1 Overview
1.1 Dispute
The applicant, a company, is a beneficiary under a residential strata insurance plan
held with the financial services provider (FSP). In August 2015, the applicant lodged
a claim under the policy for damage sustained following a burst hot water pipe.
The FSP initially accepted the claim and paid the applicant $4,526.50 for plumbing,
$23,506.60 for loss of rent and $675.90 to the owners corporation. A dispute arose
as to the likely cost of repairs, and further investigations were made by the FSP. The
FSP subsequently declined the applicant‟s claim and says the damage was caused
by corrosion or gradual deterioration of the copper pipes, which is excluded from
cover under the terms of the policy.
The applicant disputes the FSP‟ s decision and maintains the damage is covered
under the terms of the policy. The applicant seeks payment for the cost of repairs,
loss of rent, lot owners‟ contribution fees, legal fees, and expert fees.
1.2 Issues and key findings
Is the FSP entitled to apply the policy exclusion for corrosion?
The Panel is not satisfied that the policy exclusion relating to corrosion or gradual
deterioration applies to the claim. As the policy provides cover for accidental
damage, the Panel is satisfied that the applicant is entitled to cover in accordance
with the terms and conditions of the policy, as set out under section 2.1 of this
determination.
1.3 Determination
This determination is in favour of the applicant.
The FSP is to pay the applicant $94,790.62 for rectification costs ($72,790.62),
replacement of piping ($1,000), lot owners‟ fees ($2,000), loss of rent ($13,000), legal
costs ($3,000), and expert fees ($3,000), as per section 2.1 of this determination.
Interest pursuant to section 57 of the Insurance Contracts Act 1984 (Cth) is payable
on the $94,790.62 from 19 August 2017 to date of payment of the claim.
In addition, the FSP is to pay the applicant $3,000 by way of compensation for non-
financial loss, pursuant to paragraph 9.3 of the Terms of Reference.
Case No: 468052 Determination Page 2 of 10
2 Reasons for determination
There has been a full exchange of material between the parties and each party has
had the opportunity the address the issues raised in this dispute.
The applicant has been legally represented and reference to submissions made by
the applicant includes submissions made by the applicant‟s legal representative.
Due to the complexity of the issues involved, this matter was referred to a Panel for
determination. In reaching this determination the Panel has taken into account all
relevant information provided by the parties. The determination is based on what is
fair in the circumstances having regard to the relevant legal principles, terms of the
policy, good industry practice including codes of practice, and prior determinations
where applicable.
2.1 Is the FSP entitled to apply the policy exclusion for corrosion?
Policy provides cover for accidental damage
The policy covers “ accidental loss or damage ” . “ Accidental loss or damage ” is not
defined in the policy, but is commonly understood to mean loss or damage that was
not intended or expected.
Both parties agree that the insured property was damaged by a burst hot water pipe.
There is no suggestion that this damage was intended or expected.
Policy excludes damage caused by corrosion
The FSP has the onus to establish the application of an exclusion if it wants to
decline the claim.
Page 25 of the PDS says the policy excludes cover for damage caused by wear and
tear, including “ rust, oxidation, [or] corrosion ” .
The FSP says the damage to the insured property was caused by corrosion.
Evidence of damage caused by corrosion limited
The applicant appointed „ GJ ‟ , building consultant, to inspect the prop erty. GJ‟s report
of 11 February 2016 says the hot and cold water lines at the property are encased in
a slab of concrete. GJ says it is “ nearly impossible to specifically locate any pipe
burst in these types of installations ” .
The FSP has provided a report dated 31 August 2016 from „ BL ‟ , building consultant.
BL‟s report states as follows:
The copper pipe leakage within the concrete slab floor structure is not uncommon for
properties of this age due to a reaction between the copper and the alkaline nature o f the
concrete. Corrosion over time of unshielded or unwrapped copper pipe is now very
common.
...
Case No: 468052 Determination Page 3 of 10
The water leak/burst pipe has been caused by corrosion related to the age of the building.
GJ provided a further report dated 3 November 2016. GJ disagrees w ith BL‟s
conclusion that the leak was caused by corrosion, and cites the following reasons:
Corrosion of copper pipes is caused by either poor pH standards or cavitation
(water hammer). GJ‟s report contains a lengthy discussion of GJ‟s investigation
into both of these factors, and concludes that neither has been an issue at the
insured property
GJ disagrees with BL‟s assertion that leaking due to copper corrosion is “ not
uncommon for properties of this age ” . GJ says leaks in properties like this are
“quite rare… as copper has proven to be a very reliable materi al ”
GJ dug into the concrete and removed about 200mm of the copper pipe. GJ
examined the copper pipe and found that it was “ clean and free of any type of
corrosion ”
BL‟s report referred to concrete reacting with “ unshielded or unwrapped copper
pipe ” , but the section of copper pipe removed by GJ was wrapped in plastic.
In a letter to the applicant‟s solicit ors dated 4 May 2017, GJ says: “ ln [my] view the
cause of the pipe burst… [was] an intermittent or la rge increase in water pressure…”
The FSP says the lack of corrosion in the copper pipe extracted by GJ does not rule
out the possibility that there was corrosion elsewhere. The FSP says GJ‟s repo rt
does not establish the cause of the leak, and BL‟s report establishes that the leak
was caused by corrosion.
The information provided by the FSP is limited. BL‟s report only contains his
assertion that the corrosion is a common occurrence in buildings of this type. It does
not cite any further examinations that he had conducted.
The Panel is satisfied that the report provided by GJ is a more thorough and detailed
report as to the circumstances of the loss. The Panel is satisfied, based on the
information provided, that the report from GJ should be preferred.
In the circumstances, the Panel is satisfied that the exclusions relating to corrosion
and gradual deterioration do not apply and that the FSP is liable to meet the
applicant‟s claim in accordance with the terms of the policy.
It is appropriate to set out the method of settlement of the claim under the various
sections of the policy as applicable.
Payment of rectification costs
Page 27 of the PDS says the FSP can choose to settle a claim by repairing damage,
or paying the cost of repairs.
The applicant has arranged repairs independently of the FSP, the FSP having denied
the claim. The repairs were completed in February 2018. In the circumstances, a
cash settlement is appropriate.
Fair to rely on quote from GJ
A scope of works was prepared for the FSP by „ DLBA ‟ . Based on this scope of
works, the FSP obtained a quote from „ TBS ‟ of $22,335.50 for rectification, plus a
Case No: 468052 Determination Page 4 of 10
quote of $5,236 to re-route the copper water line. Another quote was obtained from
„ BBS ‟ for $34,298.88. The FSP concedes these quotes were inadequate.
A further quote was obtained from „ ABC ‟ with an estimate of $59,466. The estimate
did not include any allowance for alternative accommodation whilst the works were
carried out, but noted the burst pipe and pipe relocation works form a major part of
the repair costs.
The applicant provided a quote from GJ, together with a detailed report from GJ in
February 2016. GJ assessed the total rectification costs, including GST, at
$70,638.62.
A subsequent quote from GJ in November 2016 was for $94,310.62. This included
16 weeks ‟ accommodation calculated at $19,120, and 16 weeks ‟ storage totalling
$2,400. If accommodation and storage costs are deducted, the quote to complete the
works totals $72,790.62.
The applicant has since completed the work and claims rectification costs of
$110,387.90. Invoices have been provided to support the total claim.
The Panel notes that at the time the hot water pipe burst, the applicant had already
commenced some renovations to the property. It is unclear exactly what renovations
were contemplated. The Panel notes from the invoices that it appears work was
performed in addition to the work required as a result of the damage sustained to the
property.
The Panel considers the fairest way to resolve the claim for the rectification of the
damage sustained is to rely upon the quote provided by GJ in November 2016 of
$94,310.62, less the relocation and accommodation expenses of $21,520, making a
total of $72,790.62. The Panel notes that this quote was provided to the FSP on 19
July 2017.
Repair and replacement of the water pipes
The applicant says the damage could only be repaired by re-routing the water pipes
and re-connecting each fixture and fitting. The applicant says the FSP proposed a
cheaper solution, but it would not have complied with relevant regulations.
GJ‟s report of 11 February 2016 says the only way to repair the damage is to install
new pipes around the outside of the building and completely bypass the pipes
encased in the concrete slab. BL‟s report concurs, stating that rectification will require
re-routing the pipes around the perimeter walls of the building. The Panel
acknowledges that the only way to repair the damage may have been to re-route the
piping.
The policy provides, under special benefit 9, a $1,000 limit on exploratory costs,
replacement of defective parts, etc. There is no dispute that the FSP has indemnified
the applicant for the exploratory costs of locating the water leak.
Both parties agree that the re-routing of the hot and cold water supply pipes is
necessary as the pipes should no longer run through the concrete slab . They
disagree as to whether the limit under the policy for the cost of rectifying the defective
part or pipes is $1,000.
Case No: 468052 Determination Page 5 of 10
Detailed submissions have been made by the applicant and the FSP, with respect to
the application of this limit to the repair/re-routing of the pipes. The applicant says
that the special benefits provided under the policy are provided in addition to broad
form accidental loss and damage covered under the terms of the policy. The
applicant says that the rectification work required in the re-routing of the pipes is not
simply to repair a damaged pipe, but the re -routing of the pipe is accidental damage
caused by the pipe.
The Panel does not agree with this argument. The re-routing of the pipes is part of
the necessary repair of the damaged part. The actual re-routing is not part of the
damage caused by the burst pipe but is a consequence of the need to replace the
pipe. It is a part of the rectification of the defective part.
The Panel accepts the argument put by the FSP and accepts that the cost to repair
the defective part, that is to repair the pipes, is limited to $1,000 as specified under
special benefit 9 of the policy.
This does not avoid the applicant‟s claim for the cost of repairing the damage
sustained as a result of the burst pipe.
Loss of rent
Page 20 of the PDS says that if the property is made uninhabitable by an insured
event: “ We will pay the actual Rent You lose… from the time of the Event until the
time [the property] is relet f ollowing completion of… repairs” . This entitlement is
subject to a requirement that the applicant takes all reasonable actions to ensure the
property is relet. The certificate of insurance shows that the sum insured for loss of
rent is $757,350.
The FSP agrees that the burst pipe made the property uninhabitable. The FSP has
not disputed that the applicant lost rent as a result of the damage.
The Panel notes that at the time of the loss the rental agreement was signed on
behalf of the applicant by „ PH ‟ , and rented the property to PH. At that time, the rent
payable was $3,250 per month. The FSP has paid the applicant $23,506.60,
representing over seven months ‟ loss of rent.
Even though the property was uninhabitable, PH entered into a further tenancy
agreement with the applicant on 29 January 2016, with a rental increase to
$5,178.33. Whilst this may have been a commercial rent, the Panel is concerned as
to such an arrangement being made at a time when the property was uninhabitable.
The arrangement is between PH and the applicant company of which PH is a
director. Although perfectly legal it is hardly an arm‟s length transaction. The Panel
would expect that any such increase in rent could not apply until the repairs had been
completed.
The Panel considers it fair in the circumstances that the rent on which to base any
payment is the rent payable at the time o f the loss, being $3,250 per month.
The applicant claims loss of rent of $106,576.87, being loss of rent to the completion
of the rectification works. The estimated time to complete the repairs provided by GJ
is four months. The Panel considers the applicant could have commenced the repairs
Case No: 468052 Determination Page 6 of 10
after receiving the report from GJ and the FSP‟s rejection of the claim. The Panel
considers the applicant was in a position to arrange for the repairs to be completed
within that timeframe.
It is fair in the circumstances that the additional loss of rent payable to the applicant
be limited to a period of four months to allow for the rectification work to be
completed. Calculated at $3,250 per month, the Panel determines the FSP is liable to
pay the applicant a further $13,000 by way of loss of rent.
Lot owners’ contributions and fees
Page 21 of the PDS says that if the property is made uninhabitable by an insured
event: “We will pay, up to $2,000… for contributions, levies, maintenance and other
fees You are required to pay during the period [the property] is made unfit to be
occupied…”
The FSP must reimburse the beneficiary for any contributions, levies, maintenance
and other fees paid by the beneficiary in respect of the insured property from the time
the pipe burst to the time repairs are completed, up to $2,000, upon receipt of
evidence establishing that the beneficiary was required to make those payments.
Legal fees payable under paragraph 9.4 of Terms of Reference (TOR)
During the course of this dispute, the applicant has been represented by lawyers.
The applicant says he is entitled, under the policy, to recover his legal fees from the
FSP.
Page 19 of the PDS says the FSP will pay legal fees incurred by the applicant in
making submissions to “ any Public or Statutory Authority, Builders Licensing Board,
or Land and Environment Courts ” . FOS is not a public or statutory authority, a
licensing board, or a court. The policy does not provide for the reimbursement of
legal fees incurred in making submissions to FOS.
FOS provides a service that is free to an applicant and it is not usually necessary for
an applicant to be legally represented. Normally, if an applicant chooses to have
representation, they will be responsible for their own legal costs. However, given the
complexity of the issues raised in some disputes, FOS can determine under
paragraph 9.4 of the TOR that an insurer should contribute up to $3,000 to an
applicant‟s legal costs.
The P anel found the applicant‟s lawyers‟ submissions thorough and of assistance in
considering this dispute. The Panel accepts the applicant reasonably needed the
legal representation.
The Panel considers it fair in all the circumstances that the FSP contribute up to
$3,000 to the applicant‟s legal costs, upon receipt of an invoice or invoices from the
applicant ‟s lawyers.
Expert fees payable under paragraph 9.4 TOR
Page 19 of the PDS says the FSP will pay for any “ architects fees, surveyors fees
and other professional fees ” necessarily incurred by the applicant in the replacement
Case No: 468052 Determination Page 7 of 10
of insured property. This provision does not apply to the applicant‟s claim because
the property is being repaired, not replaced.
Section 9.4 of the TOR provides that FOS may decide that an insurer should
contribute up to $3,000 to professional costs incurred by an applicant in the course of
a dispute.
The Panel found GJ‟s reports to be of assistance in considering this dispute. The
Panel considers it fair in all the circumstances that the FSP contribute up to $3,000 to
GJ‟s fees, upon receipt of an invoice or invoices from GJ.
FSP to pay interest
The Panel considers that in the circumstances, it is fair that interest be paid on the
settlement amount of $94,790.62, in accordance with section 57 of the Insurance
Contracts Act 1984 (Cth), from 19 August 2017 until date of payment of the claim.
FSP liable to pay compensation for non-financial loss
Under paragraph 9.3 of the TOR, FOS can determine that compensation be paid for
non-financial loss, where an applicant suffers an unusual degree or e xtent of physical
inconvenience, time taken to resolve the situation, or interference with the applicant‟s
expectation of enjoyment or peace of mind.
Whilst the applicant in this instance is a company, it is effectively a company set up
to monitor a family trust on behalf of PH. PH is effectively the applicant in this
instance.
The damage was sustained to the property in August 2015. The FSP initially
accepted liability. It was not until the dispute as to the costs to rectify the damage
arose that the FSP obtained further information and rejected the claim. That was not
until August 2016. According to the applicant and not disputed by the FSP, it did not
agree to mediate this dispute.
As indicated in the body of this determination, the Panel is persuaded by the
information provided by the applicant that, on balance, the damage was accidental
and covered under the terms of the policy. The Panel is of the view that the FSP
should have acted more promptly and responsibly in responding to the applicant‟s
claim.
In the Panel ‟ s view, the conduct of the FSP, particularly the delay in responding to
the applicant‟s claim and submissions , has caused a significant impact on PH. In the
circumstances, the Panel determines it is appropriate to award $3,000 by way of
compensation for non-financial loss.
Case No: 468052 Determination Page 8 of 10
3 Supporting information
3.1 Relevant policy terms
Policy 1 - Insured Property page s 19 – 28
Policy 1 is a „broad form‟ accidental loss and damage insurance contract in terms of the Insurance
Cont racts Act, 1984 .
What we insure
(page 19)
We insure You up to the Sum Insured shown for Policy 1 on the Schedule,
against ACCIDENTAL LOSS or DAMAGE to Your Insured Property which
occurs during the Period of Insurance.
Additional benefi ts
(page s 19 – 20 )
When Your Sum lnsured under Policy 1 is not otherwise expended in
respect of any one Event We will pay for:
1. Archi tects and profe ssional fees, removal of debris
a t he cost of architects fees, surveyors fees and other professional
fees;
…
You necessarily incur in the Replacement of Your lnsured Property as a
result of loss or damage that is admitted as a claim under Policy 1 .
4. Legal fees
Legal fees You necessarily incur in making submissions and/or applications
to any Public or Statutory Aut hority, Builders Licensing Board, or Land and
Environment Courts as a result of loss or damage to Your lnsured Property
that is admitted as a claim under Policy 1.
Special benefits
(page s 20 – 25 )
Special Benefi ts are included in addition to Your Sum Ins ured for Policy 1 .
1. Temporary accommodation / rent / contributions / storage
…
b Rent
When You have leas ed out or can substantiat e by means of a
signed agreement that You would have leased out Your Lot/Unit or
Common Area We will pay the actual Rent You lose or would have
lost if your Lot/Unit or Common Area is made unfit to be occupied
for its intended purpose by:
i lo ss or damage that is admitted as a claim under Policy 1; or
ii reaso nable access to or occupancy of Your Lot/Unit or
Common Area being prevented by damage from an Event
claimable under P olicy 1 happening to other property in the
immediat e vicinity.
We will pay:
under b i from the time of the Event until the time Your Lot/Unit or
Common Area is relet following completion of rebuilding, repairs or
repl acement provided You demonstrat e You have taken all
reasonable actions to obtain a new tenant; and
Case No: 468052 Determination Page 9 of 10
under b ii from the time of the Event until the time when access to
Your Lot/Unit or Common Area is re - established .
…
g Lot owners’ contributions and fee s
We w ill pay, up to $2,000 a Lot/Unit, for contributions, levies,
maintenance and ot her fees You are required to pay during the
period Your Lot/Unit is made unfit to be occupied for its intended
purpose by loss or damage to Your Ins ured property that is
admitte d as a claim under Policy 1.
10. Exploratory costs, replacement of defective parts
We will pay for the reasonable exploratory costs You necessarily incur in
locating the source of bursting, leaking, discharging or overflowing of tanks,
apparatus or pipes used to hold or carry liquid of any kind.
We will also pay for reasonable costs incurred in:
a repairing the area of Your Insured Property damaged by such
exploratory work;
b repairing or replacing the defective part or parts of such tanks,
apparatus or pipes, to a limit of $1,000;
c rectifying contamination damage or pollution damage to land at
Your Situation caused by the escape of liquid, to a limit of $1, 000.
Exclusions - what
we do not insure
(page s 25 – 27 )
1. We will not pay for loss or damage:
…
c caused by lack of maintenance, rust, oxidation, corrosion, Wear,
Tear, fading, gradual corrosion or gradual deterioration, concrete or
brick cancer, developing flaws, wet or dry rot, or failure to maintain
Your Insured Property in a reasonably good state of repair.
…
h cau sed by underground (hydrostatic) water.
However We will pay if the loss or damage is due to bursting,
leaking or overflowing of water tanks, pipes, or drains.
Claims - how we
will settle your
claim
(pages 27 – 28)
1. Replacement
lf Your lnsured Property is damaged, we may choose to either rebuild,
replace, repair or pay the amount it would cost to rebuild, replace or repair.
The amount We pay under Policy 1 will be the cost of Replacement at the
time of Replacement subject to the following provisions:
a the necessary work of rebuilding, replacing or repairing (which may
be carried out upon another site or in any manner suitable to Your
requirements provided our liability is not increased), must be
commenced and carried out without unreasonable delay;
b where Yo ur lnsured Property contains any architectural or structural
feature of an ornamental, heritage or historical character or where
materials used in the original construction are not readily available
We will use the nearest equivalent available to the origi nal
materials;
c if it is lawful, and with Our prior written consent, You will not be
required to actually rebuild any building destroyed but may
Case No: 468052 Determination Page 10 of 10
purchase an alternative existing building or part thereof to replace
all or part of the one destroy ed.
Such Repl acement will be deemed to constitute Replacement for the
purpose of this insurance provided Our liability is not increased,
d if You cause unreasonable delays in commencing or carrying out
Replacement, We will not pay any extra costs that result from that
de lay;
e when We wish to rebuild, replace or repair and You do not want this
to occur We will only pay lndemnity Value.