Home insurance claim for collapsed rear wall declined as gradual deterioration
Summary
The applicant's home insurer denied a claim for a storm-damaged rear wall, attributing the collapse to gradual deterioration and earth movement. AFCA found the storm was a proximate cause that the insurer had not excluded, and ordered the claim settled under the policy with interest.
Where the insured establishes a prima facie storm claim, the insurer must prove on the balance of probabilities that an exclusion was the proximate cause, which it failed to do.
Issues
- Claim denial primary · upheld
“The FSP is not satisfied it established on the balance of probabilities that the poor condition of the wall was the proximate cause of its collapse. The FSP is liable.”
- Inadequate claim investigation secondary · upheld
“I am not satisfied that MP gave sufficient consideration to the strength of the winds experienced during the storm and their likely effect on the applicant's property.”
Subjects and remedies
home or building damagepay claimpay interest
Text of the determination
Determination
Case No: 464969 Determination Page 1 of 6
Case number: 464969 30 November 2017
1 Overview
1.1 Dispute
The applicant lodged a claim under her home insurance policy with the financial
services provider (FSP), after the rear wall of her house collapsed during a severe
storm.
The FSP denied the applicant’s claim on the basis that the damage had not been
caused by the storm but by gradual deterioration and naturally occurring earth
movement over an extended period of time.
The applicant disputes the FSP denial of her claim and seeks cover for the cost of
rebuilding the wall.
1.1 Issue and key findings
Is the FSP liable for the damage to the applicant’s home?
The applicant has established a prima facie claim for storm damage under the policy.
The available information does not establish that, on the balance of probabilities, the
excluded factors identified by the FSP were a proximate cause of the loss.
Accordingly, the FSP is liable for the applicant’s claim.
1.2 Determination
This determination is in favour of the applicant.
The FSP is liable for the damage to the applicant’s property and is required to settle
her claim in accordance with the terms and conditions of the policy.
If the claim is cash settled, the FSP is required to pay interest on the settlement
amount at the rate calculated in accordance with section 57 of the Insurance
Contracts Act 1984 (Cth) from 25 November 2016 until the payment date.
Case No: 464969 Determination Page 2 of 6
2 Reasons for determination
2.1 Is the FSP liable for the damage to the applicant’s home?
Policy provides cover for storm damage subject to exclusions
The applicant is required to show that, on the balance of probabilities, she has
suffered a loss caused by a risk insured against under the policy. This is known as a
prima facie (or valid) claim.
If the applicant is able to establish a prima facie claim, then the onus shifts to the
FSP to show that, on the balance of probabilities, it is entitled to rely on an exclusion
under the policy to deny the claim.
The applicant’s policy provides cover for the insured events listed in the policy
(including the insured event of ‘storm’), subject to the conditions and exclusions
contained in the policy.
The policy contains general exclusions for loss or damage caused by naturally
occurring earth movement and wear, tear and gradual deterioration.
Applicant has established prima facie claim
The applicant says she woke up on 29 September 2016 to discover that the rear
stone wall of her house had collapsed outwards during a severe storm. The applicant
says the damage was caused by the strong winds experienced during the storm.
The FSP accepts that the applicant’s property was affected by a severe storm. The
engineer (MP) appointed by the FSP to inspect the damage confirmed the strong
winds had contributed to the storm.
On this basis, I am satisfied that the applicant has established a prima facie claim for
storm damage under the policy.
FSP says damage was caused by excluded factors
As the applicant has established a prima facie claim, the FSP bears the onus of
showing that, on the balance of probabilities, it is entitled to deny the claim based on
a policy exclusion.
The FSP says the storm was not the proximate cause of the damage to the wall (that
is the real, dominant or operative cause).
The FSP says the wall collapsed because it was in very poor condition at the time of
the storm, due to gradual deterioration and the effects of earth movement over an
extended period of time.
Contractors disagree as to cause of damage
The rear wall of the applicant’s hous e collapsed outwards during the storm, exposing
the toilet and laundry area. The wall is built out of large, unreinforced stones and is
Case No: 464969 Determination Page 3 of 6
estimated to be over 100 years old. It is approximately 4 metres high at its highest
point.
During the storm, the upper gable section of the wall collapsed, leaving the bottom
section intact up to a height of about 1.4 metres from ground level.
The applicant’s builder (BC) who attended the property shortly after the storm
reported that the damage to the wall had been caused by cyclonic winds. BC noted
that warnings of high wind gusts up to 120 km/hr had been issued on the day of the
storm.
However, the builder (BE) and engineer (MP) appointed by the FSP disagree with
BC’s findings.
The builder (BE) reported that the condition of the wall was poor, with heavy signs of
salt damp, a lack of appropriate footings and no ties downs to the roof or ceiling. BE
advised that the wall also had large amounts of mortar missing throughout, which
had also compromised its integrity.
While BE acknowledged that the strong winds experienced during the storm had
contributed to the collapse of the wall, he considered the proximate cause was wear
and tear, incorrect footings and an absence of tie downs.
The FSP’s engineer (MP) concluded that t he collapse had been caused by several
factors which had contributed to the instability of the wall, leading to it eventually
falling over. These factors included:
long term deterioration of the wall, including the stones and the mortar in
between them
long term soil movement which caused the wall to move outward
the wind pressure exerted on the wall during the storm.
In his report, MP advised that the manner in which the wall was constructed meant
that it had an inherent lack of lateral strength and stability which meant it was
incapable of withstanding lateral loadings.
MP considered the wall’s capacity to resist win d loadings had diminished over time
due to wear and tear and deterioration. He advised that, had the wall been in good
condition, the maximum wind speed of 81 km/hr (recorded at the closest weather
station) would not have been sufficient to cause it to collapse.
FSP’s engineer did not give sufficient regard to strength of winds recorded
As an engineer, I accept that MP was appropriately qualified to identify the cause of
the damage.
As outlined above, MP concluded that the recorded wind speeds during the storm
would not have been sufficient to cause the wall to collapse, had it not been for its
existing poor condition.
In reaching his conclusions, MP relied on the maximum wind gust of 81 km/hr
reported for 28 September 2016. He noted that:
this wind gust was the equivalent of a Force 9 Strong/Severe Gale on the
Beaufort Wind Scale, which typically causes slight structural damage only
Case No: 464969 Determination Page 4 of 6
the wall had withstood several higher wind gusts during the previous few
months indicating its eventual collapse was due to its ongoing deterioration.
However, I am not satisfied that MP gave sufficient consideration to the strength of
the winds experienced during the storm and their likely effect on the applicant’s
property.
MP’s report refers to a maximum wind gust of 104 km/hr having been recorded on 29
September 2017. MP did not identify at what time this wind gust was recorded.
Given the weather data for 29 September 2017 covers the full period of 24 hours (to
midnight) on that date, it is quite possible that the maximum wind gust of 104 km/hr
occurred in the early hours of the morning.
When the applicant lodged her claim at around 9:30am on 29 September 2016, she
advised that the wall of her house had fallen down during the storm ‘last night’. She
subsequently advised MP during his inspection that she had woken up on 29
September 2016 to find the wall had collapsed.
While the FSP recorded the date and time of the damage as 9:00pm on 28
September 2016, it is not clear whether this was the exact time or merely an
approximation.
The maximum wind gust of 104 km/hr recorded on 29 September 2016 represents a
Force 11 Violent Storm on the Beaufort Wind Scale, which is described as being very
rarely experienced and capable of causing widespread damage (exceeding the
‘considerable structural damage’ caused by a Force 10 Storm).
Neither the FSP nor MP considered the possible effects of a Force 11 wind gust on
the applicant’s wall, even when this matter was specifically raised by the applicant in
her submissions.
FSP has not established exclusions apply
The reports provided by the FSP’s contractors (including the photographs contained
therein) clearly establish that the wall was in a deteriorated condition prior to the
storm.
However in order to be entitled to deny the applicant’s clai m, the FSP must establish
that, on the balance of probabilities, the condition of the wall was the proximate
cause of its collapse.
As outlined above, the FSP’s engineer (MP) concluded that a wind gust of 81 km/hr
would not have caused the wall to collapse, had it not been in a deteriorated
condition.
However, MP did not consider the potential effects of the significantly stronger wind
gust of 104 km/hr which was recorded on 29 September 2016. It is possible that the
wall would have collapsed when subjected to this wind gust, regardless of its pre-
existing condition.
MP’s conclusion that the ongoing deterioration of the wall had contributed to its
collapse was based partly on the fact that the wall had withstood equivalent wind
Case No: 464969 Determination Page 5 of 6
gusts during previous months. However, the records relied on by MP do not show
that the wind speeds experienced during this period ever exceeded 104 km/hr.
In these circumstances, I am not satisfied that the FSP has established that, on the
balance of probabilities, the poor condition of the wall was the proximate cause of its
collapse.
FSP is liable for storm damage to property
For the reasons outlined above, the FSP is liable for the damage to the applicant’s
property caused by the storm.
Accordingly, the FSP is required to settle the claim in accordance with the terms and
conditions of the policy.
To the extent the claim is cash settled, the FSP is to pay interest on the settlement
amount at the rate calculated in accordance with section 57 of the Insurance
Contracts Act 1984 (Cth) from 25 November 2016 until the payment date.
Case No: 464969 Determination Page 6 of 6
3 Supporting information
3.1 FOS approach to this dispute
This determination follows the review of a recommendation provided on behalf of the
Financial Ombudsman Service (FOS) on 26 April 2017. The recommendation was
rejected by the applicant.
This dispute has been determined based on what is fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous FOS decisions (which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered (whether or not it is expressly referenced in this determination).