the normal degree of inconvenience experienced when a problem occurs, and take reasonable steps to minimise the inconvenience suffered. The FSP put a manhole into the applicant’s ceiling which kept falling onto the couch with additional debris. The applicant says this landed on her young child at one stage and was causing her stress with another baby on the way. The applicant has provided photographs in support. I accept this would have been extremely distressing and would have caused a considerable amount of inconvenience. The FSP is wholly responsible for the manhole. I note the FSP has already offered to refund half of the applicable excess for its incorrect assessment and accepted delay. I consider it fair and reasonable that the FSP compensate the applicant another $500, being $750 in total, for her stress and inconvenience caused by the faulty manhole and handling of the claim. Case No: 468349 Determination Page 5 of 5 3 Supporting information 3.1 FOS approach There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered for the purposes of this determination. This dispute has been decided on its merits, having regard to the relevant law, good industry practice, codes of practice and previous Financial Ombudsman Service (FOS) decisions. 3.2 Relevant policy extract s The relevant policy extracts are referred to in the parties’ submissions , the recommendation and in the FSP’s Notice of Response dated 12 April 2017. Both the policy documents and the Notice have been exchanged with the applicant. 3.3 Other relevant material considered and relied on  Parties’ sub missions and reports  The applicant’s photos  The FSP’s builder assessment and quote.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.