Defective insurer-arranged building repairs after fire and storm; cash settlement and loss of rent disputed
Text of the determination
Determination | Case number: 465171 Page 1 of 8
Determination
Case number: 465171 21 January 2020
1 Determination overview
1.1 Complaint
The complainant holds a home and contents insurance policy with the financial firm
(insurer). The complainant lodged a claim for fire damage with the insurer, following
an electrical fire.
The insurer accepted the claim and authorised repairs. However, due to insurer
delays in completing the repairs, the property suffered further (storm) damage. The
insurer accepts it is liable for this further damage.
The complainant says that the repairs were not completed to a satisfactory standard.
The insurer arranged for an expert to assess the completed repairs. The expert also
provided a scope of works to satisfactorily complete the repairs.
1.2 Issues and key findings
Is the insurer’s settlement for the building repairs fair and reasonable?
The insurer cash settled the additional repairs for $50,000. Since that settlement an
expert (GC) has assessed the property and provided a scope of works. He has
assessed the cost to rectify the previous repairs and to complete the repairs at
$211,865. GC also said that the repairs would take about 12 months to complete.
The complainant does not want the insurer to complete the repairs and wants a cash
settlement. Given this, and as the complainant has lost the benefit of lifetime repair
guarantee, it is fair the insurer pays the complainant a further 20% on the sum of
$211,685.
Is the complainant entitled to further loss of rent?
The further repairs are as the result the poor standard of the initial repairs. The
complainant is entitled to loss of rent for the period that the property is to be
unoccupied. It is fair the insurer is to pay $33,040 for loss of rent.
Determination | Case number: 465171 Page 2 of 8
Is the complainant entitled to further repair costs?
The complainant says he has paid out at least $100,000 extra in repairs. I am
satisfied that apply the principle of fairness, on balance, that he has expended the
previously paid $50,000, on repairs to the property.
Additionally, the insurer’s offer to provide a further payment of $32,340, upon the
provision of building certificates and bank account statements.
To effect this, the complainant should follow the ins tructions set out in section 2.3 of
this determination.
Is the insurer’s settlement for contents reasonable ?
The complainant has not provided any further information to substantiate his further
claim for contents. The insurer paid the complainant $85,234.90 on 9 April 2018 in
cash settlement or the outstanding contents. The $85,234.90 paid is reasonable.
Is the complainant entitled to non-financial compensation?
The complainant is entitled to $3000 non-financial compensation.
1.3 Determination
This determination is substantially in favour of the complainant. Upon acceptance of
this determination the insurer is to pay:
$254,058.
$33,040 loss of rent.
$3,000 non-financial loss.
Any further amounts as set out in section 2.3 of the determination.
Determination | Case number: 465171 Page 3 of 8
2 Reasons for determination
I have decided this case on its merits, having regard to the relevant law, good industry
practice, codes of practice, fairness and previous Australian Financial Complaints
Authority (AFCA) decisions. I have taken into account all material submitted by the
parties. I am satisfied the documentation I have relied on has been provided to both
parties.
2.1 Is the insurer ’s settlement for repairs fair and reasonable?
Applicant is required to establish an insured event caused the loss
The complainant is required to show, on the balance of probabilities, he suffered a
loss caused by a risk insured under the policy. This is known as a valid (or prima
facie ) claim.
If the complainant is able to establish a valid claim, then the onus shifts to the insurer
to show, on the balance of probabilities, it is entitled to rely on an exclusion under the
policy or is otherwise entitled to decline the claim.
The complainant ’s policy provides cover for loss or damage caused by the events
listed in the policy, subject to various conditions and exclusions.
There is no dispute the property suffered damage. On this basis, I am satisfied the
complainant has established a valid claim. What remains in dispute is whether the
insurer ’s offer is fair and reasonable.
Insurer settled the claim for a total of $109,140.99
The insurer submits a scope of works from the builders indicate the total cost of
repairs to be $109,140.99. To this end, the insurer has provided documentation
showing it paid $109,958.44 for repairs, being:
$59,958.44 to its builder
$50,000 to the complainant.
The complainant was dissatisfied with the builder.
I am satisfied the complainant would have spent the $50,000 in relation to the building
and is entitled to keep that sum.
Subsequently it was agreed between the parties to arrange a report by a structural
engineer and building surveyor (GC).
Insurer is to pay $254,058
GC provided a substantial report as follows:
Determination | Case number: 465171 Page 4 of 8
SUMMARY OF MAJOR FINDINGS
“ S1. --- WORK DEFECTIVE
All structural work carried out by --- is deficient or defective.
The deficient and defective work is required to be reconstructed to comply
with relevant standards.
Note: This will have major ramifications to all non structural work located on the
struc tural members.
S2. WORK SPECIFICATIONS AND BUILDING PERMIT
The building permit did not describe the amount or standard of work to
be undertaken.
--- scope of works was insufficient and did not provide any plan(s) identifying
the extent, location or standard of reconstruction works required.
There was no engineering design verifying either --- scope of structural work or
building permit work.
There was no building contract for the works.
S3. RECONSTRUCTION REQUIRED
Reconstruction of the structural work will result in significant work: structural and
non structural; as well as removal of all contents and vacation of the building
during the reconstruction stage.
S4. COST AND TIME
Significant costs and time for reconstruction will result from the rectification
work schedule contained in this report [see Table 1(BsBS)].
S5. PROPER REDOCUMENTATION AND BUILDING CONTRACTS
Proper and complete designs, plans, specifications, reports and investigation of the
relevant existing conditions are required to prepare a new building contract and
obtain a building permit for the reconstruction work specified in Table 1(BsBS). ”
GC then provided a scope of works.
SUMMARY OF MAJOR FINDINGS
S6. RECTIFICATION COSTS
The cost to rectify the defective work is $211,865 exclusive of relocation costs and
any costs paid previously by the owner.
Days to Complete
Determination | Case number: 465171 Page 5 of 8
128 working days. Allow double time for delay = 256 days = 51 weeks = 12 months approx. 1 year
GC stated that his rectification costs were exclusive of 1 year’s relocation and rental
costs.
I am satisfied that the repairs were neither completed nor done to anywhere near a
satisfactory standard.
I totally accept GC’s report and find that all structural work carried out is ‘’ deficient or
defective’’. The solution i s to undertake the repairs set out in the scope of works
provided by GC. The repair cost as set out by GC are $211,865.
The complainant does not want the insurer to carry out the repairs and wants the
matter cash settled. This is appropriate in the circumstances. The complainant will
lose any insurer’s lifetime guarantees and further is exposed to any contingencies and
risks associated with the repairs, which may arise. To compensate for this, the insurer
is to pay a further 20%. This equates to $42,373.
The total payable by the insurer for the repairs is $254,058.
2.2 Is the complainant entitled to further loss of rent?
Insurer says the complainant has already been paid the full loss of rent.
The insurer has said that it has paid the full amount required under the policy and that
the complainant is not entitled to any further.
I do not accept this. The complainant will be forced to provide a vacant property for
the repairs to be carried out. The repairs are a direct result of the deficient and
defective repairs carried out by the insurer. The application of fairness results in the
insurer being responsible for this loss.
Complaint is entitled to loss of rent.
The property is rented, and the complainant has provided an estimate from his agent
of $590 per week. I accept that the property is unlikely to be available for rental for at
least 12 months. The complainant will have to offer the property for rental at the
completion of the works which means it is likely to be unoccupied for greater than the
repair period. In the circumstances it is fair for the insurer to pay rental loss of
$33,400.
2.3 Is the complainant entitled to further repair costs?
Complainant has not provided sufficient information regarding costs claim
In bringing the complaint to this Service, in additional to the amounts paid for by the
insurer, the complainant says he incurred further repair costs of at least $100,000. In
Determination | Case number: 465171 Page 6 of 8
support, the complainant provided the insurer 14 handwritten statements for
reimbursement.
In review of these handwritten stateme nts, and during a telephone conciliation call
conducted by this Service, the insurer agreed to pay the complainant a further
$32,340. However, the insurer says it will only make this payment if the complainant
can provide relevant building certificates and bank account statements showing this
amount withdrawn.
Despite this Service requesting, the complainant did not provide the further
information requested by the insurer. However, I note the insurer ’s request for
building certificates and bank account statement is reasonable.
Given this, until the complainant does so, the insurer is not required to make a further
payment to the complainant for building repairs.
To resolve this aspect and to maintain fairness to the complaint, if the complainant
accepts this determination:
within a further 14 days of his acceptance, he is to provide the insurer with the
requested documentation (building certificates / bank account statements)
once in receipt of these document, the insurer is to, within a further seven days,
pay the complainant up to $32,340 or such lesser sum as is provided in the
documentation .
2.4 Is the insurer ’s settlement for contents reasonable?
Applicant says contents settlement is insufficient
Some of the complainant ’s contents suffered damage as a result of the initial fire and
subsequent storm. The insurer appointed its restoration contractor (ST) to review the
damaged contents items and determine which of them it could restore.
The insurer noted:
many of the items claimed by the complainant were able to be restored.
some of the quotes provided by the complainant were considered an upgrade to
previous items
some of the claimed items were undamaged.
Despite asking, the complainant has not provided information in response to the
submissions made by the insurer.
Insurer is not required to increase contents settlement
The insurer has paid the complainant $85,234.90 cash settlement for all the contents.
Determination | Case number: 465171 Page 7 of 8
As mentioned above, despite this Service asking him to do so, the complainant has
not provided further information in support of his position.
Additionally, the complainant maintains his contents were stored on site during
repairs, resulting in further damage. However, the complainant has not provided any
supporting information regarding this statement.
The complainant has referred items which he says were damaged but for which, he
has not been compensated but has provided no more information.
In careful review of the submissions by the parties, I am satisfied the insurer ’s
payment for the contents is fair and reasonable. The offer from the insurer takes into
consideration lack of proof of ownership provided by the complainant in some
instances, and proof of value.
Accordingly, the insurer is not required to increase the contents cash settlement
amount.
2.5 Is the complainant entitled to non-financial loss?
Complainant is entitled to non-financial loss.
AFCA awards financial loss in circumstances where there has been an unusual
amount of:
physical inconvenience
time taken to resolve a situation
interreference with the complainant’s expectation of enjoyment or peace of mind.
In the circumstances the complainant is entitled to receive the maximum non-financial
loss for this claim, of $3,000
Determination | Case number: 465171 Page 8 of 8
3 Supporting information
There has been a full exchange of all the information relied on for the purpose of this
determination, and each party has had the opportunity to address any issues raised
by the other.
I have reviewed and considered all of the material provided by the parties. While the
parties have raised numerous issues in their submission, for the purpose of this
recommendation, I have restricted commentary to those issues directly relevant to the
outcome.
3.1 The determination is made under FOS Terms of Reference
The Australian Financial Complaints Authority ( AFCA) has commenced managing
disputes previously lodged with F inancial O mbudsman S ervice (FOS) .
This determination is made under FOS Terms of Reference but has adopted the
following terminology for consistency with AFCA. In this determination the AFCA
terms have the same meaning as the FOS terms defined in paragraph 20.1 and
Schedule 1, 2 & 3 of the FOS Terms of Reference.
FOS definitions AFCA term
applicant complainant
financial services provider financial firm
dispute complaint
claim claim
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.