Home / Financial Firm (Unknown - Insurer) / Determination 464613
Determination 464613
Water damage claim denied under strata policy
Summary
A strata body corporate claimed for water damage to wall frames caused by incorrectly installed roof flashing, and the FSP denied the claim. AFCA found the resultant water damage covered but not the cost of rectifying the flashing.
The resultant damage was accidental and the rot, gradual deterioration and latent defect exclusions did not apply, but the policy excludes the cost of rectifying faulty workmanship.
Issues
- Claim denial primary · upheld“FSP has not shown the resultant water ingress damage is excluded from cover under the policy.”
- Repairs or contractors secondary · not upheld“Policy excludes the cost of rectifying faulty or defective materials or workmanship, so flashing rectification is not payable.”
Subjects and remedies
home or building damagepay claimpay interest
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Determination
Case No: 464613 Determination Page 1 of 7
Case number: 464613 10 November 2017
1 Overview
1.1 Dispute
The applicant lodged a water damage claim under a strata insurance policy held with
the financial services provider (FSP).
The FSP denied the claim saying the applicant has been unable to establish a valid
claim under the policy, and the damage claimed was otherwise excluded from cover.
The applicant disagrees with the FSP’s decision and expects it to honour the claim.
1.2 Issues and key findings
Has the applicant established a valid claim?
The applicant has established a valid claim under the policy because:
the policy provides cover for accidental damage
the damage was unforeseen and unintended and so accidental for the purpose
of the policy.
Has the FSP established the damage claimed is excluded from cover?
The FSP has shown the roof flashing issues were a result of faulty workmanship, and
so associated rectification costs excluded from cover under the policy.
However, the FSP has not shown the resultant water ingress damage is excluded
from cover under the policy because:
the rot and associated deterioration resulted from the water ingress, and so is
an effect (as opposed to a cause) of the damage claimed
the roof flashing issues were visible upon examination, and so the damage not
resulting from a latent defect for the purpose of the policy.
1.3 Determination
This determination is substantially in favour of the applicant.
The FSP is liable to indemnify the applicant for the resultant water ingress damage,
but not the cost to rectify the roof flashing issues.
Payment should be made within 21 days of receiving a copy of the repair invoice for
the resultant damage and confirmation of the date the invoice was paid.
Interest is payable on this amount in accordance with section 57 of the Insurance
Contracts Acts 1984 from the date the invoice was paid to the date the FSP makes
payment to the applicant.
Case No: 464613 Determination Page 2 of 7
2 Reasons for determination
2.1 Has the applicant established a valid claim?
The applicant in this dispute is a body corporate represented by its chairman. For
ease of reading, any reference to the applicant includes the body corporate and its
representative.
Policy provides accidental damage cover subject to exclusions
The applicant’s policy provides co ver for accidental damage subject to various
exclusions outlined in the policy.
The term accidental is not defined in the policy, but is generally accepted to mean
unforeseen and unintended.
The initial onus lies with the applicant to establish a valid claim under the policy.
Therefore, it needs to be shown that the damage claimed was unforeseen and
unintended for the purpose of the policy.
If established, the responsibility then passes to the FSP to show why it may
otherwise be entitled to deny the claim, such as the application of any policy
exclusions.
No dispute the units have suffered damage
There is no dispute between the parties that two units within the strata complex
suffered water damage, primarily in the form of rotting to some wooden wall frames.
The damage was first identified by a tradesman undertaking unrelated maintenance
works on the roof. He noticed the roof flashing was too short and had not been
installed correctly. Upon further investigation, he found the flashing issues were
allowing water to enter into the building and damage the wall frames.
Repairs have since been undertaken by the applicant.
Damage claimed was accidental for the purpose of the policy
In its IDR decision (which also forms its formal submission to FOS), the FSP
acknowle dges the applicant’s policy provides cover for accidental loss or damage.
However, it says:
… the policy covers accidental loss or damage to the insured property. The term 'accidental'
means sudden and unforeseen. [Appointed experts] have confirmed that the damage occurred
over a long period of time. As a result, we do not consider that the insured has established that
there is an insured event … because the damage was not accidental or sudden.
As stated above, the policy does not provide a definition for the work accidental. In
the absence of such a definition, the word accidental should be given its ordinary and
natural meaning, that being unforeseen and unintended.
It is unclear why the FSP deems accidental to encompass an element of
suddenness. It may be the FSP is relying upon its policy definition for ‘insured
damage’, that being:
Case No: 464613 Determination Page 3 of 7
means sudden and accidental physical loss or damage which occurs during the Period of
Insuranc e
However, this definition encompasses the word accidental as opposed to defining it.
Further, this definition only applies to the machinery breakdown section of the policy.
There is no dispute the damage claimed was unforeseen and unintended by the
applicant. All experts agree there was no visible internal or external damage
associated with the water ingress that could have alerted him to the internal damage
being caused.
Therefore, I am satisfied the damage claimed was accidental for the purpose of the
policy, and so the applicant establishing a valid claim under the policy.
2.2 Has the FSP established the damage is excluded from cover?
No dispute damage resulted from faulty installation of roof flashing
Both parties have provided reports from their appointed experts. These reports are
summarised in Section 3.1 of this determination.
There is agreement between all experts that during construction of the building, the
roof flashing was both of an insufficient length, and installed incorrectly.
As a result, this has allowed water to enter the wall cavity and cause some wooden
wall framing to rot over time, possibly since the building was constructed some 15
years prior.
The damage was only discovered during unrelated roof maintenance works in July
2016.
FSP says damage claimed excluded from cover under the policy
In denying the claim, the FSP relies upon the policy exclusions set out in Section 3.2
of this determination. In essence and in the circumstances of the applicant’s claim,
the policy excludes loss or damage caused by:
gradual deterioration
wet or dry rot
a latent defect.
The policy also excludes costs associated with rectifying faulty or defective materials
or faulty or defective workmanship.
FSP has not established the damage is excluded from cover
With regards to the policy exclusion for rot, there is no dispute the wooden framing
has been damaged in this manner.
However, this rot has only occurred as a result of the water ingress. It is an effect, not
a cause, of the damage. But for the roof flashing issues, the rot (to the extent seen)
would not (on balance) have occurred.
Case No: 464613 Determination Page 4 of 7
Therefore, I am not satisfied this exclusion for rot applies to defeat the applicant’s
claim.
With regards to the policy exclusion for gradual deterioration, FOS takes the
approach that such damage must result from natural deterioration over time.
In this instance, the proximate cause of the deterioration is again the water ingress
and so similar to the rot is an effect, not a cause, of the damage. But for the roof
flashing issues, the deterioration (to the extent seen) would not (on balance) have
occurred.
Therefore, I am not satisfied this exclusion for deterioration applies to defeat the
applicant’s claim.
With regards to the policy exclusion for a latent defect, the policy does not provide a
definition of this term. However, the Macquarie Dictionary provides the following
relevant definitions:
Latent
hidden; concealed; present, but not visible or apparent: latent ability
Latent defect
a hidden defect which could not have been discovered by reasonable examination.
Therefore, to be a latent defect, the defect needs to be:
in existence, but hidden or concealed
unable to be discovered by reasonable examination.
Putting these requirements to the circumstances of the applicant’s claim, it is
reasonable to conclude:
there were existing issues with the flashing, those being its length and how it
was installed
these issues were visible and apparent, and discovered during an examination
of the roof.
On this last point, I note the FSP own builder (AB) confirms the issues could ‘easily
be seen from roof inspection’.
For these reasons, I am not satisfied the issues were a latent defect for the purpose
of the policy, albeit not identified prior to this point in time. They were both visible and
discoverable through examination.
Therefore, I am not satisfied this exclusion for a latent defect applies to defeat the
applicant’s claim.
FSP liable for resultant damage
For the reasons discussed above, I am not satisfied the FSP has established (on
balance) the damage resulting from the water ingress is excluded from cover.
Therefore, the FSP is liable for the costs incurred by the applicant in repairing this
resultant damage.
Case No: 464613 Determination Page 5 of 7
FSP not liable for cost to rectify the roof flashing issues
Whilst deeming the FSP liable for the resultant damage, the policy excludes ‘ the cost
of rectifying faulty or defective materials or faulty or defective workmanship ’.
Therefore, I am not satisfied the FSP is liable for the costs inc urred by the applicant
in rectifying the roof flashing issues themselves.
Applicant to provide a copy of the repair invoice
As stated above, the applicant has rectified the roof flashing issues and repaired the
resultant damage to prevent further loss. In my view, this action was entirely
reasonable in the circumstances.
However, it does not appear a copy of the repair invoice has been provided by the
applicant to date.
Unless I am mistaken on this point, the applicant is required to provide the FSP with
a copy of this invoice, including confirmation of the date the invoice was paid.
If the works were completed by a single contractor and the invoice does not
distinguish between the roof flashing rectification works and the resultant repairs, the
applicant is required to seek an associated breakdown.
Upon receipt of this information, the FSP is required to make payment to the
applicant within 21 days.
Statutory interest is payable on this amount from the date of invoice payment to the
date the FSP makes payment to the applicant.
Case No: 464613 Determination Page 6 of 7
3 Supporting information
3.1 Expert reports
Expert Key points
Applicant’s engineer
(BC)
15 February 2008
BC were engaged to inspect the common areas of the unit
complex due to concerns about building defects prior to the
BSA warranty period ex piring.
The complex was approximately five years old.
Generally the complex has been built to a good standard with
minor defects to common areas and one major defect around
the balcony/column/tiling of units 10 - 12.
More defects could develop over the coming years as the
building ‘settles in’.
Unit one shows no exterior or interior defects. The roof
drainage appears adequate and to standard.
Unit two is also in excellent condition and the comments in
relation to unit one also apply.
There are no id entifiable roof leaks in the common areas.
Applicant’s builder
(LC)
12/14 July 2016
Upon doing some roof repairs and maintenance , it was
identified that the f ront panel of the wall on the first fl oor o f
unit s 1 & 2 had rotted out due to water damage .
The water damage was caused b y the roof flashing not being
long enough , and installed incorrectly.
Repair cost to the wall is $ 3 , 150 ( plus GST) for each unit.
Repair cost to the flashing is $475.
FSP’s claims specialist
(EA)
2 August 2016
The unit complex is approximately 15 years old and
maintained in a clean and tidy condition.
LC advised the issue only affected thes e two units.
There is no visible internal or external damage because the
damage is in the wall cavity at the front of the units.
By default of the presence of rot, the damage is suspected to
have been occurring over an extended period of time,
possibly since construction.
LC’s quotes appear reasonable.
FSP’s builder (AB)
11 August 2016
The units have no visible external or internal resultant
dam age, but have sustained considerable water damage to
the timber frame work to the front gable feature walls either
side of the top windows.
The damage to the framework has been occurring since the
units were constructed.
The valley and gable flashing are t oo short and allowing
water to ingress the framework causing the timber to dec ay
over the years.
The framework will require replacement.
Case No: 464613 Determination Page 7 of 7
3.2 Policy provisions
Exclusions - what we do not insure
1 We will not pay for loss or damage:
…
Wear, Tear … gradual deterioration … wet or dry rot
…
caused by … latent defect
…
2 We will not pay for:
…
the cost of rectifying faulty or defective materials or faulty or defective workmanship
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.