Determination 463120

Delay in funding $800,000 overdraft

FirmFinancial Firm (Unknown - Credit)
Decided2017-08-25
ProductCredit · Business lending
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$100,000
SourceAFCA PDF

Summary

The applicant company said the FSP unreasonably delayed funding an $800,000 overdraft and misled it about timing. AFCA found the delay was caused by the applicant's unmet funding conditions and ordered no compensation.

The delay was attributable to the applicant's failure to meet conditions of funding, the offer was conditional, and the claimed losses were unsubstantiated.

Issues

Subjects and remedies

small businessno remedy

Related

All Financial Firm (Unknown - Credit) determinations · Find similar determinations

Text of the determination

Determination Case No: 463120 Determination Page 1 of 2 Case number: 463120 25 August 2017 1 Overview 1.1 Dispute The applicant is a company. In early 2016, in its capacity as corporate trustee, it made an application to the financial services provider (FSP) for an $800,000 overdraft. The overdraft was funded on 28 July 2016. The applicant says that:  the FSP unreasonably delayed in its assessment of the overdraft application,  the overdraft should have been available to it by 1 July 2016,  because the overdraft was not available, the applicant suffered loss. FOS provided the parties with a recommendation on the issues in dispute. The recommendation was in favour of the FSP. A copy of the recommendation is attached to this determination. 1.2 Issues and key findings Were the findings of the recommendation correct? The findings contained in the recommendation were correct and are adopted in this determination. Further submissions provided after the recommendation have been considered. Do the applicant’s submissions change the outcome? Further submissions provided after the recommendation have been considered b ut, for the reasons set out in section 2, do not change the outcome of the dispute. 1.3 Determination This determination is in favour of the FSP. The FSP is not required to pay the applicant compensation. Case No: 463120 Determination Page 2 of 2 2 Reasons for determination 2.1 Were the findings in the recommendation correct? I have decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. I have taken into account all the material submitted by the parties, both before and after the recommendation. I am satisfied that the documentation I have relied on has been provided to both parties. I am satisfied that recommendation contains an accurate summary of the dispute, the issues to be determined, any applicable paragraphs of the Terms of Reference and any relevant law. 2.2 Do the applicant’s submissions change the outcome? The applicant rejected the recommendation In rejecting the recommendation, the applicant says the FSP:  should have taken steps in April 2016 to ensure that the description of the security property on its loan documentation matched its description on its title,  should have ensured that the requisite paperwork and settlement issues had been resolved earlier, so that it could have obtained the required clear title to security property well before 1 July 2016, and  made a „without prejudice‟ offer earlier in the dispute, which indicates the FSP believed it made an error. The further submission does not change the outcome The recommendation found that an operative cause of the delay was caused b y the applicant‟s failure to meet a condition that it provide copies of account statements. The applicant‟s further submission s therefore do not provide a basis to depart from this finding. Finally, an early offer to resolve a dispute on a „without prejudice‟ basis does not mean that the FSP is bound by that offer, should the matter not settle. Nor does the making of such an offer establish that the FSP had, in fact, made an error. Recommendation Case No: 463120 Recommendation Page 1 of 12 Case number: 463120 28 June 2017 3 Overview 3.1 Dispute The applicant is a company. In early 2016, in its capacity as corporate trustee, it made an application to the financial services provider (FSP) for an $800,000 overdraft. The overdraft was funded on 28 July 2016. The applicant says that the FSP unreasonably delayed in its assessment of the overdraft application, and that the overdraft should have been available to it by 1 July 2016. It says it contacted the FSP on many occasions to emphasise the importance of having the facility funded by that date. The applicant says it has incurred a loss, because as a result of the FSP‟s delay:  it had to seek more expensive credit, and  it lost the opportunity to obtain more business revenue. It seeks compensation of at least $100,000 from the FSP. 3.2 Issues and key findings Did the FSP unreasonably delay in assessing the application? The delay in finalisation of the overdraft was due to both:  the applicant‟ s failure to meet the conditions of funding, and  the FSP‟s decision to re -issue its letter of offer to correctly describe its security consistent with the relevant title documents, which it was entitled to do. The delays were not caused by the FSP or were not unreasonable. Did the FSP mislead the applicant into believing the facility would be funded before 1 July 2016? The available information does not establish that the FSP misled the applicant to believe that the loan would be funded before 1 July 2016. Is the applicant entitled to be compensated? It is not established that the FSP erred in unreasonably delaying the funding of the overdraft. In any event, the applicant has not substantiated its claim for loss. Case No: 463120 Recommendation Page 2 of 12 3.3 Recommendation This recommendation is in favour of the FSP. It is not required to pay compensation to the applicant. Case No: 463120 Recommendation Page 3 of 12 4 Reasons for recommendation 4.1 Did the FSP unreasonably delay in assessing the application? FOS can consider a claim of unreasonable delay FOS cannot review a financial services provid er‟s assessment of the credit risk posed by lending, or the security to be required for a loan. However, FOS can consider a dispute about maladministration in lending, loan management, or security matters. FOS can therefore consider whether a financial services provider unreasonably delayed in assessing an application for credit. Any delay up to 27 June 2016 was caused by the applicant A detailed history of the correspondence between the FSP and applicant is set out in section 3.1 of this recommendation. T he reason the overdraft was not funded up to 27 June 2016 was the applicant‟s failure to meet two conditions of funding, being:  to provide documents to enable the FSP to take a registered first mortgage over a security property, and  to provide account stat ements for existing loans held by one of the applicant‟s directors, Mr J. Specifically, the FSP‟s letter of offer of 22 June 2016 disclosed that it was to take a registered first mortgage over a property owned by one of the applicant‟s directors as security for the overdraft. On 27 June 2016, the applicant provided documentation to the FSP showing clear title to the property. The applicant has not demonstrated that those documents were provided to the FSP earlier than that date. The FSP‟s letter of offer al so contained a condition of funding that the applicant was to provide account statements for three loans in the name of Mr J, covering the most recent three months. The applicant did not provide documents in relation to those loans until 27 June 2016, and what it provided at that time was incomplete and insufficient. Accordingly, the FSP is not liable for any delays caused up to 27 June 2016. It was reasonable for the FSP to reissue the letter of offer after 27 June 2016 The FSP‟s conditional letter of off er of 22 June 2016 provided that it would take a registered first mortgage over a property at Unit 402, 4 -6 B** Place, as security for the loan. After receiving the title documents from the applicant on 27 June 2016, the FSP noted that the property was described on the title as Lots 22 and 54 in Strata Plan 262, 4-6 B** Place. This was different to the description of the property in the letter of offer. The FSP says that it initially described the property as being Unit 402, having relied on information Mr J had previously provided to the FSP. It is understandable that Mr Case No: 463120 Recommendation Page 4 of 12 J described the property in that way, because a Google search shows that the description of the property as Unit 402 is an acceptable postal address for the property. Regardless, the FSP was entitled to ensure that the security was accurately described before funding the overdraft. It was therefore entitled to correct the letter of offer by redescribing the security consistent with the Certificate of Title. It made this correction by issuing a new letter of offer on 11 July 2016 and requiring the applicant to sign it. The new letter of offer was signed on 14 July 2016. It is also reasonable to allow the FSP one business day to process this documentation. Accordingly the delay between 27 June 2016 and 15 July 2016 was not unreasonable. The FSP did not err in failing to fund the overdraft in this period. The delay up to 27 July 2016 was caused by the applicant After the new letter of offer was returned on 15 July 2016, the information establishes that the facility remained unfunded for two reasons:  the applicant had not met the requirements to provide copies of Mr J‟s loan statements for the relevant period, and  the FSP was waiting on the return of legal advice in relation to lending to the trust. In its letter of offer of 11 July 2016, the FSP had repeated that a condition of funding was for the applicant to supply three months‟ worth of account statements for the loans held by Mr J. The only relevant documents the applicant had provided in relation to these loans were provided on 27 June 2016, and were:  Statement for Bank M investment loan **7969 for the period 27 May 2015 to 30 June 2015.  Statement for Bank M investment loan **7113 for the period 20 May 2015 to 30 June 2015.  “Account details” f or Bank S residential loan **2600 for the period 17 January 2016 to 17 June 2016. The Bank M statements did not span a three month period and were not current. The Bank S document was not an account statement and did not name the borrower. The applicant has not provided any information to establish that it ever provided documents that satisfied this condition of funding. The FSP‟s file notes indicate that:  On 15 July 2016, it had noted that the required statements had not been provided.  On 25 July 2016, it noted that it was waiting on the information from the applicant.  On 27 July 2016, the FSP decided to waive the condition. Given this, the FSP was not responsible for the delay up to 27 July 2016. Rather, the cause of the delay was the failure of the applicant to meet a condition of funding. As the FSP made the overdraft available on 28 July 2016, it did not cause an unreasonable delay. Case No: 463120 Recommendation Page 5 of 12 4.2 Did the FSP mislead the applicant into believing the facility would be funded before 1 July 2016? Misleading conduct A financial services provider must not engage in misleading or deceptive conduct. To establish misleading or deceptive conduct, an applicant must show:  the provider made a representation that was false or misleading, or was likely to be false or misleading,  the applicant acted in reliance on the representation, and  in relying on the representation, the applicant suffered loss. The letter of offer was not misleading The applicant says that the letter of offer of 22 June 2016 was a promise of funding that the FSP failed to meet. However, the offer was clearly conditional, and the applicant never met all of the conditions. The overdraft was only funded because the FSP later waived one of the conditions. The letter of offer did not misrepresent that the FSP would fund the overdraft by 1 July 2016. The applicant says it was misled in conversation The applicant also says that:  it contacted the FSP on many occasions in June and July 2016 to ask why the overdraft had not been funded, and to emphasise the importance of funding the facility by 1 July 2016, and  the FSP‟s Ms H specifically guaranteed that the overdraft “would be approved before June 30”. On the balance of probabilities, the FSP did not mislead the applicant In support of its claim, the applicant provided copies of call logs that show it called the FSP on various occasions. However, the applicant‟s director has not provided a statement of recollection or any supporting documentation that sets out what was discussed in those calls, or what messages were left. Nor has the applicant provided details of the date and manner in which Ms H is said to have promised approval. The FSP says it has provided copies of all correspondence between it and the applicant and also provided comments from Ms H, who says:  the applicant did emphasise the importance of getting funding by 1 July 2016,  however, she never promised a date by which the overdraft would be approved, and  while at one point, the FSP‟s branch advised an incorrect timeframe, Ms H corrected the misinformation. Ms H did not detail the dates such conversations occurred. The copies of the written correspondence and the FSP‟s systems notes are silent on the promise of funding by a certain date, and are also silent on the applicant‟s expectations or desire to have the overdraft funded by 1 July 2016. Case No: 463120 Recommendation Page 6 of 12 The applicant and FSP have therefore provided conflicting accounts as to whether any assurance was given regarding the date of funding. On balance, the available information supports a conclusion that the FSP did not mislead the applicant for the following reasons. First, as part of its investigation, FOS asked the applicant whether the FSP ever guaranteed that the overdraft would be approved by a certain date or in a specific timeframe, and if so, how and when the FSP made that assurance. The applicant responded by referring to the letter of offer of 22 June 2016, which was signed on behalf of the FSP by Ms H. For the reasons above, this letter was not misleading. Further, the applicant has not claimed that it relied on any information given to it by the FSP‟s branch staff to its detriment. Finally, the applicant said that it contacted the FSP on many occasions, but that its efforts “fell on deaf ears”. This makes it unlikely that the FSP misled the applicant. The applica nt‟s directors were evidently concerned about getting the overdraft funded when they needed it. Their repeated calls to the FSP indicate that they were aware of the possibility that the FSP would not fund the overdraft by the date they wanted. It does not indicate that the FSP caused the applicants to believe the overdraft would be funded. 4.3 Is the applicant entitled to be compensated? The applicant claims the delay caused financial loss To establish a claim for financial loss, the loss must be substantiated, as opposed to being speculative, and the loss must be sufficiently connected to the breach or error of the financial services provider. If the financial loss is established, FOS will also consider whether the loss is direct or consequential. The applican t says the FSP‟s delay caused it the following losses:  It was forced to obtain short-term finance of $461,000 from sources outside the FSP, on more expensive terms.  It was denied the opportunity to obtain further revenue (approximately $100,000 to $230,000) because: o it was only able to provide a partial service to a number of its customers, and o some of its prospective customers decided not to engage the applicant‟s services. The applicant claims it began to suffer these losses on 1 July 2016, when the overdraft remained unfunded. However, for the reasons set out above, the FSP is not responsible for the delay in funding the overdraft. However, even if an error on the part of the FSP was established (which it is not), the applicant has not established it incurred a financial loss. The short term finance was obtained between 30 June and 8 July 2016 The applicant says that it obtained finance of $461,000, paid into the account between 30 June 2016 and 8 July 2016. Case No: 463120 Recommendation Page 7 of 12 However, the applicant has not provided any doc umentary information to establish the cost it paid to borrow this amount. It has provided an extract from what appears to be a ledger showing that it paid $5,775 of interest on “loans”, but this document does not establish what loans the payment relates to, nor does it show when and how the amount was paid. Its claim for loss in relation to the short term finance has not been substantiated. There is insufficient information to substantiate loss of business opportunity The applicant describes its business as follows:  It runs an accounting business that prepares tax returns for customers.  It provides its customers with the value of their estimated tax return “on the spot” in return for the business receiving the refund from the Australian Taxation Office (ATO) later.  It charges a fee that depends on the value of the return. The applicant says:  Without the overdraft facility, it could only offer some of its customers partial payments “on the spot”. As the fees it charges depends on the size of the “on the spot” payment, it lost the opportunity to charge more fees.  It saw 2,082 clients in the month of July, and it lost the opportunity to take revenue of around $231,000.  Some of its prospective customers also chose not to use the applicant‟s service because it coul d only promise a partial refund “on the spot”. It provided a partial extract from a ledger showing the number of clients it saw in July 2015 and July 2016, as well as the fees it took. However, this information does not form a sufficient basis to award compensation for loss. This is because:  The applicant has not provided information to establish how many specific customers to which they gave partial refunds, and the total size of those partial refunds.  The applicant has claimed for losses incurred throug hout July 2016, however has not explained why its loss of business opportunity extended to periods where it had received $461,000 in external funding (as at 8 July 2016) and a temporary overdraft with a limit of $200,000 on 8 July 2016, increasing to $800,000 on 22 July 2016. In any event, the claimed loss is consequential Had the claim for loss had been substantiated or shown to be caused by the FSP‟s delay, the applicant would face a further difficulty, because its claimed losses are consequential, and su bject to FOS‟s compensation cap of $3,300. This is discussed further in section 3.4 of this recommendation. The FSP provided a temporary excess at a lower rate The FSP provided a temporary excess of $200,000 on 8 July 2016, increasing to $800,000 on 22 July 2016. The cost of the excess was interest of 13.94% p.a. The Case No: 463120 Recommendation Page 8 of 12 applicant used the excess on six days, and for this use, the FSP charged interest of $425.99. The temporary excess was on better terms than the overdraft. The relevant calculation is set out in section 3.2. Case No: 463120 Recommendation Page 9 of 12 5 Supporting information 5.1 Timeline of events Date Event 20 A pril 2016 Letter from applicant to FSP, saying that the applicant is seeking to borrow funds. It says that enclosed are 2015 financials for the previous company under which the business operated. 22 April 2016 Ms H emails the applicant saying that the following is required to proceed with an application:  Individual tax returns for financial year ending (FYE) 2015  3 months‟ statements for any non - FSP bank accounts, home loans, cr edit cards, business loans, that must cover the most recent 3 months and include full name, account number, and full transaction history for the period  Personal statement of financial position to be completed by both of the applicant‟s directors  Privacy co nsent forms to be completed by both of the applicant‟s directors 27 April 2016 Applicant sends FSP the following under cover of letter dated 27 April 2016:  Statement of financial position for applicant‟s director, Mr J, showing – o One property loan with Ba nk S o Two property loans with Bank M  Statement of financial position for applicant‟s director, Mr M, showing – o One property loan with Bank W  Account details for Bank S loan **2600 for the period 17.1.16 – 17.4.16, however this is not a formal statement of account and does not include the name/s of the account holder/s  Transaction history for Bank W Business Cheque Account **3999 for the period 17.11.15 – 20.4.16  Transaction history for Bank W Cash Account **7970 for the period 31.12.14 – 31.3.16  Signed priv acy consent forms  Individual tax return for Mr J for FYE 2015  Trust tax return for “J” Family Trust for FYE 2015 5 May 2016 Ms H emails the applicant asking for the following before the application could proceed:  Trust deed for “TK” Trust  Individual tax r eturns for FYE 2014, 2015 and Notices of Case No: 463120 Recommendation Page 10 of 12 Assessment, assets and liabilities statement, and copies of any non - FSP loans for the most recent three months, for Mr M  Individual tax return for FYE 2015 and Notice of Assessment, assets and liabilities statement, and copies of any non - FSP loans for the most recent three months, for Mr J  12 months‟ statements for the overdraft account the applicant held with Bank S  Trust tax return for FYE 2015 for “J” Family Trust  Current ATO portals 18 May 2016 Applicant provides Notices of Assessment for Mr M for FYE 2014 and 2015. 1 June 2016 FSP emails applicant saying that it is still awaiting the trust deed for “TK” Trust. It says it is unable to submit the loan application for assessment until this is provided. 8 J une 2016 The applicant emails Ms H to say that “as [Bank S has] an overdraft in place, a settlement between Banks will be required – this needs to be attended to ASAP”. 8 June 2016 Ms H says that the applicant must organise for Bank S‟s mortgage over the B** Place property to be discharged to allow the FSP to take its registered first mortgage. 20 June 2016 Proposed product changed in FSP‟s system from business loan to overdraft. 22 June 2016 FSP issues letter of offer to the applicant. 27 June 2016 App licant provides the following to the FSP:  Account transaction history for Bank S account **6839 for the period 31.3.16 – 1.6.16  Account statements for Bank S account **6839 (containing an overdraft of $800,000) for the period 27.6.15 – 6.5.16.  Account statement for Bank M loan **7969 in the name of Mr J for the period 27.5.15 – 30.6.15.  Account statement for Bank M loan **7113 in the name of Mr J for the period 20.5.15 – 30.6.15.  Account transaction history for Bank S account **2600 for the peri od 17.1.16 – 17.6.16, borrower not shown FSP says Certificate of Title and discharge documents received for B** Place property also received. 8 July 2016 FSP provides a $200,000 temporary excess on the account. 11 July 2016 FSP provides new letter of off er to applicant. Case No: 463120 Recommendation Page 11 of 12 12 July 2016 FSP increases the temporary excess to $500,000. 14 July 2016 New letter of offer signed by the applicant‟s directors. 22 July 2016 FSP increases the temporary excess to $800,000. 27 July 2016 FSP receives legal advice from its lawyer in relation to lending to the trustee. It refers to having received the request for advice on 13 July 2016. 28 July 2016 Overdraft funded. 5.2 The temporary excess was less expensive The cost of the FSP‟s temporary excess was 13.94% p.a. The FSP charged a total of $425.99 for use of the temporary excess from 11 July 2016 onwards. The cost of the overdraft was 6.76% p.a. interest on drawings of the overdraft, with a 1.12% p.a. line fee on the limit of $800,000. Overdraft interest is calculated by applying the daily rate (6.76%/365) on the closing balance. The line fee is calculated by applying the daily rate (1.12%/365) to the limit of $800,000 (or the balance of the account, if it exceeds the limit). Between 1 July 2016 and 31 July 2016, the account was in debit at the end of these days: Date Closing balance Overdraft intere st at 6.76% 11 July 2016 - $90,573.17 $16.77 12 July 2016 - $200,508.17 $37.14 13 July 2016 - $310,614.17 $57.53 14 July 2016 - $421,110.48 $77.99 21 July 2016 - $66,705.57 $12.35 27 July 2016 - $27,421.18 $5.08 TOTAL $206.86 Had the account been funded from the overdraft instead, the FSP would have been entitled to charge a line fee of $490.96 for the period (20 days) and interest of $206.86, totalling $697.82. As the FSP charged $425.99 under the temporary excess, the applicant has not incurred a loss in this regard. 5.3 Fees charged The applicant also complained about a number of fees charged under the overdraft, including:  Account establishment fee of $4,650 Case No: 463120 Recommendation Page 12 of 12  Overdraft line fees totaling $5,302.34 charged between September 2016 and March 2017. The basis of the complaint in relation to the fees was that the FSP should not have charged them, given it delayed in approving the overdraft. As the fees would have been charged in any event, the FSP is not required to refund the fees. 5.4 Other issues in relation to the applicant’s claim for loss Consequential loss When a claim for financial loss is established, FOS can award compensation for that loss. Per claim, FOS can award a maximum of $309,000 for direct financial loss, and $3,300 for consequential financial loss. A dispute may incorporate multiple claims. Consequential losses are anything beyond the normal measure, such as profits lost or expenses incurred through breach, while losses in the normal measure are those that that would be suffered by any person in a like situation. The applicant‟s claimed losses are all consequential, and if they had been substantiated and linked to the FSP‟s delay, would be subject to FOS‟s compensation cap of $3,300.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.