Home / Financial Firm (Unknown - Insurer) / Determination 461892

Determination 461892

Declined storm claim for collapsed cellar earth wall

FirmFinancial Firm (Unknown - Insurer)
Decided2018-03-05
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$57,200
Non-financial loss—
Amount claimed$57,200
SourceAFCA PDF

Summary

The applicants' cellar earth wall collapsed after a violent storm in October 2014 and the FSP denied the claim, citing erosion, subsidence and faulty design. AFCA found the storm was the proximate cause, no exclusion was established, and ordered payment of $57,200 repair costs plus interest.

The storm was the dominant effective cause of the collapse and the FSP did not establish that an excluded cause was a concurrent proximate cause.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 461892 Determination Page 1 of 8 Case number: 461892 27 February 2018 1 Overview 1.1 Dispute The applicants lodged a claim on their building insurance policy after an earth wall in their cellar collapsed due to water ingress from a violent storm on 15 October 2014. The FSP denied the applicants’ claim on the basis the policy did not respond . The FSP says the collapse of the wall was due to erosion over time leading to subsidence or landslide and/ or due to faulty design and workmanship. The applicants dispute the FSP’s findings. 1.2 Issues and key findings Has the applicant established a claimable loss? The policy provides cover for damage caused by a storm. The panel is satisfied that the water ingress resulting in the collapse of the earth wall was caused by a storm. The panel is satisfied in the circumstances the applicants have established a claim that falls within the terms of the policy. Has the FSP established an exclusion applies? The panel is not satisfied that the FSP has established the application of an exclusion to defeat the applicants’ claim. The panel is not satisfied the loss or damage was caused by erosion over time, subsidence or landslide or faulty design and workmanship. 1.3 Determination This determination is in favour of the applicants. The FSP is to meet the applicants claim in accordance with the terms and conditions of the policy and pay the applicants $57,200 being the cost of the repairs in the repair process. Further interest is payable in accordance with Section 57 of the Insurance Contracts Act 1984 (the Act) from the 15 February 2015 as set out under paragraph 2.2. Case No: 461892 Determination Page 2 of 8 2 Reasons for determination There has been a full exchange of material between the parties and each party has had the opportunity to address the issues that arise from the information exchanged. In view of the complexities involved in this dispute, it has been referred to a panel for determination. This determination follows consideration of all of the information available and is based on what is fair in all the circumstances having regard to the relevant legal principles, terms of the policy, good industry practice including codes of practice and prior determinations where applicable. 2.1 Have the applicants established claimable loss? The applicants have the onus to establish a claim within the terms of the policy The applicants have the onus to establish on the balance of probabilities a claim that falls within the terms of the policy. The applicants’ policy , a Home Building and Contents Policy, provided cover for a series of defined events including storm subject to a number of exclusions. The applicants believe the damage to the earth wall arose as a result of a storm. In the circumstances, the onus is on the applicants to show, on the balance of probabilities that the damage resulted from a storm. The applicants have established an insured event An extreme weather event occurred on 15 October 2014, with the Bureau of Meteorology reporting rainfall of 82.4mm that day – which is 22.4mm over the threshold for a storm to be considered violent. On 28 November 2014, the applicants discovered the earth wall in their cellar had collapsed and water had entered the property. They lodged a claim and advised the FSP that they believed the collapse to be the result of the October storm event. The applicants obtained an engineering report from MLE who attended the property on 10 December 2014. MLE concluded that the violent storm was responsible for the failure/erosion of the earth wall. A second engineering report was obtained from RR. RR also concluded that due to the low permeability of the soil that formed the earth wall only events similar to that of 15 October 2014 would cause the erosion. The panel is satisfied on the basis of the reports provided that the applicants have established a claim for the damage to the earth wall arising from the insured event of storm. 2.2 Has the FSP established an exclusion applies? The FSP has argued that the collapse of the wall was as a result of:  Erosion  Subsidence Case No: 461892 Determination Page 3 of 8  Faulty design or workmanship. Each of these causes is excluded under the terms of the policy and the onus is on the FSP if it wishes to establish the application of any of these exclusions. DWK report not persuasive The FSP has relied upon a report from an engineer DWK. DWK concluded that the erosion of the earth wall was due to faulty design as a result of a localised failure of the unrestrained excavation face of the wall and natural seepage. DWK noted the following issues arose with the construction of the earth wall:  Excavation of the natural soil within the subfloor area consisted of a vertical cut face and steep battering. The natural material consists of extremely weathered shale with no formal retaining system.  Water would naturally flow through the block from north to south via natural seepage wetting the unrestrained vertical cut face of the original excavation.  Permanent soil batters require a minimum permanent batter of 1V:2H - 30° to horizontal to remain stable.  In the absence of additional i nformation, the localized failure of the unrestrained excavation face was consistent with moisture infiltration over a significant period of time from a number of storm events.  The damage arose due to a faulty design, construction resulting in erosion and failure of the wall. Pre Purchase report indicates no evidence of water seepage The pre purchase report from CBR following an inspection of the earth wall on 19 February 2014 notes there was no visible seepage and no evidence of previous seepage. The pre purchase report findings are inconsistent with the comments by DWK that the wall had weakened over the years as a result of repeated moisture ingress. In the panel’s view, previous water seepage would have been evident as at 19 February 2014 if it had occurred. The panel accepts there was no evidence of water seepage prior to 14 February 2014. Proximate cause of the collapse was the extreme storm event The pre purchase report from CBR identifies there were no visible signs of seepage or evidence of previous seepage. The panel is satisfied that the damage or signs of damage did not exist prior to 19 February 2014. There is no information to show any erosion or subsidence or seepage impacting on the wall prior to the storm on 15 October 2014. MLE noted that substantial seepage had occurred as a result of the storm on 15 October 2014. According to MLE the substantial seepage led to a significant increase in the applied pressure which caused the failure of the wall. In the report dated 20 January 2015 MLE described the earth wall as follows: Case No: 461892 Determination Page 4 of 8 ‘ behind the rear garage there is localised excavated material of approximately 1m high battered at an angle of 45m also and then dropping approximately 2m vertically. Partial erosion of the excavated material occurred between 16 October 2014 and 21 November 2014. ’ MLE considered the storm and not a building defect caused the failure of the wall. RR in a report dated 3 March 2017 notes:  the earth wall was an angled earth batter wall;  there was no previous erosion evident and  the ground water seepage due to the violent high intensity storm was the cause of the movement. According to RR, the storm had compromised the integrity of the wall and the repairs were required for that reason. RR considered the DWK report did not adequately consider the soil characteristics when stating the earth batter wall was inadequate. The proximate cause of a loss is the effective or operative cause. It is not necessarily the first or last cause in a chai n of events but is the dominant or effective cause of the loss. The panel is not persuaded by the report from DWK. The panel accepts the findings in the pre purchase report, and of MLE and RR that the proximate cause, that is, the dominant or effective cause of the loss was the storm of 15 October 2014. FSP has not established the application of the exclusions The FSP says that in the event the Service does consider an insured event has occurred, it is still protected by the Wayne Tank principle on the basis that the construction of the wall itself is also fundamental to the loss. The Wayne Tank principle applies that where the proximate cause of damage is both an insured event and an excluded event. If both, then the excluded event applies to defeat the claim. The panel acknowledges that if the FSP could establish that an excluded event was a concurrent proximate cause of the loss, then it would be entitled to refuse payment of the claim. The panel is not satisfied however that a design defect, erosion or la ndslide was a concurrent proximate cause of the loss. As indicated earlier, the panel notes that the re is insufficient information to support the finding by DWK that the surface had weakened and was unstable as a result of repeated moisture ingress. There is no information that there had been any moisture ingress at any time prior to the storm on 15 October 2014. The panel prefers the findings of MLE and RR that the movement was caused as a result of the ground water seepage due to the high intensity storm. In the circumstances, the panel is not satisfied the FSP has established the application of an exclusion such that the Wayne tank principle is engaged. The panel is satisfied that the FSP is liable to meet the applicant’s claim. FSP is liable to meet the costs incurred by the applicant The FSP says that the policy only requires it to effect repairs or rebuild that part of the home that was damaged. It says that to build a retaining wall would be an Case No: 461892 Determination Page 5 of 8 upgrade. The panel notes that both parties’ experts have identified that it is necessary to rectify the collapsed wall. Both experts identify that it is necessary for a new structure, a retaining wall, to be built. DWK considers that whilst the stability of the dwelling had not been compromised, any further loss of soil carried the risk of causing distress to the structures above. The panel accepts that such damage falls within the terms of the policy. The applicants say they have followed the instructions contained in the FSP’s letter of 6 January 2015. That le tter advised that the FSP’s expert had recommended a retaining wall be built ‘to prevent any further damage’. The letter indicated it was the applicants’ responsibility to ensure this was completed to mitigate any further damage to the home. Even though t he applicants were contesting the FSP’s decision at this time, they complied with the FSP’s instructions in good faith and in accordance with the policy terms which are to maintain their home in good repair and condition. They had the repairs completed by 15 February 2015. There is no suggestion in any report that the earth wall can be repaired. Rather the suggestions from DWK is that either a retaining wall is built or a conventional cantilever reinforce block work system is put in place . The FSP’s enginee r RR confirmed that the earth batter wall cannot be repaired and considers that a retaining wall would be the optimum solution. The FSP is liable to meet the cost incurred by the applicants The panel has considered the options put forward by the FSP and th e applicants’ experts and notes that the applicants have undertaken to build the retaining wall based on the information provided by the FSP. The panel accepts that the applicants have acted reasonably and consistent with the terms of the policy. It is fair in the circumstances that the applicants be compensated for their loss. The applicants obtained a quote from AA for the completion of the repairs and construction of the retaining wall for $57,200. The applicants had the repairs completed based on this quotation by 15 February 2015. Accordingly the panel determines that the FSP pay the applicants in accordance with the terms of the policy the cost of repairs of $57,200. Interest calculated in accordance with section 57 of the Act should be paid on the $57,200 from the date on which the applicants paid for the repairs to date of payment of the claim. The applicants will need to provide a copy of the relevant invoice to the FSP to confirm the date of payment. Case No: 461892 Determination Page 6 of 8 3 Supporting information 3.1 Terms of the policy Subject Terms Section 2 Buildings and contents we insure Under buildings insurance, we insure certain types of buildings, Your home Your home includes:  domestic residential buildings at your site that can be locked up  home improvements at your site – for example garage, carport, in - ground pool  fixtures or items permanently atta ched or fixed to your home – for example, light fixtures, built in wardrobes, kitchen cupboards and floating floorboards The events we cover Storm Page 23 Covered  violent wind, cyclone or tornado  thunderstorm, hail, rain or snow sudden excessive run off water as a direct result of a storm in your local area Exclusions for all cover These exclusions apply to all cover under your policy Page 53 What we don’t cover Loss, damage, injury of death arising from:  erosion  subsidence or landslide Maintaining and occupying your home We don’t cover loss, damage, injury or death arising from:  faulty design or workmanship  you not maint aining your home in good repair and condition. This means your home must be watertight, structurally sound, secure and well maintained 3.2 Relevant documentation Document Key Points CBR (APP’ s expert) Pre - purc hase inspection report 19 February 2014  At the rear of the garage is a storage area with the natural excavated ground in the background. There was no visible seepage this date, or e vidence of previous seepage. DWK (FSP’ s expert) Engineering report 23 December 2014  Building was originally constructed in 2006. The Insured has owned the property since February 2014  Insured has advised that following an intense rain period on 15.10. 14, the excavation cut face behind the rear basement garage door has collaps ed Case No: 461892 Determination Page 7 of 8  We have viewed the pre - purchase building inspection report  The rear subsurface drainage and surface drainage above the subject area have been tested and are understood to be functioning adequately  On the day in question BOM has recorded rainfall at 82.4mm and this would be considered violent (>50 mm is violent)  The localised failure of the unrestrained excavation face is consistent with moisture infiltration over a significant period of time from a number of storm events  It is possible that the failure of the cut face occurred as claimed, due to the weakened and unstable face that had developed over the years as a result of repeated moisture ingress  Consider the erosion/ failure of the excavation face to be an inherent original design/construction issue  The stability of the dwelling does not appear to have been compromised at th is stage however the piers and strip f ootings are unreinforced and therefore not designed to wit hstand lateral loading from being exposed on one side.  Further loss of soil carries the risk of causing local footing movement and distress to the structure above  Recommendations: either a formal re t aining system or a conventional cantilever reinforced block - work system MLE (APP’ s expert) E ngineering report 20 January 2015  Attended property on 10 December 2014  Visible inspection of the excavated materials reveals that approx. 2 metres of the materi al has a straight vertical line which indicates that such failure/erosion has not happened before  I would consider that the violent storm is responsible for the failure/erosion of the excavated materials RR (APP’ s expert) Engineering report 18 January 2015  Erosion rates are dependent on seepage rates which accelerate erosion  Seepage is dependent on the permeability of the soil whic h relat es to the soil characteristics  The soil is clay which is reputably a very slow seeping soil due to its fine nature an d small voids, limiting the velocity of ground water through it  Therefore, due to the low permeability of the soil only events similar to that of 15 October 2014 may cause erosion  (FSP) may wish to obtain their own report from other than DWK who do not app ear to be a qualified specialist geotechnical engineer, based on the opinions made FSP decline letter Correspondence 6 January 2015  A recommendation has been made by DWK that a formal retaining system is required to prevent further damage from occurring  It is your responsibility to ensure this is completed to mitigate the risk of any further damage to your home  Report included for your review and action RR (APP’ s expert) Correspondence 3 March 2017  The wall in question was an angled earth batter wall  The earth batter wall is not regarded as a retaining wall  Erosion was not evident in the pre - purchase report  The earth batter wall had a drainage system as witnessed by MLE Case No: 461892 Determination Page 8 of 8  The ground movement caused from ground water seepage due to the violent high intensity storm in November 2014 is not deemed erosion by any means  Also refutes that it can be considered subsidence  The storm event had compromised the int egrity of the wall and therefore repairs were required for this reason  DWK report does not take into account the soil characteristics when stating the earth batter wall was inadequate. 1V:2H and 1V:1H is adequate given the soil conditions.  Rectification to reinstate the earth batter wall in its original form was not recommended and cannot be achieved, and theref ore required a wall system as recommended by both parties’ experts.  (APP) received a letter from the FSP dated 2 Dec ember 2014 stating ‘it is your responsibility to ensure this is completed to mitigate the risk of any further damage to your home’, and cons idered it to be a direction pursuant to page 53 of the supplementary PDS and thus commissioned a builder to follow through with the rec ommendations, despite the claim not being fully closed