Declined claim for damage to replacement flooring

FirmFinancial Firm (Unknown - Insurer)
Decided2018-06-29
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$2,607
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicants' replacement flooring was damaged shortly after the FSP laid it, and the FSP declined the new damage claim. AFCA found the FSP liable to fund the flooring restoration, storage costs of $2,607, interest and expert report costs, but not drainage works or legal fees.

The FSP replaced the flooring without addressing known drainage and subfloor issues, which materially prejudiced the applicants under the policy and Insurance Contracts Act.

Issues

Subjects and remedies

home or building damagepay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 462909 Determination Page 1 of 8 Case number: 462909 30 May 2018 1 Overview 1.1 Dispute In October 2011, the applicants lodged a claim with the financial services provider (FSP) for storm damage to the property. The claim was accepted. The FSP’s builder (L) carried out rectification works to the property which included replacement of the flooring. The FSP completed the repairs in December 2012. In February 2013, the applicants noticed the floor had started to ripple, and there were gaps appearing between the floor and kickboards. On investigation, the FSP determined there were several possible causes for the damage to the new floor. Ultimately, the FSP decided to decline the new damage on the basis an insured event had not taken place, and also because the applicants had not attended to the identified drainage works on the property. The applicants disagree, and say the damage to the replacement flooring was the result of poor rectification work by L. They also dispute there was a ny conversation with the FSP regarding the need for them to undertake drainage works. The applicants are seeking the FSP cover the cost of the replacement flooring. They are also seeking reimbursement for the costs of the drainage works, the expert reports, their legal fees, storage and interest. 1.2 Issues and key findings Is the FSP liable to restore the flooring? The FSP is liable to restore the flooring because:  the FSP was aware of various drainage and subfloor issues that may affect the flooring  the FSP laid the new floor without ensuring these issues were addressed  the evidence shows these issues were the cause of the new flooring being damaged shortly after The FSP is therefore liable to reimburse the applicants’ costs to restore the flooring previously laid by the FSP. Is the FSP liable for drainage and subfloor issues? The FSP is not liable for these costs because they were either pre-existing issues or resulting from matters excluded by the policy. Case No: 462909 Determination Page 2 of 8 Are the applicants entitled to legal fees, expert reports and storage costs? The policy covers costs for storage. As such the FSP must pay the applicants’ costs for the period they were unable to live in their home whilst the floor was being replaced. The FSP is not obligated to pay for storage for any period of time the applicant could not live in their home due to the rectification of the drainage and subfloor issues. The applicants are not entitled to legal costs as the dispute did not raise any complex legal matters for consideration. The applicants are entitled to the report costs they obtained as it assisted their position. This is subject to those report fees not exceeding $3,000 and the applicants providing invoices in support. 1.3 Determination This determination is substantially in favour of the applicants. The FSP is required to pay the applicants for the costs incurred to restore the flooring. The FSP is also liable to pay interest on this amount from 18 April 2016 to date of payment, in accordance with Section 57 of the Insurance Contracts Act 1984 The FSP is required to reimburse the applicants’ storage fees totalling $2,607. This sum represents three months of storage costs as well as the costs of removing and returning goods. The FSP should reimburse the applicants’ expert report costs subje ct to the applicants providing invoices in support. The amount payable for each report cost is not to exceed $3,000. The FSP is not required to pay costs relating to drainage or subfloor works or legal costs. Case No: 462909 Determination Page 3 of 8 2 Reasons for determination 2.1 Is the FSP liable to restore the new flooring? The following facts are not in dispute  In October 2011 the applicants lodged a claim for storm damage to the property  The claim was accepted by the FSP  Between April 2012 and October 2012 the FSP assessed the property and conducted various investigations into the cause of the water ingress  By December 2012 the FSP laid the new flooring and the applicants returned to the property  In February 2013, the applicants noticed problems with the new floor  Between February 2013 and December 2014 the FSP considered whether it was liable for damage to the new flooring  In December 2014, the FSP formally declined the applicants’ claim for the damage to the new flooring FSP replaced the flooring without applicants addressing various issues The policy says the FSP will do the following when accepting a claim: “At our option, we will: a. repair or rebuild the damaged part of your building to the same condition as when it was new; or b. pay you the reasonable cost of repairing or rebuilding any damaged part of your building to the same condition as when it was new; or c. pay you up to the amount of the sum insured It is clear that when exercising a discretion under the policy, the FSP must act reasonably and fairly. Prior to installing the flooring, the FSP had engaged two builders (P and L) and an engineer (JJ) to consider the issue. An experienced loss adjuster (VD) was engaged to assist the FSP in managing the claim. P recommended drainage issues in the east courtyard be addressed, subfloor fans be installed to improve ventilation and works to the underground water tank. JJ also recommended that a surface drain be provided to the east courtyard and:  a possible mechanical sub-floor ventilation system be installed  a check of the underground stormwater tank VD’s statutory declaration said she recommended to the male applicant the underground stormwater tank be investigated and mechanical subfloor ventilation be installed. Based on all this, the evidence clearly sho ws the FSP and VD were aware of these issues prior to replacing the flooring. However, it is clear they had not been addressed before the flooring was replaced. It appeared this was due to L, being the builder who replaced the flooring, identifying various drainage issues after the old flooring was removed. The issues identified by L Case No: 462909 Determination Page 4 of 8 did not include the underground stormwater tank or installing a mechanical subfloor ventilation system. There is no dispute the applicants addressed L’s concerns following whi ch, the flooring was replaced. This was set out in L’s report dated 12 October 2012. Experts say new flooring affected by poor subfloor ventilation Subsequent to the new flooring being damaged, various investigations were undertaken by numerous experts. Their evidence noted the following:  NC said that the problem is likely due to inadequate subfloor ventilation  IP said external ground levels to south (rear) and east side of the home, as well as inadequate subfloor ventilation, has resulted in the damage  CW said there was excess moisture entering the subfloor from the east side and there was inadequate subfloor ventilation. CW also said: “The writer concurs wit h [JJ] and [P] that sub -floor ventilation was poor and the writer suggests this should have been addressed prior to installation of replacement flooring.”  TN said the damage was due to subfloor drainage problems and lack of adequate subfloor ventilation  MC, who repaired the property, said: “… the main cause of the sub - floor dampness … was predominant ly as a result of the malfunctioning under-ground stormwater tank in the back- yard. … The moisture was compounded by poor ventilation of the sub -floor, the temperat ure control unit under the staircase and some surface flow of water from the light-well on the Eastern boundary of the property.” MC’s evidence is particularly persuasive given they were best placed to inspect the extent of subfloor moisture and the underground storage tank when repairing the property. When considering the weight of this evidence , the consistent theme is the damage to the new flooring is associated with the underground storage tank, lack of subfloor ventilation and other drainage issues along the east side. These issues were identified by P and JJ. VD was aware of them and brought it to the applicants’ attention. However, despite being aware the applicants had not addressed all these issues, the FSP agreed to replace the flooring. The evidence shows that within a couple of months, the new flooring was affected by these issues. Give n this background, the panel does not accept the FSP’s decision to replace the flooring was reasonable in the circumstances. Further, the panel accepts the FSP’s decision materially prejudiced the applicants. This is because the applicants were effectively required to replace the new flooring shortly after its installation. In effect, the applicants received no benefit from their insurance claim as a result of this. Therefore, the panel believe it is fair in the circumstances the FSP reimburse the applicants for the cost of restoring the floor. The FSP should also pay interest on this amount, pursuant to Section 57 of the Insurance Contracts Act, from the date the applicants incurred this cost until payment is made. Case No: 462909 Determination Page 5 of 8 2.2 Is the FSP liable for drainage and subfloor issues? Repair of drainage issues not within the scope of cover Part of the applicants’ claim included the costs of addressing the drainage and subfloor investigation. The applicants say that as the FSP was prepared to address structural issues with the lightwell area, it should remedy the drain defects. The panel does not agree. The evidence does not show that prior to the flooring being replaced, the FSP was prepared to rectify any drainage issues, inadequate subfloor ventilation or underground storage concerns. The policy is also inconsistent with this. It responds to accidental loss or damage that occurs during the period of insurance. Drainage issues and inadequate subfloor ventilation were all pre-existing issues prior to the storm. The evidence does not show they were damaged by the storm. Regarding the underground storage tank, MC’s evidence is that there was a malfunctioning overflow pipe that was due to subsidence. The policy excludes subsidence. Whilst the applicants say this evidence is unclear given it was identified years after it likely occurred, it is the only opinion available showing how it was affected. No other expert opinion has been provided to show how this pipe malfunctioned or whether the circumstances fall within the policy coverage. Given this, the panel is not satisfied the evidence shows the cost to repair the underground storage tanks falls within the policy coverage. The FSP is therefore not liable for any of the costs the applicants incurred to remediate the property in respect of drainage or subfloor issues. 2.3 Are the applicants entitled to legal fees, expert reports, and storage? FSP is not liable for the applicants’ legal costs The applicants’ solicitor has claimed an amount of $15,000 for legal costs. FOS’s Terms of Referenc e provide that FOS may require an FSP to contribute to an applicant’s legal costs. However, in doing so, FOS considers whether the dispute raised legal issues which reasonably required legal advice, the complexity of the dispute and whether expert assistance was genuinely required. The issues in dispute were technical ones surrounding the cause of damage to the flooring after its replacement. The resolution of these issues were based on the expert opinions provided. Given this, the Panel does not consider t he submissions provided by the applicants’ solicitors was material to the outcome of this decision. As such, the FSP is not required to contribute to the applicants’ legal costs. Case No: 462909 Determination Page 6 of 8 FSP is not liable for the cost of the applicants’ expert reports The panel agrees the issues in dispute required the assistance of experts. Further, the applicants’ expert reports did assist them as set out above. Particularly MS’s opinion. Given this, the Panel accepts the FSP should contribute to the costs of these reports. Any payment is subject to a limit of $3,000 per report and the applicants producing invoices in support. FSP is liable for applicants’ storage costs for a limited perio d only The policy allows for storage costs whilst the property cannot be lived in because it is undergoing repairs as a result of an insured event. However, it is plain that part of the period claimed by the applicants included remediating the drainage and subfloor issues surrounding the property. The FSP is not obligated to pay for storage during this period given they were not covered under the policy. The panel notes that when the flooring was replaced by the FSP, the applicants had to arrange for alternative accommodation for about three months. Given this, the panel considers it is fair that this be allowed in these circumstances. Therefore, the FSP is to pay for three months of storage costs as well as the costs of removing and returning the goods. This totals $2,607 based on the invoices provided. The FSP is also liable for interest on this amount from date the costs were incurred, to date of payment, in accordance with Section 57 of the Insurance Contracts Act. Case No: 462909 Determination Page 7 of 8 3 Supporting information 3.1 FOS approach to the dispute This case has been decided on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. There has been a full exchange of all material information relied on for the purpose of this determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered. While the parties have raised numerous issues in their submissions, for the purposes of this determination commentary has been restricted to those issues which are considered directly relevant to the outcome only. 3.2 Terms of the policy Record Key points Policy Schedule Period of Insurance – 23.08.2011 to 23.08.2012 Our agreement with you Page 5 We will insure you for accidental loss or damage, and the other benefits, as set out in this policy occurring during the period of insurance 9. Emergency Storage of Contents Page 21 – 22 (Applicable only when you have contents cover) If the buildings you live in at the risk address are damaged by an event to such an extent they cannot be lived in by you, we will pay the reasonable costs to move and store your contents while the buildings are being repaired or rebuilt for a maximum period of 12 months Our maximum payment for this benefit will be limited to the balance of any sum insured remaining after payment of your claim for the damage to the contents. 19. Removal of debris, profe ssional fees and extra costs Pages 28 - 29 (applicable wh ether you have buildings and/or contents cover) When the buildings have been destroyed or damaged by an event covered by this policy and we have agreed to pay your claim, we will also pay the reas onable and necessary costs of: a) demolition and removing debr is from your risk address b) architects’, engineers’, surveyors’ and solicitors’ fees; and c) meeting the requirements of any statutory authority We will only pay these costs if they relate directly to the destroyed or damaged part of the building and we have a greed to do so before they are incurred. Case No: 462909 Determination Page 8 of 8 The maximum combined total amount we will pay under this benefit…. Is 10% of the sum insured on the buildings plus the balance of any sum insured remaining after payment of your claim for damage to buildings. When we will not pay a claim under Part A – Buildings and/or Contents Pages 35 - 37 This policy does not cover loss, liability, injury or damage: … 3. caused by or arising from soil movement including erosion, landslide. Mudslide or subsidence unless it is directly caused by and occurs within 72 hours of an:  explosion  earthquake; or  storm … 10. caused by or arising from water percolating, seeping or otherwise penet rating into your buildings as a result of:  structural defects  faulty design of the buildings  fa ulty workmanship in the construction of the buildings  your failure to adequately maint ain the buildings … 12. to the defective part or parts of any fixed apparatus, fixed tank, fixed pipe or installation from which liquid has escaped causing loss or damage to your home or contents. Nor will we pay for the cost of repair or replacement of any broken main or pipe … You are not covered for consequential loss except where we have stated otherwise in this policy Part A & B When we will not pay a claim under your policy Pages 40 - 42 1. This policy does not cover loss, liability, injury or damage: … g. Inherent defects caused directly or indirectly through inherent defects, faulty design, structural defects or poor workmanship …