Home / Financial Firm (Unknown - Insurer) / Determination 463817
Determination 463817
Home insurance claim denial for sub-floor damage attributed to long-term ground movement
Summary
The applicant claimed storm damage to his home's sub-floor, footings and cracking. AFCA found the FSP could deny that part of the claim because the damage did not occur within 72 hours of the storm, but ordered reimbursement of the applicant's engineering report cost.
Policy cover for earth movement requires it to occur within 72 hours of a storm, and the expert evidence showed long-term moisture ingress.
Subjects and remedies
home or building damagenatural disasterpay compensation
Text of the determination
Determination
Case No: 463817 Determination Page 1 of 6
Case number: 463817 29 August 2017
1 Overview
1.1 Dispute
This matter involves a claim by the applicant under his Home Insurance Policy, held
with the financial services provider (FSP), following damage to his home and
contents.
The FSP has accepted part of the applicant’s claim but has denied the claim in
regard to damage to the sub floor, footings, any bearers, damage to the joist of the
floor framing and/or internal and external cracking to the building and pathways
caused by long term ground movement.
The panel notes that the applicant has accepted that some of the damage pre-
existed the storm event of 6 June 2016 and he is not making a claim in respect to
that damage.
However, the applicant does claim with regard to repairs to the sub floor area.
1.2 Issues and key findings
Is the FSP required meet the applicant’s claim in respect to repairs for the sub
floor area?
The FSP is not required to meet the applicant’s claim for repairs to th e sub floor area.
The FSP is required to reimburse the applicant for the cost he incurred in obtaining
the report from the engineers JMG.
1.3 Determination
This determination is in favour of the FSP.
The FSP is not required to meet the applicant’s claim for th e repairs to the sub floor
area.
The FSP is required to reimburse the applicant the reasonable cost of the report from
JMG Engineers. The applicant is to provide the FSP with an invoice and receipt, if he
has not already done so.
Case No: 463817 Determination Page 2 of 6
2 Reasons for determination
There has been a full exchange of material between the parties and each party has
had the opportunity of addressing the issues that arise from the material exchanged.
This determination follows consideration of all of the information exchanged and is
based on what is fair in the circumstances, having regard to the relevant legal
principles, terms of the policy, good industry practice and where applicable, prior
determinations.
This dispute has been determined by a panel consisting of the lead Ombudsman
together with a representative with extensive experience in the insurance industry
and a representative with extensive experience in consumer claims.
2.1 Is the FSP required t o meet the applicant’s claim in respect to
repairs to the sub floor area?
Coverage of the policy
The coverage provided by the applicant’s Home Insurance Policy, is in respect to
loss or damage caused directly by a number of insured events which are detailed
within the policy documentation.
This means that not all loss and damage is automatically covered, but rather only
loss and damage caused directly by an insured event which is listed within the policy.
The details of the coverage provided by the policy are contained within the Product
Disclosure Statement (PDS).
The PDS details:
Case No: 463817 Determination Page 3 of 6
…
…
The coverage provided by the policy is subject to exclusions which are detailed within
the PDS.
The PDS details:
…
…
It is accepted insurance law that the insured carries the initial onus to establish that
he has suffered loss and damage which is covered by the terms and conditions of the
policy.
Case No: 463817 Determination Page 4 of 6
The FSP’s obligation to establish an exclusion, only arises once the applicant has
established a claim which is covered by the terms and conditions of the policy.
Circumstances of the loss
The exchanged material confirms that on 6 June 2016 the applicant’s home was
impacted by a significant weather event which also impacted numerous areas within
Tasmania and other parts of Australia.
There is no doubt that the applicant’s home was affected and appropriately the FSP
accepted part of the applicant’s claim.
The FSP has made payment to the applicant in respect to internal floor coverings,
kitchen cabinetry and additional footings (in the event that the floor is to be redone).
The FSP has also paid an amount for a removalist and for temporary
accommodation.
The dispute continues as to the claim for repairs to the sub floor area. The FSP has
denied this aspect of the applicant’s claim.
Expert evidence
In support of his claim, the applicant engaged a builder (BD) who has provided a
report dated 30 September 2016.
BD advised that within the sub-floor area the bases of the internal stumps have
upheaved to an unacceptable level causing serious bowing to the timber floor,
placing pressure on the outside walls.
Further BD advised that the subsoil clay in the area is highly reactive and that
excessive rainwater had found its way in the wall vent and had run underneath the
dwelling.
Following inspection BD noted that the swelling has since subsided somewhat but
the floor framework is still in the elevated position and the timber stumps are now
loose and not doing their job of supporting the floor frame.
In BD’s view, the only remedial act ion is to remove the timber floor and framework
and replace the concrete bases which are upheaved and install new bases down to
about 800mm deep where the plasticity rate of the clay rate is dramatically reduced.
Once this work is completed, the floor framework needs to be installed and the floor
reinstated.
The applicant also engaged an engineer (JMG) who provided a report dated 18
August 2016, which attaches a number of helpful photographs.
Following inspection JMG reported that it was reasonable to conclude that the
extreme rain event caused stormwater to flow overland downhill to the applicant’s
property, where it partly flowed under the floor and partly entered the rear rooms of
the dwelling.
Case No: 463817 Determination Page 5 of 6
JMG said that this stormwater would have caused damage to the kitchen, bathroom
and living room floors. Floor coverings and furniture sitting on the floors would have
suffered water damage.
The FSP engaged engineers (AL) who inspected the site and provided a report dated
26 July 2016, which attaches a number of helpful photographs.
At inspection, AL noted:
poorly maintained surface water catch drain along the boundary fence
previous issues with illegal discharge of storm water from an adjacent property
evidence of long term moisture ingress to footing adjacent eastern corner of
residence
numerous pre-existing cracks and damage to external walls
evidence of pre-existing differential movement between
kitchen/bathroom/laundry extension and original residence, with previous repair
attempts evident
evidence of long term moisture ingress at construction joint between external
concrete deck and north-eastern external wall of residence
two internal timber bearers beneath lounge/dining room are poorly supported on
timber posts which are not connected to their concrete pad foo tings
gaps evident between underside of bearers and concrete foundation on north-
western elevation, cobwebs and debris evident.
At inspection, AL noted that the only observed dampness in the sub floor void space
was located on the northern corner and north-eastern elevation beneath the concrete
deck.
It was AL ’s opinion that this moisture ingress is due to a combination of factors
including:
the poor construction and drainage of the north-eastern external deck
the poor condition of the north-eastern gutter above the deck
the potential for saturation of soils surrounding the absorption trench system
poor surface drainage at the perimeter of the building and poor subsurface
drainage upslope of the residence.
Further, this combination of factors has likely allo wed for long term moisture ingress
into the sub floor void space which is evidenced by sub floor and external staining to
structural elements.
In conclusion, it was AL’s opinion that a one off heavy rain event, as reported, is
unlikely to cause the observed building movement and that the building movement
has been occurring over a long period of time.
Further, it is likely that the building movement is correlated with the site geology and
the abnormal moisture conditions at the perimeter footings of the residence,
influenced by poor construction and drainage of the deck, poor condition of the gutter
above the deck, potential for saturation surrounding the absorption trench system,
poor surface drainage at the perimeter of the building and poor subsurface drainage
upslope of the residence.
Case No: 463817 Determination Page 6 of 6
Finally, AL advised its opinion that the likely source of the moisture ingress related to
building construction and maintenance issues and not the reported event and the
observed building movement is attributed to a loss of bearing capacity in the soil due
to elevated moisture conditions at localised sections of the building perimeter,
resulting in vertical displacement of the footings.
The exchanged material confirms earth movement at the applicant’s property.
However, the policy only provides coverage in the event of earth movement if it is as
a result of a storm and it occurs no more than 72 hours after the storm.
Whilst the panel accepts that there was a significant volume of water that flowed
through the property, given the observations of AL as to the presence of the internal
and external cracking and previous repair points, the panel accepts that the problems
with the underfloor area are unlikely to be the result of the storm event of 6 June
2016.
Rather, consistent with the views expressed by AL, there has been water ingress
over a long period of time resulting in building movement over a long period of time.
On the basis of the exchanged material, the panel is not satisfied that the damage or
earth movement occurred within the period required by the policy coverage, that is,
no more than 72 hours after the storm event.
The result is that whilst the FSP appropriately accepted some aspects of the
applicant’s claim, it is entitled to deny the balance of the applicant’s claim on the
basis that the applicant has not established earth movement occurring no more than
72 hours after the storm event.
The panel has been assisted in its deliberations by the report from JMG and the FSP
should reimburse the costs incurred by the applicant in obtaining that report, upon
provision by the applicant of a receipt, if he has not already done so.