Home / Financial Firm (Unknown - Insurer) / Determination 466657
Determination 466657
Inadequate cash settlement for burglary damage to flooring
Summary
A beneficiary of a strata policy disputed the FSP's cash settlement for burglary damage to timber flooring and sought temporary accommodation costs. AFCA decided in favour of the applicant, requiring settlement on a sand and polish basis and an accommodation allowance.
The insurer's proposed repair method was not shown to be feasible, so settlement follows the applicant's method, supported by unchallenged contractor evidence.
Subjects and remedies
home or building damagetheft or burglarypay claim
Text of the determination
Determination
Case No: 466657 Determination Page 1 of 4
Case number: 466657 30 June 2017
1 Overview
1.1 Dispute
The applicant is a beneficiary of a strata insurance policy held by the owner’s
corporation (OC) at her residence, and underwritten by the financial services provider
(FSP).
On 13 September 2016 a claim was lodged under the policy for damage to the
applicant’s unit after a burglary.
The FSP accepted the claim and arranged a cash settlement to the OC for the
damages. The applicant says the amount offered is insufficient to repair all of the
claim related damage, in particular the damaged flooring. The applicant also seeks
an allowance for temporary accommodation and associated expenses whilst the
flooring repairs are undertaken.
1.2 Issue and key findings
Does the FSP’s offer of settlement fulfil its obligations under the policy ?
The FSP’s offer of settlement does not fulfil its obligations because the applicant has
demonstrated the method of repair proposed by the FSP is not feasible. The
settle ment is to be based on the applicant’s proposed method of repair.
Is the applicant entitled to an allowance for temporary accommodation and
associated expenses?
The applicant is entitled to an allowance for temporary accommodation because her
material shows the property will need to vacant for the repairs to be conducted. The
parties are to work together to establish a reasonable settlement for this component
of the claim.
1.3 Determination
This determination is in favour of the applicant.
The FSP is to cover the cost to sand and polish the floor, in accordance with the
settlement set down in section 3 of this determination. The FSP is also to cover the
temporary accommodation and associated costs.
Case No: 466657 Determination Page 2 of 4
2 Reasons for determination
2.1 Has the FSP fulfilled its obligations under the policy terms?
Applicant has the onus to establish a claim
It is established insurance law the applicant carries the initial onus to show that the
terms and conditions of the relevant insurance policy covers the loss. This is known
as a prima facie claim.
It is not disputed the FSP accepts liability for the claim and has settled the applicant
its assessed cost of repairs. However, a dispute has arisen between the parties as to
the adequacy of the FSP's settlement for the flooring.
The applicant asserts the settlement is inadequate and does not constitute a proper
repair. As the party seeking the benefit, the onus rests with the applicant to establish
she is entitled to the benefit which she is seeking.
FSP ’s evidence says the floorboards can be replaced
The FSP appointed building firm “AJ” to inspect the propert y. AJ considered the
damage to the dining room floor from the claimed event was limited to one small
gouge in the flooring. The remainder of the scratches and damage to the flooring was
consistent with general wear and tear.
AJ’s proposed method of repair is to cut out and replace the damaged area with a
similar material, which would adequately remedy the claimed damage. The FSP
based its settlement for the flooring component on AJ’s cost to repair, being $604.12.
App licant’s evidence says the floor requires sanding and polishing
In support of her position that replacing the damaged board is not feasible, the
applicant has presented evide nce from flooring companies “TF”, “ CC ” and “VT” . All
three say the floorboards need to be sanded back and polished for the entire lower
floor area.
The applicant has also presented photographs of additional damage she says is
caused by the event, which was not included by AJ in its scope of works.
TF’s evidence is a quotation for the sanding and polishing. It confirms the property
will be need to vacant for the flooring repairs to be undertaken. However, TF’s
material does not comment on why AJ’s proposed method of repair will not
adequately repair the claimed damage.
CC’s quotation says the boards cannot be replaced due to the tongue and groove
connectors between the boards being glued.
VT’ s report provides that replacing the boards is not possible due to there being no
guarantee the colour will match. In addition, the boards are glued down. VT
considers all scratching and damage to the floor is as a result of the break -in.
Case No: 466657 Determination Page 3 of 4
The FSP’s policy limits the liability for repairing damaged areas only, with the closest
available equivalent. Therefore, I do not consider the possibility of replacement
boards not matching the original as a basis for not proceeding with AJ’s proposed
method of repair. This is not a scenario for which the policy provides cover.
However, both CC and VT are unequivocal in stating the floorboards cannot be
removed and replaced because the boards are either glued in place, or glued in the
connections.
The FSP does not appear to have sought comment from AJ in relation to this issue.
Therefore, the statements from VT and CC are unchallenged. On this basis, I accept
the boards are glued in place and cannot be removed and replaced, and the only
other option presented for repair is sanding and polishing.
As the wooden flooring extends for almost the entire lower floor area, I accept it
would not be possible to remedy the claim related damage without sanding back and
polishing the entire area.
As the FSP has not challenged the amounts quoted by the applicant’s contractors,
then I accept the lower quotation of $1,320 as quoted by VT is reasonable. In the
circumstances, an award of interest is not appropriate.
Temporary accommodation
The applicant’s material shows the property will need to be vacated for approximately
three days whilst the repairs are undertaken. Again, the FSP has not challenged the
applicant’s evidence in this regard so I accept the property will need to be vacated.
Although the applicant has provided some quotations for these expenses, which the
FSP has not commented on, I consider the applicant’s figures to be excessive. For
example, the quotation for storing her items is for a period of a month, far greater
than the period which would reasonably be required to undertake the works required.
Therefore, as the claim is to be cash settled, the parties are to work together to
establish a reasonable settlement for these components. In the event the parties
cannot reach a mutually acceptable solution, then either side is at liberty to seek
FOS’ s assistance in resolving that dispute.
Other matters
The applicant has raised issue with the FSP settling her claim despite her making it
aware she was not happy with the proposed settlement. She was also concerned
about settlement funds being remitted to the OC.
As the OC is the insured in this matter rather than the applicant, the FSP was obliged
remit any fund to the OC as the insured. Further, it is appropriate for the FSP to
discharge what it considers its liability for a claim in a timely manner to enable repairs
to commence . Acceptance of the settlement does not prejudice the insured’s abilit y
to pursue the matter further, and in the event it is found further funds are due to the
insured (as is the case in this instance) then the FSP can simply settle the difference.
Case No: 466657 Determination Page 4 of 4
3 Supporting information
3.1 FOS approach to this dispute
A full exchange of the relevant information has taken place between the respective
parties and each party has had the opportunity of addressing any issues raised.
All of the provided material has been reviewed and considered. The parties have
raised numerous issues in their submissions to the Service. For the purpose of this
determination, commentary is restricted to only those issues considered relevant to
the outcome.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.