The applicant claimed for storm damage to her swimming pool, steps and surrounds, which the FSP denied as caused by gradual process or inherent defect. AFCA found the applicant established storm damage and the FSP did not prove the exclusion, so it must decide within seven days whether to repair or cash settle, with any cash settlement based on a scope of works prepared by an experienced pool builder.

Once the insured shows a prima facie storm loss, the insurer bears the onus of proving an exclusion applies, and the FSP's engineering evidence did not establish gradual or inherent-defect causation.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 460914 Determination Page 1 of 11 Case number: 460914 19 October 2017 1 Overview 1.1 Dispute The applicant holds an insurance policy with the financial services provider (FSP) covering her home and contents. The applicant lodged a claim after a storm event damaged her property on 21 April 2015. The FSP appointed experts to attend the property and prepare reports on the cause of damage. The FSP accepted the claim and settled damage to the home. However, the FSP declined cover for the swimming pool, saying the damage was not caused in the storm event. The applicant disputes the FSP’s decision and s eeks to have the pool damage covered under the claim. The applicant also claims the steps leading from the pool will need to be removed and rebuilt. 1.2 Issue and key findings Is the FSP entitled to deny cover for the applicant’s swimming pool? On the information provided, the applicant has established on the balance of probabilities a prima facie claim. This is because this was an extraordinary storm event and the topography of the land, the photographs, the video and the material from a pool specialist who inspected the pool both before and after the storm event, establishes on the balance of probabilities the pool was damaged in the extraordinary storm event. On the information provided, the FSP has not established the claimed damage was caused by an inherent defect or by gradual process. In these circumstances, the FSP is not entitled to deny the claim relying on a policy exclusion. 1.3 Determination This determination is in favour of the applicant. Within seven days of acceptance of this determination by the applicant, the FSP is to decide whether it will repair the damage or pay the reasonable costs to repair the damage as set out in this determination under the heading “mechanism for settlement of the claim”. Case No: 460914 Determination Page 2 of 11 2 Reasons for determination 2.1 Is the FSP entitled to deny cover for the applicant’s swimming pool? Applicant must establish the claimed damage caused by storm event The applicant must establish on the balance of probabilities that she has suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. In the circumstances of this claim, the applicant must establish the claimed damage to the swimming pool and surrounds and steps leading from the pool was caused by the storm event on 21 April 2015. It is not in dispute there was a significant storm event in the area of the insured property on 21 April 2015. The applicant has provided photographs and video. They show significant amounts of water coming down the steps from the pool towards the house. During the storm event, the applicant contends a large amount of water came from the hill behind the pool impacting the western wall of the pool. Water overflowed the pool and flowed down the steps into the house. The applicant says she had never experienced a storm and water flow event like this. After the storm, the applicant said the western side of the pool had a big bulge in it. Subsequently, she says the pool cracked and water drains out. Photographs, video and opinion of pool specialist establishes storm damage In support of her position, the applicant provided material from pool specialists. C Pool Spas confirmed the western side wall of the pool was in good condition with no cracks or bowing when he installed a sand filter before the storm event on 2 February 2015. However, when he inspected the pool after the storm event on 18 July 2016 he noted the western wall had bulged inward and a large crack was running vertical. He said the bowing of the wall had pulled the deep end of the pool and coping away from the body concrete. He says: ….the only possible cause of this type of damage is excessive force to the pool wall. After viewing photos of the April 2015 flood it is plain to see the amount of force that was against the western side of the pool was enormous. I note the FSP’s engineer describes the raised landsca ped garden along the western side of the pool and the large grassed area behind. He says during a storm, run-off would flow towards the pool area from this large catchment. Further, he says subsoil groundwater would flow towards the pool. Having considered the topography of the land, the photographs, the video, and the material from C Pool Spas who inspected the pool both before and after the storm Case No: 460914 Determination Page 3 of 11 event, I am satisfied on the balance of probabilities the pool was damaged in the storm event. This is because the material provided establishes this was an extraordinary storm event and a significant amount of rain fell on 21 April 2015 as evidenced by the photographs and the video. In view of this material, I accept it is probable the amount of force that was against the western side of the pool was significant and caused the pool to bulge. On the information provided, I am satisfied the applicant has established a prima facie claim. FSP must prove loss caused gradually or by an inherent defect Once so established, the onus shifts to the FSP to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. Relying on reports the FSP obtained from two engineers, the FSP says the pool was not damaged in the storm event. In denying the claim, the FSP also relied on a policy exclusion which says the policy does not cover loss or damage resulting from or caused by inherent defects, structural defects, faulty workmanship, faulty design or any gradual process. The FSP engaged two structural engineers to provide reports about the cause of damage and provide scopes of work in July 2015 and August 2016. The engineer who examined the pool in 2015 describes a bulge in the western side of the fibreglass pool shell but does not describe any cracking damage to the shell. As set out earlier, he also described the raised landscaped garden along the western side of the pool and the large grassed area behind. He says during a storm, run-off would flow towards the pool area from this large catchment. Further, he says subsoil groundwater would flow towards the pool. The engineer said a pool bulges when the pressure on the outside of the pool wall exceeds the pressure on the inside of the wall. He lists four factors which contribute. No material provided establishes the hydrostatic valve failed. Further, the pool was not emptied. Rather, the applicant says the pool overflowed. According to the FSP’s first engineer, this leaves two other factors contributing to t he pressure on the wall. Either the sand/cement backfill around the pool had insufficient cement or there was insufficient backfill. First engineer does not establish deficiency in backfill or malfunction of valve However, I am not satisfied the FSP’s eng ineer is sufficiently definitive in his conclusion. He does not actually say the backfill was deficient. He only cites deficient backfill as a possible cause. He says only if there was any deficiency in the backfill or malfunction of the valve it would be quite plausible that the pressure on the wall would cause the bulge in the wall. The engineer has not established there was a deficiency in the backfill or a malfunction of the valve. Case No: 460914 Determination Page 4 of 11 The FSP engaged another structural engineer (BT) to provide a report abo ut causation. He inspected and photographed the pool in August 2016. BT concluded the movement of the paving slab indicated the soil on the downside of the pool had moved away from the pool and this movement meant the soil no longer supported the wall. The wall tension caused the appearance of the crack in the pool. He says the cracking in the mortar of the paving coping may be the result of minor movements in the wall. BT said the damage to the pool was not storm related. Rather, he said the bulge in the pool wall was most likely caused by the settlement of backfill. As it appeared to him the pool was constructed on a combination of cut and fill, he concluded the movement of the backfill was consistent with what would be expected from inadequately compacted fill, over time. He conceded the storm event hastened the movement but says the process was already occurring. He says this is supported by the fact the cracking occurred more than a year after the storm event. Second engineer insufficiently persuasive regarding gradual process However, I am not satisfied this is a persuasive reason to say the process was already occurring. This is because it is equally possible the cracking occurred in 2016 because of the stress on the pool wall caused by the bulge and by the minor movements on the wall identified by BT. Further, in or about October 2016, the applicant engaged C Pools to provide a scope of works to replace the pool. C Pools could not diagnose the exact cause of the pool without consulting an engineer but he also thought ground movement was the primary contributing factor. He did not think there had been gradual movement over time because of the good drainage behind the pool and the relative lack of damage to the concrete surrounds. No further investigation conducted about the backfill The applicant also arranged for an engineer to review the FSP’s reports. The applicant’s engineer did not inspect the pool. He agrees pool walls bulge when there is a difference in pressure on the external and internal sides of the wall. He describes a number of possible factors causing a pressure difference including poor drainage, the type and quality of backfill, removal of water from the pool, malfunction of the pool’s hydrostatic valve and highly reactive clays. As stated earlier, there is no evidence the pool’s hydrostatic valve malfunctioned. Water was not removed from the pool. There is also no evidence of poor drainage. The only material provided about the drainage is from C pools who refers to “good drainage” behind the pool. There is no i nformation about the clay content of the soil. The applicant’s engineer does not state the cause of the bulge. He says in order to establish the cause of the bulge there needs to be further investigation. This further investigation includes investigations to establish the type and extent of the backfill used, the properties of the soil next to the pool, and the installation of subsoil drainage around the pool. Case No: 460914 Determination Page 5 of 11 Recently, the applicant engaged P to discuss options to repair the pool. He had seen the kind of damage to the applicant’s pool before. Like the others who examined the pool, he identified this kind of damage occurs when there is more pressure outside the pool through excessive groundwater than was inside the pool. P said this commonly happened when the pool owner drains the pool. It is not in dispute the applicant did not drain the pool. Otherwise, P says weight of soil and water outside the shell may cause the side walls of the fibreglass to bulge inwards. Like the FSP’s first engineer, P refers t o the groundwater sitting higher up the adjacent slope causing greater pressure on the pool. The applicant relied on video of the storm showing the force and amount of water produced in the storm event. The applicant submitted the backfill may have been washed away during the storm. As to whether the backfill was washed away during the storm, P said this was impossible to determine without examining the ground around the pool. Neither party has investigated the nature of the backfill. FSP not entitled to rely on policy exclusion to deny the claim I accept the storm event was a significant event. I also accept the pool was not damaged before this storm event. While there is much discussion about the nature of the backfill, and how it may have caused the pool wall to bulge, the material provided is inadequate and insufficiently persuasive to establish with sufficient probability the nature of or sufficiency of the backfill caused the pool wall to bulge. Having carefully considered all the material provided I am not satisfied on the balance of probabilities the FSP has established the damage to the pool was caused gradually or by an inherent defect such as inadequate backfill or inadequately compacted backfill. In the circumstances, on the material provided, I am not satisfied the FSP has established the damage was caused by an event excluded in the policy. I am not satisfied the FSP is entitled to deny the applicant’s claim. FSP to decide whether it will repair the damage or pay the costs of repair The FSP’s policy provides, at its option, it can repair the damage, or pay the reasonable costs of repair. In October 2016, the applicant obtained a quote from C Pools. The pool package described in the swimming pool proposal and scope of works dated 31 October 2016 totalled $104,734. The quote is extremely comprehensive and includes removal of the old pool and concrete paving surrounds. The applicant also claims the steps leading from the pool to the house were damaged. Neither party has provided information about the cost to repair the steps leading from the pool to the house. Case No: 460914 Determination Page 6 of 11 The applicant recently indicated she tried to obtain a quote but no tradespeople would quote just the steps as it required the excavation of the steps and surrounding areas, removal of the fence adjacent to the steps and formwork to re-concrete the steps. The applicant also indicated landscaping may have to be replaced. The first engineer who examined the pool damage for the FSP provided a scope of works but conceded an exact scope to repair the damage should be provided by an experienced pool builder. The second engineer engaged by the FSP only provided a scope relating to the cracked fibreglass. He said the cracking was repairable. But he also noted this should be confirmed with a tradesperson willing to warrant repairs. The most recent attendance on the pool was by P. The bulge was still apparent. The crack was sealed but P said the pool may be leaking as the pool needs to be refilled more often. P said he had seen this kind of damage before and was able to repair the damage. He notes the plumbing may be damaged and recommended a leak detection test. P and the applicant apparently discussed several options of repair. No further information is provided by P or by the applicant about whether the pool is repaired and/or the cost of repairs. Mechanism for settlement of the claim Within seven days of acceptance of this determination by the applicant, the FSP is to decide whether it will repair the damage or pay the reasonable costs to repair the damage. If the FSP elects to cash settle the claim, it must act fairly particularly as there are indications, although the cracking to the fibreglass is repairable, this should be confirmed by tradesperson willing to warrant repairs. Therefore, if the FSP elects to cash settle, the quote upon which it relies should be actionable, and any cash settlement should consider all reasonable factors including the nature of the repairs required, and whether a cash settlement will adequately ensure the applicant is able to complete all repairs and cover all reasonable possibilities once repairs begin. If the FSP elects to cash settle, the FSP is to prepare and cost a scope of works on which a cash settlement will be based. The scope is to be prepared by an experienced pool builder. The scope must address all damage to the pool, the pool surrounds and steps caused by the storm event on 21 April 2015. I consider it is not appropriate to require the FSP to pay interest on any cash settlement amount, given that this amount will be determined based on costings prepared using current market rates. It remains necessary for the FSP to decide whether it will repair the damage or for the cash settlement amount to be agreed. Case No: 460914 Determination Page 7 of 11 FOS encourages the parties to this dispute to resolve any issues that might arise during that process. However, the parties can return to FOS if they are unable to resolve any issues arising from the scope of works and/or the costing of that work. Case No: 460914 Determination Page 8 of 11 3 Supporting information 3.1 FOS Approach There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered for the purposes of this determination. This dispute has been decided on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome only. During the dispute, the applicant was represented by her broker. In the interests of brevity, a reference to the applicant includes a reference to the broker. It is an accepted principle of general insurance law that an insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. 3.2 Relevant policy extracts The relevant policy extracts are referred to in the correspondence between the parties and in the FSP’s Notice of Response dated 8 December 2016. Both the policy document and the Notice of Response have been exchanged with the applicant. 3.3 Summary of expert material Applicant’s material Summary C Pool Spas Email 9 September 2016  On 2 February 2015, C installed a sand filter  At the time of installation, the western side wall of the pool was in good condition and pool shell had no cracks or bowing C Pools Spas undated email  18 July 2016 C inspected the pool  Western side wall of the pool had bulged inwards  Bulged wall also had a large crack running vertical  Bowing of the wall it had also pulled the deep end of the pool and coping away from the bo dy concrete  Only possible cause of this type of damage is excessive force to the pool wall.  After viewing photos of the April 2015 flood it is plain to see the amount of force that was against the western side of the pool was enormous. Case No: 460914 Determination Page 9 of 11 C Pools Email 17 November 2016  Impossible to establish why pool cracked without consulting an engineer  Thinks ground movement or sub surface soil conditions is the primary contributing factor  Not a lot of gradual movement over time because of the good drainage behind the pool. Otherwise the concrete surrounds would have multiple hairline fractures and the concrete is in good shape  An extreme ground event has placed a lot of pressure on the wal l of the pool and the pool cracked at the top of the coping DH engineer 24 April 2017  Engineer did not visit the site but reviewed the expert reports.  Bulging of walls occurs when the difference in pressure on the external and internal sides of the wall exceeds the structural strength of the wall  Pressure differences can be caused by poor drainage, the type and quality of backfill, removal of water from the pool, malfunction of the pools hydrostatic valve and highly reactive clay soils  Although the FSP’s experts attribut ed the failure to the settlement of the backfill around the pool, neit her could determine the type of fill us ed.  As this is as important as the type of fill used can have an effect on the way the pool shell behaves over time, DH recommend ed there be further investigation into the type and extent of backfill used  May not prove the bulge was caused by the storm and may prove the pool was poorly installed and maintained and reached a stage where repairs are required.  Fibreglass pools general ly need replacing after 25 years Letter P Pty Ltd undated  In a recent inspection noted western wall had a crack on the upper edge and a bulge inward running most of the length of the wall at the bottom half of the wall  Had seen this before and was able t o carry out repairs successfully  Discussed repair options with the applicant  Often caused by draining the pool during a severe weather event causing hydrostatic failure (t he applicant did not drain the pool)  Another cause is the force from the groundwater to be higher than the pool even if the pool was full. The weight of the soil and water outside the pool causes the sides of the fibreglass to bulge inward. (He noted during the storm there may have been groun dwater sitting higher up the adjacent slope causing greater pressure on the pool)  As for the possibility the backfill washed away during the storm, unless some of the surrounding pebblecrete was removed and the ground around the pool examined almost imposs ible to determine what caused the pool wall bulge FSP’s material Summary Cons ulting structural engineer CB Report 25 August 2015  Inspected and photographed pool and surrounds 6 July 2015  Noted bulge in the western side of the fibreglass shell near the bottom of the pool about 5m long which projects about 50mm into the pool  Cracks in the pool coping likely caused by lack of expansion joints  Cracks in the pebblecrete paving are shrinkage cracks  Paving not damaged in storm  Described steps to repair t he damage but said an exact scope of works required from an experienced pool builder  Noted the ground on the western side of the pool was likely subjected to Case No: 460914 Determination Page 10 of 11 groundwater flowing down from the uphill western catchment  Bulge in the pool wall has most probabl y been caused due to excess pressure on the pool wall from factors which are not attributable to the storm. If there was any deficiency in the backfill along the western side of the pool or malfunction of the hydrostatic valve it would be quite plausible t hat the res ulting pressure on the western wall of the pool could have caused the bulge in the pool wall Cons ulting structural engineer BT 15 August 2016  Inspected and photographed pool 15 August 2016  Was told by the applicant’s representative the pool constructed about 17 years earlier and water about 300mm deep flowed across the pool down the steps and into the house in the storm  Bowing in the western wall was noticed immediat ely after the storm  Cracking in the western wall appeared about six weeks pr ior to inspection and the pool began to leak  Noted visible bulge in the western wall; fine crack about 300mm from the top of the pool in the middle of the western side; water level about 50mm from the bottom of the crack; distance from the top of the pool to the water level varied; gap bet ween the pool coping and pebblecrete paving on south side of pool and a cont rol joint opened slightly; cracking in the mortar of the paver coping  Says the cracking is repairable but should be confirmed with a tradesperson who will warrant repairs noting the age of the pool (17 years) is approaching its expected lifespan which is typically 25 years  Said the presenc e of the low rock retaining wall and the battered slope indicated the pool had been constructed in a combination of cut and fill with the fill being on the downside slope of the pool.  Movement of the paving slab indicates soil on downslope has moved away from pool and the soil no longer supports the wall as intended causing the wall to crack  Cracking in the mortar of the paver coping may be the result of minor movements of the pool wall or the flexible nature of the supporting fibreglass  Bu lging in the western wall of the pool is most likely a result of the settlement of backfill which does not currently compromise the integrity of the pool  Movement of backfill consistent with what would be expected from inadequately compacted fill over tim e.  Possible flooding event hastened the movement but the process was already occurring.  Supported by the fact of cracking about a year after the storm event  Damage to the pool is not storm related. Email from BT 9 May 2017  Reviewed report from DH which he says does not contradict anything in his report  Subsoil drainage is not generally installed around pools Case No: 460914 Determination Page 11 of 11 3.4 Other relevant material considered and relied on  Parties’ submissions, emails, videos, reports, photographs and all attachments to all submissions  Correspondence between the parties