Settlement of fire and theft claims (jewellery, accommodation, building repairs and other items)

FirmFinancial Firm (Unknown - Insurer)
Decided2018-07-30
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$14,597
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant disputed the settlement of fire and theft claims under a home policy, including jewellery, accommodation, repairs and smaller items. AFCA ordered further payments of $12,680.40 plus smaller items, refused further compensation for the bedroom suite, clothing and dress, and required an independent contractor to assess later repair complaints.

Policy caps and the insured's onus to prove value and ownership limited most items, but cash settlement of repairs was found to shift unforeseen risk to the insured, so the repair cost was allowed in full.

Issues

Subjects and remedies

home or building damagetheft or burglarypay claimreassess claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 465914 Determination Page 1 of 17 Case number: 465914 26 July 2018 1 Overview 1.1 Dispute The applicant holds an insured events home building policy with the financial service provider (FSP). On 10 September 2016 the insured building sustained fire damage. On 12 September 2016 a further fire occurred causing additional damage. On or about 28 October 2016, the applicant claimed unidentified persons stole numerous items from the home. The FSP accepted the claims and settled several items. A dispute has arisen between the parties regarding some outstanding items and/or the amounts paid for some items. 1.2 Issues and key findings Has the FSP fully settled the fire and theft claims? Aside from offers already made and referred to in this determination, the FSP is liable to make further payments as follows:  $8,250 to finalise the jewellery claims  $642 to reimburse the accommodation costs paid by the applicant  $3,788.40 to rectify the building repairs In addition, if not paid already,the following is to be paid:  $50 for the dress box  $597 for the watch boxes  $219.98 for the jewellery boxes  $149.95 for the teddy bear  $650 for the spoiled food  $250 for the stolen cash Is the applicant entitled to compensation? The applicant is not entitled to financial compensation because of the number of insured events which occurred and the need to properly assess the claims. The available material does not establish on the balance of probabilities the FSP‟s conduct caused the loss. Non-financial compensation is not warranted as the available material does not establish an unusual amount of physical inconvenience, time taken to resolve a situation, or interference with the a pplicant‟s expectation of enjoyment or peace of mind. Case No: 465914 Determination Page 2 of 17 1.3 Determination This determination is partly in favour of the applicant. Should the applicant accept this determination, then within seven days of acceptance, the FSP is to pay to the applicant $12,680.40 in full and final settlement of the claims for the jewellery, accommodation and building repairs. Otherwise, assuming the FSP has made the other payments referred to in this determination, the FSP is not required to take any further action in relation to the claims or the dispute save as set out in paragraph 3.6 of this determination. Case No: 465914 Determination Page 3 of 17 2 Reasons for determination 2.1 Has the FSP fully settled the fire and theft claims? The following items from the fire and theft claims remain in dispute:  Jewellery  Bedroom Suite  Clothing  Wedding dress  Wedding dress box  Jewellery boxes and watch boxes  Teddy Bear  Food and other incidentals  Cash stolen from the premises  Accommodation costs  Building repairs New issues regarding rectification of the FSP‟s repairs have been raised more recently. They are not the subject of this determination. The new issues are dealt with in supporting section 3.6 of this determination Each of the above items will be dealt with separately as the evidence, policy terms and submissions in relation to these items require individual assessment. As a general principle, the applicant has the onus of proof to establish the loss was caused by an insured event and the amount of the loss. Further, the policy terms provide an insured must provide proof of value and ownership. A review of the policy terms and certificate of insurance confirms the applicant did not have additional contents or personal effects cover. Cover for those type of items will therefore be subject to the general policy terms. The FSP is to pay a further $8,250 for jewellery as two claims may apply The FSP has paid to the applicant an amount of $8,250 for jewellery. The applicant does not dispute this. The applicant seeks the balance of the quotation for replacement jewellery being $77,963. The quotation provides a retail price of $86,213 and an insurance price of $51,760. The FSP and jeweller have a commercial relationship which allows an „insurance price‟ which is a discount on the retail price. Pursuant to the policy terms, the figure of $51,760 would therefore have been the replacement cost payable by the FSP for all the listed jewellery items. It is not in dispute the applicant lost jewellery either through the fire or theft events. It is also not in dispute the policy provides cover for the events of fire and theft. However, the policy is subject to limits. The policy has a clear limit of $7,500 for one claim for special items such as jewellery unless the current policy schedule lists them Case No: 465914 Determination Page 4 of 17 separately. The applicant has no separately listed items which means the cap for any one claim is $7,500. There are essentially two claims on foot, one for the fires and one for the theft. Because of the way these claims have progressed, it is difficult to ascertain whether some jewellery did survive the fire only to be later stolen. The applicant describes a melted jewellery box as evidenced by photographs provided by the FSP‟s contractor. This suggests not al l the jewellery may have been damaged by the fire. However, it is difficult to accept if the jewellery box had melted to the extent shown in the photographs that some of the jewellery was not heat affected. There are no restoration notations regarding the jewellery items to assist a review of the claim. The material provided by the applicant also supports the contention jewellery was also stolen. Having reviewed all the available material, I accept the jewellery was both fire damaged and stolen which means there are two claims on foot. This means the policy cap of $7,500 applies to each claim. As the accepted itemisation of the jewellery is $51,760, the policy cap on a second claim would not exceed the loss and it is fair the FSP make a further payment for the stolen or fire damaged jewellery. The applicant also says she believed she could not take the jewellery with her after the fire events. Consideration has been given to the applicant‟s statement the jewellery was left at her home as she was told not to remove items. However, I find these contentions insufficiently compelling in view of the statements from the FSP‟s contractors and usual industry practice. The FSP‟s contractor says the applicant was only told not to disturb the scene and they were not asked about the removal of the jewellery nor were they aware of the extent of jewellery and cash on the premises. In all the circumstances, I am satisfied it is fair in the circumstances the FSP pay to the applicant a further $7,500 plus GST for the stolen and the fire damaged jewellery. The FSP is not obliged to pay anything further for the bedroom suite There is no dispute the bedroom suite was damaged by the insured event of fire. The applicant disputes the amount paid by the FSP for the bedroom suite. The applicant has provided material showing she had a bedroom suite made of white leather and gold leaf. The applicant also says the furniture was made of cedar. The applicant has provided an invoice showing in June 2010 she paid $18,999 for a bed head, two bedside tables, dresser, padded seat, mattress delivery and assembly However, because of the policy terms, this does not mean this is the amount to which the applicant is entitled. The applicant is only entitled to the cost of replacement of the item (as new) for the current retail price. Case No: 465914 Determination Page 5 of 17 The policy terms also say if it is not possible to replace the damaged item then the nearest equivalent will be used for settlement of the item. A review of the quotations suggests the item could not be exactly replicated. Most of the drawer sets for example do not appear to include seven drawers or gold leaf. Given this, it is reasonable to use the nearest equivalent bedroom suite to value the item. The invoices provided vary considerably. The quotations a nd photographs do not assist in determining whether the wood from which the furniture is made is cedar. There is one quotation in the sum of $9,545 which is addressed to the applicant. This quotation provides a description of the bedroom furniture presumably to a standard satisfactory to the applicant. The applicant has previously suggested this provider of bedroom furniture had quoted a higher amount but the available information shows a quotation in the amount of $9,545. The information provided shows the applicant was settled for this item for $9,545 based on this quotation. Considering the available information and the policy terms, I am satisfied the amount offered by the FSP for the bedroom suite is fair. The FSP is not obliged to play anything further for this disputed item. The FSP is not obliged to pay anything further for clothing Initially, the applicant claimed $22,161 for men‟s and women‟s clothing. Considering amounts already paid for emergency payments and the policy excess of $1,000, the FSP paid the applicant $15,053. The FSP has also paid the applicant $583 for clothing which was in the second bedroom which was damaged by the second fire. Subsequently, the applicant said the clothing loss was $29,161 because she already deducted $7,000 for emergency payments. As she had already made that deduction herself, she says therefore she only claimed $22,161. Essentially, she says the FSP is not entitled to deduct the emergency payments twice. The applicant also claims $493 for clothing items which were disposed of by the FSP‟s contractor because they were unable to be restored. The applicant has provided long lists of damaged items including clothing. But the actual amount claimed is unsubstantiated by invoices or proof of payment for the clothing. The FSP has provided material which establishes three emergency payments were made totalling $10,000. It is unclear if the applicant has arrived at the claimed figure herself or believes it to be an assessed figure. The applicant has not produced sufficient persuasive material to confirm the figure of $29,161 is the fair amount for damaged clothing. Given this, and considering the overpayment of $3,000 for emergency payments, I am not satisfied the available material supports a finding in the applicant‟s favour for Case No: 465914 Determination Page 6 of 17 this disputed item. The FSP is not obliged to pay anything further for damaged clothing. The FSP is not obliged to pay anything further for the wedding dress The FSP‟s contractor damaged the applicant‟s wedding dress. The contractor has offered to pay or has paid the sum of $5,200 for this loss. The applicant claims $14,300 which is the amount she says she paid for the dress. The designers identified by the applicant were unable to identify the applicant‟s purchase of one of their dresses. The applicant has provided photographs of the dress. She says she cannot provide an invoice as it was in an item which was stolen. As explained above, the amount paid for a damaged item is not what the applicant is necessarily entitled to. Pursuant to the policy terms, the applicant is entitled to the current value of the dress as new or the value of the nearest equivalent dress. As the applicant was unable to provide proof of purchase, the FSP‟s contractor obtained several quotes from bridal dress shops based on her photographs. The maximum quotation provided was for $2,500 and the applicant was settled for $5,200. Whilst the applicant contends she is entitled to 14,300 for her wedding dress, she has not provided proof this is what she paid for the dress nor has she provided current retail quotations to substantiate her claim. Accordingly, the available material does not establish an entitlement to an additional amount for the wedding dress. The FSP or its contractor is not obliged to pay anything further for the wedding dress. The FSP is not obliged to pay anything more than $50 for the dress box The applicant claims $380 for the box in which the wedding dress was stored. The FSP obtained quotations from drycleaners for wedding dress boxes ranging from $50 to $84.05. The material provided by the applicant is insufficiently persuasive as to why an amount above the $50 allowed by the FSP for this item should be paid. Accordingly, considering the policy terms, the available material does not establish an entitlement to an additional amount for the wedding dress box. If not paid already, the FSP is to pay $50 for the wedding dress box. The FSP is not obliged to pay anything more than $597 for the watch boxes and $219.98 for the jewellery boxes The applicant previously said she was satisfied with the amount of $597 for replacing the watch boxes. The FSP‟s assessor recommended acceptance of the said amount. If not paid already, the FSP is to pay to the applicant $597 for the watch boxes. A dispute remains in relation to jewellery boxes for which the FSP has allowed $109.99 each, being a total of $219.98. Case No: 465914 Determination Page 7 of 17 The applicant claims $299 for each jewellery box. It is unclear if this is based on the applicant‟s original purchase price or the current retail value of same/similar boxes. The material provided by the applicant is insufficiently persuasive as to why an amount above $219.98 allowed by the FSP for the jewellery boxes should be paid. Accordingly, considering the policy terms, the available material does not establish an entitlement to an additional amount for the jewellery boxes. If not paid already, the FSP is to pay to the applicant $219.98 for the jewellery boxes. The FSP is not obliged to pay anything more than $149.95 for the teddy bear The applicant has sought the amount of $299 to replace a teddy bear she believes was damaged in the fire. The FSP has obtained quotations in the sum of $149.95 to replace the bear. There is no evidence from the applicant to demonstrate the new current retail value of the bear exceeds the amount allowed for by the FSP. Accordingly, considering the policy terms, the available material does not establish an entitlement to an additional amount for the teddy bear. If not paid already, the FSP is to pay to the applicant $149.95 for the teddy bear. The FSP is not obliged to pay anything more than $650 for spoiled food The parties have agreed the applicant is to be paid $650 for spoiled food. The available information does not establish what food products had to be thrown out and if this exceeds the $650 allowed by the FSP. Further, no information has been provided by the applicant to establish why an amount exceeding $650 should be paid by the FSP. Accordingly, considering the policy terms, the available material does not establish an entitlement to an additional amount for the spoiled food. If not paid already, the FSP is to pay to the applicant $650 for the spoiled food. The FSP is entitled to rely on policy cap of $250 for stolen cash The applicant says $2,750 cash was stolen from the home. The FSP says it is not obliged to pay anything more than the policy cap of $250. The applicant disputes this amount. She says she left $2,750 in the home because she believed she was not allowed to remove the cash because of the advice of the FSP‟s contractors. For reasons stated above, there is no basis to prefer the applicant‟s version over the FSP‟s contractor‟s version. As with the jewellery claim, the available information is insufficiently persuasive to establish there was a misrepresentation upon which the applicant relied to her detriment. Case No: 465914 Determination Page 8 of 17 I am satisfied the available information establishes the FSP is entitled to rely on the policy cap and pay no more than $250 for any cash stolen from the premises. The FSP is to reimburse the applicant $642 for accommodation costs The applicant says she had to pay $642 accommodation costs for the period between 15 and 18 September 2016 as the FSP did not pay in time. The FSP produced an invoice dated 14 September 2016 for $1,284 for accommodation for that period. The FSP also provided internal material showing payment in the said sum on or about 14 September 2016. The FSP said if the applicant has paid the provider $642 for this accommodation the applicant should seek a refund directly from the accommodation provider. The FSP has produced a copy of the invoice and proof of payment of the invoice for the same dates. The proof of payment also appears to show the cheque was printed on 14 September 2016 so there is no indication it was a late payment. However, the following is noted about whether the cheque was presented “? N”. The information suggests the cheque was not presented, most likely because the applicant had already made some payment for accommodation. Given alternative accommodation is the responsibility of the FSP and the cheque may not have been presented, the FSP is to reimburse the applicant for the amount paid for the accommodation costs in the sum of $642. If the accommodation provider has been paid twice, then the FSP can approach the provider for a refund. The FSP is to pay to the applicant $3,788.40 to rectify repairs The applicant was unhappy with the quality of repairs. The parties and builders inspected the repairs on 7 July 2017. The FSP agreed to rectification. A scope of works was provided in the sum of $2,333.10. Another estimate was provided in the amount of $3,788.40. This included fitting loose laid insulation in the ceiling which appears to be justified by photographs provided. The FSP discounted the works because it considered some of it was not claim related. The FSP raised concerns about the inclusion of a phone line which did not exist previously (which is disputed) and replacement of cistern rather than just the tiles. The FSP offered a compromise by offering to pay $2,679.60. As both parties agree there are still outstanding items after the FSP‟s builder finished the works, I am satisfied it is fair in the circumstances to allow the applicant‟s claim. This is because by cash settling instead of rectifying the repairs, the FSP transfers all the risk to the applicant. Any unforeseen contingencies or variations are not allowed for in its offer. It is fair all the circumstances the FSP pay to the applicant $3,788.40 to rectify repairs. Case No: 465914 Determination Page 9 of 17 2.2 Is the applicant entitled to financial compensation? The FSP’s claims handling not the cause of the claimed loss The applicant has claimed for consequential losses which include loss of income and medical costs. FOS can award compensation (with a $3,300 cap) for direct loss or consequential loss. Direct losses are losses, such as out of pocket expenses or other liabilities, which are caused directly because of the FSP‟s conduct. Consequential losses are losses whi ch are indirectly caused by the FSP‟s conduct. Under FOS‟s Terms of Reference FOS may not compensate an applicant for consequential financial loss arising from a claim on a general insurance policy which expressly excludes such liability. The FSP‟s polic y terms exclude consequential loss. However, if the consequential loss arises from the FSP‟s claims handling, FOS will consider a compensation payment. A review of the material does not indicate the medical costs such as inhalers were due to claims handling but rather a reaction to the newly painted premises. It is unclear what the FSP could have done to avoid this as the applicant‟s home required painting after the fires. The claim for lost wages due to moving into alternative accommodation has been considered. It is noted wages would necessarily have been lost due to the need to move out of the property given its fire damaged state. Some loss of income would therefore be unavoidable regardless of the claims handling. Further, having considered all the a vailable material, I am not satisfied the FSP‟s claims handling and responses were unreasonably delayed. The available material does not establish on the balance of probabilities any claimed losses were caused by the FSP‟s claims handling. The FSP is not obliged to make any payment to the applicant for financial loss compensation. 2.3 Is the applicant entitled to non-financial compensation? Compensation paid only in some circumstances The Terms of Reference also allow the payment of compensation (capped at $3,000) for non-financial loss. FOS may decide an FSP should compensate an applicant for such loss only where there has been an unusual amount of physical inconvenience, time taken to resolve a situation, or interference with the applicant‟s expectation of enjoyment or peace of mind. FOS takes a conservative approach to compensation for non-financial loss. Compensation is not provided due to normal claims handling processes. FOS expects an applicant to be moderately robust during the claims process. Case No: 465914 Determination Page 10 of 17 A review of this dispute shows there were two fires and one theft which occurred during the claims handling. Each event caused items to be damaged or lost which required assessment. The FSP was entitled to investigate the cause of the fires and theft and determi ne whether a genuine claim had occurred. Then once this was verified, it was required to quantify the loss. A review of all the material provided shows there were difficulties in obtaining a proper itemisation of the loss or information regarding amounts a nd the applicant often made alterations to amounts sought. Given the extent of damage this is understandable, however it would have caused delays in handling the claim. I am not satisfied the available material warrants an award of non-financial compensa tion because of the FSP‟s claims handling. The FSP is not obliged to make any payment to the applicant for non-financial compensation. Case No: 465914 Determination Page 11 of 17 3 Supporting information 3.1 FOS Approach As advised to the parties, FOS has considered it appropriate to expedite this dispute in accordance with the Operational Guidelines to the FOS Terms of Reference, due to the nature of the dispute. Accordingly, this dispute has not been the subject of a FOS recommendation and has proceeded directly to determination. There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All the material provided by the parties has been reviewed and considered for the purposes of this determination. This dispute has been decided on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome only. It is an accepted principle of general insurance law an insured bears the onus to establish on the balance of probabilities they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities an exclusion applies if it seeks to deny or limit its liability for the loss. 3.2 Relevant policy extracts The relevant policy extracts are referred to in the FSP‟s Notice of Response dated 3 August 2017. Both the policy document and the Notice have been exchanged with the applicant. Relevant policy wording Contents with specified limits of cover 14. the following special items: a. jewellery, watches or an item containing gold and/ or silver. We will not pay more than $2,000 for any one item, pair, set or collection unless they are separately listed in the current schedule as specified contents items; .. The maximum amount we will pay for any one claim in respect of special items is $7,500 unless they are separately listed in the current schedule as specified contents items; .. money, cheques and other negotiable instruments up to a total value of $250; .. How we will settle your contents claim Case No: 465914 Determination Page 12 of 17 1. At our option, we will: a. repair or replace your contents; or b. pay you the reasonable cost of repair or replacement; or c. pay you up to the amount of the sum insured. If we pay you the reasonable cost of repair or replacement, this means the retail price of the item as if it were new less any discount available to us were we to repair or replace it. .. When it is not possible to repair or replace a damaged item with original materials or an original item, the nearest available equivalent to the original materials or item will be used. We will not pay to repair or replace property which has not been physically damaged. .. What we will not pay ... j. consequential loss. .. When we will not pay a claim under your policy .. If there is any loss, liability, injury or damage which is likely to result in a claim, you must give us immediate notice of the full details of any loss, anticipated or alleged liab ility, injury or damage. You or your representative must give us full details in the manner we request which will be either: a. in writing by completing our claim form which will be supplied to you when you contact us; or b. verbally. You must also: • prov ide us with any original receipts, proof of ownership or quotes we require to settle your claim, • inform us if your property is insured under any other policy, • give us immediate notice of the commencement of any … 2. Proof of value and ownership When you make a claim for loss or damage to any item insured by this policy we will ask you to provide evidence of value and ownership of the property. Receipts, valuations, photographs and instruction manuals will assist you to prove that you owned the item an d prove its value. 3.3 Relevant expert reports and proof of loss Record Key points FSP’s Assessor Report s Various dates  Assessor report dated 13 Sept ember 2016 reviews the circumstances of the fire. The engagement of “J” for an electrical make safe. It was n oted during these works a power Case No: 465914 Determination Page 13 of 17 cord located in the second bedroom caught on fire. The electrician extinguished the fire immediately and switched off all power and removed the fuses. In relation to the contents it was considered the master bedroom contents could not be restored. An inventory was taken and a suggested reserve of $60,000 for contents was provided.  Assessor report dated 14 Sept ember 2016.  Assessor report dated 20 October 2016. Tax invoices for alternative accommodation submitted and balance of emergency payment ($2,108) to be put towards replacement clothing. Builder A attended to inspect and complete a scope of works.  Assessor Report dated 1 November 2016. Builders quotes reviewed and builder A recommended. Assessors advised on 28 October 20 16 that building broken into. Assessors took inventory and requested instructions.  Assessor Report dated 15 November 2016. Assessor had received instructions to replace bed and fridge to allow a return to the property. The assessor obtained a quote from a merchant for $2, 048  Assessor report dated 7 December 2016. The assessor had reviewed an inventory of losses from the theft. The applicant had provided proof of ownership for items but the assessor was seeking more. The cost of replacing the jewellery was $51,760 including GST.  Assessor report dated 12 December 2016. Confirms that builder A disposed of non - restorable contents without any prior approval.  Assessor report dated 20 December 2016  Assessor report dated 19 January 2017.  Assessor report dated 30 Ja nuary 2017. The fire caus ed a surge which damaged other electrical items such as the pool filtration system. The FSP paid a sum of $15, 053, being $22,161 less prior amounts of $6,108 paid and $1,000 excess.  Assessor report dated 31 January 2017. The fire h ad caused the alarm panel to short out causing a fault to come up. The alarm is approximately 25 years old and will require replacement as there are no parts for an alarm of that age.  Assessor Report dated 17 February 2017. Assessor recommended settlement in the sum of $30,661.95 which included a mattress for $5, 499 and double bed frame with white leather of $3,499. There were outstanding electrical items for which ownership was still being established.  Assessor Report dated 6 Marc h 2017. Repairs estimated to be completed by 15 March 2017 (awaiting window and wardrobe deliveries expected on 9 March 2017). Recommendations were made for payment of electronic items. The applicant was to provide quotations for the inventory of fire damaged items in bedroom 2. P ayment of theft items was further recommended. Case No: 465914 Determination Page 14 of 17  Assessor Report dated 20 April 2017. The applicant was dissatisfied with builder A and issues were not ed with the works. The applicant further produc ed a report supporting payment of electrical appliances dama ged.  Assessor Report dated 24 May 2017. Reviewed the outstanding building, contents and theft items. Further settlements were recommended by the assessor. However, the wedding dress, crystal tiara and wedding shoes were deemed to be the responsibility of b uilder A. Further payments were indicated for the theft claim, however the assessor noted the cover for stolen cash was only $250.  Assessor Report dated 13 June 2017. The report indicates discussions regarding bedroom furniture and clothing. The FSP‟s con tractor, J, disputes the building was not secured at the time of the theft although the alarm system was not operational due to the event.  Assessor Report dated 7 July 2017. A table of additional works was required to the building after a complaint had be en by the applicant. The builder responsible for the removal of the wedding dress and wedding shirt did not return the special box. Further, builder A has issued payment to the Applicant for the dress in the sum of $5,200. Similar beds to the Applicants be d were quoted at $10,298, $6,295 and $5,500. The most similar is the $5,500. As the bed furniture had previously been settled for $9,545 no further payment was recommended. The assessor has researched jewellery boxes and the similar items are approximately $109.99 each so the assessor recommended $219.98. The assessor recommends payment of the watch boxes in the sum of $597. FSP ’s expert ( A B) Report 14/11/ 2016  Lists all thermally damaged items located in master bedroom  Does not list/show teddy bear. Scope of Works for building issues 18/7/2017  Scope of works is for a total of $2,121 (GST exclusive), of which only $1,428 was recommended for settlement.  The items to be discounted from settlement were due to applicant confirming pre - existing damage, the builder considering some items pre - existing damage or not claim related. Quotations for items  Quotation provided lists electrical items in the sum of $13,175.35 (GST inclusive)  Secondary quotation provides a quote for electrical items in the sum of $14,2 40. Another from the same provider lists as $14,749 (GST inclusive).  An itemisation of items included clothing, haberdashery, electronics, building repairs and food with hand written notes has a total of $25,500.  A bedding quotation dated 24 January 2017 for a replacement bedroom suite (including bedside drawers and mirror dresser) in the sum of $9,545. Case No: 465914 Determination Page 15 of 17  A television quotation for $1,296  A quotation for kitchen applianc es $3,203.61  A quotation for electrical goods $1,425.71 (GST inclusive)  A quotation for e lectrical goods $8,669.50 (GST inclusive)  A jewellery quot ation dated 18 November 2016. Retail value was $86,213 but the insurance cost was $51,760.  Invoice for accommodation dated 7 August 2017 in the sum of $642 (for which payment had been received).  Quotation dat ed 3 August 2017 for repairs to the property in the sum of $3,788 plus photographs of the work.  Invoice for bed furniture. The figures in the running total are $18,999, $6, 499 and $280 with the GST total being $28,355 which has been crossed o ut. There is then a cash price provided of $21,500. There are quotations provided by vendors of beds and bedding furniture, including $5,500 for a bedroom set which includes a four piece bedroom set. However it does not appear that the dresser has 7 drawer s or gold leaf like the damaged item. Further, the bedside tables do not appear to have leather or gold leaf painted design/handles.  Quotations for wedding dress boxes ranged from $50 - 84.05  Lists of itemized clothing amounts in the sum of $36,793 and list of outstanding payments in the sum of $80, 896 including: - Jewellery $44,260 - Balance of clothing $11,632 - Balance of bedroom $14,023 - Balance of wedding dress/shirt $9,389 - Clothing thrown out $493 - Stuffed bear $299 - Food and incidentals $800. 3.4 Other observations  Make safe invoice dated 20 October 2016 to secure the property. The works included boarding two front windows, cleaning up broken glass and debris and arranging an electrician to attend. The invoice notes a secondary fire occurred and the electrician advised it was not safe to re-instate the power.  Internal email from investigations unit dated 2 February 2017 that the investigators and the investigations unit did not advise the applicant she could not remove possessions from the property.  Internal email dated 14 December 2016 requesting a $4,000 emergency payment to the applicant. Due to previous payments of $6,000 the applicant would now have received a total of $10,000.  Internal email dated 7 June 2017 noting the quotations provided by wedding dress vendors for replacement was $1,500-2,500. The quotations provided were $2,000, $2,500 (including embroidery), $1,500 and $1,500 - $2,000. The bridal shop from which the applicant stated she purchased the dress believed it was not in fact one of their dresses. Case No: 465914 Determination Page 16 of 17  Email from the bridal dress store from which the applicant purchased the dress. The bridal dress store did not have records going back 10 years. It requested a label or picture to see if it could offer further assistance identifying the dress. A further email on 13 July 2017 confirms this was not one of its dresses.  On 20 July 2017 an internal email from the assessing company confirms the assessor did not recall seeing a teddy bear in the main bedroom. The applicant had informed the assessor that the house had been broken into prior to the restoration company attending the site.  On 26 July 2017 an email between the assessor and insurer notes the applicant had previously agreed to settlement and up until recently had not raised a concern. In relation to the teddy bear, the applicant came across old pictures of her bedroom and believes a teddy bear worth $299 was burnt in a fire. The bear is large and would be quite noticeable. Neither the assessor nor the restoration team recall seeing a large teddy bear in the room. There are two broken decorative tiles which are believed to be related to age and not the claim. 3.5 Other relevant material considered and relied on  Parties‟ submissions, emails , file notes, reports, invoices, quotations, estimates, photographs and all attachments to all submissions.  Correspondence between the parties. 3.6 New matters raised in March 2018 Several months after the dispute was conciliated, new issues regarding the quality of the FSP‟s contractor‟s repairs were raised by the applicant in March 2018. The applicant says electricity was shorting. The insured property was occupied by tenants. She says the fuses were inadequate. She arranged for them to be replaced. She also alleges the FSP‟s electrician‟s work did not meet the required standards. The applicant also claims the roof was about to collapse due to severe weather. A builder met her on site. She was advised there were broken tiles on the roof which had been broken by the installer of the alarm system. New carpet had to be replaced. The builder secured the roof and sealed the tiles. She alle ges the FSP‟s builders cut corners and did everything on the cheap. Her builder estimated it would cost up to $8,000 to fix the roof, replace the tiles, replace insulation and the carpet. Photographs show some of the claimed damage. She also claims the cistern installed in the master bedroom‟s ensuite leaked. She says it had to be replaced and the carpets steam cleaned. She says the cost of these several issues added up. She attributes the damage to the poor-quality work undertaken by the FSP‟s contractors. The FSP says the applicant has not provided any detailed causation reports regarding the complaints. It says as she has not provided sufficient evidence regarding her assertion of faulty workmanship it has no further response. It also asserts as the alarm repairs were Case No: 465914 Determination Page 17 of 17 undertaken in 2016 it is likely these new issues are a new event and are unrelated to the repairs undertaken because of the 2016 claims. On information provided, no finding can be made in relation to these complaints in this determination. However, in view of past issues with the FSP‟s builder, I am satisfied it is fair in the circumstances the FSP arrange for a new independent building contractor to attend the property and assess these new complaints made by the applicant regarding the FSP‟s builder‟s repairs. Depending on the outcome of the assessment, if the FSP accepts the further claim, then the FSP is entitled to either rectify the repairs or cash settle the applicant to rectify the repairs. If a dispute arises on the items claimed in March 2018 (either about liability or quantum) the parties can return to FOS for a supplementary determination.