Text of the determination
Determination
Case No: 462909 Determination Page 1 of 8
Case number: 462909 30 May 2018
1 Overview
1.1 Dispute
In October 2011, the applicants lodged a claim with the financial services provider
(FSP) for storm damage to the property. The claim was accepted. The FSP’s builder
(L) carried out rectification works to the property which included replacement of the
flooring. The FSP completed the repairs in December 2012.
In February 2013, the applicants noticed the floor had started to ripple, and there
were gaps appearing between the floor and kickboards. On investigation, the FSP
determined there were several possible causes for the damage to the new floor.
Ultimately, the FSP decided to decline the new damage on the basis an insured
event had not taken place, and also because the applicants had not attended to the
identified drainage works on the property.
The applicants disagree, and say the damage to the replacement flooring was the
result of poor rectification work by L. They also dispute there was a ny conversation
with the FSP regarding the need for them to undertake drainage works.
The applicants are seeking the FSP cover the cost of the replacement flooring. They
are also seeking reimbursement for the costs of the drainage works, the expert
reports, their legal fees, storage and interest.
1.2 Issues and key findings
Is the FSP liable to restore the flooring?
The FSP is liable to restore the flooring because:
the FSP was aware of various drainage and subfloor issues that may affect the
flooring
the FSP laid the new floor without ensuring these issues were addressed
the evidence shows these issues were the cause of the new flooring being
damaged shortly after
The FSP is therefore liable to reimburse the applicants’ costs to restore the flooring
previously laid by the FSP.
Is the FSP liable for drainage and subfloor issues?
The FSP is not liable for these costs because they were either pre-existing issues or
resulting from matters excluded by the policy.
Case No: 462909 Determination Page 2 of 8
Are the applicants entitled to legal fees, expert reports and storage costs?
The policy covers costs for storage. As such the FSP must pay the applicants’ costs
for the period they were unable to live in their home whilst the floor was being
replaced. The FSP is not obligated to pay for storage for any period of time the
applicant could not live in their home due to the rectification of the drainage and
subfloor issues.
The applicants are not entitled to legal costs as the dispute did not raise any complex
legal matters for consideration.
The applicants are entitled to the report costs they obtained as it assisted their
position. This is subject to those report fees not exceeding $3,000 and the applicants
providing invoices in support.
1.3 Determination
This determination is substantially in favour of the applicants.
The FSP is required to pay the applicants for the costs incurred to restore the
flooring. The FSP is also liable to pay interest on this amount from 18 April 2016 to
date of payment, in accordance with Section 57 of the Insurance Contracts Act 1984
The FSP is required to reimburse the applicants’ storage fees totalling $2,607. This
sum represents three months of storage costs as well as the costs of removing and
returning goods.
The FSP should reimburse the applicants’ expert report costs subje ct to the
applicants providing invoices in support. The amount payable for each report cost is
not to exceed $3,000.
The FSP is not required to pay costs relating to drainage or subfloor works or legal
costs.
Case No: 462909 Determination Page 3 of 8
2 Reasons for determination
2.1 Is the FSP liable to restore the new flooring?
The following facts are not in dispute
In October 2011 the applicants lodged a claim for storm damage to the property
The claim was accepted by the FSP
Between April 2012 and October 2012 the FSP assessed the property and
conducted various investigations into the cause of the water ingress
By December 2012 the FSP laid the new flooring and the applicants returned to
the property
In February 2013, the applicants noticed problems with the new floor
Between February 2013 and December 2014 the FSP considered whether it
was liable for damage to the new flooring
In December 2014, the FSP formally declined the applicants’ claim for the
damage to the new flooring
FSP replaced the flooring without applicants addressing various issues
The policy says the FSP will do the following when accepting a claim:
“At our option, we will:
a. repair or rebuild the damaged part of your building to the same condition as when it
was new; or
b. pay you the reasonable cost of repairing or rebuilding any damaged part of your
building to the same condition as when it was new; or
c. pay you up to the amount of the sum insured
It is clear that when exercising a discretion under the policy, the FSP must act
reasonably and fairly.
Prior to installing the flooring, the FSP had engaged two builders (P and L) and an
engineer (JJ) to consider the issue. An experienced loss adjuster (VD) was engaged
to assist the FSP in managing the claim.
P recommended drainage issues in the east courtyard be addressed, subfloor fans
be installed to improve ventilation and works to the underground water tank.
JJ also recommended that a surface drain be provided to the east courtyard and:
a possible mechanical sub-floor ventilation system be installed
a check of the underground stormwater tank
VD’s statutory declaration said she recommended to the male applicant the
underground stormwater tank be investigated and mechanical subfloor ventilation be
installed.
Based on all this, the evidence clearly sho ws the FSP and VD were aware of these
issues prior to replacing the flooring. However, it is clear they had not been
addressed before the flooring was replaced.
It appeared this was due to L, being the builder who replaced the flooring, identifying
various drainage issues after the old flooring was removed. The issues identified by L
Case No: 462909 Determination Page 4 of 8
did not include the underground stormwater tank or installing a mechanical subfloor
ventilation system.
There is no dispute the applicants addressed L’s concerns following whi ch, the
flooring was replaced. This was set out in L’s report dated 12 October 2012.
Experts say new flooring affected by poor subfloor ventilation
Subsequent to the new flooring being damaged, various investigations were
undertaken by numerous experts. Their evidence noted the following:
NC said that the problem is likely due to inadequate subfloor ventilation
IP said external ground levels to south (rear) and east side of the home, as well
as inadequate subfloor ventilation, has resulted in the damage
CW said there was excess moisture entering the subfloor from the east side
and there was inadequate subfloor ventilation. CW also said:
“The writer concurs wit h [JJ] and [P] that sub -floor ventilation was poor and the writer suggests
this should have been addressed prior to installation of replacement flooring.”
TN said the damage was due to subfloor drainage problems and lack of
adequate subfloor ventilation
MC, who repaired the property, said:
“… the main cause of the sub - floor dampness … was predominant ly as a result of the
malfunctioning under-ground stormwater tank in the back- yard. … The moisture was
compounded by poor ventilation of the sub -floor, the temperat ure control unit under the
staircase and some surface flow of water from the light-well on the Eastern boundary of the
property.”
MC’s evidence is particularly persuasive given they were best placed to inspect the
extent of subfloor moisture and the underground storage tank when repairing the
property.
When considering the weight of this evidence , the consistent theme is the damage to
the new flooring is associated with the underground storage tank, lack of subfloor
ventilation and other drainage issues along the east side.
These issues were identified by P and JJ. VD was aware of them and brought it to
the applicants’ attention. However, despite being aware the applicants had not
addressed all these issues, the FSP agreed to replace the flooring. The evidence
shows that within a couple of months, the new flooring was affected by these issues.
Give n this background, the panel does not accept the FSP’s decision to replace the
flooring was reasonable in the circumstances. Further, the panel accepts the FSP’s
decision materially prejudiced the applicants. This is because the applicants were
effectively required to replace the new flooring shortly after its installation. In effect,
the applicants received no benefit from their insurance claim as a result of this.
Therefore, the panel believe it is fair in the circumstances the FSP reimburse the
applicants for the cost of restoring the floor. The FSP should also pay interest on this
amount, pursuant to Section 57 of the Insurance Contracts Act, from the date the
applicants incurred this cost until payment is made.
Case No: 462909 Determination Page 5 of 8
2.2 Is the FSP liable for drainage and subfloor issues?
Repair of drainage issues not within the scope of cover
Part of the applicants’ claim included the costs of addressing the drainage and
subfloor investigation. The applicants say that as the FSP was prepared to address
structural issues with the lightwell area, it should remedy the drain defects.
The panel does not agree. The evidence does not show that prior to the flooring
being replaced, the FSP was prepared to rectify any drainage issues, inadequate
subfloor ventilation or underground storage concerns.
The policy is also inconsistent with this. It responds to accidental loss or damage that
occurs during the period of insurance. Drainage issues and inadequate subfloor
ventilation were all pre-existing issues prior to the storm. The evidence does not
show they were damaged by the storm.
Regarding the underground storage tank, MC’s evidence is that there was a
malfunctioning overflow pipe that was due to subsidence. The policy excludes
subsidence. Whilst the applicants say this evidence is unclear given it was identified
years after it likely occurred, it is the only opinion available showing how it was
affected. No other expert opinion has been provided to show how this pipe
malfunctioned or whether the circumstances fall within the policy coverage.
Given this, the panel is not satisfied the evidence shows the cost to repair the
underground storage tanks falls within the policy coverage.
The FSP is therefore not liable for any of the costs the applicants incurred to
remediate the property in respect of drainage or subfloor issues.
2.3 Are the applicants entitled to legal fees, expert reports, and storage?
FSP is not liable for the applicants’ legal costs
The applicants’ solicitor has claimed an amount of $15,000 for legal costs.
FOS’s Terms of Referenc e provide that FOS may require an FSP to contribute to an
applicant’s legal costs. However, in doing so, FOS considers whether the dispute
raised legal issues which reasonably required legal advice, the complexity of the
dispute and whether expert assistance was genuinely required.
The issues in dispute were technical ones surrounding the cause of damage to the
flooring after its replacement. The resolution of these issues were based on the
expert opinions provided.
Given this, the Panel does not consider t he submissions provided by the applicants’
solicitors was material to the outcome of this decision. As such, the FSP is not
required to contribute to the applicants’ legal costs.
Case No: 462909 Determination Page 6 of 8
FSP is not liable for the cost of the applicants’ expert reports
The panel agrees the issues in dispute required the assistance of experts. Further,
the applicants’ expert reports did assist them as set out above. Particularly MS’s
opinion.
Given this, the Panel accepts the FSP should contribute to the costs of these reports.
Any payment is subject to a limit of $3,000 per report and the applicants producing
invoices in support.
FSP is liable for applicants’ storage costs for a limited perio d only
The policy allows for storage costs whilst the property cannot be lived in because it is
undergoing repairs as a result of an insured event. However, it is plain that part of the
period claimed by the applicants included remediating the drainage and subfloor
issues surrounding the property.
The FSP is not obligated to pay for storage during this period given they were not
covered under the policy.
The panel notes that when the flooring was replaced by the FSP, the applicants had
to arrange for alternative accommodation for about three months. Given this, the
panel considers it is fair that this be allowed in these circumstances. Therefore, the
FSP is to pay for three months of storage costs as well as the costs of removing and
returning the goods. This totals $2,607 based on the invoices provided.
The FSP is also liable for interest on this amount from date the costs were incurred,
to date of payment, in accordance with Section 57 of the Insurance Contracts Act.
Case No: 462909 Determination Page 7 of 8
3 Supporting information
3.1 FOS approach to the dispute
This case has been decided on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions.
There has been a full exchange of all material information relied on for the purpose of
this determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination commentary has been restricted to those issues which are
considered directly relevant to the outcome only.
3.2 Terms of the policy
Record Key points
Policy Schedule Period of Insurance – 23.08.2011 to 23.08.2012
Our agreement with you
Page 5
We will insure you for
accidental loss or damage, and
the other benefits,
as set out in this policy occurring during the period of insurance
9. Emergency Storage of
Contents
Page 21 – 22
(Applicable only when you have contents cover)
If the buildings you live in at the risk address are damaged by
an event to such an extent they cannot be lived in by you, we
will pay the reasonable costs to move and store your contents
while the buildings are being repaired or rebuilt for a maximum
period of 12 months
Our maximum payment for this benefit will be limited to the
balance of any sum insured remaining after payment of your
claim for the damage to the contents.
19. Removal of debris,
profe ssional fees and
extra costs
Pages 28 - 29
(applicable wh ether you have buildings and/or contents cover)
When the buildings have been destroyed or damaged by an
event covered by this policy and we have agreed to pay your
claim, we will also pay the reas onable and necessary costs of:
a) demolition and removing debr is from your risk address
b) architects’, engineers’, surveyors’ and solicitors’ fees;
and
c) meeting the requirements of any statutory authority
We will only pay these costs if they relate directly to the
destroyed or damaged part of the building and we have a greed
to do so before they are incurred.
Case No: 462909 Determination Page 8 of 8
The maximum combined total amount we will pay under this
benefit…. Is 10% of the sum insured on the buildings plus the
balance of any sum insured remaining after payment of your
claim for damage to buildings.
When we will not pay a
claim under Part A –
Buildings and/or
Contents
Pages 35 - 37
This policy does not cover loss, liability, injury or damage:
…
3. caused by or arising from soil movement including erosion,
landslide. Mudslide or subsidence unless it is directly caused by
and occurs within 72 hours of an:
explosion
earthquake; or
storm
…
10. caused by or arising from water percolating, seeping or
otherwise penet rating into your buildings as a result of:
structural defects
faulty design of the buildings
fa ulty workmanship in the construction of the buildings
your failure to adequately maint ain the buildings
…
12. to the defective part or parts of any fixed apparatus, fixed
tank, fixed pipe or installation from which liquid has escaped
causing loss or damage to your home or contents. Nor will we
pay for the cost of repair or replacement of any broken main
or pipe
…
You are not covered for consequential loss except where we
have stated otherwise in this policy
Part A & B
When we will not pay a
claim under your policy
Pages 40 - 42
1. This policy does not cover loss, liability, injury or damage:
…
g. Inherent defects
caused directly or indirectly through inherent defects, faulty
design, structural defects or poor workmanship
…