Summary
The applicant's landlord policy covered water damage to two bathrooms, but the FSP declined the ensuite damage as a separate claim after the applicant began repairs. AFCA found the ensuite damage covered and ordered the FSP to cover the repair costs with statutory interest.
The FSP did not establish on balance that the applicant's early repairs prejudiced it to the full extent of the claimed loss, so it could not rely on section 54 of the Insurance Contracts Act 1984 to decline.
Issues
- Claim denial primary · upheld
“The FSP has not established its entitlement to decline the ensuite claim; the FSP is to cover the applicant for the cost of repairs claimed.”
- Poor claim handling secondary · not upheld
“I am satisfied the FSP's request to lodge Claim 2 was reasonable under the circumstances.”
Subjects and remedies
home or building damagepay claimpay interest
Text of the determination
Determination
Case No: 462561 Determination Page 1 of 4
Case number: 462561 17 July 2017
1 Overview
1.1 Dispute
The applicant held a landlord building insurance policy (the policy) with the financial
services provider (FSP). On 19 July 2016, the applicant contacted the FSP and
reported water damage in and around two bathrooms one of which was the ensuite.
The FSP accepted the claim (Claim 1) for the bathroom and which has been settled
by way of a cash settlement to the applicant.
The applica nt remains dissatisfied with the FSP’s position that the damage to the
ensuite needed to be assessed under a separate claim (Claim 2) as well as it
decision to decline this second claim. The FSP maintains the applicant against clear
instructions from its assessor initiated the repairs to the ensuite. The FSP says this
has deprived it of the opportunity to assess its liability under the claim.
1.2 Issues and key findings
Has the applicant established a valid claim for the damage in the ensuite?
The available information establishes on balance the ensuite did suffer water
damage because of leaking copper pipe (copper pipes) which is an insured event.
Accordingly, the applicant has established a valid claim.
Has the FSP established an entitlement to decline the ap plicant’s claim ?
The FSP may have been prejudiced by the applicant’s decision to commence repairs
to the ensuite prior to the FSP completing a detailed assessment of the damage
claimed.
The FSP has not established the extent of such prejudice nor that it reasonably
represents the full extent of the loss claimed by the applicant.
1.3 Determination
This Determination is in favour of the applicant.
The FSP is to cover the applicant for the cost of repairs claimed.
The FSP is to pay interest at the statutory rate on the final settlement amount form 23
November 2016 to the date on which payment is issued to the applicant.
Case No: 462561 Determination Page 2 of 4
2 Reasons for Determination
2.1 Has the applicant established a valid claim?
The applicant has established a prima facie claim
The available information establishes on the balance of probabilities that the insured
building did suffer significant water damage in the areas of the bathroom and ensuite
which was reported to the FSP on 19 July 2016.
The FSP arranged for consultants ‘P’ to attend the insured property to assess the
cause and extent of the damage claimed. P also employed the services of plumbing
consultants’ ‘O’ to complete investigations into the cause and extent of the water
damage at the insured property.
The applicant, a plumber of 30 years or more, has also made available evidence in
support of his position under Claims 1 and 2.
The FSP’s investigations on balance confirm the damage to the bathroom was the
result of significantly corroded and leaking copper pipes which the applicant would
not have been reasonably aware i.e. circumstances covered under the policy.
The consultants appointed by the FSP and the applicant agreed that all the copper
pipes installed within the insured building were on balance subject to the same
degree of corrosion and deterioration needing replacement. This included the copper
pipes in the ensuite which also showed clear evidence of water damage to certain
areas in and around the shower cubicle.
Proximate cause of the damage to the ensuite is the leaking copper pipes
Having considered the available information, I am satisfied the water damage in and
around the ensuite did occur as a result of circumstances for which the policy
extends cover i.e. a prima facie claim has been established.
The available information shows the proximate cause and circumstances leading to
the water damage in the ensuite are on balance similar to those resulting in the
damage covered under Claim 1. The damage to the ensuite is the result of the
leaking and significantly corroded copper pipes.
The onus rests with the FSP to establish on balance an entitlement to reduce its
liability and/or decline the claim in line with the policy terms and conditions.
2.2 Has the FSP established an entitlement to decline the claim?
The prejudice to the FSP is not sufficient to decline the claim
The insured building was tenanted at the time of the loss. This necessitated the
availability of one of the two bathrooms for their use. The tenants had threatened to
take legal action against the applicant if both bathrooms were put out of use at the
same time i.e. repairs to both bathrooms were commenced at the same time.
Case No: 462561 Determination Page 3 of 4
The FSP, having completed a minor assessment of the ensuite area, elected to delay
competing a detailed assessment and investigation into the extent and cause for the
water damage in the ensuite until such time the other bathroom was repaired.
The applicant was instructed not to commence repairs to the ensuite until such time
the FSP’s assessor was present and/or had the opportunity to assess the damage
claimed.
Despite being advised not to commence repairs, the applicant did carry out repairs to
the ensuite prior to allowing the FSP the opportunity to complete a detailed
assessment of the cause and extent of the damage in ensuite.
I accept the applicant’s decision to do so may have prejudiced the FSP’s ability to
determine the extent of its liability under the claim.
The FSP’s view is that the extent of such prejudice is the full extent of the loss and
damage claimed by the applicant. However, I am not satisfied the FSP has been
successful in establishing this position.
I note the FSP was given the opportunity to make available information to support
and establish the extent of its claimed prejudice. However, the FSP has elected not
to provide any supporting evidence in this regard. The FSP simply maintains the
extent of prejudice suffered represents the full extent of the applicant’s claim.
I am not satisfied the FSP has reasonably established its position as there exists a
valid claim under the policy. Further, there is an absence of evidence to establish on
balance the applicant caused additional damage to the insured building which may
not have otherwise been necessary in completing the required repairs to the ensuite.
I accept the repair works completed and claimed by the applicant are consistent with
the nature of the damage as well as repairs completed under the claimed accepted
and cash settled by the FSP (Claim 1).
I accept the applicant did deprive the FSP of the opportunity to assess the damage
claimed in the ensuite which may have prejudiced the FSP ’s ability to assess its
liability under the claim. However, the FSP has not made available reasonable
evidence establishing the degree of such prejudice.
I am not satisfied the FSP has been successful in establishing on balance its
reference to and reliance upon section 54 of the Insurance Contracts Act 1984 (the
Act) supports its decision to decline the claim on this occasion.
I determine the FSP is to cover the applicant for the cost of repairs he has claimed to
have incurred in completing the repairs to the ensuite. In addition, the FSP is to also
pay interest at the statutory rate upon the claims settlement amount from 23
November 2016 to the date payment is issued to the applicant.
Other matters raised
I am satisfied the damage to both areas of concern were reported to the FSP by the
applicant on the same day with a view they would be covered under the one claim. I
acknowledge the applicant’s concern that the FSP should not have requested him to
lodge a second claim for the damage in the ensuite and all the damage should be
covered under Claim 1.
Case No: 462561 Determination Page 4 of 4
However, considering the damage is in two separate areas and on balance due to
leaking of different sections of the deteriorated copper pipes, I am satisfied the FSP’s
request to lodge Claim 2 was reasonable under the circumstances.
I note the applicant is seeking cover for losses associated with having to replace
water damaged carpet in the bedroom and ensuite area as well as $2,000 towards
higher water bills received for the relevant period.
I have not been provided with sufficient information to determine whether these costs
are related to the insured event giving rise to the claim, were actually incurred and/or
were necessary under the circumstances.
Accordingly, the applicant if seeking cover for these losses, is to make available
reasonable supporting evidence to the FSP for its consideration. The FSP, once
received, is to consider the available information in line with the findings of this
determination and the policy’s terms and conditions.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.