Home / Financial Firm (Unknown - Insurer) / Determination 464969

Determination 464969

Home insurance claim for collapsed rear wall declined as gradual deterioration

FirmFinancial Firm (Unknown - Insurer)
Decided2017-12-04
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant's home insurer denied a claim for a storm-damaged rear wall, attributing the collapse to gradual deterioration and earth movement. AFCA found the storm was a proximate cause that the insurer had not excluded, and ordered the claim settled under the policy with interest.

Where the insured establishes a prima facie storm claim, the insurer must prove on the balance of probabilities that an exclusion was the proximate cause, which it failed to do.

Issues

Subjects and remedies

home or building damagepay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 464969 Determination Page 1 of 6 Case number: 464969 30 November 2017 1 Overview 1.1 Dispute The applicant lodged a claim under her home insurance policy with the financial services provider (FSP), after the rear wall of her house collapsed during a severe storm. The FSP denied the applicant’s claim on the basis that the damage had not been caused by the storm but by gradual deterioration and naturally occurring earth movement over an extended period of time. The applicant disputes the FSP denial of her claim and seeks cover for the cost of rebuilding the wall. 1.1 Issue and key findings Is the FSP liable for the damage to the applicant’s home? The applicant has established a prima facie claim for storm damage under the policy. The available information does not establish that, on the balance of probabilities, the excluded factors identified by the FSP were a proximate cause of the loss. Accordingly, the FSP is liable for the applicant’s claim. 1.2 Determination This determination is in favour of the applicant. The FSP is liable for the damage to the applicant’s property and is required to settle her claim in accordance with the terms and conditions of the policy. If the claim is cash settled, the FSP is required to pay interest on the settlement amount at the rate calculated in accordance with section 57 of the Insurance Contracts Act 1984 (Cth) from 25 November 2016 until the payment date. Case No: 464969 Determination Page 2 of 6 2 Reasons for determination 2.1 Is the FSP liable for the damage to the applicant’s home? Policy provides cover for storm damage subject to exclusions The applicant is required to show that, on the balance of probabilities, she has suffered a loss caused by a risk insured against under the policy. This is known as a prima facie (or valid) claim. If the applicant is able to establish a prima facie claim, then the onus shifts to the FSP to show that, on the balance of probabilities, it is entitled to rely on an exclusion under the policy to deny the claim. The applicant’s policy provides cover for the insured events listed in the policy (including the insured event of ‘storm’), subject to the conditions and exclusions contained in the policy. The policy contains general exclusions for loss or damage caused by naturally occurring earth movement and wear, tear and gradual deterioration. Applicant has established prima facie claim The applicant says she woke up on 29 September 2016 to discover that the rear stone wall of her house had collapsed outwards during a severe storm. The applicant says the damage was caused by the strong winds experienced during the storm. The FSP accepts that the applicant’s property was affected by a severe storm. The engineer (MP) appointed by the FSP to inspect the damage confirmed the strong winds had contributed to the storm. On this basis, I am satisfied that the applicant has established a prima facie claim for storm damage under the policy. FSP says damage was caused by excluded factors As the applicant has established a prima facie claim, the FSP bears the onus of showing that, on the balance of probabilities, it is entitled to deny the claim based on a policy exclusion. The FSP says the storm was not the proximate cause of the damage to the wall (that is the real, dominant or operative cause). The FSP says the wall collapsed because it was in very poor condition at the time of the storm, due to gradual deterioration and the effects of earth movement over an extended period of time. Contractors disagree as to cause of damage The rear wall of the applicant’s hous e collapsed outwards during the storm, exposing the toilet and laundry area. The wall is built out of large, unreinforced stones and is Case No: 464969 Determination Page 3 of 6 estimated to be over 100 years old. It is approximately 4 metres high at its highest point. During the storm, the upper gable section of the wall collapsed, leaving the bottom section intact up to a height of about 1.4 metres from ground level. The applicant’s builder (BC) who attended the property shortly after the storm reported that the damage to the wall had been caused by cyclonic winds. BC noted that warnings of high wind gusts up to 120 km/hr had been issued on the day of the storm. However, the builder (BE) and engineer (MP) appointed by the FSP disagree with BC’s findings. The builder (BE) reported that the condition of the wall was poor, with heavy signs of salt damp, a lack of appropriate footings and no ties downs to the roof or ceiling. BE advised that the wall also had large amounts of mortar missing throughout, which had also compromised its integrity. While BE acknowledged that the strong winds experienced during the storm had contributed to the collapse of the wall, he considered the proximate cause was wear and tear, incorrect footings and an absence of tie downs. The FSP’s engineer (MP) concluded that t he collapse had been caused by several factors which had contributed to the instability of the wall, leading to it eventually falling over. These factors included:  long term deterioration of the wall, including the stones and the mortar in between them  long term soil movement which caused the wall to move outward  the wind pressure exerted on the wall during the storm. In his report, MP advised that the manner in which the wall was constructed meant that it had an inherent lack of lateral strength and stability which meant it was incapable of withstanding lateral loadings. MP considered the wall’s capacity to resist win d loadings had diminished over time due to wear and tear and deterioration. He advised that, had the wall been in good condition, the maximum wind speed of 81 km/hr (recorded at the closest weather station) would not have been sufficient to cause it to collapse. FSP’s engineer did not give sufficient regard to strength of winds recorded As an engineer, I accept that MP was appropriately qualified to identify the cause of the damage. As outlined above, MP concluded that the recorded wind speeds during the storm would not have been sufficient to cause the wall to collapse, had it not been for its existing poor condition. In reaching his conclusions, MP relied on the maximum wind gust of 81 km/hr reported for 28 September 2016. He noted that:  this wind gust was the equivalent of a Force 9 Strong/Severe Gale on the Beaufort Wind Scale, which typically causes slight structural damage only Case No: 464969 Determination Page 4 of 6  the wall had withstood several higher wind gusts during the previous few months indicating its eventual collapse was due to its ongoing deterioration. However, I am not satisfied that MP gave sufficient consideration to the strength of the winds experienced during the storm and their likely effect on the applicant’s property. MP’s report refers to a maximum wind gust of 104 km/hr having been recorded on 29 September 2017. MP did not identify at what time this wind gust was recorded. Given the weather data for 29 September 2017 covers the full period of 24 hours (to midnight) on that date, it is quite possible that the maximum wind gust of 104 km/hr occurred in the early hours of the morning. When the applicant lodged her claim at around 9:30am on 29 September 2016, she advised that the wall of her house had fallen down during the storm ‘last night’. She subsequently advised MP during his inspection that she had woken up on 29 September 2016 to find the wall had collapsed. While the FSP recorded the date and time of the damage as 9:00pm on 28 September 2016, it is not clear whether this was the exact time or merely an approximation. The maximum wind gust of 104 km/hr recorded on 29 September 2016 represents a Force 11 Violent Storm on the Beaufort Wind Scale, which is described as being very rarely experienced and capable of causing widespread damage (exceeding the ‘considerable structural damage’ caused by a Force 10 Storm). Neither the FSP nor MP considered the possible effects of a Force 11 wind gust on the applicant’s wall, even when this matter was specifically raised by the applicant in her submissions. FSP has not established exclusions apply The reports provided by the FSP’s contractors (including the photographs contained therein) clearly establish that the wall was in a deteriorated condition prior to the storm. However in order to be entitled to deny the applicant’s clai m, the FSP must establish that, on the balance of probabilities, the condition of the wall was the proximate cause of its collapse. As outlined above, the FSP’s engineer (MP) concluded that a wind gust of 81 km/hr would not have caused the wall to collapse, had it not been in a deteriorated condition. However, MP did not consider the potential effects of the significantly stronger wind gust of 104 km/hr which was recorded on 29 September 2016. It is possible that the wall would have collapsed when subjected to this wind gust, regardless of its pre- existing condition. MP’s conclusion that the ongoing deterioration of the wall had contributed to its collapse was based partly on the fact that the wall had withstood equivalent wind Case No: 464969 Determination Page 5 of 6 gusts during previous months. However, the records relied on by MP do not show that the wind speeds experienced during this period ever exceeded 104 km/hr. In these circumstances, I am not satisfied that the FSP has established that, on the balance of probabilities, the poor condition of the wall was the proximate cause of its collapse. FSP is liable for storm damage to property For the reasons outlined above, the FSP is liable for the damage to the applicant’s property caused by the storm. Accordingly, the FSP is required to settle the claim in accordance with the terms and conditions of the policy. To the extent the claim is cash settled, the FSP is to pay interest on the settlement amount at the rate calculated in accordance with section 57 of the Insurance Contracts Act 1984 (Cth) from 25 November 2016 until the payment date. Case No: 464969 Determination Page 6 of 6 3 Supporting information 3.1 FOS approach to this dispute This determination follows the review of a recommendation provided on behalf of the Financial Ombudsman Service (FOS) on 26 April 2017. The recommendation was rejected by the applicant. This dispute has been determined based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions (which are not binding). There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered (whether or not it is expressly referenced in this determination).

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.