Storm damage settlement: inadequate bathroom reinstatement offer, adjoining room damage, mould report and roof
Text of the determination
Determination
Case No: 465891 Determination Page 1 of 4
Case number: 465891 6 March 2018
1 Overview
1.1 Dispute
This matter involves a claim by the applicants under their home and contents
insurance policy, held with the financial services provider (FSP) in respect of damage
to the property following a storm on Christmas day 2011.
The FSP has accepted the claim but a dispute continues as to the extent of the
FSP‟s obligations to the applicant s under the terms and conditions of the policy.
1.2 Issues and key findings
Has the FSP met its obligations under the terms and conditions of the policy?
The FSP has not met its obligations under the terms and conditions of the policy and
must, upon acceptance of this determination by the applicants, comply with the terms
of this determination.
1.3 Determination
This determination is in favour of the applicants.
Upon acceptance of the determination by the applicants, the FSP is to:
obtain an updated quote to reinstate the applicants ‟ bathroom based on the
agreed scope of works and cash settle the applicants ‟ for the amount of the
updated quotation
pay the applicants $3,000 for damage to the adjoining room
pay the applicants $2,000 for non-financial loss
pay the applicants $2,310 for the mould report
obtain an updated quotation in respect to the roof repairs referred to in the
report from the builder (BBS) dated 22 June 2012 and then cash settle the
applicants for the amount of the updated quotation.
The FSP is to pay interest on the $3,000 for the damage to the adjoining room and
the $2,310 for the mould report, in accordance with the Insurance Contracts Act 1984
(the Act), from 30 June 2016, until the payment date.
Case No: 465891 Determination Page 2 of 4
2 Reasons for determination
This dispute has been the subject of a recommendation issued by the Service on 27
September 2017.
It was the case a nalyst‟s recommendation that the FSP was required to:
obtain an updated quote to reinstate the applicants ‟ bathroom based on the
agreed scope of works
pay the applicants $3,000 for damage to the adjoining room
pay the applicants $2,000 for non-financial loss
pay the applicants $2,310 for the mould report.
The exchanged material confirms that the parties have accepted the substance of the
recommendation.
A copy of the recommendation is attached to this determination.
I have carefully considered all of the material provided both before and after the
recommendation in the preparation of this determination.
This determination follows consideration of all of the information exchanged and is
based on what is fair in the circumstances, having regard to the relevant legal
principles, terms of the policy, good industry practice and where applicable, prior
determinations.
2.1 Has the FSP met its obligations under the terms and conditions of
the policy?
As detailed, the FSP accepted the applicants ‟ claim in respect to damage at the
property, following a storm event on Christmas day in 2011.
However, a dispute continues as to the extent of the FSP‟s obligations to the
applicants under the terms and conditions of the policy.
As also detailed, the case analyst prepared a detailed recommendation (attached)
dealing with the issues outstanding between the parties.
I have had the opportunity to carefully consider all of the exchanged material and the
recommendation prepared by the case analyst.
I am satisfied that the result recommended by the case analyst is in accordance with
the exchanged material and fair in all the circumstances.
I determine that upon acceptance by the applicants of this determination, the FSP is
to attend to the applicants‟ bath room, the adjoining room, non-financial loss and the
mould report in accordance with the recommendation and this determination.
Subsequent to the case analyst‟ s recommendation, the applicants advised in an
email of 30 October 2017:
„We are not accepting th e recommendation settled prior to having received money for the
roof as offered.‟ [SIC]
The FSP advised in an email 31 October 2017:
Case No: 465891 Determination Page 3 of 4
„The FSP has accepted the recommendation finding. We do seek clarity on the roof
mentioned in the recommendation as the applicant advised she had received the
determination on this. As I understand from your email below, the roof was not part of the
formal recommendation and/or this dispute.‟
The reference by the case analyst to the roof within the recommendation occurs at
page 4 of the recommendation and says:
„An offer has been agreed upon between the parties for damage to the roof tiles, however
an updated insulation quote needs to be obtained.‟
The exchanged material includes a Chronology of events provided by the applicants.
Within that chronology, the applicants ‟ say:
„…Roof needs to be repaired, Insurance also acknowledged this in their correspondence
dated 30/6/2016 and are offering $4,920 plus GST. We believe that this a reasonable offer
and we are willing to accept this to repair our roof. We have made inquiries into how much
it will cost us to repair our roof and this is close to what our tradesman said.‟ [SIC]
The FSP‟s claim notes, include the notation:
„Roof repairs – additional skylight
chipped roof tiles 200-250
cracking to hips, ridges are maintenance related…‟
Upon instructions from the FSP, the builder BBS re-attended the property and
provided a report dated 22 June 2012.
That report includes:
„ Roof Repairs : At the time of our initial inspection we were advised by the insured that the
broken roof tiles had been replace and that the only damage remaining was to the skylight
and valley pointing which was visible from ground level. Based on this advice from the
insured we did not inspect the roof, which in hindsight was a mistake as it has become
evident that an additional skylight was damaged unknown to the insured. An additional
allowance to replace the skylight would be approximately $900 + GST.‟
In relation to the damaged roof tiles, we noted and confirmed with t he insured that there are
no “broken” roof tiles (unlike the description provided by the other builder). Currently the
insured is concerned with the chipped roof tiles. This means chips that vary from the size of
a 5c coin to anywhere up to 4cm². If consideration is given to replace every individually
chipped tile we estimate anywhere between 200-250 terracotta tiles (and pointing where
required) will need to be replaced. An estimated cost for this including safety railing would
be approximately $4,920 plus GST, however the number of chipped tiles may be greater
upon closer inspection of our trades and will incur a greater cost.
The insured acknowledged that the majority of the cracking to the hips and ridges are
maintenance related, yet he is more concerned with these maintenance damages than the
chipped tiles. Therefore, after further discussions with the owner he advised that we would
accept leaving the chipped tiles in place, in lieu of alternative works which includes having
the ridges and hips re-bedded and repointed to the entire house.
If the insured was to accept and sign off on this repair method we note this would be more
cost effective that replacing the approx. 250 chipped roof tiles. The cost to rebed and
repoint all ridges, hips and valleys is approximately $4,320 plus GST. This option will not
incur unknown costs as t he entire roof is being done…‟
The FSP detailed this part of the report in its letter to the applicants of 30 June 2016.
The FSP says that it is not convinced that there were any claim related issues with
the roof.
In this regard, I wish to make two points.
Case No: 465891 Determination Page 4 of 4
First, on the basis of the FSP‟s letter of 30 June 2016 to the applicants and
specifically its commentary in respect to the roof, I am satisfied that the roof forms
part of the applicants ‟ claim and this dispute.
Secondly, based on the exchanged material and in particular the report from BBS of
22 June 2012, I am satisfied that the roof did suffer damage in the course of the
storm and the FSP is required to meet the damage under the terms and conditions of
the policy.
The report from BBS is clearly out of date and thus the FSP should arrange for an
updated quote and cash settle the applicants accordingly.
Recommendation
Case No: 465891 Recommendation Page 1 of 6
Case number: 465891 27 September 2017
3 Overview
3.1 Dispute
A claim was lodged by the applicants under their home and contents policy with the
financial services provider (FSP) after a severe storm swept through the area on
Christmas Day 2011.
The FSP assessed the claim and liability was accepted, however a dispute has
arisen over:
the quality of repairs
further damage as a result of the quality of repairs
the amount offered in settlement
mould
time taken to settle the claim.
An offer to accept part of the claim has been made, however the applicants have
rejected the amount and seek further costs and additional damage to be included in
the settlement.
The applicants also seek compensation for financial and non-financial loss.
3.2 Issues and key findings
Is the settlement offer sufficient to resolve the dispute?
Based on the available information, the offer to settle the applicants‟ bathroom is not
fair in all the circumstances.
A quote is to be obtained by the FSP to reinstate the applicants‟ bathroom which is
subject to a variance for mould contained in the wall cavity and is to be settled in
accordance with the terms and conditions of the policy.
The FSP is to accept the resultant damage in the adjoining room and pay the
applicants $3,000 for repairs.
The FSP is to arrange a quote for replacement of the roof insulation and for an
inspection to ensure no further mould has contaminated the roof cavity.
Are the applicants’ entitled to non -financial and financial loss?
The FSP is to pay the applicants $2,000 for non-financial loss due to the unusual
degree of physical inconvenience they experienced through the course of this
Case No: 465891 Recommendation Page 2 of 6
dispute, the time taken to resolve the situation and the interference with the
applicants‟ enjoyment and peace of mind.
The FSP is to reimburse the applicant $2,310 for the mould report provided by BH.
3.3 Recommendation
This recommendation is in favour of the applicants.
If the parties agree to the recommendation, the FSP is to:
Obtain a updated quote to reinstate the applicants‟ bathroom based on the
agreed scope of works
Pay the applicants $3,000 for damage to the adjoining room
Pay the applicants $2,000 for non-financial loss
Pay the applicants $2,310 for the mould report.
With the exception of the award for non-financial loss, the FSP is required to pay
interest at the rate determined under section 57 of the Insurance Contracts Act 1984
(Cth) from 30 June 2016 until the payment date.
Case No: 465891 Recommendation Page 3 of 6
4 Reasons for recommendation
4.1 Is the offer of settlement sufficient to resolve the dispute?
The applicants cannot repair the bathroom for the offered amount
The applicants‟ home suffered damage as a result of a severe storm conditions on
Christmas Day 2011.
Repairs were carried out to the home by „M‟ on behalf of the FSP, which included the
bathroom. This work included the complete stripping of the shower.
In 2015, the applicants raised concerns with the FSP over M‟s work.
The applicants changed insurers after the storm event and lodged a claim for water
damage that occurred to an adjacent room of the bathroom. It was determined by the
new insurer, the loss appeared to be related to previous repairs carried out by the
FSP to the bathroom.
The FSP offered an amount of $11,209.31 to reinstate the applicants‟ bathroom
which the FSP says is sufficient to attend to the damage.
The applicants obtained three quotes to reinstate the bathroom, totalling $16,357,
$17,950 and $24,000.
They seek the additional costs to reinstate the shower, as they have been unable to
obtain the services of a contractor who can repair the bathroom for amount offered
by the FSP.
Based on the available information, I am not of the view the amount offered by the
FSP will satisfactorily reinstate the applicants‟ bathroom.
Pursuant to the terms of the policy, the FSP has the discretion to cash settle the
applicants for repairs to the home, however such discretion must be exercised
appropriately. The settlement must be sufficient to reinstate the damage as provided
for under the policy.
To resolve this matter a new quote should be provided as per the agreed scope of
works and the FSP must use this as the basis to settle the applicants under the terms
and conditions of the policy.
Additional damage located to an adjoining room of the shower found
The applicants‟ assert, due to the poor standard of work carried out by M to the
bathroom, a leak has occurred causing damage to an adjoining room.
Damage extends to carpet, timber skirting boards and a shelving unit.
The applicants engaged a plumber, only to discover the problem appeared to be
coming from within the shower wall.
The FSP engaged „CC‟ to assess the damage. The opinion provided by CC is the
leak is coming from either the shower taps or waste pipe from the bath. CC is also of
Case No: 465891 Recommendation Page 4 of 6
the opinion the waterproof membrane may have failed or may not have been
installed, also contributing to the damage.
„IP‟ plumbers were engaged by the FSP and attended the home on at le ast two
occasions. After extensive testing, the opinion of IP is a leaking pipe in the cavity wall
may have caused the damage to the adjacent room.
The FSP has not provided any information to establish what work was performed by
M. The FSP do say the work to the bathroom appeared to be a variation from the
initial scope of works.
The applicant has confirmed the shower walls were stripped, which is confirmed by
photos provided showing white tiles. The extent of this work is not in dispute by either
party.
Whilst there are opinions as to why the additional damage has occurred, the FSP has
not established the work undertaken by M is not the cause of the additional damage
to the adjoining room.
I accept the damage to the adjoining room was a result of substandard workmanship
undertaken by M.
Therefore, the FSP should accept the resultant water damage to carpet, timber
skirting boards and a shelving unit.
The applicants previously stated they would accept $3,000 to reinstate this damage.
Should the parties agree to the recommendation, the FSP is to pay the applicants
$3,000 to resolve this aspect of the claim.
Evidence of mould has been detected in the home
The applicant raised concerns over mould contained in the home, especially to the
bathroom and adjoining water damaged room.
The applicants were so concerned, they engaged a specialist „BH‟ in the field of
mould to undertake testing to the home as the sme ll was becoming more apparent.
The report provided by BH identified mould in the home. The major areas of concern
include the insulation in the roof, the shower wall to the main bathroom and the
adjoining room.
An offer has been agreed upon between the parties for damage to the roof tiles,
however an updated insulation quote needs to be obtained.
To resolve this aspect of the dispute, the FSP is required to obtain the services of an
expert who can replace the insulation and treat the roof space if mould is detected on
other surfaces in the roof cavity.
As the FSP has agreed to settle the bathroom, a variation will have to be included for
the undertaking of the removal of any mould in the shower wall.
Case No: 465891 Recommendation Page 5 of 6
4.2 Are the applicants’ entitled to financial and non -financial loss?
Non-financial loss
Pursuant to the Terms of Reference (TOR), FOS may award up to $3,000 for non-
financial compensation if an applicant(s) experiences an unusual degree of physical
inconvenience, time take to resolve the situation or interference with his, her or their
expectation of enjoyment or peace of mind.
In this case, the applicants‟ endured many contractors attending the home, some of
which did not keep appointments.
The applicants also expressed frustration at missing out on family time due to
potential health issues in the home as a result of the mould and the undue amount of
time it has taken to resolve the matter.
I am satisfied the applicants have suffered an unusual degree of physical
inconvenience in this dispute and that the time taken to resolve the situation
interfered with their enjoyment and peace of mind.
In view of the potential mould issues, I am satisfied the inconvenience and
interference is at the higher end of the scale.
Therefore, it is fair in all the circumstances the FSP pay $2,000 compensation to the
applicants under paragraph 9.3 of the TOR.
Financial loss
Under the TOR, FOS may also award payment (capped at $3,300) for consequential
financial loss suffered by an applicant in connection with a claim.
The applicants have incurred a fee of $2,310 in the appointment of BH, the mould
specialist. The evidence from BH is persuasive as to the cause of the mould in the
home arising from entry of rain through the roof tiles. I am satisfied this cost was
reasonably incurred and arose as a direct result of the claimed event.
Case No: 465891 Recommendation Page 6 of 6
5 Supporting information
5.1 FOS approach to this dispute
A full exchange of the relevant information has taken place between the respective
parties and each party has had the opportunity of addressing any issue raised.
All of the provided material has been read and considered. The parties raised
numerous issues in their submission to FOS. For the purpose of this
recommendation, commentary is restricted to only those issues considered relevant.
5.2 Relevant material considered and relied on
Parties submissions, email and photographs and all attachments to
submissions
Correspondence between the parties
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.