Text of the determination
Determination
Case No: 461486 Determination Page 1 of 11
Case number: 461486 30 October 2017
1 Overview
1.1 Dispute
The applicant lodged a claim on his building insurance policy held with the financial
services provider (FSP) after storms caused damage to his home in April 2015.
The FSP accepted the applicant’s claim for some of the internal damage and offered
$9,868.38 (less $500 excess) to settle the claim. The FSP denied cover for the
remaining damage claimed. It considered the storm did not cause the damage but
occurred due to events excluded under the policy.
The applicant seeks a review of the FSP’s decision and f or the FSP to pay him out.
1.2 Issues and key findings
Is the settlement amount sufficient to cover the loss?
The panel is not satisfied that the amount offered is sufficient to cover the applicant’s
loss. The panel determines that the FSP should obtain a further scope of works to
cover the repointing and replacement of the tiles, damage to the eaves and the
cosmetic damage to the concrete slab, garage and driveway. The FSP is entitled to
cash settle the applicant’s claim for the cost of these repairs.
Is the applicant entitled to payment of the costs incurred?
The panel determines pursuant to Paragraph 9.4 of the Terms of Reference that the
FSP should reimburse the applicant for the cost of reports obtained from his engineer
and surveyor.
1.3 Determination
This determination is partially in favour of the applicant.
Within 28 days of the applicant accepting this determination, the FSP is to arrange
for a further scope of works to be obtained by a suitable independent builder covering
the costs of repairs to the roof including the repointing and replacement of tiles,
ceiling lining, cornicing, storm related damage to the eaves, and repairs to the
concrete slab, garage and driveway. Upon receipt of the relevant scope of works and
costings the FSP is entitled to cash settle the applicant’s claim.
The FSP must pay the applicant $2,640 for the cost of reports obtained from the
engineer and surveyor.
The FSP is otherwise entitled to deny liability for the balance of the applicant’s claim.
Case No: 461486 Determination Page 2 of 11
2 Reasons for determination
2.1 Is the settlement amount sufficient to cover the loss?
There is no dispute that the applicant’s property was damaged during a
storm/tornado on or about April 2015.
The FSP has sought to limit its liability and offer to cash settle the applicant’s claim
on 15 September 2016 for $9,368.38 being the cost to repair water damage to an
eave and to paint most of the ceiling.
The FSP denied the balance of the claim relying on policy exclusions relating to:
rust, corrosion, gradual deterioration, depreciation, wear or tear
the settling, shrinkage or expansion in buildings, foundations, walls or
pavements
subsidence unless it happens immediately as a result of an earthquake or
explosion
faulty design and workmanship
failure to maintain
The FSP says that the cracked cement bedding and pointing to the ridge capping of
the roof and three chipped tiles on the roof did not occur during the storm. It submits
the damage to the roof was caused by wear and tear.
Insofar as the concrete slabs forming the floor over the upper level of the home
garage and driveway, the brick walls and footings it maintains that damage was
caused by shrinkage and faulty workmanship and design.
FSP is liable for additional damage
The panel has considered the information provided and is satisfied that the cause of
the claim damage is due to the following factors:
Area Damage and c ause What i s the FSP responsible
for ?
roof pointing and
tiles
FSP’s builder (AIR) i dentified cracking of
all cement bedding and pointing of the
ridge caps and three chipped tiles.
On balance, the damage is most likely
due to the storm based on the
applicant’s undisput ed report of severe
winds driving rain into the roof and
supporting report from his engineer (I).
No information to suggest this occurred
due to a lack of maintenanc e.
FSP to c over the cost of
r epairing the damage to make
roof watertight.
Scope of works of 15 July 2016
with quote of $4,054.16 by
FSP’s repairer (EP) to be
updated .
ceiling lining and
cornice s
The FSP’s experts do not take into
consideration all the damage to the
ceiling and walls . Although AIR’s scope
As the FSP is responsible for
roof repairs, it is also required
to cover the cost of assessing
Case No: 461486 Determination Page 3 of 11
Area Damage and c ause What i s the FSP responsible
for ?
of works (SOW) allows for the painting
of stained ceiling sheets, it does not
provide for any replacement of cornices
or possible water damaged insulation or
other unknown damage within the roof
cavity. This is because it is undisput ed
neither of the FSP’s experts entered the
roof cavity to inspect the top side of the
ceiling plaster from above.
The applicant provided photographs,
which show water ingress from above
has caused the ceiling plaster to
become discolo u red (especially alon g
the joists) and appears to have grown
mildew. Some of the ceiling cornices
have lifted from the walls.
the roof cavity and
repair/replac ement for any
observed damage (given it is
responsible for an y additional
damage caus ed by continued
water leaks through the roof).
main and upper
level concrete
slab, surrounding
area
FSP’s engineer (F) obs erved localis ed
cracking to the slab over the supporting
wall ( consistent with flex ural cracking ),
5 - 10mm overhang of slab on one side of
stairwell, cracking to mortar of adjacent
wall with similar movement to the other
side of the stairwell , hairline to 1mm
cracking over the line of support of the
slab between living area and front
entrance/hall .
F also observed various cracking less
than 1mm to the living, dining and
kitchen area.
F considered the loc alised cracking
observed to the slab over the supporting
wall wa s consistent with flexural
cracking , however, it does not explain
why. But F concludes the cracking
overall is minor and is considered to be
only cosmetic and not preventing the
slab from f ulfi lling its design function and
although unsightly, remains structurally
adequate.
The applicant’s own engineer (I)
som ewhat supports this finding. I states
the cracks are mostly an aesthetic issue
given their sizes are within the crack
sizes deemed acceptable by Australian
code s . Even after a re - inspection, I still
maintained this view.
However, I concludes t he cracks
occurred after the storm given they
On the balance of the
information provided the
observed cracking in the slabs
resulted from the storm. This is
especially because of I’s
description of the appearance
of the new cracks and F’s lack
of attributing the shrinkage and
flexural cracking to excluded
causes as oppos ed to
occurring directly after the
storm.
However, the panel cannot
suggest that repairs are
required given the opinions of
both enginee rs, especially that
of the applicant’s. Neither
engineer rec ommends the
extent of cracking require any
rectification, except to replace
upper level walls to a more
flexible material. However, this
does not show the repairs are
required as a res ult of the
s torm.
The applicant suggests the
cracking will lead to corrosion.
However, there is currently no
information to show this
damage has occurred and is
only potential damage at this
Case No: 461486 Determination Page 4 of 11
Area Damage and c ause What i s the FSP responsible
for ?
appeared to be fairly young with sharp
edges and free of dirt . I observed areas
of cracked clay ground surrounding the
house indicating the presence of
reactive clays , which swell and shrink
with and without wat er. I concludes the
cracking occurred after the April 2015
storm due to the unusual amount of
stormwat er on the site from the creek
overflow that would have caused
extreme swelling of the reactive clay
ground .
The applicant argues the damage was
more extensi ve than F reported. He
provided photographs to show the
cracking extends the 8m width of the
house.
time. The applicant bears the
onus to establish his loss and
damage. In the c ircumstances,
and for the above reasons, the
panel does not consider the
FSP is responsible for the cost
of providing any repairs to the
concrete slabs in the
applicant’s home.
footing or
foundations
It is unclear there is such damage based
on the informa tion provided.
The applicant indicated the foundations
were completed in December 1980 and
designed to carry three storeys with
structural calculations completed by three
engineers. He provided photographs to
show some cracks in the dirt ground under
suppo rting brick walls and water trapped
against the foundations during and after
the storm.
In the absenc e of evidence to
support there is damage to the
footings and foundations, the
FSP is not responsible for the
claim for such damage.
cracked brickwork FS P’s engineer (F) noticed cracking of
up to 1mm in various locations of the
external brickwork. F noted there were
no visible articulation joints installed.
The applicant’s engineer (I) observed
such cracking throughout the building
with a maximum size of 1.25mm wide .
The applicant says the bricks are
colonial cream, whic h were tumbled
when he purc hased them to avoid faulty
bricks. He explains the bricks cannot be
replaced as they are no longer available.
Neither F nor I concluded
whet her the cracked brickw ork
was a res ult of the storm or not,
and whet her they required
repairs/replacement.
In the absenc e of such
information, the FSP is not
responsible for any repairs to
cracked brickwork.
garage cracking,
driveway lifting
and cracking
FSP’s engineer (F) obs erved varied
shrinkage cr acking from hairline to 2mm
to the driveway and garage slabs. F also
noted the level of the driveway slab with
the garage had a five to 10mm
differenc e. F considered the cracking
The applicant explains when
the property was constructed,
the steel in the concrete
driveway was tied to the house
footing. As the movement to
the foundations occurred, he
Case No: 461486 Determination Page 5 of 11
Area Damage and c ause What i s the FSP responsible
for ?
was typical of a slab structur e that has
undergone shrink age cracking however,
it does not to explain why or if this was
due to the storm.
Applicant’s engineer (I) noted a lifted
section of the concrete driveway apron
and crack at the ent ranc e to the NE
garage door .
The applicant says during the storm, the
level of water inundation in garage
reached 2.5 inches/65mm.
The applicant also did not live in the
house after the storm because he
thought the water, which entered the
downstairs garage area, might have
been septic because all house s above
his are on a septic tank. There is no
evidence to show his property was
affected by any contamination.
asserts this caused the
driveway to crack and lift.
Given the proximity in time of
the cracking and liftin g after the
inundation of water, it appears
the damage to the garage and
driveway resulted from the
storm.
Although the FSP refers to F’s
report and a concrete
information sheet, the FSP has
not explained how the
exclusion for shrinkage of a
building shou ld apply to
cracking in the garage and
driveway, and lifting of the
driveway. Further, F’s report
suggests the cracking is typical
of shrinkage cracking, but does
not deny (or attribute) the
cause of such shrinkage is a
result of the storm.
Accordingly, th e FSP is
responsible for repairing such
damage.
eaves The SOW from FSP’s builder (AIR)
provides for the reinstatement of an
eave lining and painting an eave sheet
on the right side of the house.
The applicant submits all eave sheets
around the house recei ved water
staining when the gutters overflowed
and backed onto the eaves, however, he
has not presented any evidence to
support this.
The SOW does not adequately
identify all of the damage to the
eaves. There is a likelihood of
further damage which should
be further considered.
The FSP should attend to the repairs to the roof including the roof pointing and tiles.
As it is responsible for the repairs it is also required to cover the cost of assessing the
roof cavity and repairing and replacing any observed damage and covering additional
leaks.
There is damage to the main and upper level of the concrete slabs. The panel
recognises the observed cracking resulted from the storm however considers such
damage is largely cosmetic and the extent of the FSP’s liab ility is to repair the
cosmetic damage.
Case No: 461486 Determination Page 6 of 11
Given the proximity in time to the storm the panel determines the damage to the
garage and driveway was caused as a result of the storm. The panel does not accept
that the FSP has established the exclusion for shrinkage applies.
As for the damage to the eaves the panel is not satisfied the available information is
sufficient to determine that the only damage is to the right side of the house. The
panel believes that this requires further assessment and the FSP should include such
further assessment in the relevant scope of works of the storm related damage.
The available information does not support the applicant’s claim that the damage to
the foundations footings and brick work was related to the storm. The FSP is entitled
to refuse payment of that aspect of the claim.
2.2 The FSP’s settlement offer in not sufficient
The panel is not satisfied that the FSP’s settlement payment of $9,868.38 is sufficient
to cover the loss identified.
FSP required to obtain further scope of works
The applicant has claimed that the FSP should assess the house as a total loss and
pay him the sum insured.
The applicant has not provided any information or quotes to suggest the property is a
total loss or cannot be repaired for less than this amount. Therefore, there is no
reason for the panel to require the FSP to pay the applicant the policy sum insured.
In the panel’s view it is appropriate that the FSP obtain a further scope of works
taking into account the damage as identified under paragraph 2.2 of this
determination as being related to the storm.
The panel considers the FSP is responsible for the roof, ceiling, garage, driveway
damage and any relevant scope of works and subsequent quotations should take
into account the cost of these repairs. In addition as part of obtaining a further scope
of works and costing, the FSP should include in the scope of works the cost to repair
the storm related damage to the eaves. The FSP should also inspect the void
between the ceiling and the roof and also the footings or foundations below the
house for any evidence of mould or mildew that may be related to the storm.
Upon receipt of the scope of works and relevant quotations the FSP is entitled to
cash settle the applicant’s claim for the cost of r epairs.
2.3 Is the applicant entitled to payment for the cost of the engineer and
surveyor reports?
Paragraph 9.4 of the Terms of Reference provides that FOS may require the FSP to
contribute up to $3,000 towards the costs incurred by an applicant in the course of a
dispute.
The applicant has provided tax invoices which show he has paid $1,210 for his
engineers’ inspection and reports and $1,430 for his survey report.
Case No: 461486 Determination Page 7 of 11
Both reports have been relied upon by the panel and have assisted the panel in
forming its view in this dispute. In, the circumstances the panel determine it is fair
and reasonable that the FSP reimburse the applicant $2,640 for the cost of these
reports.
Case No: 461486 Determination Page 8 of 11
3 Supporting information
3.1 FOS Approach
This dispute has not been the subject of a FOS recommendation. Due to the nature
of the dispute, it has been referred directly to a panel for determination, in line with
the Operational Guidelines to the FOS Terms of Reference. The panel consists of an
Ombudsman and two representatives with consumer and insura nce experience.
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other.
This determination follows consideration of all of the information exchanged and is
based on what is fair in the circumstances, having regard to the relevant legal
principles, terms of the policy, good industry practice including codes of practice and
prior determinations where applicable.
The panel has reviewed and considered all of the material provided by the parties.
While the parties have raised a number of issues in their submissions, for the
purposes of this determination the panel has restricted its commentary to those
issues which it considers directly relevant to the outcome only.
3.2 Reports
Record Key points
FSP’s builder (AIR)
R oof r eport
11.11. 2015
Roof type is c oncrete t ile .
I nspection of the roof report revealed cracking of all cement
bedding and pointing of the ridge caps and the cement be dding
have fallen straight out.
Three tiles found to have small chips on the corner of them.
This is more of a maintenance issue a lthough the applicant
mentioned he thinks his house has moved a couple of inches,
which could cause some cracking.
FSP’s engineer (F)
Report
16.11. 2015
Instructed to provide causation report for resultant damage to
slab on ground and suspended conc rete slab above and
surrounding areas.
C racking observed to the driveway, garage and upper floor
slabs are typical of a slab structure that has undergone
shrinkage cracking .
The localised cracking observed to the upper floor slab over the
supporting wall is consistent with flexural cracking .
The cracking overall is minor and is only cosmetic . It is not
pr eventing the slab from f ulfi lling its design function and
although unsightly, remains structurally adequate.
The cracking to the slab is categorised under AS2870 as very
slight to slight. The standard does not stipulate the cracks of the
type observed requ ire repair.
Case No: 461486 Determination Page 9 of 11
Record Key points
The cracking in the concret e slabs are unlikely to be a result
from the storm event, but due to the nature of the construction
material .
There was poor construction of the original structure, with no
indication of movement away from brick walls .
Damage observed:
cr acking to the driveway and garage from hairline to 2mm
upper floor slab has 5 - 10mm overhang one side of stairwell
cracking to mortar of adjacent wall
similar movement to other side of stairwell
ext ernal brickwork cracking less than 1mm ( no articulation
joints installed )
hairline to 1mm cracking over line of support of the upper floor
slab between living area and front entrance/hall
less than 1mm cracking to living, dining and kitchen area
FSP’s builder (AIR)
Site r eport
24.11. 2015
Damage caused by wind driven rain up under the tiles and over
flowing gutters and valleys .
During the storm event bet ween 19 and 23 April 2015, concrete
slab has moved and cracked in the main part of the house,
garage and driveway .
D amage caused by the sto rm event on 20 April 2015.
Loss appears to be covered within the terms of the policy under
storm.
Areas of the damage include :
1. Conc rete driveway
2. concrete slab in the garage
3. Conc rete slab in the main part of the hous e
4. Ceiling in the k itchen / di ning room , staining
5. Eave sheet on the right side of the hous e
6. Down pipe at the front of the house
7. Ceiling in the laundry , staining
FSP’s builder (AIR)
SOW
24.11. 2015
$9,868.38 to prepare for repairs, install scaffolding, reinstate eave
lining on right side of house, paint eave sheet, paint kitchen (one
continuous ceiling so dining, hallway, lounge, entry and living
room will have to be painted as well), remove stain and paint
laundry including cornice.
Applicant’s engineer ( I )
Report
11 .02. 2016
Structural move ment observed is due to reactive clay
movement of the site.
C racking occurred after the April 2015 storm due to the unusual
amount of storm water on the site from the neighboring creek
overflow that would have caused extreme swelling of the
reactive clay ground. The cracks appeared to be fairly young
with sharp edges and free of dirt, etc.
The size of the cracks are such that we are not concerned
about the structural adequacy of the building. The wall and floor
cracks are mostly an aesthetic issue given their sizes are within
the crack sizes deemed accept able by an Australian code.
Case No: 461486 Determination Page 10 of 11
Record Key points
The tiled truss roof can be observed from the west of the
building and it was obvious that structural movement has
occurred to the roof lines and subsequently the mortar pointi ng
of the tiles has cracked in many places. This has caused wat er
leaks and the plasterboard ceilings are water damaged
throughout.
Recommend ed roof be repaired and made water tight, then
ceiling linings repaired as well.
FSP’s engineer (F)
Report
23.05. 2016
S tand s by its comments in the previous report.
D amage is not a result of the April 2015 storm .
S ite has significant cross fall across the si te, falling from north
to south.
For soil heave to occur water has to be trapped against the
foundations for significant periods of time, to allow time for
infiltration to depth into the adjacent soil. Depending upon the
permeability of the soils, this period often exceeds numerous
days (not hours).
Such damage is usually due to broken pipes constantly
satur ating the soils or water is impounded against the building
for significant periods of time, it does not occur from running
water passing by the building perimeter .
FSP’s repairer (EP)
SOW and q uote
15.07. 2016
$4,054.16 for:
supply and install edge protection
re - bed & re - point ridge and hip capping (58lm)
labour and scaffolding
disposal and tip fees
FSP’s engineer (F)
Comments
19.04. 2017
Considered applicant’s photographs and correspondence.
Stands by previous comments.
Hous e was built prior to current footing recommendations.
Worst construction type for a reactive clay site.
If the soils were reactive, the structure would have suffered
significant damage in its history from reactive soil movement
due to our record drought period.
The damage is n ot consistent with what we would see from
reactive soil movements.
The damage is of no structural significanc e, purely cosmetic,
and probably there prior to the storms but maybe not noted by
the applicant.
Applicant’s surveyor ( P )
Survey r eport
16.05. 2017
Plan shows verticality survey on external brick walls.
Applicant’s engineer ( I )
Report
26.05. 2017
Re - inspected property on 20 May 2017.
Also considered survey res ults.
Survey documents measurements of the walls being out of
plumb to the vertical, with the lean of the wall varying in degree
and direction.
Case No: 461486 Determination Page 11 of 11
Record Key points
Measured movement and brickwork cracking confirms reactive
clay movement of the site is occurring and subsequent foot ing
movement damaging the superstructure above.
Structural damage to the walls, floors, ceilings and roof appears
to have increased since the previous inspection.
Conc rete driveway apron has undergone further movement and
cracking.
Roof trusses would be restraining tops of the walls. Movement
of walls is placing stress onto the trusses and their connections.
This is likely to continue to cause further damage to the roof.
Recommended replacement of walls above the upper floor slab
level with steel or timbe r framed walls, which will have flexibility
to accommodat e ongoing reactive clay movement.
Recommended roof repair of damaged tiles and jointing to
prevent further leaks and ceiling damage.
Consider floor slab movement and cracking is not affecting the
str uctural integrity of the building and are mainly an aesthetic
issue.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.