Home / Financial Firm (Unknown - Insurer) / Determination 465503

Determination 465503

Vessel damage claim denied under wear and tear, maintenance and unseaworthiness exclusions

FirmFinancial Firm (Unknown - Insurer)
Decided2018-03-16
ProductGeneral Insurance · Boat
OutcomeFor the complainant in part
Amount awarded$63,995
Non-financial loss$1,000
Amount claimed$230,758
SourceAFCA PDF

Summary

The applicant's vessel partially sank and the FSP denied the claim under wear and tear, maintenance and seaworthiness exclusions, later refusing the hardstand and berthing costs. AFCA decided the FSP must pay $64,994.72 in full and final settlement, including $50,000 for repairs, consequential losses and $1,000 non-financial loss.

The FSP did not prove on the balance of probabilities that any policy exclusion applied, so it had to indemnify the loss, with repairs assessed by reference to the applicant's engineer quote.

Issues

Subjects and remedies

pay claimpay compensationpay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 465503 Determination Page 1 of 14 Case number: 465503 9 March 2018 1 Overview 1.1 Dispute The applicant lodged a claim on her i nsurance policy with the financial services provider (FSP) for damage to her vessel when it partially sunk on 20 October 2016. The FSP initially denied the applicant‟s claim on the basis the damage was caused by pre-existing poorly repaired damage together with the failure to keep the vessel in a seaworthy condition. It later considered the damage was also caused by wear and tear or due to a lack of repair or maintenance of the vessel, both of which are excluded under the policy. The applicant seeks a review of the FSP‟s decision along with compensation for the costs incurred as a result of the delay of the repairs to the vessel. 1.2 Issues and key findings Is the FSP entitled to deny the claim? The FSP is not entitled to deny the claim because the information does not show the damage was caused by wear and tear, a lack of repair or maintenance of the vessel or that the vessel was unseaworthy. How should this dispute be resolved? It is fair in all the circumstances that the FSP pay the applicant the sum of $64,994.72 in full and final settlement of her dispute. This accounts for the following:  $7,004 in hardstand fees  $3,690.72 for the salvage and initial repair costs  $4,300 in consequential financial losses and non-financial loss  $50,000 for the cost to repair the vessel. 1.3 Determination This determination is substantially in favour of the applicant. Within 21 days of the applicant accepting this determination, the FSP is required to pay the applicant the sum of $64,994.72 in full and final settlement of her dispute. Case No: 465503 Determination Page 2 of 14 2 Reasons for determination 2.1 Is the FSP entitled to deny the claim? Policy covers all risks of physical damage subject to exclusions There is no dispute the applicant suffered physical loss of or damage to the vessel during the policy period and as such has established a prima facie claim, subject to the conditions and exclusions contained in the policy. The onus, therefore is on the FSP to establish an exclusion or any other condition on which it relies to refuse the claim. The FSP relies on a number of policy exclusions to deny liability. These include the following:  any cost of repairing damage to the vessel which has been caused by the wear and tear of a part of the vessel  loss of or damage to the vessel that is attributable to a lack of repair or maintenance of the vessel  loss of or damage to the vessel that is attributable to unseaworthiness of the vessel. The FSP has to prove on the balance of probabilities that the cause of damage falls within any of these policy exclusions. No evidence that damage due to lack of repair or maintenance The FSP now accepts the main cause of the water entering the vessel was the Packless Seal System (the shaft seal) moving. However, the FSP says this moved due to wear and tear or lack of maintenance. No expert evidence has been provided to show the shaft seal failed due to any lack of maintenance. The FSP engaged marine surveyor (JS) to review the vessel. JS, in an email dated 13 December 2016, said the damage could have been caused in the following manners: grubscrews that hold the collar in place must have loosened somehow, either because they were not tight enough in the first place or because of adverse vibration of the shaft This does not attribute the damage to any lack of maintenance. The applicant ‟s marine engineer (MG) specifically says the shaft seal does not require servicing or maintenance. The FSP has provided a weblink to support its position that the shaft seal requires maintenance. However, in the absence of any expert saying the shaft seal failed due to lack of maintenance, the Panel is not persuaded the exclusion is engaged by reference to this weblink alone. Case No: 465503 Determination Page 3 of 14 No evidence damage caused by wear and tear The policy does not define the term „wear and tear‟. Case law indicates wear and tear means damage due to ordinary usage. The FSP submits the movement of the shaft seal (possibly due to the usual vibrations of the shaft) is considered to be wear and tear. It states the manufacturer advises the hose clamps need to be regularly checked to avoid this from happening. The applicant has presented information to show the part of the shaft seal which became loose - the rotor - does not experience wear during operation. Further, there is no evidence to show any hose clamps on the shaft seal caused it to move. Based upon the information available, it is unclear why the shaft seal moved. The only evidence supporting the FSP‟s position is JS‟s email dated 13 December 2016. However, this is speculative as JS did not investigate this possible cause when ins pecting the vessel. His opinion in the email was offered in response to the FSP‟s query as to why the shaft seal moved. Given this, the Panel is not satisfied the FSP has shown on the balance of probabilities that wear and tear caused the shaft seal to mo ve. No evidence damage caused by vessel being unseaworthy The FSP says the vessel was unseaworthy due to the following:  sterntube seal was not properly maintained  a lack of seals on the rudder stocks  the bilge pumps being inoperable due to failed float switches or disconnected wiring There is no evidence to show the sterntube seal was not properly maintained. It is not mentioned in either of the expert‟s reports. There is also no evidence of a lack of seals on the rudder stocks. JS or MG makes no reference to these seals being missing. JS suggested the FSP obtain an electrician‟s opinion regarding the condition of the batteries to confirm if the bilge pumps had failed before the water inundation. The FSP has not produced such evidence. Therefore, the evidence does not establish these were inoperable before the inundation. The applicant provided a survey report of 16 September 2015. This comprehensive report showed the vessel was seaworthy. Given all this, the Panel is not satisfied the FSP has shown the damage was caused by the vessel being unseaworthy. Accordingly, after careful consideration of all the evidence and arguments, the FSP has not established any of the exclusions. Therefore, the FSP is required to indemnify the applicant for this claim. Case No: 465503 Determination Page 4 of 14 2.2 How should this dispute be resolved? Applicant seeks the FSP to repair her barge The applicant‟s claim has evolved during the dispute and includes the following: 1. $7,004 for marina hardstand fees and associated costs 2. $6,102 for marina berthing fees, increasing at $1,017 per month (this figure is for a six month period) 3. $16,000 for travel to and from her island to the mainland (estimated from the date of loss to 1 March 2017, increasing at $1,000 per return trip) 4. $3,690.72 for initial salvaging and repair work done by MG, paid 5. $41,245.84 for repairs initially assessed by MG (incomplete according to the applicant and duplicates some of the repairs below) 6. $33,900.66 for diesel motors electronics, various 7. $27,307.16 for main diesel engines, repair 8. $47,462 for 240v generator (replacement and installation) 9. $4,200 for six large marine batteries 10. $40,546 for two gearboxes (replacement of port and starboard) 11. $3,300 for electric/hydraulic controllers. There appear to be overlaps and duplications in the applicant‟s claim. For instance:  the applicant‟s email dated 24 April 2017 provides a total of $28,212 for both the purchase of the 240v generator and installation – however, in her email dated 21 May 2017, she included $28,212 as the installation costs alone  MG‟s scope of w orks appears to overlap with the amounts set out between 6 and 8. FSP can cash settle the cost of repairs The policy states with regard to claims for partial loss: „Claims for partial loss of or damage to the vessel shall be settled on the basi s of reasonable repair and/or replacement costs nece ssary to re -instate the vessel nearly as is reasonably possible to its pre-incident condition where a claim is recoverable under this insurance. These necessary costs will include the cost of transporting the vessel to the nearest appropriate repair facility.‟ [our emphasis] Following from this, the policy says the following regarding partial losses: “… in the event of partial loss a deduction of 30% will be made from the claim settlement in respect of parts or materials where the part which is repaired or replaced was, at the time of the incident, more than 2 years old. The deduction will not be applied to labour costs, or the repair of the basic hull and deck structures of the vessel.” When these provisions are considered together, it is reasonable to conclude the policy allows the FSP to cash settle a claim when a deduction applies to parts. This is because it would be impractical for the FSP to attempt to repair the vessel in circumstances when the applicant would have to contribute to the costs of various parts. Case No: 465503 Determination Page 5 of 14 Panel proposes to provide a cash settlement for this dispute Given the longstanding nature of this dispute, the applicant‟s circumstances and the parties disagreeing about the scope of works, the Panel considers it is fair in all the circumstances to provide a cash settlement. This is because such an outcome would provide finality if it is accepted by the applicant. In contrast, if the applicant‟s preferred outcome of having the FSP repair the vessel was undertaken, there is potential for these issues to arise:  disagreement about the scope of works when they are finalised – this is likely given the current position of the parties and the increasing amount of the applicant‟s claim  what parts should be subject to a deduction  concerns about the contractors the FSP wishes to authorise . Similar issues would also likely arise if the parties were asked to assess the loss and secure quotes for the outstanding repairs. FSP responsible for MG’s costs for initial repairs The applicant seeks $3,690.72 for the engineer who attended, kept the vessel afloat and conducted the initial investigations to determine the cause of the partial sinking. The applicant has substantiated these costs with invoices from MG. It is fair for the FSP to pay these costs. Particularly given the evidence shows it is likely these costs mitigated the costs of the claim. FSP should pay for hardstand fees The applicant seeks $7,004 in hardstand and associated fees charged by the marina slipway. She has presented a tax invoice to show the costs incurred. The information exchanged shows the applicant arranged for staff at the marina to lift and place the vessel on a hardstand on 21 October 2016. The applicant says the FSP was aware of this pursuant to their discussion on the same date. In a letter of 4 November 2016, the FSP agreed to meet the cost for the salvage, survey and assessments undertaken to identify the cause of the damage. However, it denied the claim for the damage based on its exclusions. On 7 December 2016, the FSP formally declined any liability under the policy. The FSP also said it would not accept any liability for the hardstand costs or any other expenses incurred. On 20 December 2016, the FSP issued its final decision which maintained its denial. The vessel was placed back in the water on 21 December 2016. The applicant argues the FSP wanted her to place her vessel on the slipway hardstand so its surveyor could inspect and assess the barge. The information shows the FSP‟s survey or inspected the barge on 26 October 2016. It is clear such an inspection would have been most effective if the vessel was on a hardstand. Case No: 465503 Determination Page 6 of 14 The applicant also indicates the vessel was on the hardstand so the FSP could complete the repairs. This is consisten t with MG‟s quote which said the vessel had to be on a hardstand. Given this, the Panel accepts the FSP should reimburse the hardstand fees. They were reasonably incurred to allow the vessel to be inspected. Further, repairs could only be effected if the vessel was on a hardstand. It would only have been apparent to a reasonable person in the applicant‟s circumstances that the FSP would not be paying for the cost of repairs after sending its final decision letter. The applicant removed the vessel from the hardstand a day after this letter. Accordingly, the FSP should pay the marina‟s invoice of $7,004. Marina slipway fees are recoverable losses The applicant seeks $6,102 for marina slipway casual berthing fees charged and paid from 8 January 2017 to July 2017. She indicates the costs continue to increase at $1,017 per month. The FSP says these costs are consequential and excluded under the polic y. However, the Panel does not accept the policy exclusion applies. The applicant‟s claim for this cost is not based on a loss suffered from an insured event. Instead, it is a financial loss she has incurred due to the FSP‟s decision to incorrectly deny th e claim. This does not fall within the policy exclusion. The FSP has also argued the applicant failed to mitigate her loss as she did not explore options to relocate the vessel to her own island‟s marina. There is merit to the FSP‟s position. In the Pan el‟s view, after the parties undertook an unsuccessful conciliation on 8 March 2017, it ought to have been apparent to the applicant that any possibility for the FSP to willingly change its position would have been remote. Therefore, it was reasonable to explore options to mitigate her losses. This would include transporting the vessel to its usual berth whilst she continued pursuing the dispute. However, for reasons to follow, any amount payable for this loss would be subject to FOS‟s cap of $3,300 for con sequential financial losses. Berthing and transport costs are consequential financial losses Consequential financial losses are losses that are indirectly caused by the FSP‟s conduct. This would generally include losses that would not have been incurred by most insureds. That is, it is a loss specific to the applicant‟s circumstances. In this case, the applicant‟s claim for the marina slipway fees was due to the following factors:  the applicant‟s residence and the vessel‟s usual berthing is on an island  the applicant does not pay for berthing fees at its usual berthing place  the vessel was damaged whilst on the mainland, which the applicant regularly travels to for both commercial and personal reasons Case No: 465503 Determination Page 7 of 14  the availability of repairers are on the mainland – this was one of the reasons the vessel remained there. Given this, the Panel does not accept the applicant‟s circumstances would be similar to most insureds of this policy. Instead, it is clear they are specific to her situation. Therefore, the applicant‟s cl aim for these costs are consequential financial losses which resulted from the FSP‟s action. That is , the FSP‟s erroneous decision to refuse the claim, but are subject to the Service‟s $3,300 cap, per its Terms of Reference. Further, this cap would encompass her claim for travel costs to and from her island to the mainland. This is because such a situation is specific to her circumstances. Accordingly, the Panel proposes to award $3,300 for these aspects of her claim. This is because the evidence shows the applicant‟s marina slipway fees alone would have likely exceeded this cap and are substantiated. Outstanding repair costs As discussed, there is overlap in the amounts being sought by the applicant for the outstanding repairs. MG‟s quote is economical compared to the amounts quoted by C. Further, it appears MG is appropriately qualified and capable of conducting the repairs. Particularly given:  the applicant has referred to the contractor‟s excellent work in salvaging the vessel  the FSP has provided no evidence to indicate MG‟s skills and experience are insufficient. The applicant says MG‟s quote was rushed and incomplete. There is no evidence to support this. Further, MG‟s quote appears fairly extensive and detailed. The FSP has submitted the cost of repairs are approximately $14,600. The Panel is not persuaded by this. The FSP has provided no quote or expert evidence in support of its position. The amounts allowed for parts and labour are significantly less than those provided by both MG and C. For instance, the FSP allowed $3,500 for the generator when MG and C quoted in excess of $18,000. Given this, the Panel prefers to rely upon MG‟s quote in considering an appropriate amount for the cost of repairs. However, the Panel also accepts there are aspects within the quote that are either incomplete or could lead to additional costs. These include:  hardstand costs that are not quoted – the FSP‟s amount estimated $2,000 for this alone  parts and labour quoted are likely outdated and would have increased  additional damage that is likely to have been identified when items are removed and reviewed (e.g. hydraulic switches and batteries the applicant says was caused by the event) Case No: 465503 Determination Page 8 of 14 Therefore, the Panel is conscious that any allowance provided should take into account these contingencies as well as the fact the FSP can apply 30% depreciation to parts more than two years old. Given this and the above factors, and after careful consideration of all the available evidence and information, the Panel proposes to award $50,000 towards the cost of repairs. This does not include any allowance for the replacement of the gearboxes for the following reasons. FSP not required to replace the gearboxes The applicant has claimed that two gearboxes have been damaged and require replacement. This was submitted in an email dated 4 July 2017. The FSP has disputed liability saying they likely require replacement because the applicant failed to mitigate her circumstances. The FSP also noted that MG only referred to one gearbox being damaged. The Panel is persuaded by the FSP‟s position. MG‟s quote only refers to one gearbox being damaged. The quote did not require this gearbox to be replaced. Further, MG said that the engine room should be washed down with fresh water. This is likely to remove any residual salt water from the area. It does not appear this mitigating action was taken despite MG‟s suggestion being set out in a quote dated 12 November 2016. The applicant says MG did one flush on both gearboxes. However, the only evidence of this being done was when the vessel was salvaged. This is set out in MG‟s invoice. There is nothing to indicate MG undertook any subsequent washing down in line with its quote dated 12 November 2016. Given this, the evidence shows the gearboxes require replacement due to the applicant failing to mitigate her situation by washing them down with fresh water. Therefore, the Panel does not accept the FSP is liable to pay for the cost of this. FSP should pay $1,000 in non-financial loss FOS can award up to $3,000 if the FSP causes the applicant to suffer an unusual degree or extent of inconvenience, interference or delay. FOS awards compensation conservatively. Applicants are expected to be moderately robust and bear the normal degree of inconvenience experienced when a problem occurs. The Panel does not accept the FSP acted unreasonably throughout. There were legitimate concerns that the cause of the loss did not fall within the policy terms. However, during the course of the dispute, it became clearer that:  the cause of loss was the shaft seal, and  the successful application of the policy exclusions being relied upon was remote. Case No: 465503 Determination Page 9 of 14 Further, the FSP‟s offer to settle for the cost of repairing of the vessel on a without prejudice basis did not mitigate the situation. This is because the offer was manifestly low given it was less than half of MG‟s quote and not based on any other quote. Given this, the Panel accepts the applicant suffered an unusual degree of stress and inconvenience during the course of the dispute. The Panel also accepts the impact of these factors would have been relatively significant given how reliant the applicant was on the vessel. As such the Panel considers an award of $1,000 for non-financial loss to be fair in all the circumstances. Case No: 465503 Determination Page 10 of 14 3 Supporting information 3.1 Financial Ombudsman Service (FOS) approach to this dispute This dispute has not been the subject of a FOS recommendation. Due to the nature of the dispute, it has been referred directly to a Panel for determination, in line with the Operational Guidelines to the FOS Terms of Reference. The Panel consists of an Ombudsman and two representatives with consumer and insurance experience. The Panel has decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS (or predecessor scheme) decisions. There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered (whether or not it is expressly referenced in this determination). While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues which are considered to be directly relevant to the outcome only. 3.2 Relevant policy sections Subject Terms §1. Insurance Cover All Risks: This insurance covers th e insured against all risks of physical loss of or damage to the vessel occurring during the policy Period subject to the Terms, Conditions and Exclusions of this insuranc e. §4. Exclusions This insurance does not cover: … 4. Unless specified in the schedule, any cost of repairing damage to the vessel which has been caused by the wear and tear of a part of the vessel. If the insured selects wear and tear cover then the cost of repair of any damage proven to have been caused by wear and tear of a part will be covered, but not the cost of the part which has sustained wear and tear. 6. Loss of use, Loss of Charter Inc ome (unless otherwise specified in the schedule), loss of mark et value, diminution of racing performanc e, diminution in aesthetic appearanc e , loss of any manufacturer‟s or supplier‟s warranty or any other form of non physical loss or damage; 7. Loss of or damage to the vessel that is attributable to: 7.1 recklessness of the insured; 7.2 unseaworthiness of the vessel 7.3. a lack of repair or ma intenance of the vessel; or 7.4 failure to comply with statutory requirements. §3. Agreed 3. Partial Loss: Case No: 465503 Determination Page 11 of 14 Subject Terms Fixed Value, Total and Partial Loss and Deductible(s) Claims for partial loss of or damage to the vessel shall be settled on the basis of reasonable repair and/or replacement costs necessary to re - instate the vessel nearly as is reasonably possible to its pre - incident condition where a claim is recoverable under this insuranc e. These necessary costs will include the cost of transporting the vessel to the nearest appropriate repair facility. This clause will also apply to the insurance of any other property insured with specified limits under Section A §2 of this insurance. 4. New For Old: For Partial Loss claims, the insured has the option to select co ver either with or without a deduction due to the age of the part repaired or replaced. If the insured selects cover without a deduction, then no deductions will be made for any claim for New for Old under this §3.4. If the insured selects cover on terms w hich include a deduction due to the age of the part repaired or replaced and unless otherwise specified in the schedule, in the event of partial loss a deduction of 30% will be made from the claim settlement in respect of parts or materials where the part which is repaired or replaced was, at the time of the incident, more than 2 years old. The deduction will not be applied to labour costs, or to the repair of the basic hull and deck structures of the vessel. 5. Deductibles: The deductibles specified in the schedule will apply to each claim except that in no circumstances shall a deductible apply in respect of: 5.1 a total loss of the entire vessel under Section A §3.2; 5.2 any payments made under Section A §2.1 - 7; 5.3 any claim under Section A §2. 11 for Lo ss of Charter Income, but the first 7 days of Loss of Charter Income are not rec overable; and 5.4 any claim for loss or damage arising whilst the vessel is moored at its usual berth, pontoon or private jetty or when the vessel is ashore within a commercial marina providing the vessel is not moored on a swing mooring or is at anchor. 3.3 Reports Record Key points Applicant’s consultant (JL) Survey i nspection report 16.09. 2015  Surveyed on 15 September 2015 for insurance.  Barge launched in 1992 and custom built.  JL was able to inspect and evaluate the s tern b earing ( PSS Water Sealed ) and after visually observing the item, it appeared to be functioning as intended allowing for normal wear and tear.  JL was able to inspect and evaluate the twin inboard engine (with PSS gland on starboard shaft w ater cooled) and after visually observing the component, it appeared to be functioning as intended allowing for normal wear and tear.  JL was able to inspect and evaluate the four bilge pumps and after visually observing them, they appeared to be functioning as Case No: 465503 Determination Page 12 of 14 Record Key points intended allowing for normal wear and tear.  JL was able to inspect and evaluate the generator and after visually observing the unit, it appeared to be functioning as intended allowing for normal wear and tear.  JL wa s able to inspect and evaluate the vessel‟s electrical system and after visually observing the unit, all parts appeared to be functioning as intended allowing for normal wear and tear.  JL commented the vessel was seawort hy and well found.  JL valued the mar ket value of the vessel and associated equipment to be approximately $160,000. FSP’s surveyor (JS) Survey report 31.10. 2016  Inspected vessel on 26 October 2016 following a partial sinking .  Observed uncoated aluminium and crack in bottom of starboard skeg indicated cont act with the seabed.  Sighted crack below welded portside skeg to hull join was possibly caused by shock of repeated seabed contact.  Concluded slow ingress of seawater via crack in port skeg and failure of automatic bilge pump operation would have caused the vessel to gradually take on water and sink.  Once internal water level had reached the port rudder stock PSS seal, water ingress would have rapidly increas ed via the 8mm gap between ceramic seal faces. Applicant’s marine engineer (MG) Repair quote 1 2 .11. 2016 $41 , 245.84 total for parts and repairs, including:  Labour to attend vessel at marina berth.  Assist in removal of ingressing water.  Pump out remaining water once on hardstand.  Wash down engine room with fresh water  Drain genset oil and both gear box oil.  Refill with diesel oil combination.  Run up port motor, starboard motor would not start due to ECM unit malfunction due to being submerged in salt water.  Remove and refit new starter motors.  Remove starboard gear box to overhaul and r efit.  Replace ECM unit on starboard motor, clean all connections, replace wiring where needed, changed all pumps, fit overhauled hydraulic pump, remove and reinstall genset, check over all 240V wiring, relaunch vessel to conduct seatrials. Applicant’s marine engineer (MG) Statement 13.11. 2016  The marina contacted him to urgently attend to sinking vessel.  Found engine room flooded.  Three auxiliary 240 volt submersion pumps were engaged to pump out water.  MG turned off all through hull seacocks.  After 45 minutes of pumping it was evident that we were not overcoming water int rusion.  Travel lift was engaged to hold vessel in slings to avoid vessel sinking.  On close inspection with aid of diving goggles, MG found that the starboard [Packless Seal System] PSS shaft seal rotor had moved from the seated position with a gap of more than 12mm. Case No: 465503 Determination Page 13 of 14 Record Key points  MG obtained a ball peen hammer from adjacent vessel and knocked rotor up to seated position. Onc e this was completed, bilge pumps overcame the water intrusion rate.  Vessel was lifted out of the wat er and plac ed on hardstand and had considerable amount of wat er remaining in bilge.  No noticeable leaks from vessel hull any where.  Concluded that the water int rusion had come from starboard side PSS seal assembly. FSP’s surveyor (JS) Comments 2 2 .11. 2016 (or 23.11.2016 )  Photographs provided by MG of starboard and port PSS seals indicate that the seal on the starboard shaft has moved up the shaft, covered the corrosion stain and releas ed the seal pressure letting water in. FSP’s surveyor (JS) Comments 2 4 .11. 2016  Water would not have got in through the rudder stock as the seal is 60mm above the waterline.  After speaking to MG the day before, together with his photographs of the propeller shaft seals , JS believe d that the bulk of the water came in through the starboard propshaft seal.  If the bilge pumps had been working they would have kept up with the water ingress until the batteries went flat, however, the forward pump did work when JS switched it to manual set ting, but that doesn‟t mean the batteries were charged enough to run the pumps at full capacity.  No pumps functioned via float switches during the survey even after he switched them to automatic on the electrical panel but, they may have failed during the immersion. FSP’s surveyor (JS) Comments 13 .1 2 . 2016  T he grubscrews that hold shaft seal collar in place must have somehow loosened (either because they were not tight enough or due to adverse vibration of the shaft ).  It is also possible the threadlock was not used on the screws, but JS was not sure if this was common practice.  FSP may require an electrician to inspect the condition of the batteries and confirm why the bilge pumps were not working. Applicant’s marine engineer (MG) Tax invoice #81 01.02. 2017  $ 1 , 590.82 for repairs to barge  parts (machine long and short bearings and fasteners) and labour Applicant’s marine engineer (MG) Tax invoice #82 01.02. 2017  $ 2 , 099.9 0 for repairs to barge  Once out of water, engine room compartment was drained of remaining water, engine compartment was degreased and cleaned out with fresh water. Gear boxes were drained of ingressed sea water, diesel and oil additives was then int roduced int o gear boxes. All submersed electric items were sprayed with a dewatering fl uid, port motor was started, starboard motor could not be started due to ECM unit having been submers ed. Applicant’s marine  The PSS or Packless Seal System fitted to the barge is not an item Case No: 465503 Determination Page 14 of 14 Record Key points engineer (MG) Statement 27.02. 2017 that would require maintenanc e or servicing.  It is designed to be maintenance free once installed to manufacturer‟s specifications. 3.4 Key references  JSM Management Pty Ltd v QBE Insurance (Australia) Ltd [2011] VSC 339.  Policy schedule and product disclosure statement.  Applicant‟s submissions, photographs, reports and quotes.  FSP‟s submissions, reports and photographs.  Correspondence between the parties. Word Definition Wear and tear (Oxford English dictionary)  d amage or deterioration sustained from continuous use Wear and tear (Macquarie dictionary)  diminution, decay, damage, or injury sustained by ordinary use Wear (Macquarie dictionary)  to impair, det eriorate or consume gradually by use or any continued process

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.