Escape of water damage to ensuite denied as occurring before policy commenced

FirmFinancial Firm (Unknown - Insurer)
Decided2018-01-31
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The FSP denied an ensuite water escape claim as pre-dating the policy. AFCA preferred the applicant's engineer, found the leak occurred after cover began, and ordered indemnity, interest on any cash settlement, and reimbursement of the engineer's fees.

Water usage data showed the leak arose after inception, so the insured event occurred during the period of insurance and the exclusions did not defeat the claim.

Issues

Subjects and remedies

home or building damagepay claimpay compensationpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 466387 Determination Page 1 of 3 Case number: 466387 29 January 2018 1 Overview 1.1 Dispute The financial services provider (FSP) denied the applicant’s claim for escape of liquid damage to his ensuite on the basis it occurred prior to being on risk. The applicant has disputed this as he says the escape of liquid occurred after he first commenced cover with the FSP. 1.2 Issues and key findings Can the FSP deny the claim? The FSP cannot deny the claim because:  the evidence shows the ensuite damage was caused by escape of liquid  the damage occurred after the policy commenced with the FSP. 1.3 Determination This determination is in favour of the applicant. The FSP is required to indemnify the applicant for the damage to the ensuite in accordance with the policy. In the event any aspect is cash settled by payment to the applicant, the FSP is to pay interest on that amount from 17 November 2016 until payment is made. The FSP is also to reimburse the applicant’s costs for obtaining his engineer’s opinion. Case No: 466387 Determination Page 2 of 3 2 Reasons for determination 2.1 Can the FSP deny the claim? Loss caused by escape of water These relevant facts are not in dispute:  the applicant obtained a pre-purchase inspection report on 18 November 2013  the applicant commenced cover with the FSP on 22 November 2013  the applicant lodged a claim on 27 July 2016 for damage around his ensuite The policy responds in the following circumstances: “… we will provide cover for loss or damage caused by an insured event described on pages 8 to 11, which occurs during the period of insurance.” Numerous experts have reviewed the damage and provided reports. The FSP is relying upon engineer LK who concluded the following regarding the cause of damage to the ensuite: “Our observations have led us to conclud e that the cause of the cracks to the ensuite floor and the ensuite wall tiles is differential ground movement due to:  Escape of water from leaking water supply pipe under the ensuite floor  Escape of water from ensuite shower waste pipe  Escape of water from disconnected stormwater downpipe DP8. It is our opinion that the escape of water has also resulted in the saturation of the timber framing, insulation and walls to the ensuite, resulting in the observed mould to wall tiles and decay of studs.” One of the FSP’s arguments is that the cause of loss falls within a number of exclusions. This includes earth movement, gradual deterioration or tree roots. I cannot accept this. LK’s evidence is clear in saying that the escape of liquid is the dominant, efficient or operative (proximate) cause of the loss to the ensuite. Further, there is no other expert opinion that says the loss would have occurred regardless of the leaks found. Given this, I accept the evidence shows the damage to the ensuite was caused by water leaks. This falls within the insured event of “Sudden and unexpected escape of liquid at the insured address”. The primary issue in dispute is when the leak occurred. The FSP says the leak occurred prior to being on risk. In support of this, the FSP is relying on a pre-purchase inspection report obtained by the applicant on 18 November 2013 and LK’s opinion. In particular, LK says: “Based on the Insured’s water bills and the crack to the floor tiles in the ensuite noted in the pre-purchase inspection report, it is our opinion that the damage to the ensuite first occurred prior to November 2013 and prior to policy inception.” Case No: 466387 Determination Page 3 of 3 The applicant has provided evidence from engineer AE who disagreed with LK’s opinion. This was substantively based on the following:  the average daily water usage over the course of the applicant’s history increased significantly following 2015 – this shows the leak occurred sometime after 1 October 2015  the crack in the ensuite represents a design flaw – this is because there are multiple layers under the ensuite floor which shows this area was once the verandah AE’s evidence is preferred On the primary issue in dispute, I prefer AE’s evidence. In particular, AE’s analysis of the water usage is persuasive. There is clearly a marked increase in water usage a couple of years after the policy commenced. It more than tripled after 2 October 2014. Further, during 11 February and 2 October 2014, the usage of the property was within range of the ordinary amount set out by LK. Regarding the cracking to the floor tiles, AE provided a plausible explanation as to why it is not associated with the claimed event. LK’s report does not address this possibility. The FSP’s submissions also referred to other damage within the area of the ensuite identified in the pre-inspection report. The FSP says this supports its position that the event occurred prior to being on risk. This is not persuasive. Neither expert considered this other damage relevant to the issue. For instance, LK made no reference to this other damage as supporting his opinion. AE provides no support for this. Therefore, after careful consideration of all the available information, I accept the evidence shows the leak occurred after the policy commenced. FSP is to indemnify the applicant for the ensuite The FSP is liable to indemnify the applicant for the ensuite damage in accordance with the policy. In the event any aspect of the claim is cash settled, the FSP is to pay interest on that amount pursuant to section 57 of the Insurance Contracts Act 1984 (the Act). Interest is payable from 17 November 2016, being the date the FSP denied the claim, until payment is made. In addition, the FSP is to reimburse the fees incurred by the applicant in obtaining AE’s opinion. This is because AE’s opinion substantively assisted the applicant’s position.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.