Determination 462863

Storm building claim partly declined, cash settlement offer, and policy cancelled and reissued

FirmFinancial Firm (Unknown - Insurer)
Decided2017-06-20
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$293,794
Non-financial loss$6,000
Amount claimed$267,294
SourceAFCA PDF

Summary

After a 1-in-100-year storm damaged their home, the applicants rejected the FSP's $17,788.68 building settlement. AFCA found the storm the proximate cause, ordered a $265,000 cash settlement plus accommodation and expert costs with interest, $6,000 non-financial loss, and expunging of an incorrect cancellation.

The storm was the proximate cause of the damage, and a cash settlement at the sum insured was fair given the relationship between the parties and the risk transfer.

Issues

Subjects and remedies

home or building damagenatural disastercorrect recordspay claimpay compensationpay interestpay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 462863 Determination Page 1 of 9 Case number: 462863 19 June 2017 1 Overview 1.1 Dispute The applicants lodged a claim with the financial services provider (FSP) after their home and contents suffered damage due to a storm. The FSP accepted the claim and paid out the full sum insured for contents. While the FSP’s assessor indicated the building claim should be treated as a total loss, the FSP did not accept all of the damage to the building was related to the storm. It offered to waive the policy excess of $600 and pay the applicants $17,788.68 in settlement of the building claim. The applicants rejected the FSP’s offer and maintained the building should be treated as a total loss due to the storm related damage and subsequent mould infestation. The applicants also seek reimbursement of the cost of expert reports and compensation for the manner in which the FSP handled their claim, including cancelling the policy and issuing a new policy without their authority. 1.2 Issues and key findings Does the FSP’s offer meet its obligations under the policy? The FSP’s offer of settlement does not meet its obligations under the policy because the panel is satisfied, from the material provided, on the balance of probabilities, the proximate cause of all of the damage to the property was the storm event. In the circumstances, on the information provided, the panel is satisfied it is fair in all the circumstances the FSP pay to the applicants the sum insured of $265,000 and 10% of the sum insured to cover accommodation needs while the property is repaired. Was the FSP entitled to cancel the applicants’ policy and create a new one? The FSP was not entitled to cancel the applicants’ policy and create a new one. Whilst the policy allows for the policy to come to an end when the insured property becomes a total loss, at the time the FSP cancelled the policy, it had not agreed to treat the building claim as a total loss. Are the applicants entitled to compensation? The applicants are entitled to compe nsation for non-financial loss pursuant to paragraph 9.3 of the Terms of Reference, in the sum of $3,000 each as, on the information provided, the panel is satisfied the applicants experienced an unusual Case No: 462863 Determination Page 2 of 9 degree of physical inconvenience and time taken to resolve the claim which would have interfered with the applicants’ expectation of enjoyment or peace of mind. The panel is also satisfied the FSP must reimburse the applicants for the cost of expert reports due to the amount of and complexity of the dispute, and the genuine need for expert assistance. 1.3 Determination This determination is in favour of the applicants. Within seven days of acceptance of this determination, the FSP is to make the following payments to the applicants:  $265,000 to repair the property;  $26,500 for temporary accommodation; and  $2,293.70 for the applicants’ expert reports . The FSP is to pay interest on the above amounts (which total $293,793.70) from 3 January 2017 until the date payment is made in accordance with section 57 of the Insurance Contracts Act 1984 (the Act). The FSP is also to pay the applicants $3,000 each ($6,000 in total) as compensation for non-financial loss. As the FSP was not entitled to cancel the policy when it did, the FSP is also to expunge from its records any reference to the policy cancellation on 20 April 2016. Case No: 462863 Determination Page 3 of 9 2 Reasons for determination 2.1 Does the FSP’s offer meet its obligations under the policy ? Applicants have established a prima facie claim The applicants have the onus of establishing, on the balance of probabilities, their claim falls within the terms of the policy. This is called a prima facie claim. Once the applicants have established such a claim, the onus shifts to the FSP to establish the application of an exclusion. The applicants ’ Home and Contents policy is a defined events policy covering a number of insured events including ‘ storm ’, which covers damage caused by :  violent wind or thunderstorm (including a tornado or cyclone)  heavy rain, hail or snow. There is no dispute the applicants’ property suffered damage as a result of severe storm event on 27 January 2016. Accordingly, the applicants have established a prima facie claim. The onus shifts to the FSP to establish the application of any exclusions it wishes to rely upon to deny or limit its liability for the claim. Evidence indicates the proximate cause of the loss was the storm The FSP partially accepted the claim on the basis some o f the damage was due to the storm event. It says the remaining damage, including the mould, was not caused by the storm but arose over time due to a number of factors including poor sub -floor ventilation, drainage problems, ground movement, and lack of maintenance, all of these being causes excluded from cover. The FSP must establish these causes are the proximate cause of the loss or damage. ‘Proximate cause’ is the dominant, effective or operative cause of the loss whether or not that be the last in time or the sole cause. If there are several causes operating contemporaneously, each must be examined for the qualities of reality, predominance and efficiency. If one cause would have caused the harm in any case, and the other would not have done so in the absence of the first, the first is the proximate cause. The FSP’s experts say the cracking damage at the property is a result of long-term surface water ingress into the sub-floor space, combined with the lack of adequate ventilation, resulting in the underlying clay bearing strata moving over the life of the property. However, the panel is not satisfied there is evidence of any significant movement related damage to the property prior to the storm event. The panel has reviewed photographs taken of the property at the time of sale in 2014 which indicate it was in a good, well maintained condition for a property of its age. Furthermore, the panel is not satisfied there is evidence of any pre-storm mould infestation. Case No: 462863 Determination Page 4 of 9 The panel notes the FSP’s own assessor, w ho first inspected the property only a few days after the storm event, noted only one crack in the lounge room when she first inspected the property. On this basis, she concluded in her report (which recommended the property was a total loss) that further cracks had formed since her first attendance and was therefore disinclined to accept the cracking was long- standing. Additionally, when forming their view, the panel considers the FSP’s experts have not taken into sufficient consideration the significant nature of the 1 in 100 year storm event, which was declared by the relevant State government to be a ‘natural disaster’. For example, the FSP’s engineer (IL) noted 44mm of rain fell in a 24 hour period. However, the evidence indicates that amount fell in 90 minutes, causing flash flooding and widespread damage throughout the region. The engineer also refers to long-term surface water ingress into the subfloor space and provides by way of illustration a photograph of a floor stump noting a water level was not visible. The panel however, considers the FSP has taken insufficient account of the applicants’ experts’ opinions to inform its position. In particular, the panel notes the contemporaneous inspection by the applicants’ expert (AC). He said there was clear evidence the stumps had suffered severe recent water damage due to the storm. He noted the soil was still soaked and he noted water stain marks up the stumps. The FSP also claims construction defects with the roof contributed to the loss. However, the applicants’ roofing expert indicated the roof would have been constructed in accordance with the relevant code at the time. Given current codes requires roofs and gutters to meet a 1 in 20 year storm event, the panel is not persuaded the claimed roofing defects were the proximate cause of the loss and damage, in circumstances where a significant amount of rain fell in a short period of time and the storm was classified as a 1 in 100 year storm event. The panel accepts as a result of the storm event water entered in and under the property, and as there was no early intervention, despite evidence of mould growth in the contents, the mould damage continued. Having considered the available evidence, the panel is satisfied the mould infestation, movement damage and water damage at the property arose after and as a direct result of the significant storm event on 27 January 2016. While noting the other issues with the property, the panel is satisfied the storm event was the proximate cause of the claimed damage to the property. Cash settlement of $265,000 is fair in all the circumstances The applicant has provided quotes for the necessary works to repair/remediate the storm damage to the property. The FSP has not challenged the amounts claimed. The panel calculates the total of the quotes is slightly less than the sum insured of $265,000. Case No: 462863 Determination Page 5 of 9 The FSP’s policy allows the FSP to elect whether to repair or rebuild the property or pay the reasonable costs of repairing or rebuilding the property. Having reviewed all the exchanged information, the panel is satisfied the relationship between the parties is such that any ongoing arrangements would be fraught with difficulty and unlikely to resolve the re-build in an efficient and fair manner. In the circumstances, the panel is satisfied it is fair in this particular dispute, that the extent of the FSP’s obligations under the policy be resolved by way of a cash settlement. Having reached this conclusion, the panel acknowledges the risk associated with the repairs will transfer from the FSP to the applicants. In calculating an appropriate cash settlement amount the panel has taken into account all reasonable factors, including the time between the storm event and the FSP’s IDR response, the nature of the repairs required and w hether the cash settlement will adequately ensure the applicants are able to properly complete all repairs and cover all reasonable eventualities. Therefore, the panel is satisfied it is fair in all the circumstances a cash settlement include an allowance for contingencies and variations. Taking all these matters into account, the panel is satisfied it is fair in all the circumstances the FSP cash settle the applicants up to the sum insured of $265,000. No policy excess is to be paid for the building claim The policy schedule states if the applicants make a claim for both building and contents the applicants are obliged to pay only one excess. The panel assumes the applicants paid a policy excess when the contents claim was settled. If not, in view of the FSP’s preparedness to waive the policy excess, the panel considers it is fair in all the circumstances the applicants do not pay a policy excess for the building claim. Fair in all the circumstances $26,500 is paid for temporary accommodation There is no evidence to indicate how long the property will be unliveable as a result of the repair/remediation process. As the applicants have been unable to live in the property for some time already (with only limited temporary accommodation provided by the FSP during that time), the panel considers it is fair in all the circumstances for the FSP to pay the applicants 10% of the sum insured ($26,500) - as allowed under the policy - to cover any accommodation needs whilst the property is under repair/remediation. FSP to pay for expert reports and pay statutory interest on the claim The applicants also claim the cost of expert reports totalling $2,293.70. Pursuant to the Terms of Reference, FOS may decide an FSP contribute to costs incurred by applicants in the course of a dispute. Considering the amount of and complexity of the dispute, and the genuine need for expert assistance, the panel is satisfied it is fair in all the circumstances the FSP pay to the applicants the amount claimed for expert reports. Case No: 462863 Determination Page 6 of 9 The panel is also satisfied it is fair in all the circumstances the FSP pay interest on the total settlement amount ($293,793.70) from 3 January 2017 (the date of the FSP’s IDR decision) until the date payment is made, in accordance with section 57 of the Act. 2.2 Was the FSP entitled to cancel and reissue the policy? Property not declared a total loss when policy cancelled The applicants received correspondence from the FSP dated 20 April 2016 notifying them their policy had been cancelled. The letter stated: ‘…We’d like to confirm that we’ve cancelled your policy effective 20 April 2016 due to the total loss of your home’ Whilst the FSP’s policy allows for cancellation in the event of a total loss, the property had not been declared a total loss, by the FSP, at the time cancellation was effected. In fact, the property was never declared a total loss at any time by the FSP and as such, cancellation of the policy should not have occurred. It appears the FSP subsequently realised its error and reissued the policy, albeit with differing sums insured and without the applicants’ authority. The FSP should expunge any reference to policy cancellation on 20 April 2016 from its records. 2.3 Are the applicants entitled to compensation? FOS can award compensation in certain circumstances Under its Terms of Reference (TOR), FOS may award up to $3,000 for non-financial compensation if an applicant experiences an unusual degree of physical inconvenience, time taken to resolve the situation or interference with the applicant’s expectation of enjoyment or peace of mind. In this case, the applicants have been forced out of their home due to the dangerous levels of mould arising from the storm damage. The FSP was aware of mould issues at the property as early as February 2016 but did little to stop the problem worsening, despite the possible health implications for the applicants and their family. The applicants have been unable to reside at the property for over 12 months and during this time have suffered significant financial difficulty as a result of the need to meet mortgage repayments and fund alternate accommodation and pay for expert reports. They also lost a number of animals, who perished as a result of having to be left behind. The panel is satisfied the applicants have suffered an unusual degree of physical inconvenience in this dispute and that and the time taken to resolve the situation would have interfered with the applicants’ expectation of enjoyment or peace of mind. In view of the mould issues and the actual health implications for the applicants and their family, and the incorrect cancellation of the policy, the panel is satisfied the inconvenience and interference is at the highest end of the scale. Case No: 462863 Determination Page 7 of 9 In the circumstances, the panel is satisfied it is fair in all the circumstances the FSP pay $3,000 compensation to each applicant under paragraph 9.3 of the TOR ($6,000 in total). Case No: 462863 Determination Page 8 of 9 3 Supporting information 3.1 FOS Approach As advised to the parties, FOS has considered it appropriate to expedite this dispute in accordance with the Operational Guidelines to the FOS Terms of Reference, due to the nature of the dispute. Accordingly, this dispute has not been the subject of a FOS recommendation and has proceeded directly to determination. The determination is made by a panel consisting of the ombudsman together with an industry representative who has extensive experience in consumer claims and a n industry representative who has extensive experience in the insurance industry. There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered for the purposes of this determination. This dispute has been decided on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome only. It is an accepted principle of general insurance law an insured bears the onus to establish on the balance of probabilities they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities an exclusion applies if it seeks to deny or limit its liability for the loss . 3.2 Relevant policy extracts The relevant policy extracts are referred to in the FSP’s Notice of Response dated 16 February 2017. Both the policy document and the Notice have been exchanged with the applicants. 3.3 Key Documents  Correspondence between the parties.  Parties’ submissions, reports and photographs including but not limited to: o Certificate of insurance. o Reports from FSP’s assessor . o FSP’s hygienist reports and mould assessment reports . o FSP’s engineers’ reports . o FSP’s building consultant report . o FSP’s roof report. o FSP’s quotations from builder . o A pplicants’ reports about subfloor, plaster, plumbing and mould . Case No: 462863 Determination Page 9 of 9 o A pplicants’ report from engineer . o A pplicants’ building repair quote . o A pplicants’ invoices for reports.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.