Text of the determination
Determination
Case No: 466091 Determination Page 1 of 8
Case number: 466091 20 December 2017
1 Overview
1.1 Dispute
The applicant holds a home building and contents insurance policy with the financial
services provider (FSP). In September 2012, the applicant lodged a claim under the
policy for escape of liquid. The applicant claims a leaking storm water pipe caused
the building to subside which resulted in damage to the internal plasterboard.
The FSP appointed engineers (F) to assess the damage and requested the applicant
allow an 18 month drying out period to allow reassessment of the damage. After the
18 month drying out period, the FSP‟s builder was unable to commence repairs due
to the property requiring re-stumping. The FSP, after consulting a further engineer
(M), determined the leaking storm water pipe was responsible for only 30% of the
damage to the stumps.
The applicant disputes this and has provided his own engineer‟s report (A) who
deemed the leaking storm water pipe to be the cause of the entire house subsiding.
The applicant says the FSP is liable for the full costs of re-stumping.
1.2 Issue and key findings
Is the FSP’s offer fair and reasonable in the circumstances ?
The proximate cause of the majority of the cracking damage to the app licant‟s home
was gradual deterioration of the timber stumps and movement of the foundation
material, as a result of seasonal and environmental factors.
The FSP is not required to cover the majority of the damage.
1.3 Determination
This determination is in favour of the FSP.
The FSP is not required to increase its offer.
Case No: 466091 Determination Page 2 of 8
2 Reasons for determination
2.1 Is the FSP’s offer fair and reasonable in the circumstances ?
Policy provides cover for insured events subject to exclusions
The applicant is required to show, on the balance of probabilities, he suffered a loss
caused by a risk insured against under the policy.
If the applicant is able to establish a loss caused by a risk insured against under the
policy, then the onus shifts to the FSP to show, on the balance of probabilities, it is
entitled to rely on an exclusion under the policy or is otherwise entitled to deny the
claim.
The applicant‟s policy provides cover for listed events, subject to various conditions
and exclusions. The listed events include escape of liquid.
However, the policy contains general exclusions for damage caused by, arises from
or involves ground movement:
“Erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other
e arth movement”.
Applicant has established a loss caused by a risk insured against under the
policy
The evidence provided by the parties confirms damage occurred throughout the
applicant‟s home as a result of a leaking storm water pipe. As the policy covers
escape of liquid, I accept the applicant has established a loss caused by a risk
insured against under the policy.
Part of the building damage claimed by the applicant is movement of the stumps,
which caused cracking damage through the home. The FSP agreed to pay 30% of
the re-stumping cost.
The applicant maintains the cracking at the property was caused by the leaking storm
water pipe. However, the FSP will only be liable for all of the damage to the stumps ,
if the proximate cause of the damage (that is, the real, effective or dominant cause)
was the leaking storm water pipe.
Accordingly, in order to determine whether the FSP is liable for all of the applicant‟s
claim for re-stumping of the property, or is entitled to rely on an exclusion to limit its
liability under the policy, it is necessary to determine the proximate cause of the
damage.
Majority of the damage to the stumps is caused by gradual deterioration
As outline above, the relevant insured event for this claim is damage caused by
escape of liquid. The parties have each retained experts to inspect and report on the
cause of the damage.
The applicant provided a report from A, a commercial builder, who indicate the
movement and cracking occurred as a result of the leaking storm water pipe. A
Case No: 466091 Determination Page 3 of 8
details the methods used in testing the soil and concluded the internal damage was
caused by the leaking storm water pipe.
The FSP provided reports from its engineers, F and M. F concluded the majority of
the damage was caused by soil movement as a result of highly reactive soils. F
accepted some of the damage was a result of the leaking storm water pipe.
M observed issues with the ground surface levels at the property. In particular, M
noted:
the pathway is absent of storm water drainage or storm water pits to collect
surface water run off
the ground surface is absent of specific ground surface levels to shed surface
water away from the subfloor of the home
the ground surface levels generally do not meet the minimum requirements of
the Building Code of Australia that requires external ground surface levels to be
graded to shed all surface water run off away from the property.
As a result of these findings, M concluded that the issues with the surface levels
would cause water to pond against the side of the property. This resulted in the
subfloor stumps to be absorbing moisture and incurring long term decay.
Based on the information from F and M, it was concluded the settlement had
occurred over a period of time and therefore it is gradual deterioration. Further the
gradual deterioration is the result of highly reactive soils as observed by F.
FSP is not liable for re- stumping the applicant’s home
For the reasons outlined above, I am satisfied the proximate cause of the damage to
the stumps at the applicant‟s property was :
rot and gradual deterioration of the central timber stumps
soil movement as a result of seasonable and environmental factors.
As damage caused in this manner is excluded under the policy, the FSP is not liable
to meet that aspect of the claim.
Even if I accept the leaking storm water pipe operated interdependently and
concurrently with the rotting timber stumps to cause the damage, the FSP is still
entitled to limit its liability.
Where a loss is caused by two proximate causes operating in tandem and one is
excluded while the other is not, the exclusion clause operates to allow the insurer to
decline part of the claim. Accordingly, the exclusion prevails and the FSP is not
required to indemnify the applicant for all of the re-stumping of his property.
Offer of 30% is reasonable under the terms and conditions of the policy
The applicant is seeking for the FSP to cover 100% of the restumping. The policy
excludes coverage for damage resulting from long term ground movement. Further,
as observed by M, the surface levels are not compliant with the relevant building
codes. The applicant has not provided any information to counter M‟s findings
regarding building codes.
Case No: 466091 Determination Page 4 of 8
The policy wording is clear, the damage is not covered if the building is not compliant
with building regulations. In this regards, the FSP is entitled to decline the claim in
full.
The FSP submits the applicant verified that six years prior to the escape of liquid, a
veranda was installed. The FSP says the applicant should have been aware at that
time of the issues of the surface drainage defect. In this regard, the FSP is of the
view, the applicant did not correct the defect. There is no evidence to counter these
submissions.
However, M indicated the leaking storm water pipe contributed to some of the
damage. On this basis M advised the leaking storm water pipe caused 30% of the
damage to the stumps at the property. The applicant relies on A‟s report which state
the storm water pipe contributed to 100% of the damage to the stumps due to the soil
tests completed. However, the FSP submits the methods used by A are incorrect and
do not provide an accurate reading of the soils.
As discussed above, I am satisfied that the majority of the damage to the stumps at
the property was due to highly reactive soils and gradual deterioration. I am of the
view the offer of 30% is fair and reasonable in these circumstances. The FSP is not
obligated to pay for all of the restumping due to the various issues listed above.
Case No: 466091 Determination Page 5 of 8
3 Supporting information
3.1 Policy wording
Escape of Liquid
We cover
Loss or damage to the building caused by liquid leaking, overflowing or bursting from any of the
following:
…
any drain, fixed pipes, roof gutters or guttering and rainwater downpipes, drainage and sewage
systems.
We do not cover
wear and tear, or loss or damage by the escape of liquid occurring as a result of a gradual
process of leaking, splashing, dripping or overflowing over a period time when you could
reasonable be expect to be aware of this condition.
….
What we do not cover – general exclusions
Ground movement
Erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth
movement, but we will cover landslide or subsidence that is specifically covered under the following
insured events:
Storm
Flood (by only if you have cover for insured event „Flood‟)
Earthquake and Tsunami
Explosion.
Wear, tear and gradual deterioration
wear, tear, rust, fading, rising damp, mould, mildew, corrosion, rot, action of light, or gradual
deterioration such as but not limited to:
tiles and their adhesives or grouting breaking down;
weat hering of roof tiles or roof ridge capping;
gradual weathering and breakdown of bricks, mortar or concrete.
How we settle building claims
We will not:
pay extra to repair to rebuild the building to a better standard, specification or quality than it was
before the loss or damage occurred except as stated in the fo llowing meaning of „new for old‟;
fix a fault that existed before loss or damage occurred;
pay to repair or replace electrical or electronic items that were no longer in use or were no
longer able to be used for the purpose they were intended.
Case No: 466091 Determination Page 6 of 8
3.2 Reports
Record Key points
FSP’s expert (C )
Report
25 - 09 - 2012
Slow consistent leak to storm water pipework has resulted in
possible foundation movement.
Engineer to be appointed to inspect and report in detail.
FSP ’s expert ( F )
Report
08 - 11 - 2012
Clay soils highly reactive.
Minor distress observed in the vicinity of the leak.
No structural damage observed.
Floor levels survey indicates a general pattern of settlement
from north to south, likely a result of the re - levelling work
carried out six years ago.
Leak has cont ribut ed to the obs erved distress.
A period of at least 18 mont hs should be allowed to elaps e in
order to allow the foundation soils to “dry out” (i.e to reach
equilibrium levels).
During this time, the floor levels may approximately return, or
partially return, to their pre - leak levels.
After the moisture cont ent of the foundation soils has
stabilised, cosmetic repairs can be carried out to the building
distress in the vicinity of the leak location.
Long term foundation soil movement will continue at the
property d u e to highly reactive soils and normal seasonal
variations in soil moisture content.
Such movement may at time result in „cosmetic‟ damage to
the property and requiring maint enance type repairs.
FSP ’s expert ( F )
Report
28 - 03 - 201 4
Floor level survey indicates the pattern of relative heave in
the vicinity of the leak location has dissipated.
Foundation soils in the vicinity of the leak have dried out and
returned to their pre - event moisture condition.
Repairs works can now be carried out to the building
damage.
General pattern of settlement from north to south has not
been caused by the leak.
Future cracking in the property is not necessarily a
consequence of policy defined events, but as a result of
naturally occurring soil - footing interaction movement in
response to changes in climate that brin g about concomitant
changes in s oil moisture content.
APP ’s expert ( A )
R eport
07 - 03 - 2016
Considerable movement of the floo ring.
Moisture testing of the soils around the property including
where the leak was situat ed has indicat ed a reduction in the
soil moisture.
All the internal damage is attributed to the water escaping
from the broken pipe.
Case No: 466091 Determination Page 7 of 8
FSP ’s expert ( F )
Report
17 - 06 - 201 6
Soil moisture readings taken by A with a meter which cannot
be used to measure the moisture content in soils.
A‟s report draws heavily on the results of the moisture test to
determine the area of the property affected by the leak.
Findings of A hav e been derived from incorrect methodology
and incorrect data.
The soil moisture measurements taken have not been taken
in accordance with accepted engineering practice nor using
appropriate equipment.
The soil moisture contents presented in A‟s report ar e not
representative of the site conditions.
Reiterate the house footing are expected to be subject to
ongoing movement.
FSP ’s expert ( M )
Report
11 - 08 - 201 6
Ground surface is absent of specific ground surface levels to
shed surface water away from the su bfloor of the property.
Ground surface levels generally do not meet the minimum
requirements of the Building Code of Australia that requires
external ground surface levels to be graded to shed all
surface water run - off away from the property.
Built - up garden bed prevents water from escaping and allows
water to pond against the east side of the property.
The base of the subfloor stumps are observed to be
absorbing moisture and are moisture stain ed .
The majority of the stumps have incurred long term decay to
the timber.
A water level mark to the subfloor stumps is observe d
indicating water is ponding within the subfloor area at times.
The general ground surface levels within the subfloor prevent
the escape of moisture and external surfac e wate r run - off has
been entering the subfloor over a long period of time.
Some pre - existing damage shall likely have been existing
prior to the event.
The leak to the storm water pipe has significantly
exacerbated any damage to the South East corner.
The water leak has caused the significant decay and damage
to the subfloor stumps to the South East corner of the
property only.
The remainder of the subfloor stumps have inc urred age
related movement and decay.
Unable to provide a categorical det erminat ion on the precise
extent of the damage caused by the water leak.
A reasonable estimate of the percentage cont ribution of
damage caus ed by the water leak to the South East corner of
the property is 30%.
3.3 Issue considered but not relevant to the outcome
The applicant raised an issue regarding the experts used in assessing the damage.
The applicant says that the FSP did not consider A ‟s submissions in its review of the
Case No: 466091 Determination Page 8 of 8
claim. He says A is a contractor used by the FSP on another claim and therefore is
dissatisfied the FSP dismissed the findings of A.
On review of the information provided by the parties, I considered the FSP‟s position
of preference for its engineer. The FSP highlighted A:
does not hold certification in engineering
does not practice as an engineer
is registered as a commercial builder not a domestic builder.
In weighting the expert evidence provided, FOS looks at the relevant qualifications of
the experts in determining which expert‟s opinion is preferred. All expert reports are
considered in determining the cause of the damage.
On the basis of all of the information exchanged, I am satisfied that the FSP was
entitled to limit its obligations to the offer made.