Home / Financial Firm (Unknown - Insurer) / Determination 461486

Determination 461486

Storm damage claim partly denied and settlement offer disputed

FirmFinancial Firm (Unknown - Insurer)
Decided2017-11-30
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$2,640
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant claimed storm damage to his home and the FSP cash-settled part of the claim, denying the rest on exclusion grounds. AFCA found the FSP liable for roof, ceiling, garage and driveway damage, required a further scope of works, and ordered reimbursement of $2,640 in expert report costs.

The storm caused the roof and some slab damage on the balance of probabilities, while the applicant did not establish storm causation for the foundations and brickwork.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay compensationreassess claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 461486 Determination Page 1 of 11 Case number: 461486 30 October 2017 1 Overview 1.1 Dispute The applicant lodged a claim on his building insurance policy held with the financial services provider (FSP) after storms caused damage to his home in April 2015. The FSP accepted the applicant’s claim for some of the internal damage and offered $9,868.38 (less $500 excess) to settle the claim. The FSP denied cover for the remaining damage claimed. It considered the storm did not cause the damage but occurred due to events excluded under the policy. The applicant seeks a review of the FSP’s decision and f or the FSP to pay him out. 1.2 Issues and key findings Is the settlement amount sufficient to cover the loss? The panel is not satisfied that the amount offered is sufficient to cover the applicant’s loss. The panel determines that the FSP should obtain a further scope of works to cover the repointing and replacement of the tiles, damage to the eaves and the cosmetic damage to the concrete slab, garage and driveway. The FSP is entitled to cash settle the applicant’s claim for the cost of these repairs. Is the applicant entitled to payment of the costs incurred? The panel determines pursuant to Paragraph 9.4 of the Terms of Reference that the FSP should reimburse the applicant for the cost of reports obtained from his engineer and surveyor. 1.3 Determination This determination is partially in favour of the applicant. Within 28 days of the applicant accepting this determination, the FSP is to arrange for a further scope of works to be obtained by a suitable independent builder covering the costs of repairs to the roof including the repointing and replacement of tiles, ceiling lining, cornicing, storm related damage to the eaves, and repairs to the concrete slab, garage and driveway. Upon receipt of the relevant scope of works and costings the FSP is entitled to cash settle the applicant’s claim. The FSP must pay the applicant $2,640 for the cost of reports obtained from the engineer and surveyor. The FSP is otherwise entitled to deny liability for the balance of the applicant’s claim. Case No: 461486 Determination Page 2 of 11 2 Reasons for determination 2.1 Is the settlement amount sufficient to cover the loss? There is no dispute that the applicant’s property was damaged during a storm/tornado on or about April 2015. The FSP has sought to limit its liability and offer to cash settle the applicant’s claim on 15 September 2016 for $9,368.38 being the cost to repair water damage to an eave and to paint most of the ceiling. The FSP denied the balance of the claim relying on policy exclusions relating to:  rust, corrosion, gradual deterioration, depreciation, wear or tear  the settling, shrinkage or expansion in buildings, foundations, walls or pavements  subsidence unless it happens immediately as a result of an earthquake or explosion  faulty design and workmanship  failure to maintain The FSP says that the cracked cement bedding and pointing to the ridge capping of the roof and three chipped tiles on the roof did not occur during the storm. It submits the damage to the roof was caused by wear and tear. Insofar as the concrete slabs forming the floor over the upper level of the home garage and driveway, the brick walls and footings it maintains that damage was caused by shrinkage and faulty workmanship and design. FSP is liable for additional damage The panel has considered the information provided and is satisfied that the cause of the claim damage is due to the following factors: Area Damage and c ause What i s the FSP responsible for ? roof pointing and tiles  FSP’s builder (AIR) i dentified cracking of all cement bedding and pointing of the ridge caps and three chipped tiles.  On balance, the damage is most likely due to the storm based on the applicant’s undisput ed report of severe winds driving rain into the roof and supporting report from his engineer (I).  No information to suggest this occurred due to a lack of maintenanc e. FSP to c over the cost of r epairing the damage to make roof watertight. Scope of works of 15 July 2016 with quote of $4,054.16 by FSP’s repairer (EP) to be updated . ceiling lining and cornice s  The FSP’s experts do not take into consideration all the damage to the ceiling and walls . Although AIR’s scope As the FSP is responsible for roof repairs, it is also required to cover the cost of assessing Case No: 461486 Determination Page 3 of 11 Area Damage and c ause What i s the FSP responsible for ? of works (SOW) allows for the painting of stained ceiling sheets, it does not provide for any replacement of cornices or possible water damaged insulation or other unknown damage within the roof cavity. This is because it is undisput ed neither of the FSP’s experts entered the roof cavity to inspect the top side of the ceiling plaster from above.  The applicant provided photographs, which show water ingress from above has caused the ceiling plaster to become discolo u red (especially alon g the joists) and appears to have grown mildew. Some of the ceiling cornices have lifted from the walls. the roof cavity and repair/replac ement for any observed damage (given it is responsible for an y additional damage caus ed by continued water leaks through the roof). main and upper level concrete slab, surrounding area  FSP’s engineer (F) obs erved localis ed cracking to the slab over the supporting wall ( consistent with flex ural cracking ), 5 - 10mm overhang of slab on one side of stairwell, cracking to mortar of adjacent wall with similar movement to the other side of the stairwell , hairline to 1mm cracking over the line of support of the slab between living area and front entrance/hall .  F also observed various cracking less than 1mm to the living, dining and kitchen area.  F considered the loc alised cracking observed to the slab over the supporting wall wa s consistent with flexural cracking , however, it does not explain why. But F concludes the cracking overall is minor and is considered to be only cosmetic and not preventing the slab from f ulfi lling its design function and although unsightly, remains structurally adequate.  The applicant’s own engineer (I) som ewhat supports this finding. I states the cracks are mostly an aesthetic issue given their sizes are within the crack sizes deemed acceptable by Australian code s . Even after a re - inspection, I still maintained this view.  However, I concludes t he cracks occurred after the storm given they On the balance of the information provided the observed cracking in the slabs resulted from the storm. This is especially because of I’s description of the appearance of the new cracks and F’s lack of attributing the shrinkage and flexural cracking to excluded causes as oppos ed to occurring directly after the storm. However, the panel cannot suggest that repairs are required given the opinions of both enginee rs, especially that of the applicant’s. Neither engineer rec ommends the extent of cracking require any rectification, except to replace upper level walls to a more flexible material. However, this does not show the repairs are required as a res ult of the s torm. The applicant suggests the cracking will lead to corrosion. However, there is currently no information to show this damage has occurred and is only potential damage at this Case No: 461486 Determination Page 4 of 11 Area Damage and c ause What i s the FSP responsible for ? appeared to be fairly young with sharp edges and free of dirt . I observed areas of cracked clay ground surrounding the house indicating the presence of reactive clays , which swell and shrink with and without wat er. I concludes the cracking occurred after the April 2015 storm due to the unusual amount of stormwat er on the site from the creek overflow that would have caused extreme swelling of the reactive clay ground .  The applicant argues the damage was more extensi ve than F reported. He provided photographs to show the cracking extends the 8m width of the house. time. The applicant bears the onus to establish his loss and damage. In the c ircumstances, and for the above reasons, the panel does not consider the FSP is responsible for the cost of providing any repairs to the concrete slabs in the applicant’s home. footing or foundations It is unclear there is such damage based on the informa tion provided. The applicant indicated the foundations were completed in December 1980 and designed to carry three storeys with structural calculations completed by three engineers. He provided photographs to show some cracks in the dirt ground under suppo rting brick walls and water trapped against the foundations during and after the storm. In the absenc e of evidence to support there is damage to the footings and foundations, the FSP is not responsible for the claim for such damage. cracked brickwork  FS P’s engineer (F) noticed cracking of up to 1mm in various locations of the external brickwork. F noted there were no visible articulation joints installed.  The applicant’s engineer (I) observed such cracking throughout the building with a maximum size of 1.25mm wide .  The applicant says the bricks are colonial cream, whic h were tumbled when he purc hased them to avoid faulty bricks. He explains the bricks cannot be replaced as they are no longer available. Neither F nor I concluded whet her the cracked brickw ork was a res ult of the storm or not, and whet her they required repairs/replacement. In the absenc e of such information, the FSP is not responsible for any repairs to cracked brickwork. garage cracking, driveway lifting and cracking  FSP’s engineer (F) obs erved varied shrinkage cr acking from hairline to 2mm to the driveway and garage slabs. F also noted the level of the driveway slab with the garage had a five to 10mm differenc e. F considered the cracking The applicant explains when the property was constructed, the steel in the concrete driveway was tied to the house footing. As the movement to the foundations occurred, he Case No: 461486 Determination Page 5 of 11 Area Damage and c ause What i s the FSP responsible for ? was typical of a slab structur e that has undergone shrink age cracking however, it does not to explain why or if this was due to the storm.  Applicant’s engineer (I) noted a lifted section of the concrete driveway apron and crack at the ent ranc e to the NE garage door .  The applicant says during the storm, the level of water inundation in garage reached 2.5 inches/65mm.  The applicant also did not live in the house after the storm because he thought the water, which entered the downstairs garage area, might have been septic because all house s above his are on a septic tank. There is no evidence to show his property was affected by any contamination. asserts this caused the driveway to crack and lift. Given the proximity in time of the cracking and liftin g after the inundation of water, it appears the damage to the garage and driveway resulted from the storm. Although the FSP refers to F’s report and a concrete information sheet, the FSP has not explained how the exclusion for shrinkage of a building shou ld apply to cracking in the garage and driveway, and lifting of the driveway. Further, F’s report suggests the cracking is typical of shrinkage cracking, but does not deny (or attribute) the cause of such shrinkage is a result of the storm. Accordingly, th e FSP is responsible for repairing such damage. eaves  The SOW from FSP’s builder (AIR) provides for the reinstatement of an eave lining and painting an eave sheet on the right side of the house.  The applicant submits all eave sheets around the house recei ved water staining when the gutters overflowed and backed onto the eaves, however, he has not presented any evidence to support this. The SOW does not adequately identify all of the damage to the eaves. There is a likelihood of further damage which should be further considered. The FSP should attend to the repairs to the roof including the roof pointing and tiles. As it is responsible for the repairs it is also required to cover the cost of assessing the roof cavity and repairing and replacing any observed damage and covering additional leaks. There is damage to the main and upper level of the concrete slabs. The panel recognises the observed cracking resulted from the storm however considers such damage is largely cosmetic and the extent of the FSP’s liab ility is to repair the cosmetic damage. Case No: 461486 Determination Page 6 of 11 Given the proximity in time to the storm the panel determines the damage to the garage and driveway was caused as a result of the storm. The panel does not accept that the FSP has established the exclusion for shrinkage applies. As for the damage to the eaves the panel is not satisfied the available information is sufficient to determine that the only damage is to the right side of the house. The panel believes that this requires further assessment and the FSP should include such further assessment in the relevant scope of works of the storm related damage. The available information does not support the applicant’s claim that the damage to the foundations footings and brick work was related to the storm. The FSP is entitled to refuse payment of that aspect of the claim. 2.2 The FSP’s settlement offer in not sufficient The panel is not satisfied that the FSP’s settlement payment of $9,868.38 is sufficient to cover the loss identified. FSP required to obtain further scope of works The applicant has claimed that the FSP should assess the house as a total loss and pay him the sum insured. The applicant has not provided any information or quotes to suggest the property is a total loss or cannot be repaired for less than this amount. Therefore, there is no reason for the panel to require the FSP to pay the applicant the policy sum insured. In the panel’s view it is appropriate that the FSP obtain a further scope of works taking into account the damage as identified under paragraph 2.2 of this determination as being related to the storm. The panel considers the FSP is responsible for the roof, ceiling, garage, driveway damage and any relevant scope of works and subsequent quotations should take into account the cost of these repairs. In addition as part of obtaining a further scope of works and costing, the FSP should include in the scope of works the cost to repair the storm related damage to the eaves. The FSP should also inspect the void between the ceiling and the roof and also the footings or foundations below the house for any evidence of mould or mildew that may be related to the storm. Upon receipt of the scope of works and relevant quotations the FSP is entitled to cash settle the applicant’s claim for the cost of r epairs. 2.3 Is the applicant entitled to payment for the cost of the engineer and surveyor reports? Paragraph 9.4 of the Terms of Reference provides that FOS may require the FSP to contribute up to $3,000 towards the costs incurred by an applicant in the course of a dispute. The applicant has provided tax invoices which show he has paid $1,210 for his engineers’ inspection and reports and $1,430 for his survey report. Case No: 461486 Determination Page 7 of 11 Both reports have been relied upon by the panel and have assisted the panel in forming its view in this dispute. In, the circumstances the panel determine it is fair and reasonable that the FSP reimburse the applicant $2,640 for the cost of these reports. Case No: 461486 Determination Page 8 of 11 3 Supporting information 3.1 FOS Approach This dispute has not been the subject of a FOS recommendation. Due to the nature of the dispute, it has been referred directly to a panel for determination, in line with the Operational Guidelines to the FOS Terms of Reference. The panel consists of an Ombudsman and two representatives with consumer and insura nce experience. There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. This determination follows consideration of all of the information exchanged and is based on what is fair in the circumstances, having regard to the relevant legal principles, terms of the policy, good industry practice including codes of practice and prior determinations where applicable. The panel has reviewed and considered all of the material provided by the parties. While the parties have raised a number of issues in their submissions, for the purposes of this determination the panel has restricted its commentary to those issues which it considers directly relevant to the outcome only. 3.2 Reports Record Key points FSP’s builder (AIR) R oof r eport 11.11. 2015  Roof type is c oncrete t ile .  I nspection of the roof report revealed cracking of all cement bedding and pointing of the ridge caps and the cement be dding have fallen straight out.  Three tiles found to have small chips on the corner of them.  This is more of a maintenance issue a lthough the applicant mentioned he thinks his house has moved a couple of inches, which could cause some cracking. FSP’s engineer (F) Report 16.11. 2015  Instructed to provide causation report for resultant damage to slab on ground and suspended conc rete slab above and surrounding areas.  C racking observed to the driveway, garage and upper floor slabs are typical of a slab structure that has undergone shrinkage cracking .  The localised cracking observed to the upper floor slab over the supporting wall is consistent with flexural cracking .  The cracking overall is minor and is only cosmetic . It is not pr eventing the slab from f ulfi lling its design function and although unsightly, remains structurally adequate.  The cracking to the slab is categorised under AS2870 as very slight to slight. The standard does not stipulate the cracks of the type observed requ ire repair. Case No: 461486 Determination Page 9 of 11 Record Key points  The cracking in the concret e slabs are unlikely to be a result from the storm event, but due to the nature of the construction material .  There was poor construction of the original structure, with no indication of movement away from brick walls . Damage observed:  cr acking to the driveway and garage from hairline to 2mm  upper floor slab has 5 - 10mm overhang one side of stairwell  cracking to mortar of adjacent wall  similar movement to other side of stairwell  ext ernal brickwork cracking less than 1mm ( no articulation joints installed )  hairline to 1mm cracking over line of support of the upper floor slab between living area and front entrance/hall  less than 1mm cracking to living, dining and kitchen area FSP’s builder (AIR) Site r eport 24.11. 2015  Damage caused by wind driven rain up under the tiles and over flowing gutters and valleys .  During the storm event bet ween 19 and 23 April 2015, concrete slab has moved and cracked in the main part of the house, garage and driveway .  D amage caused by the sto rm event on 20 April 2015.  Loss appears to be covered within the terms of the policy under storm. Areas of the damage include : 1. Conc rete driveway 2. concrete slab in the garage 3. Conc rete slab in the main part of the hous e 4. Ceiling in the k itchen / di ning room , staining 5. Eave sheet on the right side of the hous e 6. Down pipe at the front of the house 7. Ceiling in the laundry , staining FSP’s builder (AIR) SOW 24.11. 2015 $9,868.38 to prepare for repairs, install scaffolding, reinstate eave lining on right side of house, paint eave sheet, paint kitchen (one continuous ceiling so dining, hallway, lounge, entry and living room will have to be painted as well), remove stain and paint laundry including cornice. Applicant’s engineer ( I ) Report 11 .02. 2016  Structural move ment observed is due to reactive clay movement of the site.  C racking occurred after the April 2015 storm due to the unusual amount of storm water on the site from the neighboring creek overflow that would have caused extreme swelling of the reactive clay ground. The cracks appeared to be fairly young with sharp edges and free of dirt, etc.  The size of the cracks are such that we are not concerned about the structural adequacy of the building. The wall and floor cracks are mostly an aesthetic issue given their sizes are within the crack sizes deemed accept able by an Australian code. Case No: 461486 Determination Page 10 of 11 Record Key points  The tiled truss roof can be observed from the west of the building and it was obvious that structural movement has occurred to the roof lines and subsequently the mortar pointi ng of the tiles has cracked in many places. This has caused wat er leaks and the plasterboard ceilings are water damaged throughout.  Recommend ed roof be repaired and made water tight, then ceiling linings repaired as well. FSP’s engineer (F) Report 23.05. 2016  S tand s by its comments in the previous report.  D amage is not a result of the April 2015 storm .  S ite has significant cross fall across the si te, falling from north to south.  For soil heave to occur water has to be trapped against the foundations for significant periods of time, to allow time for infiltration to depth into the adjacent soil. Depending upon the permeability of the soils, this period often exceeds numerous days (not hours).  Such damage is usually due to broken pipes constantly satur ating the soils or water is impounded against the building for significant periods of time, it does not occur from running water passing by the building perimeter . FSP’s repairer (EP) SOW and q uote 15.07. 2016 $4,054.16 for:  supply and install edge protection  re - bed & re - point ridge and hip capping (58lm)  labour and scaffolding  disposal and tip fees FSP’s engineer (F) Comments 19.04. 2017  Considered applicant’s photographs and correspondence.  Stands by previous comments.  Hous e was built prior to current footing recommendations.  Worst construction type for a reactive clay site.  If the soils were reactive, the structure would have suffered significant damage in its history from reactive soil movement due to our record drought period.  The damage is n ot consistent with what we would see from reactive soil movements.  The damage is of no structural significanc e, purely cosmetic, and probably there prior to the storms but maybe not noted by the applicant. Applicant’s surveyor ( P ) Survey r eport 16.05. 2017  Plan shows verticality survey on external brick walls. Applicant’s engineer ( I ) Report 26.05. 2017  Re - inspected property on 20 May 2017.  Also considered survey res ults.  Survey documents measurements of the walls being out of plumb to the vertical, with the lean of the wall varying in degree and direction. Case No: 461486 Determination Page 11 of 11 Record Key points  Measured movement and brickwork cracking confirms reactive clay movement of the site is occurring and subsequent foot ing movement damaging the superstructure above.  Structural damage to the walls, floors, ceilings and roof appears to have increased since the previous inspection.  Conc rete driveway apron has undergone further movement and cracking.  Roof trusses would be restraining tops of the walls. Movement of walls is placing stress onto the trusses and their connections. This is likely to continue to cause further damage to the roof.  Recommended replacement of walls above the upper floor slab level with steel or timbe r framed walls, which will have flexibility to accommodat e ongoing reactive clay movement.  Recommended roof repair of damaged tiles and jointing to prevent further leaks and ceiling damage.  Consider floor slab movement and cracking is not affecting the str uctural integrity of the building and are mainly an aesthetic issue.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.