Home / Financial Firm (Unknown - Insurer) / Determination 467967
Determination 467967
Delay in repairing car after accepted collision claim
Summary
The applicant sought compensation for the roughly ten-week repair period on his accepted car claim. AFCA found the delay was within the repairer's estimate and reasonable given parts from Germany, so no compensation was awarded.
FOS awards non-financial loss only for unusual inconvenience or delay, and a timeframe that matched the estimate and the parts supply was not unreasonable.
Issues
- Delay primary · not upheld“The delay was expected and not unreasonable”
Subjects and remedies
motor vehicle collisionno remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Determination
Case No: 467967 Determination Page 1 of 2
Case number: 467967 17 July 2017
1 Overview
1.1 Dispute
On 22 November 2016 the applicant lodged a claim against his car insurance policy
(Policy). The Policy was issued by the financial services provider (FSP) on 8
November 2016.
The claim for damage to the front and rear of the car was accepted. The repairs were
completed and car collected by the applicant on 4 February 2017. The applicant is
seeking compensation for delay in repairing the car.
The applicant claimed that the car also sustained damage to the left hand side rear
door in the accident. This damage was inconsistent with the accident description and
a separate claim for that damage has been lodged and is not the subject of this
dispute.
1.2 Issues and key findings
Is the applicant entitled to compensation for delay?
The delay was both expected and reasonable. The applicant was informed that it
would take two to three months to complete the repairs. The car was ready to be
collected within 10 weeks of the claim being lodged. This is within the estimated
timeframe.
1.3 Determination
This determination is in favour of the FSP. The FSP does not need to take any
further action.
Case No: 467967 Determination Page 2 of 2
2 Reasons for determination
2.1 Is the applicant entitled to compensation for delay?
FOS has limited jurisdiction for awarding compensation for delay
FOS will only award compensation for non-financial loss where there has been an
unusual amount of physical inconvenience, time taken to resolve a situation, or
interference with the a pplicant’s expectation of enjoyment or peace of mind.
In assessing whether to award compensation for non-financial loss, FOS expects
applicants to be moderately robust, bear the normal degree of inconvenience
experienced when a problem occurs, and take reasonable steps to minimise the
inconvenience suffered. Where an applicant has contributed to their loss arising from
the FSP’s conduct, their level of compensation may be reduced accordingly.
FOS can compensate an applicant for non-financial loss arising from the FSP’s poor
management of the claim. When doing so, FOS considers the severity and impact of
the FSP’s conduct on the particular applicant. For example, an applicant in financial
difficulty would be more impacted by unreasonable delays by a n FSP.
The delay was expected and not unreasonable
The FSP arranged for an assessor to examine the car. The assessor followed this up
with a further assessment on 5 December 2016. The claim was accepted and repairs
approved.
The repairer advised the applicant that the repairs would take approximately two to
three months. The timeframe was partly due to the need to obtain a number of parts
from Germany.
The repairer had completed repairs to the car around 20 January 2017. However, the
vehicle was not roadworthy until the wiring loom was fitted to the rear bar. The
applicant took possession of the car on 4 February 2017.
The repair process took approximately ten weeks. The repairer had indicated a li kely
timeframe of two to three months. Given that parts had to be obtained from Germany,
the timeframe is reasonable in all the circumstances.
I accept that the car required some minor rectification work after it was collected
however the applicant was able to use the car from 4 February 2017 and the FSP
has advised, and the applicant has not disputed, that the rectification work has been
completed. An award of compensation is not appropriate in the circumstances.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.