Storm damage claim for swimming pool denied under inherent defect and gradual process exclusion
Text of the determination
Determination
Case No: 460914 Determination Page 1 of 11
Case number: 460914 19 October 2017
1 Overview
1.1 Dispute
The applicant holds an insurance policy with the financial services provider (FSP)
covering her home and contents. The applicant lodged a claim after a storm event
damaged her property on 21 April 2015. The FSP appointed experts to attend the
property and prepare reports on the cause of damage.
The FSP accepted the claim and settled damage to the home. However, the FSP
declined cover for the swimming pool, saying the damage was not caused in the
storm event.
The applicant disputes the FSP’s decision and s eeks to have the pool damage
covered under the claim. The applicant also claims the steps leading from the pool
will need to be removed and rebuilt.
1.2 Issue and key findings
Is the FSP entitled to deny cover for the applicant’s swimming pool?
On the information provided, the applicant has established on the balance of
probabilities a prima facie claim. This is because this was an extraordinary storm
event and the topography of the land, the photographs, the video and the material
from a pool specialist who inspected the pool both before and after the storm event,
establishes on the balance of probabilities the pool was damaged in the extraordinary
storm event.
On the information provided, the FSP has not established the claimed damage was
caused by an inherent defect or by gradual process. In these circumstances, the FSP
is not entitled to deny the claim relying on a policy exclusion.
1.3 Determination
This determination is in favour of the applicant.
Within seven days of acceptance of this determination by the applicant, the FSP is to
decide whether it will repair the damage or pay the reasonable costs to repair the
damage as set out in this determination under the heading “mechanism for
settlement of the claim”.
Case No: 460914 Determination Page 2 of 11
2 Reasons for determination
2.1 Is the FSP entitled to deny cover for the applicant’s swimming pool?
Applicant must establish the claimed damage caused by storm event
The applicant must establish on the balance of probabilities that she has suffered a
loss caused by an event to which the policy responds. This is known as a prima facie
claim.
In the circumstances of this claim, the applicant must establish the claimed damage
to the swimming pool and surrounds and steps leading from the pool was caused by
the storm event on 21 April 2015.
It is not in dispute there was a significant storm event in the area of the insured
property on 21 April 2015. The applicant has provided photographs and video. They
show significant amounts of water coming down the steps from the pool towards the
house.
During the storm event, the applicant contends a large amount of water came from
the hill behind the pool impacting the western wall of the pool. Water overflowed the
pool and flowed down the steps into the house. The applicant says she had never
experienced a storm and water flow event like this.
After the storm, the applicant said the western side of the pool had a big bulge in it.
Subsequently, she says the pool cracked and water drains out.
Photographs, video and opinion of pool specialist establishes storm damage
In support of her position, the applicant provided material from pool specialists.
C Pool Spas confirmed the western side wall of the pool was in good condition with
no cracks or bowing when he installed a sand filter before the storm event on 2
February 2015.
However, when he inspected the pool after the storm event on 18 July 2016 he noted
the western wall had bulged inward and a large crack was running vertical.
He said the bowing of the wall had pulled the deep end of the pool and coping away
from the body concrete. He says:
….the only possible cause of this type of damage is excessive force to the pool wall.
After viewing photos of the April 2015 flood it is plain to see the amount of force that
was against the western side of the pool was enormous.
I note the FSP’s engineer describes the raised landsca ped garden along the western
side of the pool and the large grassed area behind. He says during a storm, run-off
would flow towards the pool area from this large catchment. Further, he says subsoil
groundwater would flow towards the pool.
Having considered the topography of the land, the photographs, the video, and the
material from C Pool Spas who inspected the pool both before and after the storm
Case No: 460914 Determination Page 3 of 11
event, I am satisfied on the balance of probabilities the pool was damaged in the
storm event.
This is because the material provided establishes this was an extraordinary storm
event and a significant amount of rain fell on 21 April 2015 as evidenced by the
photographs and the video. In view of this material, I accept it is probable the amount
of force that was against the western side of the pool was significant and caused the
pool to bulge.
On the information provided, I am satisfied the applicant has established a prima
facie claim.
FSP must prove loss caused gradually or by an inherent defect
Once so established, the onus shifts to the FSP to prove on the balance of
probabilities that an exclusion applies if it seeks to deny or limit its liability for the
loss.
Relying on reports the FSP obtained from two engineers, the FSP says the pool was
not damaged in the storm event. In denying the claim, the FSP also relied on a policy
exclusion which says the policy does not cover loss or damage resulting from or
caused by inherent defects, structural defects, faulty workmanship, faulty design or
any gradual process.
The FSP engaged two structural engineers to provide reports about the cause of
damage and provide scopes of work in July 2015 and August 2016.
The engineer who examined the pool in 2015 describes a bulge in the western side
of the fibreglass pool shell but does not describe any cracking damage to the shell.
As set out earlier, he also described the raised landscaped garden along the western
side of the pool and the large grassed area behind. He says during a storm, run-off
would flow towards the pool area from this large catchment. Further, he says subsoil
groundwater would flow towards the pool.
The engineer said a pool bulges when the pressure on the outside of the pool wall
exceeds the pressure on the inside of the wall. He lists four factors which contribute.
No material provided establishes the hydrostatic valve failed. Further, the pool was
not emptied. Rather, the applicant says the pool overflowed.
According to the FSP’s first engineer, this leaves two other factors contributing to t he
pressure on the wall. Either the sand/cement backfill around the pool had insufficient
cement or there was insufficient backfill.
First engineer does not establish deficiency in backfill or malfunction of valve
However, I am not satisfied the FSP’s eng ineer is sufficiently definitive in his
conclusion. He does not actually say the backfill was deficient. He only cites deficient
backfill as a possible cause. He says only if there was any deficiency in the backfill or
malfunction of the valve it would be quite plausible that the pressure on the wall
would cause the bulge in the wall. The engineer has not established there was a
deficiency in the backfill or a malfunction of the valve.
Case No: 460914 Determination Page 4 of 11
The FSP engaged another structural engineer (BT) to provide a report abo ut
causation. He inspected and photographed the pool in August 2016.
BT concluded the movement of the paving slab indicated the soil on the downside of
the pool had moved away from the pool and this movement meant the soil no longer
supported the wall. The wall tension caused the appearance of the crack in the pool.
He says the cracking in the mortar of the paving coping may be the result of minor
movements in the wall.
BT said the damage to the pool was not storm related. Rather, he said the bulge in
the pool wall was most likely caused by the settlement of backfill.
As it appeared to him the pool was constructed on a combination of cut and fill, he
concluded the movement of the backfill was consistent with what would be expected
from inadequately compacted fill, over time. He conceded the storm event hastened
the movement but says the process was already occurring. He says this is supported
by the fact the cracking occurred more than a year after the storm event.
Second engineer insufficiently persuasive regarding gradual process
However, I am not satisfied this is a persuasive reason to say the process was
already occurring. This is because it is equally possible the cracking occurred in 2016
because of the stress on the pool wall caused by the bulge and by the minor
movements on the wall identified by BT.
Further, in or about October 2016, the applicant engaged C Pools to provide a scope
of works to replace the pool. C Pools could not diagnose the exact cause of the pool
without consulting an engineer but he also thought ground movement was the
primary contributing factor. He did not think there had been gradual movement over
time because of the good drainage behind the pool and the relative lack of damage
to the concrete surrounds.
No further investigation conducted about the backfill
The applicant also arranged for an engineer to review the FSP’s reports. The
applicant’s engineer did not inspect the pool. He agrees pool walls bulge when there
is a difference in pressure on the external and internal sides of the wall.
He describes a number of possible factors causing a pressure difference including
poor drainage, the type and quality of backfill, removal of water from the pool,
malfunction of the pool’s hydrostatic valve and highly reactive clays.
As stated earlier, there is no evidence the pool’s hydrostatic valve malfunctioned.
Water was not removed from the pool. There is also no evidence of poor drainage.
The only material provided about the drainage is from C pools who refers to “good
drainage” behind the pool. There is no i nformation about the clay content of the soil.
The applicant’s engineer does not state the cause of the bulge. He says in order to
establish the cause of the bulge there needs to be further investigation. This further
investigation includes investigations to establish the type and extent of the backfill
used, the properties of the soil next to the pool, and the installation of subsoil
drainage around the pool.
Case No: 460914 Determination Page 5 of 11
Recently, the applicant engaged P to discuss options to repair the pool. He had seen
the kind of damage to the applicant’s pool before. Like the others who examined the
pool, he identified this kind of damage occurs when there is more pressure outside
the pool through excessive groundwater than was inside the pool.
P said this commonly happened when the pool owner drains the pool. It is not in
dispute the applicant did not drain the pool.
Otherwise, P says weight of soil and water outside the shell may cause the side walls
of the fibreglass to bulge inwards. Like the FSP’s first engineer, P refers t o the
groundwater sitting higher up the adjacent slope causing greater pressure on the
pool.
The applicant relied on video of the storm showing the force and amount of water
produced in the storm event. The applicant submitted the backfill may have been
washed away during the storm.
As to whether the backfill was washed away during the storm, P said this was
impossible to determine without examining the ground around the pool.
Neither party has investigated the nature of the backfill.
FSP not entitled to rely on policy exclusion to deny the claim
I accept the storm event was a significant event. I also accept the pool was not
damaged before this storm event. While there is much discussion about the nature of
the backfill, and how it may have caused the pool wall to bulge, the material provided
is inadequate and insufficiently persuasive to establish with sufficient probability the
nature of or sufficiency of the backfill caused the pool wall to bulge.
Having carefully considered all the material provided I am not satisfied on the
balance of probabilities the FSP has established the damage to the pool was caused
gradually or by an inherent defect such as inadequate backfill or inadequately
compacted backfill.
In the circumstances, on the material provided, I am not satisfied the FSP has
established the damage was caused by an event excluded in the policy. I am not
satisfied the FSP is entitled to deny the applicant’s claim.
FSP to decide whether it will repair the damage or pay the costs of repair
The FSP’s policy provides, at its option, it can repair the damage, or pay the
reasonable costs of repair.
In October 2016, the applicant obtained a quote from C Pools. The pool package
described in the swimming pool proposal and scope of works dated 31 October 2016
totalled $104,734. The quote is extremely comprehensive and includes removal of
the old pool and concrete paving surrounds.
The applicant also claims the steps leading from the pool to the house were
damaged. Neither party has provided information about the cost to repair the steps
leading from the pool to the house.
Case No: 460914 Determination Page 6 of 11
The applicant recently indicated she tried to obtain a quote but no tradespeople
would quote just the steps as it required the excavation of the steps and surrounding
areas, removal of the fence adjacent to the steps and formwork to re-concrete the
steps. The applicant also indicated landscaping may have to be replaced.
The first engineer who examined the pool damage for the FSP provided a scope of
works but conceded an exact scope to repair the damage should be provided by an
experienced pool builder.
The second engineer engaged by the FSP only provided a scope relating to the
cracked fibreglass. He said the cracking was repairable. But he also noted this
should be confirmed with a tradesperson willing to warrant repairs.
The most recent attendance on the pool was by P. The bulge was still apparent. The
crack was sealed but P said the pool may be leaking as the pool needs to be refilled
more often.
P said he had seen this kind of damage before and was able to repair the damage.
He notes the plumbing may be damaged and recommended a leak detection test.
P and the applicant apparently discussed several options of repair. No further
information is provided by P or by the applicant about whether the pool is repaired
and/or the cost of repairs.
Mechanism for settlement of the claim
Within seven days of acceptance of this determination by the applicant, the FSP is to
decide whether it will repair the damage or pay the reasonable costs to repair the
damage.
If the FSP elects to cash settle the claim, it must act fairly particularly as there are
indications, although the cracking to the fibreglass is repairable, this should be
confirmed by tradesperson willing to warrant repairs.
Therefore, if the FSP elects to cash settle, the quote upon which it relies should be
actionable, and any cash settlement should consider all reasonable factors including
the nature of the repairs required, and whether a cash settlement will adequately
ensure the applicant is able to complete all repairs and cover all reasonable
possibilities once repairs begin.
If the FSP elects to cash settle, the FSP is to prepare and cost a scope of works on
which a cash settlement will be based. The scope is to be prepared by an
experienced pool builder. The scope must address all damage to the pool, the pool
surrounds and steps caused by the storm event on 21 April 2015.
I consider it is not appropriate to require the FSP to pay interest on any cash
settlement amount, given that this amount will be determined based on costings
prepared using current market rates.
It remains necessary for the FSP to decide whether it will repair the damage or for
the cash settlement amount to be agreed.
Case No: 460914 Determination Page 7 of 11
FOS encourages the parties to this dispute to resolve any issues that might arise
during that process. However, the parties can return to FOS if they are unable to
resolve any issues arising from the scope of works and/or the costing of that work.
Case No: 460914 Determination Page 8 of 11
3 Supporting information
3.1 FOS Approach
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered for the purposes of this determination.
This dispute has been decided on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.
During the dispute, the applicant was represented by her broker. In the interests of
brevity, a reference to the applicant includes a reference to the broker.
It is an accepted principle of general insurance law that an insured bears the onus to
establish on the balance of probabilities that they have suffered a loss caused by an
event to which the policy responds. This is known as a prima facie claim. Once so
established, the onus shifts to the insurer to prove on the balance of probabilities that
an exclusion applies if it seeks to deny or limit its liability for the loss.
3.2 Relevant policy extracts
The relevant policy extracts are referred to in the correspondence between the
parties and in the FSP’s Notice of Response dated 8 December 2016. Both the policy
document and the Notice of Response have been exchanged with the applicant.
3.3 Summary of expert material
Applicant’s
material
Summary
C Pool Spas
Email 9
September 2016
On 2 February 2015, C installed a sand filter
At the time of installation, the western side wall of the pool was in good
condition and pool shell had no cracks or bowing
C Pools Spas
undated email
18 July 2016 C inspected the pool
Western side wall of the pool had bulged inwards
Bulged wall also had a large crack running vertical
Bowing of the wall it had also pulled the deep end of the pool and
coping away from the bo dy concrete
Only possible cause of this type of damage is excessive force to the
pool wall.
After viewing photos of the April 2015 flood it is plain to see the amount
of force that was against the western side of the pool was enormous.
Case No: 460914 Determination Page 9 of 11
C Pools
Email
17 November
2016
Impossible to establish why pool cracked without consulting an engineer
Thinks ground movement or sub surface soil conditions is the primary
contributing factor
Not a lot of gradual movement over time because of the good drainage
behind the pool. Otherwise the concrete surrounds would have multiple
hairline fractures and the concrete is in good shape
An extreme ground event has placed a lot of pressure on the wal l of the
pool and the pool cracked at the top of the coping
DH engineer
24 April 2017
Engineer did not visit the site but reviewed the expert reports.
Bulging of walls occurs when the difference in pressure on the external
and internal sides of the wall exceeds the structural strength of the wall
Pressure differences can be caused by poor drainage, the type and
quality of backfill, removal of water from the pool, malfunction of the
pools hydrostatic valve and highly reactive clay soils
Although the FSP’s experts attribut ed the failure to the settlement of the
backfill around the pool, neit her could determine the type of fill us ed.
As this is as important as the type of fill used can have an effect on the
way the pool shell behaves over time, DH recommend ed there be
further investigation into the type and extent of backfill used
May not prove the bulge was caused by the storm and may prove the
pool was poorly installed and maintained and reached a stage where
repairs are required.
Fibreglass pools general ly need replacing after 25 years
Letter P Pty Ltd
undated
In a recent inspection noted western wall had a crack on the upper edge
and a bulge inward running most of the length of the wall at the bottom
half of the wall
Had seen this before and was able t o carry out repairs successfully
Discussed repair options with the applicant
Often caused by draining the pool during a severe weather event
causing hydrostatic failure (t he applicant did not drain the pool)
Another cause is the force from the groundwater to be higher than the
pool even if the pool was full. The weight of the soil and water outside
the pool causes the sides of the fibreglass to bulge inward. (He noted
during the storm there may have been groun dwater sitting higher up the
adjacent slope causing greater pressure on the pool)
As for the possibility the backfill washed away during the storm, unless
some of the surrounding pebblecrete was removed and the ground
around the pool examined almost imposs ible to determine what caused
the pool wall bulge
FSP’s material Summary
Cons ulting
structural
engineer CB
Report
25 August 2015
Inspected and photographed pool and surrounds 6 July 2015
Noted bulge in the western side of the fibreglass shell near the bottom
of the pool about 5m long which projects about 50mm into the pool
Cracks in the pool coping likely caused by lack of expansion joints
Cracks in the pebblecrete paving are shrinkage cracks
Paving not damaged in storm
Described steps to repair t he damage but said an exact scope of works
required from an experienced pool builder
Noted the ground on the western side of the pool was likely subjected to
Case No: 460914 Determination Page 10 of 11
groundwater flowing down from the uphill western catchment
Bulge in the pool wall has most probabl y been caused due to excess
pressure on the pool wall from factors which are not attributable to the
storm. If there was any deficiency in the backfill along the western side
of the pool or malfunction of the hydrostatic valve it would be quite
plausible t hat the res ulting pressure on the western wall of the pool
could have caused the bulge in the pool wall
Cons ulting
structural
engineer BT
15 August 2016
Inspected and photographed pool 15 August 2016
Was told by the applicant’s representative the pool constructed about
17 years earlier and water about 300mm deep flowed across the pool
down the steps and into the house in the storm
Bowing in the western wall was noticed immediat ely after the storm
Cracking in the western wall appeared about six weeks pr ior to
inspection and the pool began to leak
Noted visible bulge in the western wall; fine crack about 300mm from
the top of the pool in the middle of the western side; water level about
50mm from the bottom of the crack; distance from the top of the pool to
the water level varied; gap bet ween the pool coping and pebblecrete
paving on south side of pool and a cont rol joint opened slightly; cracking
in the mortar of the paver coping
Says the cracking is repairable but should be confirmed with a
tradesperson who will warrant repairs noting the age of the pool (17
years) is approaching its expected lifespan which is typically 25 years
Said the presenc e of the low rock retaining wall and the battered slope
indicated the pool had been constructed in a combination of cut and fill
with the fill being on the downside slope of the pool.
Movement of the paving slab indicates soil on downslope has moved
away from pool and the soil no longer supports the wall as intended
causing the wall to crack
Cracking in the mortar of the paver coping may be the result of minor
movements of the pool wall or the flexible nature of the supporting
fibreglass
Bu lging in the western wall of the pool is most likely a result of the
settlement of backfill which does not currently compromise the integrity
of the pool
Movement of backfill consistent with what would be expected from
inadequately compacted fill over tim e.
Possible flooding event hastened the movement but the process was
already occurring.
Supported by the fact of cracking about a year after the storm event
Damage to the pool is not storm related.
Email from BT
9 May 2017
Reviewed report from DH which he says does not contradict anything in
his report
Subsoil drainage is not generally installed around pools
Case No: 460914 Determination Page 11 of 11
3.4 Other relevant material considered and relied on
Parties’ submissions, emails, videos, reports, photographs and all attachments to