Text of the determination
Determination
Case No: 468006 Determination Page 1 of 11
Case number: 468006 18 April 2018
1 Overview
1.1 Dispute
The applicants lodged a claim with the financial services provider (FSP) for damage
to their property following a storm in November 2016.
The FSP accepted the claim but the dispute arises because of the settlement
amounts offered by the FSP to cash settle for repairing the property‟s main building
and replacing the property‟s „granny flat‟.
The FSP made several offers of settlement but the parties are unable to reach
agreement.
The case manager provided the parties with a recommendation on the issues in
dispute. As the recommendation was not accepted by the applicants, the dispute has
been referred to a panel for determination .
1.2 Issues and key findings
Is the FSP’s offer for repairs to the home fair?
Having elected to cash settle the claim, the FSP must ensure the cash settlement is
fair and adequately covers all contingencies once repairs commence. The available
material establishes it is fair for the FSP to cash settle the applicants $56,000 for
repairs to the home.
Is the FSP’s offer in relation to the granny flat fair?
The available material including photographs, a floor plan and four quotations
establish it is fair for the FSP to pay the applicants $80,000 to replace the granny flat.
Are the applicants entitled to compensation?
The available material establishes the FSP‟s claims handling interfered with the
applicants‟ expectation of enjoyment or peace of mind and payment of compensati on
in the sum of $1,000 is warranted.
Case No: 468006 Determination Page 2 of 11
1.3 Determination
This determination is substantially in favour of the applicants.
Should the applicants accept this determination, then within seven days acceptance,
the FSP is to pay to the applicants $137,000 with no policy excess deducted.
This figure is calculated as follows:
$56,000 to repair the home
$80,000 to replace the granny flat
$1,000 compensation.
Otherwise, the FSP is not required to take any further action in relation to the matters
the subject of this determination save if the applicants elect to install the granny flat.
Case No: 468006 Determination Page 3 of 11
2 Reasons for decision
The panel has decided this dispute on its merits, having regard to the relevant law,
good industry practice, codes of practice and previous FOS decisions. The panel has
taken into account all the material submitted by the parties, both before and after the
recommendation. The panel is satisfied the documentation it has relied on has been
provided to both parties.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.
Submissions made after recommendation
After the recommendation was rejected, the applicants made further lengthy
submissions and provided some new material.
Where appropriate, the submissions are referred to in the determination.
Various negotiations have occurred
The panel notes there may still be other matters in contention between the parties
which are not the subject of this determination. This determination deals with the cost
of repairs to the home, the replacement cost of the granny flat and compensation.
It is not in dispute there was a severe storm which damaged the applicants‟ property.
The dispute relates to the amount offered to settle the claim for damage to the home
and damage to a granny flat (also referred to as a transportable home).
The available material shows the FSP made various offers to settle the claim in
January and March 2017.
On 10 March 2017 the FSP provided its internal dispute resolution (IDR) response in
which the FSP agreed to settle the claim for $126,000 and waive the policy excess of
$1,000. The offer was made up of $70,000 for the granny flat with the balance
($56,000) for the repairs to the home.
Further, if the applicants decided to purchase a replacement granny flat in the future
and install the flat, the FSP offered to consider reasonable installation costs (save for
installation of electrical or plumbing services as the original structure did not have
these facilities).
After the recommendation, the applicants indicated they would accept $149,000
being “the agreed settlement figure” of $56,000 for building repairs and $93,000 for
the granny flat. The applicants relied on the quote from J Leisure Homes in the
amount of $93,000. The applicants submit this is the closest like-for-like cost to
replace the granny flat.
Case No: 468006 Determination Page 4 of 11
2.1 Is the FSP’s offer for the repairs to the home fair?
The FSP can choose to repair the home or pay the reasonable costs of repair
The FSP‟s policy provides if it agrees to cover a claim, then it will pay the reasonable
cost to repair the part of the home which was damaged.
The FSP‟s policy says it has the option to either:
arrange to repair the home
pay the reasonable costs to repair the home.
In addition, the FSP provides a lifetime guarantee when the home is repaired by one
of its preferred repairers.
Material provided by the applicants after the recommendation indicates on
28 November 2016 the FSP‟s b uilder offered to commence repairs upon payment of
the excess. This is contrary to its own report dated 23 November 2016 in which the
builder reported:
„ The remainder of the works in our opinion are the result of the event however due to
the very old and dilapidated condition of the home generally we would be unable to
warrant repairs. ‟
The estimated cost of repairs at that stage was $40,637.91.
In mid- December 2016, the FSP‟s technical specialist attended and estimated the
cost of repairs at $41,557.
The applicants provided quotes to repaint the water damaged area and to install new
roof.
The FSP‟s builder re -attended on 9 February 2017. The builder agreed to variations
to the scope of works as he agreed a variation would be required for the roof
sheeting and agreed the roof would require a new roof batten and sarking.
The builder said he was unable to warrant the repairs to the roof because the roof did
not meet current building standards and, as existing guttering is galvanised, installing
a zinc roof would cause the galvanised guttering to rust out.
A revised quote was provided in the amount of $48,179.60. This included GST and a
builder‟s margin of 19%.
In making its IDR offer, the FSP worked from this revised amount. As the applicants
raised concerns regarding damage to the garage, the FSP agreed to i nclude an
additional allowance to repair the garage.
FSP election to cash settle is fair
The panel has carefully considered all the material provided by the parties both
before and after the recommendation.
The available material does not establish how the FSP calculated the additional
allowance made for repairs to the garage. The applicants contend there is an
alternative scope of works. The FSP says there was not an alternative scope of
works.
Case No: 468006 Determination Page 5 of 11
After the recommendation, the FSP says the applicants may have misinterpreted its
attempts to resolve the dispute by increasing the settlement offer for the building
portion of the settlement.
From the available material, the panel accepts the FSP‟s explanation in relation to
this issue. In any event, the panel considers this issue is not determinative of the
outcome.
The panel has taken the followi ng matters into account:
the asbestos garage roof was penetrated by the debris
the available material does not establish how the FSP calculated the additional
allowance made for the repairs to the garage
the amounts allowed by the parties for painting are not materially different
the amounts allowed by the parties for the cost of replacing the roof are
materially different in the amount of around $10,000
the FSP‟s policy provides it will only repair the damaged parts of the home
photographs show roof sheets were secured with screws replacing the nails
photographs show the roof was not in good condition before the storm event
and there were no purlins or struts in the roof
while the applicants provided some quotes, they provided no quote to counter
the quote relied on by the FSP in the amount of $48,179.60
while the FSP says the price quoted by the FSP‟s builder is not an insurance
discounted price, the FSP admits it is not in a position to provide a “repair cost
guarantee” noting “many factors at play”
the quotes relied on by the parties are now out of date.
FOS generally prefers an FSP to undertake repairs. This is because the FSP can
take into account any contingencies that may occur in the course of repairs. Further,
the applicants then have the benefit of the FSP‟s lifetime guarantee.
However, in the circumstances of this dispute, and the builder‟s position in relation to
warranting repairs, the panel is satisfied it is fair in the circumstances the FSP
elected to cash settle the claim.
The discretion to cash settle must be exercised fairly
The discretion to cash settle must be exercised fairly. In the circumstances of this
dispute, the panel considers a cash settlement is appropriate and it is fair that the
FSP pay $56,000 for the building repairs.
In determining this amount the panel has taken several factors into account: there
are unresolved disagreements about the scope of works, all the risk for the repairs is
transferred to the applicants, the quotations to repair are significantly out of date and
the applicants lose the benefit of the lifetime guarantee. The panel considers this
cash settlement makes a fair allowance for contingencies which may arise in the
course of repair and the transferred risk.
In the circumstances, the panel makes no allowance for statutory interest.
Case No: 468006 Determination Page 6 of 11
2.2 Is the FSP’s offer in relation to the granny flat fair?
Parties provided photographs, a floor plan and quotations
It is not in dispute the granny flat was significantly damaged in the storm event. The
available material establishes the granny flat was a portable building described as a
Millard single wide holiday home purchased several decades before the storm event.
The dispute concerns the amount offered by the FSP to indemnify the applicants for
the loss. The FSP agreed to a replacement value of $70,000 for the granny flat. The
applicants seek $93,000 for the granny flat as per a quote from J Leisure Homes.
The applicants say this is the closest like-for-like replacement.
The parties rely on a number of quotations. Photographs have been provided of a
structure standing on stumps in the garden of the insured property.
No material was provided about the original purchase cost of the granny flat although
the FSP‟s claim file notes the granny flat was purchased in the late 80‟s at a cost of
about $74,000.
The FSP‟s builder notes the granny flat structure as a portable building and referred
this to the FSP to be negotiat ed with the applicants. The FSP‟s technical specialist
JM attended in mid-December 2016 to assess the damage. He described damage to
a relocatable home which had been built on piers and located since the 1980‟s.
JM notes the applicants are not replacing the granny flat. JM advised the FSP would
not be contributing to the costs of reconnecting the services unless a later decision is
made to replace the granny flat.
JM relied on material from J Leisure Homes in relation to a leisure home 4.2m x 6.5m
which could be replaced at a cost of $85,000 including GST plus freight.
JM reported this was comparable with other pricing supplied. At that time, the
applicants had obtained a written quote from J Leisure Homes dated 15 December
2016. The quote stated the price per unit delivered was $85,000. This was for an
8.5m by 4.70m leisure home.
JM further noted he had settled a similar item in the year previously on another claim.
He recommended settlement for the granny flat in the amount of $85,000. In mid-
January 201 7 the FSP adopted JM‟s recommendation in its offer to the applicants.
The available material includes other quotations including material from:
J Leisure Homes for a 9.15m by 3m J leisure home in the amount of $93,000
including delivery (letter dated 10 February 2017)
O Transportable Homes in the amount of $57,276.40 for a 1BR Bushmate. 9X3.
(Quotation dated 27 February 2017)
O Transportable Homes in the amount of $67,560.40 for a 1BR Bushmate. 9X3.
(Quotation dated 10 March 2017).
Included with the quotati ons was a plan headed „Millard single wide holiday home
issue number 1‟. The plan had a number of annotations presumably from the
applicants. This home was 30 feet long (9.144m) by 10 feet wide (3.048m).
Case No: 468006 Determination Page 7 of 11
When FSP obtained the quotation from O Transportable Homes for $57,276.40, it
provided O Transportable Homes with the annotated Millard plan, photographs of the
damaged granny flat and a description of the property.
The description included the following details about the granny flat including:
it was a transportable structure called a 1978 Millard single wide holiday home -
after the recommendation, the applicants noted the year as 1985
the structure sat on brick piers about 500m off the ground
power fed into the structure like a normal caravan
water fed via black poly pipe from water tank with a pump
it was a 9m by 3m rectangular box with a sloping skillion roof
within the structure there was a small ensuite, a bedroom with a number of built -
in features, a lounge/dining area with a window and sliding aluminum door and
a small kitchen with laminate top, oven, range hood, cooktop and hot water
service.
O Transportable Homes advised they could provide a replica of the home for a cost
$57,276.40. Its email attaching the quotation indicated further costs migh t include a
site survey and plumbing costs.
The panel notes that despite the FSP earlier accepting JM‟s recommendation for
$85,000, this was later withdrawn. Following a review of all of these quotes, the FSP
made a revised offer of $73,500 as part of its total settlement, but all the terms of
settlement were not acceptable to the applicants.
The FSP then considered the material from the applicants‟ referred supplier J Leisure
Homes ($93,000) and the material it had sourced from O Transportable Homes
($57,2 76.40). It agreed to replace the granny flat for $70,000. It is not known how it
calculated this amount, although it appears to have been simply a compromise offer
from the FSP.
Submissions after the recommendation considered
The applicants expressed concerns the quote from O Transportable Homes dated 10
March 2017 for $67,560.40 was not taken into account by the FSP or was
deliberately withheld.
After the recommendation the FSP contacted O Transportable Homes, which
advised t he FSP the applicants attended their premises shortly after the original
quote was prepared. It is contended the applicants made adjustments to include
additional items, fittings and fixtures that were not noted on the original Millard floor
plan.
The FSP says the quote was less than the amount of $70,000 offered. The FSP
submits the applicants have not been disadvantaged by not receiving this quote. The
FSP also says it did not deliberately withhold the quote.
After the recommendation, the FSP made further enquiries in relation to whether its
technical home assessing specialist received the quote. The quote is addressed to
him. He was able to locate an archived copy. The FSP says there is no record of the
quote being sent to the people at the FSP dealing with this dispute.
Case No: 468006 Determination Page 8 of 11
The available material establishes the applicants had a copy of the quotation. The
panel notes this was conveyed to the case manager after the recommendation.
While noting it is unsatisfactory that this material was in the possession of the FSP
but not made available to the people dealing with dispute, the panel considers the
available material does not establish the applicants were disadvantaged nor does the
available material establish any adverse motive on the part of the FSP.
Fair in the circumstances to average the quotes
While noting the second quote from O Transportable Homes appears to include
some extra items, the panel is otherwise unable to reconcile the exact difference
between the two quotes from O Transportable Homes .
The panel notes the original offer of $85,000 and the reasons for that offer. The panel
also notes the withdrawal of the offer in circumstances where the FSP was
attempting to negotiate an overall settlement of the applicants‟ claim. The panel
considers the FSP was entitled to fully assess the claim by obtaining an alternative
quote from O Transportable Homes in February 2017.
The panel has carefully considered the material from J Leisure Homes and O
Transportable Homes . There is no objective reason to pre fer one quotation over the
other in circumstances where an exact replacement is no longer available .
In these circumstances, the panel considers it is fair in the circumstances to average
the quotes obtained by the applicants and by the FSP. In doing so, the panel
considers it is fair to make a further allowance in favor of the applicants because
these quotations are now over a year old.
Fair in the circumstances the FSP pay to the applicants $80,000
Taking into account all the available material, and for the reasons stated, the panel
considers it is fair in the circumstances the FSP pay to the applicants $80,000 to
replace the granny flat. Given the amount includes an allowance for the age of the
quotes, the panel makes no further allowance for statutory interest.
The panel is also satisfied it is fair in the circumstances no policy excess is payable
by the applicants as this had been previously waived by the FSP in their attempts to
settle the claim.
Should be applicants decide to install the granny flat, the FSP is also to pay the
reasonable cost of service connections but only to the extent that such services
existed before the storm event.
2.3 Are the applicants entitled to compensation?
Compensation payable in some circumstances
FOS‟s Terms of Reference allow the payment of compensation (capped at $3,000)
for non-financial loss. FOS may decide an FSP should compensate an applicant for
such loss only where there has been an unusual amount of physical inconvenience,
Case No: 468006 Determination Page 9 of 11
time taken to resolve a situation, or in terference with the applicant‟s expectation of
enjoyment or peace of mind.
The applicants make a number of complaints about the FSP‟s conduct in claims
handling. They say they felt threatened and bullied and found the negotiations and
dealings with the FSP upsetting, long drawn out and stressful. After the
recommendation, the applicants described their complaints at length.
The FSP apologised to the applicants that the handling of the claim had not met
expectations.
Fair in the circumstances the FSP pay the applicants $1,000 compensation
The panel has carefully considered the complaints made by the applicants. The
panel notes the various stages of negotiations. The panel also notes the number of
items that the negotiations included.
In circumstances where the parties could not agree on the various issues involved in
the negotiations, the panel considers the FSP was entitled to withdraw offers made
where the parties could not agree on all components of the settlement.
The panel notes the available mate rial establishes the claim was assessed by a
builder and by the technical specialist within one month of the claim event and offers
of settlement were made in January 2017. As the parties could not agree, the FSP
considered further quotations and instructe d its builder to inspect the applicant‟s
property again. The FSP‟s final position was formulated on 10 March 2017.
The panel does not accept the available information establishes the FSP‟s claims
management resulted in an unusual amount of time taken to resolve a situation in
respect of the matters which are the subject of this determination.
The panel accepts both the storm event and insurance claims are stressful. Further,
the panel considers the contents claim which arose from the same event probably
complicated the policy and claims response to the issues in dispute in this
determination.
Further, having advised the applicants that the granny flat issue would be finalised by
payment of $85,000, it later withdrew the offer; whilst it was entitled to do that, the
manner in which this was handled would have caused additional frustration and
stress for the applicants.
The panel considers the FSP did not have a holistic response to the dispute in
circumstances where one department had the second quote from O Transportable
Homes yet failed to pass it on to those dealing with the applicants‟ dispute.
While the FSP made genuine efforts to settle the claim, perhaps the second quote
would have made a material difference to a negotiated outcome in March 2017 or at
the conciliation in April 2017. Also, the failure to accurately reflect the settlement in
the Deed of Release after the conciliation further compounded the inability of the
parties to reach settlement at that time.
Case No: 468006 Determination Page 10 of 11
Taking these matters into account, the panel accepts there was interference with the
applicants‟ expectation of enjoyment or peace of mind caused by the FSP‟s claims
management.
The panel considers it is fair in the circumstances that the FSP pay the applicants
$1,000 compensation.
Case No: 468006 Determination Page 11 of 11
3 Supporting information
3.1 FOS Approach
This dispute has been the subject of a FOS recommendation and due to the nature
of the dispute has proceeded to determination by a panel.
The panel consists of an Ombudsman and two panel members with extensive
experience in insurance industry matters and consumer complaints.
3.2 Policy terms
“ What we pay for – Buildings Insurance
If we agree to cover your claim under Buildings Insurance, then we will:
pay the cost to repair or rebuild the part of your home that was damaged (whichever is
lower)…
How we settle your buildings claim
We will choose to settle your claim for loss or damage to your home „or other cover‟ in one of
the following ways:
1. arrange for repairers, builders or suppliers to repair or rebuild your home
2. pay you the reasonable cost to repair or rebuild your home.”
3.3 Other relevant material considered and relied on
Parties‟ submissions, emails, claim file notes, photographs, invoices, scopes of
work, quotations, reports and all attachments to all submissions both before and
after the recommendation.
Correspondence between the parties.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.