Text of the determination
Determination
Case No: 466037 Determination Page 1 of 11
Case number: 466037 21 March 2018
1 Overview
1.1 Dispute
The applicant lodged a claim with the financial services provider (FSP) for fire
damage to her tenanted home building.
The FSP accepted the claim and paid the applicant $435,360.
However, the applicant says the cost to demolish and rebuild the home is $533,000
and she has information from a qualified builder (T) to support her view.
The applicant wants the FSP to pay her the difference between the estimate provided
by T and the amount paid by the FSP (around $98,000). She also seeks
compensation due to the time taken to resolve the matter, during which she had to
pay the mortgage on the property.
1.2 Issues and key findings
Is the FSP required to pay any further amount in settlement of the claim?
The FSP is required to pay the applicant a further $51,448.77 to take into account an
appropriate builders margin of 10%, landscaping, asbestos removal, additional items
and a location fee as set out under section 2.1 of this determination.
Is the FSP is required to pay compensation?
Whilst the panel accepts there have been delays in the resolution of this dispute the
panel does not consider any compensation for non-financial loss is appropriate.
1.3 Determination
This determination is partly in favour of the FSP.
The FSP is required to pay the applicant a further $51,448.77 in settlement of the
claim.
The FSP is not required to pay any compensation for non-financial loss or
consequential loss.
Case No: 466037 Determination Page 2 of 11
2 Reasons for determination
2.1 Is the FSP required to pay any further amount in settlement of the
claim?
Cash settlement must take into account all contingencies
The applicant ‟ s policy provides the FSP with the option to repair, replace or cash
settle the applicants claim. When exercising this discretion the FSP must do so fairly
and consistent with the principles of reasonableness and utmost good faith.
There is no dispute that the parties have agreed to a cash settlement of the claim.
The only issue is whether the cash settlement paid is adequate to cover the loss
suffered and place the applicant in the position she was in prior to suffering the loss.
T’s estimate included a builder’s margin
T he applicant‟ s builder (T), inspected the property on 14 December 2016 and
provided a quotation to repair the building of $533,150.44.
The quote noted that given the age of the building and the presence of fibre cement
based materials the building might contain asbestos. Further any rebuild will trigger
additional building requirements because the building is in a bushfire zone.
The quote includes a builder ‟ s margin of 15%= $63,219. The panel notes neither
quote from the FSP appears to include a builder‟s margin. D quoted $397,359.60.
AJG quoted $421,658.26.
It is common for building contracts to provide provision for a builder to charge a
margin above to set price to allow for variations in the cost of parts supplied. This is
commonly called a builder ‟ s margin. Charges often range from 10% to 25%
depending on the size of the contract. Given the extent of the damage to the property
the panel accepts that it is reasonable to include an allowance for a builder‟s margin
in any cash settlement.
The panel accepts that it would be fair to allow a 10% builder ‟ s margin in this dispute
and that this should be calculated on the quote from AJG after making further
allowances for the additional items as set out below.
Location allowance
T‟s estimate included a “location factor” of $7,045.10. There is no dispute that the
app licant‟s property was in a remote location.
The panel accepts that building in various remote locations in Australia attract
additional costs, due to the travel and logistics associated with the work.
The FSP‟s says that if it were to rebuild the applicant‟s home, it would use local
builders. It has not identified any local builders or obtained any quote from a local
builder.
Case No: 466037 Determination Page 3 of 11
In the panel ‟ s view given the location of the property it is fair that a location allowance
of $7,045.10 be included in any cash settlement.
Landscaping allowance
The estimate by T included a landscaping allowance of $12,000.
The panel agrees with the applicant‟s position that in order to demolish and
reconstruct the damaged building, some if not all of the current gardens of the home
would be lost. It is therefore appropriate that an allowance for the cost to reinstate the
lost gardens should be included in the settlement.
Whilst landscaping is not covered under the terms of the policy this is not relevant.
The applicant is not seeking coverage for damage to the gardens as a result of the
fire, but the costs to reinstate the garden after the inevitable damage which would be
caused by the reconstruction.
The panel accepts the allowance of $12 ,000 is fair in the circumstances.
Reinstallation costs of heater
T provided an estimate for the cost of reinstalling a solid fuel heater of $460.77.
The applicant removed this item from the home to prevent theft and therefore
mitigate any loss as required by the policy. It is not unreasonable to allow for the
heater to be reinstated into the home. This would be less costly than rebuilding the
property and installing a new solid fuel heater.
The panel accepts an allowance of $460.77 is fair in the circumstances.
Water pump
T provided an allowance of $1,390.38 for the supply and installation of a water pump
Although T has not provided any detailed information about this item, the panel notes
that the FSP has not challenged its inclusion in the estimate by T.
Upgrade to stove
An additional amount of $1,800 for an upgraded stove is also allowed for by T. The
policy does not provide cover for an upgrade.
The panel is of the view that this was likely allowed to compensate for the limitations
of the e-Costing system used to generate the estimate and does not believe the
same allowance needs to be added to the estimate by D.
Asbestos testing
T recommended that testing of the materials be undertaken prior to demolition, or
alternatively all waste from the site be treated as asbestos and be disposed of in
accordance with Australian Standard and SafeWork Guidelines.
The estimate provided by T included $77,000 to demolish the existing dwelling,
including asbestos allowance, air monitoring removal and disposal of all materials.
Case No: 466037 Determination Page 4 of 11
The estimate did not provide a breakdown of the demolition costs, so it is not clear
how much “asbestos allowance” was included in the $77,000.
A ccording to the FSP‟s submission of 18 July 2017, it assessed the building for
asbestos and a negative result was returned. The FSP has not provided any
evidence of the process it followed to check for the presence of asbestos, or any
report of the outcome of any such check. T he applicant has not challenged the FSP‟s
position on this matter.
In the event that asbestos was found in the dwelling a nd required removal by the
applicant, the panel accepts the FSP would be liable for such cost. However in the
absence of information to dispute the FSP‟s findings, the panel accepts that at this
time the FSP is not liable for any further testing.
Other items
The applicant raised concerns that the FSP‟s estimates did not include the
replacement of the septic system, or for the removal of the slab. However, the
exchanged information does not support the applicant‟s position in this regard, as D ‟s
estimate clearly provides for removal, supply and installation of a new septic system
the excavation of the block for footing and slab.
However, several items on the D estimate note that they are “…as per plan which
has not been supplied.” It is likely that some revi sions to the costs of the rebuild
would manifest once the plans for the home were supplied and the panel is of the
view that some contingency amount needs to be allowed to cater for such revisions.
Settlement to be increased to take into account the build er’s margin and
additional items.
The FSP maintains that it has based its settlement on the estimate by D, which
produced a figure of $397,359.60 for the demolition reconstruction of the home.
The FSP agreed to increase the amount of the settlement to $420,000, an increase
of $22,641.60 over the D estimate. Further, an amount of $15,360 was paid by the
FSP for a Bushfire Rating. In effect, the settlement to the applicant totals $435,360.
It should be noted that the estimate by D is based on an itemised scope of works, but
the estimate itself is not itemised. Although D has provided a “trade breakdown” of
the costs associated with its estimate, this gives little clue as to what costs D
estimated for each item on the scope of works.
Whilst the report from T is more detailed, the estimate by T is broken down to several
broad categories, plus allowances. The broad categories of costs on T‟s estimate do
not readily equate to the scope of works provided by D. This means that direct
comparison between the estimates is not possible.
The quote from AJG is more detailed but again does not reference the scope of
works. The panel considers, given the variations in the quotes provided that it is fair
to calculate the loss based on the quote from AJG with the additional allowances and
builder ‟ s margin as follows:
Case No: 466037 Determination Page 5 of 11
AJG quote …… $421,658.27
Location allowanc e … $7,045.10
Additional items …… . $13,851.15
Subtotal…………… . $442,554.52
Builder ‟s Margin 10% …$44 , 255. 45
Total ……………………$486,809.97
As the FSP has paid the applicant $435,361.20, the balance payable to the applicant
is $51,448.77
2.2 Is the FSP required to pay compensation?
Insufficient grounds for payment of compensation for non-financial loss
Under its Terms of Reference, FOS may decide that an FSP compensate an
Applicant for non-financial loss (up to a maximum of $3,000) where an unusual
degree or extent of physical inconvenience, time taken to resolve the situation or
interference with the a pplicant‟s expectation of enjoyment or peace of mind has
occurred.
However, FOS takes a conservative approach to compensation for non-financial loss.
FOS expects applicants to be moderately robust and bear the normal degree of
inconvenience experienced when a problem occurs.
The applicant‟s main dissatisfactions with the FSP‟s handling of the claim appear to
be her belief that the FSP‟s contractors deliberately under-quoted for the work, in the
belief that she did not intend to rebuild the home. However, although the applicant
alleges that she was told by the FSP‟s contractors that they underquoted, she has
not been able to provide any evidence to support this allegation.
The applicant also says the claim took 14 months to resolve and panel has
cons idered whether the FSP‟s claim process was unreasonably protracted.
It is understood that the claim was lodged on 20 March 2016. The FSP arranged for
a scope of works to be drawn up and the estimates by AJG and D for the cost to
rebuild the home were produced on 5 May 2016 and 2 June 2016 respectively.
The applicant was dissatisfied with the amount of the quotes and at some point, the
FSP suggested she obtain her own report/quotation for the rebuild of the home. In
response, the applicant engaged T, which produced an estimate dated 14 December
2016.
The FSP paid the applicant $420,000 on 13 January 2017. Even though the applicant
remained dissatisfied with the amount of the payment, based on the exchanged
material the panel does not accept that the FSP mishandled the claim.
In the circumstances, there are insufficient grounds to require the FSP to pay
compensation to the applicant for non-financial loss.
Case No: 466037 Determination Page 6 of 11
Compensation for consequential loss not appropriate
Its Terms of Reference provide that FOS may decide that an FSP compensate an
applicant for consequential financial loss or damage (up to $3,300).
The applicant also says while the FSP was processing the claim, she was not able to
rent the home but was still required to make the mortgage payments on the property.
The policy provide cover for loss of rent during repairs. However, the payment of this
benefit is conditional on there being a rental agreement in place which indicates the
terms of the lease and the amount of rent paid.
At the time of the fire, it is understood that the property was untenanted and no lease
agreement was in place. Accordingly, no loss of rent is payable under the policy.
The panel notes that any mortgage payments made by the applicant with respect to
the property would need to be made in any event, regardless of whether the property
was rented or not, or whether the loss of rent benefit was payable.
The panel finds that the FSP did not mismanage the claim.
In the circumstances, it would not be appropriate to require the FSP to pay
compensation to the applicant for consequential loss.
Case No: 466037 Determination Page 7 of 11
3 Supporting information
3.1 Policy provisions
Policy schedule
Sum insured - Building - $612,000
Policy wording
How we settle your buildings claim
We will choose to settle your claim for loss or damage to your rental property or „other cover‟ in
one of the following ways:
…
2. Pay you the reasonable cost to repair or rebuild your rental property.
We can choose to:
pay you
…
For example, we may pay you directly when:
you decide not to repair or rebuild your rent al property, …
…
Loss of rent during repairs
If a listed event causes loss or damage to your rental property and we agree your tenants
cannot live in it and need to move out while it is being repaired or rebuilt.
Covered under Buildings Insurance
the rent you lose during the reasonable time it should take to repair or rebuild your
rental property.
We pay these costs for up to 12 months. We pay this on top of the buildings sum insured.
…
Conditions
you must have a rental agreement that states the:
term of the rental period, and
amount of rent and bond your tenant needs to pay .
…
Case No: 466037 Determination Page 8 of 11
3.2 Information considered
Record Key points
FSP’s builder
(A J G )
Quotation
5 May 2016
- Quotation according to SOW only (No allowances outside of
SOW)
- Any unforeseen damage of underground cabling or council
connection during repairs and/or discontinued products/colours
will require variation.
- Floor/ wall tiling allowed only to wet areas – rest of floor
coverings being b asic carpet.
- Kit home light fittings only.
Council costs - $1,755
Site requirements - supply - $8,190
Demolition $42,120
Conc reting repairs (incl earthworks) $18,345. 60
Termite protection supply & install $2,340
Engineer‟s details $1,404
PAAL kit home - su pply $175,500
Carpentry repairs $19,375.20
Electrical repairs $15,210
Plumbing repairs (incl PC $6,000 for 2 water tanks) $19,890
Plastering repairs $21,374.26
Painting repairs $15,246.50
Water proofing repairs $4,153. 50
Tiling repairs $2,076.75
Safety rail to roof – supply & install $1,579.50
Guttering repairs $1 , 579.50
Roofing repairs $5,967
Cabinetry repairs $1,825.20
Shower screen repairs $877.50
Vinyl repairs $9,418.50
Chimney repairs $5,850
Cleaning $1 , 872
Supervision $4,212
Home Owners Warranty $3,163.68
TOTAL (with GST added) $421,658.27
FSP’s builder (D)
Scope of Works and
estimate
2 June 2016
Scope of works – Demolition of existing dwelling
Preliminaries (insurance, supply of plant and equipment;
supervision of work & clean - up)
Site preparation (incl safety signs and fencing)
Footings/slab concreting (including excavation of block for bot h
footings and slab , reinforcing steel, and concrete - to engineer‟s
detail)
Frame/Truss Construction (per plan - not supplied)
Roof/Fascia/Gutter (C olorbond – incl blank et insulation)
Plumbing ( including downpipe; remove / supply / install new septic
system; supply/install gas cooktop. All to be done as per plan – not
supplied; )
Electrical (fans/lights to all rooms; single lights to all wet areas; 22
Case No: 466037 Determination Page 9 of 11
doub le/2 single power points ; 6 TV points and ant enna allowed,
supply & install one wall air conditioner)
Floor/Wall tiles (bat hroom - tiles to 2m in shower, 1.2m around bath
and skirting tile to rest; laundry – skirting tile only; kitchen incl
splashback; til e to lounge floor)
Floor coverings (vinyl to dining & kitchen; carpet to bedrooms )
Kitchen/Vanities (33mm laminate for melamine exteriors & drawers,
vanities in bathrooms and laundry benc h)
Shower screens, mirrors & robes (shower screen in safety glass;
fr ameless mirrors; robes with plasterboard sliding doors + 1 shelf
for all bedrooms)
Wall cladding – internal (wet areas lined with wet area plasterboard
& villaboard; other walls plasterboard, ceilings plasterboard on steel
battens; 55 mm cornices throughou t)
Wall cladding – external (F - C cladding to all external walls)
Eave cladding – external (4.5mm F - C sheeting)
Windows (all aluminium windows, with flyscreens)
Doors ($500 allowance for front door; Hume range to all internal
doors)
Skirting and architraves (66x11 bullnose skirtings; 42x11
architraves )
Painting
Termite protection (Kordon)
Scaffolding
Site cleanup
Estimate
$397,359.60 (including GST)
Applicant’s
builder ( T )
Building
Replacement Cost
Report
22 December 2016
Application for reconstruction will trigger additional requirements
(original dwelling constructed around 30 years ago)
o Bushfire risk – a qualified Bushfire consultant will be required to
report/det ermine Bushfire Attack Level – additional construction
measures may be required to comply with report
o Basix – energy efficiency – all new dwellings to be assessed
against requir ements of BASIX tool for water/thermal/ energy
matters
o Onsite water dispos al – original home constructed wit h 1,800
l itre septic tank – current waste water requirements mean tank is
likely to need an inc reas e to 3,000 l itre , including upgrade of
effluent di sposal field.
Costing for removal & replacement of dwelling derived from Cordell
e - costing tool.
Approvals and preliminary works include
o Construction Certific ate
o Section 68 – On Site Wastewater Approval
o BASIX Certificate
o Section 138 Roads Act Approval
o Home Owners Warranty Insurance
o Cont ract Works Insurance
o Site Signage
o Site Fencing
Case No: 466037 Determination Page 10 of 11
o Sediment and Erosion Cont rol
o Site Waste Control
o Structural Engineers Details
o Electrical disconnection and provision of temporary power
Complete demolition of structure requir ed (including removal and
disposal of waste
o If any asbestos is present in home, any suspected material
needs to be tested and disposed of appropriately.
Site leveling and surface water drainage to be included in site
preparation.
Provide and lay reinforc ed concrete footing and ground floor slab
per Engineer‟s details and AS2870
Termite barriers to be installed – per AS3660. 1
Erect steel wall and roof frame
Supply and install:
o External fibre cement wall linings
o Sheet metal roofing (incl fascia and gutters.)
o Aluminium sliding doors and windows
o Plasterboard wall linings ( incl to wet areas )
o All plumbing and drainage service lines per AS3500
o Electrical wiring per AS3000 and smoke alarms per Part 3.7.2
of BCA and AS 3786
o Kitchen to match existing with 1 ½ bowl sin k, laminated floor,
overhead cupboards, bencht op wall oven and cooktop
o Fixtures and fittings (power points, TV and dat a outlets, light
switches, batten holder light fitting, bat h, toilet pans & cisterns,
vanity basins and laundry tub, tap ware & shower fix tures, TV
antenna, shower screen and doors, mirrors to bathrooms.)
Waterproof wet areas per AS3740
Internal fit out incl architraves and skirting
Built in robes to bedrooms.
Wall and floor tiling to wet areas – wall tiling to 1800mm in all
shower recesse s & skirting tiles to perimet er of wet rooms.
Tiled floor to lounge room & wet areas, vinyl floor to kitchen &
dining area, carpet to bedrooms.
Painting of internal and external exposed surfaces.
Site clean.
Applicant advises there are a number of improvem ents/inclusions
made to home over & above standard construction:
o $1,800 additional allowance for stove upgrade from standard
o Reinstallation of solid fuel heater (removed to prevent theft)
o Replacement of split system air conditioner to bedroom 1
o Allowance for removal/replacement of established landscaping
which will need to be removed to enable construction of
building.
o Ceiling fans to bedrooms and living areas, to replace existing.
COSTINGS
Preliminaries - $12,650
Demolition - $77 , 000.10
Reconstruction
Case No: 466037 Determination Page 11 of 11
o 5 bedroom home - $256, 351.18
o Front & rear verandah areas - $26,803.29
Onsite wastewater system - $22,500
Allowances:
o Stove $1,800
o Reinstallation of solid fuel heater $364.25
o Waterpump - $1,099.12
o Air conditioning unit - $2,381.16
o Landscaping - $12,000
o Ceilin g fans x 7 - $1,468.60
Subtotal for cost of replacement build - $414,417.70
Location factor to be added to cost calculated by tool
Builder‟s margin and GST also to be added.
TOTAL cost for replacement build - $533,150.44