Determination 464925
claim_amount_dispute
Summary
The applicants disputed the $5,000 building excess on a water leak claim, saying a 2013 claim had already fixed the flexi-pipe and the repairs were delayed. AFCA found the applicants had privately arranged the 2013 repair, the claim was new, and the delay was largely caused by access difficulties while they were away, so the excess was payable.
A policy excess applies to a new claim unless the complainant shows the earlier claim covered the same item or the insurer unduly delayed the repair.
Issues
- Claim amount dispute primary · not upheld
“the FSP is entitled to treat the applicants claim as a new and separate event, and apply an excess of $5,000 under the building cover component.”
- Delay secondary · not upheld
“the available information does not show that the FSP unduly delayed in completing the works.”
Subjects and remedies
home or building damageno remedy
Text of the determination
Determination
Case No: 464925 Determination Page 1 of 5
Case number: 464925 5 May 2017
1 Overview
1.1 Dispute
The applicants hold a home insurance policy with the financial services provider
(FSP) which is comprised of building cover and contents cover.
On 7 October 2015, the applicants lodged a claim with the FSP for damage caused
to their home by the escape of liquid from a flexi-pipe in the bathroom vanity.
The FSP applied the excess under the building cover component of the home
insurance policy. The applicants say that they should not be liable to pay the excess
as:
the claim relates to a previous claim made by them in December 2013 in
relation to the same flexi-pipe
the FSP unduly delayed in carrying out the repairs.
1.2 Issues and key findings
Is the FSP entitled to apply the excess?
The applicants have not established that:
the FSP repaired or replaced the flexi-hose under an earlier claim
the FSP unduly delayed in carrying out the repairs.
Accordingly, the FSP is entitled to treat the applicants claim as a new and separate
event, and apply an excess of $5,000 under the building cover component of the
home insurance policy.
1.3 Determination
This determination is in favour of the FSP. The FSP is entitled to apply an excess to
the claim under the building cover component of the home insurance policy.
Case No: 464925 Determination Page 2 of 5
2 Reasons for determination
2.1 Is the FSP entitled to apply the excess?
The policy does not cover the flexi-pipe
The applicants hold a home insurance policy ending xxx9505 with the FSP. The
policy was incepted on 27 August 2002 and has renewed annually.
The policy provides at page 22:
We cover
Loss or damage caused by liquid leaking, overflowing or bursting from any of the following:
……..
- Baths, sinks, toilets and basins
………
However, the policy also provides at page 23 that it does not cover the :
cost of repairing or replacing the item from which the liquid escaped
This means that the applicants‟ policy does not cover the repair or the replacement o f
the flexi-hose in the bathroom vanity.
The available information does not show that the FSP replaced the flexi-pipe
under an earlier claim
The applicants say that the FSP‟s contractors replaced the flexi -pipe in the bathroom
vanity under a previous claim they lodged in December 2013. On this basis they say
that the current claim should be covered by the FSP‟s lifetime repair guarantee and
that they should not be required to pay the excess.
I note that the applicants have not provided any information to support their claim that
the FSP replaced or repaired the flexi-pipe under the earlier claim.
The FSP, however, has provided information to show that it is more likely than not
that the applicants‟ themselves arranged for the repair or replacement of the flexi-
pipe in December 2013. In this regard, the FSP has provided the following
information:
a plumber‟s invoice dated 27 December 2013 addressed to the applicants
which covers the plumbers service fee, as well as “Labour and material to
rectify burst easy hooker under vanity basin”
a plumber‟s report dated 7 January 2014 addressed to the applicants which
confirms that the plumber attended the applicants‟ property on 27 December
2013 and that “remedial repairs were carried out, to rectify problems”.
An email from TBS, the contractor engaged by the FSP to attend to works at the
applicants‟ property in relation to the December 2013 claim , which states that
the applicants engaged its plumber privately to replace the flexi-pipe.
The Builder Repair Quotation from TBS dated 10 March 2014 which did not
provide for any material to be provided by its plumber in relation to the
December 2013 claim.
Case No: 464925 Determination Page 3 of 5
The FSP did not unduly delay in effecting the repairs
The applicants made the claim under the policy by phone on 7 October 2015.
However, the repairs were not completed until October 2016. The applicants say
that when they lodged the claim they stipulated that the repairs needed to be carried
out while their daughter was on holidays in January 2016 as they did not want
tradesmen in the house while their daughter was at work. They say that given the
time taken to complete the works, they should not have to pay the excess.
I have summarised the key interactions between the applicants and the FSP in
section 3.1 of this determination. These interactions show that that:
the applicants were away from the property when the claim was lodged and did
not return until August 2016.
t he FSP‟s contractors experienced difficulties in arranging access to the
property to carry out the repairs.
On 9 June 2016, the applicants requested that the work be completed upon
their return to the property in August.
the repairs commenced in early September 2016 and were completed in
October 2016.
In my view, the available information does not show that the FSP unduly delayed in
completing the works. Rather, it appears that the delay in carrying out the repairs
was largely due to the FSP‟s contractors being unable to gain access to the property
while the applicants were travelling for an extended period of time.
The FSP is entitled to apply the excess
The applicants have not established that:
the FSP repaired or replaced the flexi-hose under an earlier claim
the FSP unduly delayed in completing the repairs.
Accordingly, the FSP is entitled to treat the applicants claim as a new and separate
event, and apply an excess of $5,000 under the building cover component of the
home insurance policy.
Case No: 464925 Determination Page 4 of 5
3 Supporting information
3.1 Key interactions
Date Cont act
7 October 2015 Claim lodged by the applicants.
7 October 2015 FSP engages an emergency assessor (FEN) to attend the property.
8 October 2015 FEN informs the FSP that a builder is urgently required to remove all fibro
sheeting within the walls/ceiling to allow for drying. FEN also informs FSP
that damaged insulation in the walls will need to be removed.
12 October 2015 FSP engages an external assessor.
2 November 2015 FSP allocates the claim for building repairs to a contractor (W).
12 November 2015 FEN contacts FSP noting that it is having difficulty contacting the
applicants‟ daughter.
22 December 2015 FSP authoris es W to proceed with the works.
15 February 2016 W contacts the FSP noting that the cabinets are ready for installation but
they cannot make contact with the applicants.
10 March 2016 FSP attempts to contact the applicants by phone .
10 March 2016 Applicants contact the FSP stating that they are away and to contact their
daughter to arrange for access to the property .
11 March 2016 FSP leaves a message on the applicants‟ daughter‟s mobile.
11 March 2016 The applicants‟ daughter is contacted . The applicants‟ daughter said sh e
would not call W but that W should send her a text message as her mobile
reception is unreliable . She said that the l ast time she heard from W was in
January 2016 when they said that they wanted to remove the vanity but she
refused.
17 May 201 6 W contacts the FSP noting that they have still been unable to gain access
to the property to effect the repairs.
27 May 201 6 Applicants contact the FSP noting that the wor ks have still not been
effected and that they want the works done over the week end. The FSP
told the applicant‟s that the works can only be done Monday through Friday.
The applicants were told that W has been unable to contact their daughter.
The applicants also not e that the builder is „ arguing ‟ about the type of
vanity.
9 June 201 6 Applicants tell the FSP that their daughter was home for 7 weeks in
January and the work was meant to be completed then. They tell the FSP
that they are away and will cont act the FSP when they return in August as it
is too difficult to deal with while they are away.
16 June 2016 FSP sends a message to the applicants asking them to make contact when
Case No: 464925 Determination Page 5 of 5
they have ret urned from holid ay.
16 June 2016 FSP advises W to place the job on hold until the applicants return in
August .
23 August 2016 FSP wrote to the applicants requesting p ayment of the building excess .
FSP requested that W provide it with a scheduled start and finish date fo r
the works.
30 August 2016 Applicants contacted the FSP stating that they should not have to pay the
excess as the claim rela ted to a previous claim they made in December
2013.
31 August 2016 FSP requested a copy of the plumbers report relating to the previous claim .
The Applicants tell the FSP that they have not heard from the builder. FSP
contacted W and asked them to contact the applicants.
7 September 2016 W contacts the FSP noting that works are now proceeding and provides an
updated variation. FSP confirmed to proceed with updated variation.
15 September 2016 FSP leaves a message for the applicants as to the progress of the repairs
and requesting payment of the building excess.
15 September 2016 FSP contacted the applicant s noting that it was continuing to review their
claim.
10 October 2016 FSP emailed the applicants requesting payment of the building excess .
14 October 2016 FSP receives an email from the applicants noting the repairs are still
incomplet e and noting that they should be liable to pay the excess.
17 October 2016 Applicants lodge a complaint with the FSP.
18 October 2016 FSP spoke to the applicants and said it would follow up with TBS in relati on
to whether it repaired/replaced the flexi - pipe in 2013/2014.
21 October 2016 FSP spoke with the applicant and noted that TBS did not replace/repair the
flexi - pipe in 2013/2014 and that the excess will not be waived.
31 October 2016 W submits invoice to FSP for works and payment is approved by the FSP.
3 November 2016 FSP pays W‟s invoice .