Home / Financial Firm (Unknown - Insurer) / Determination 460833

Determination 460833

Liability for balance of builder's invoice for water-damaged bathroom flooring

FirmFinancial Firm (Unknown - Insurer)
Decided2017-10-17
ProductGeneral Insurance · Strata
OutcomeFor the complainant
Amount awarded$6,248
Non-financial loss—
Amount claimed$6,248
SourceAFCA PDF

Summary

The applicant claimed the balance of a builder's invoice for water-damaged bathroom flooring after a shower recess leak, after the FSP paid a partial contribution. AFCA ordered the FSP to pay the balance of $6,248.47 plus interest.

Having accepted liability for part of the damaged flooring, the FSP is by default liable for all associated repair costs, and it provided no expert evidence to challenge the builder's scope and costings.

Issues

Subjects and remedies

home or building damagepay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 460833 Determination Page 1 of 6 Case number: 460833 13 October 2017 1 Overview 1.1 Dispute The applicant lodged a water damage claim under her strata insurance policy held with the financial services provider (FSP) following a water leak from a shower recess. This occurred as a result of a breakdown of waterproofing measures. The FSP accepted liability for the resultant damage to the kitchen ceiling below the shower recess, and some other ancillary costs. However, a dispute has arisen as to the extent of the FSP’s liability for repair costs associated with water damaged wooden flooring in the bathroom. The FSP maintains the bulk of the costs sought by the applicant are costs that would have necessarily been incurred by her in rectifying the waterproofing measures for which she is liable. It has however made a contributory repair cost payment. The applicant accepts she was liable for rectifying the waterproofing measures, but takes the opposite view to the FSP regarding the remai ning repair costs. She says the costs incurred are costs that would have necessarily been incurred by the FSP itself in replacing the damaged flooring , and for which it is liable. The applicant therefore seeks the balance of the repair costs invoiced by builder JL. 1.2 Issue and key findings Is the FSP liable for the balance of JL’s repair invoice? The FSP is liable for the balance of JL’s repair invoice because:  it has accepted liability for the damaged flooring underneath the shower and by default, all associated repair costs  there is no expert evidence to establish the FSP would not have been liable for an equivalent scope and cost of repairs had it undertaken repairs to the damaged flooring itself. 1.3 Determination This determination is in favour of the applicant. The FSP is required to indemnify the applicant for the balance of JL’s repair invoice in the amount of $6,248.47 (excl GST), or otherwise calculated in line with the applicant’s GST status. Interest is payable on this amount in accordance with section 57 of the Insurance Contracts Act 1984 (the Act) from the date of formal denial of this aspect of the applicant’s claim to the date payment is made. Case No: 460833 Determination Page 2 of 6 2 Reasons for determination The applicant has a representative acting for her in this dispute. For ease of reading, any reference to the applicant includes the applicant and the applicant’s representative. 2.1 Is the FSP liable for the balance of JL’s repair invoice? No dispute a water leak occurred from the shower recess There is no dispute the shower recess in question developed a water leak due to a breakdown of waterproofing measures. Upon inspection, the FSP’s builder in part concluded: “In our opinion, we believe that the damage is most likely due to water escaping fro m the shower recess due to a break down and cracking do [sic] the tile grout and the flexib le sealant between the floor and wall t iles allo wing water fro m the shower recess to cause the damage to the kitchen bulkhead ceiling below.” The FSP accepted liability for the resultant kitchen ceili ng damage along with associated exploratory and temporary shower hire costs. The applicant also accepts she was liable to cover the costs associated with rectifying the waterproofing measures. Dispute surrounds repairs to damaged bathroom flooring The crux of this dispute surrounds liability for the cost of repairing the water damaged wooden flooring in the bathroom. Prior to repairs being completed, a plumber attended the property to confirm there were no other sources of water escape beyond the shower recess leak. With regards to the flooring underneath the shower recess, the plumber reported: “Cut hole in laundry roof to inspect under shower, noticed wood damage, not much wetness. … Inspected wood further looks like wood has rotted away making shower un stable” There is no dispute the FSP’s builder only scoped the repairs required to the kitchen ceiling, and not the damaged bathroom flooring. On this point, the associated report states: “Please Note: no allo wance for any works to the bathroom as I believe the damage is caused by maintenance issues and no works to shower recess would be covered.” FSP accepts liability for a portion of the damaged flooring For cover to be provided under the policy (subject to exclusions), it requires an occurrence causing sudden and unforeseen damage to the property. The relevant policy provisions are set out in Section 3 of this determination. With regards to the cause of the damaged flooring, the FSP says: “To reiterate: the damage to the timber flooring underneath the shower base has been damaged as a result of an event that is not sudden & unforeseen, but is as a result of the a [sic] faulty membrane/latent defect that has allowed seepage over a period of time to the point that the timber flooring is rotten & covered in mould/ mildew.” However, the FSP also confirms: Case No: 460833 Determination Page 3 of 6 “It was advised that indemnity for the damaged section of the timber flooring would be accepted … however would be restricted to the damaged section only.” The FOS case worker sought clarification as to the FSP’s position by way of a telephone conversation with it during February 2017. The FSP advised:  it is accepting the damage underneath the failed waterproofing measures on the basis of initial exposure to a sudden and unforeseen event  it is not accepting damage to the entire floor because the policy does not respond to gradual deterioration. Repairs were completed by the applicant to avoid further damage / loss of rent In order to minimise further damage and potential loss of rent, the applicant arranged for the bathroom repairs to be completed by builder JL. The repair costs incurred by the applicant (excluding rectification of the waterproofing measures) totalled $7,288.25 (excl GST). The cost breakdown is outlined in Section 3 of this determination. FSP made a contribution payment towards JL’s repair costs Acknowledging its liability for an area of the damaged flooring, the FSP proposed (and has provided) a contribution towards the repair costs broken down as follows: Item / percentage of JL’s quote Cost (excl GST) Plywood floor / 55% $145.20 Labour costs / 20% $475.20 General costs / 50% $419.13 TOTAL $1039.53 With regards to the percentage apportionments, the FSP makes the following comments:  JL reported 3.5m² of the flooring to be damaged, but quoted for 6.5m². For this reason, the FSP apportioned a 55% contribution.  The labour strip out cost related to 20m². For this reason, the FSP apportioned a 20% contribution (based upon the 3.5m² damaged area of flooring).  With regards to the general costs, the FSP accepts these costs span both works, and so apportioned a 50% contribution. The FSP believes this contribution offer is more than reasonable in its effort to resolve the matter with the applicant. Applicant says FSP liable for balance of JL’s repair costs invoice Whilst the applicant accepts she is liable for costs associated with rectifying the waterproofing measures, she says this liability is independent of the FSP’s own liability regarding repairs to the bathroom floor. Case No: 460833 Determination Page 4 of 6 Therefore, as JL’s repair costs would have been incurred by the FSP had it undertaken associated repairs to the flooring itself, she seeks the balance of JL’s repair invoice in the amount of $6,248.47 (excl GST). As noted above, the FSP takes the opposite view in that the applicant was required to undertake almost equivalent works in order to rectify the waterproofing measures. FSP is liable for the balance of JL’s invoice The issue facing the FSP is the fact it has accepted liability for a portion of the damaged flooring. Having accepted this liability, it by default becomes liable for all costs associated with repairing that damage. A further issue facing the FSP is the fact it did not originally inspect and scope the associated repairs. I note the FSP did request of its builder the following during the course of the claim: „… a scope of works breakdown of t he damage that was sustained as a direct result of the sudden and unforeseen event versus what would be considered to be gradual long term damage‟. However, due to the time then elapsed and logistical issues, the FSP was unable to obtain any such scope of works. I acknowledge the FSP submission regarding the 20m² area of tiling requiring removal and replacement, that being: “To effect the repairs to the damaged section of the floor, the entire 20m² does not need to be removed, that was a choice the applicant took & is considered costs associated with making good the leak rectification.” However, the applicant has provided an email from JL confirming that all floor and wall tiles required removal (and so replacement) because the joint between them overlapped. Therefore, JL says the floor tiles could not be removed in isolation, and in line with applicable building codes. The FSP provides no expert evidence to challenge this view. I also acknowledge the FSP’s submission regarding the area of the floor bed and hob. However, there is again no expert evidence (or alternative scope of works) to suggest this was not a necessary part of the overall repairs. I note this appears to be separate to the actual replacement of the damaged flooring quoted at 3.5m². For these reasons, there is no persuasive evidence to establish JL’s scope of works or costings are not an accurate reflection of the FSP’s liability in replacing the damaged flooring. Therefore, the FSP is required to indemnify the applicant for the balance of JL’s repair invoice in the amount of $6,248.47 (excl GST), or otherwise calculated in line with the applicant’s GST status. Interest is payable on this amount in accordance with section 57 of the Act from the date of formal denial of this aspect of the applic ant’s claim to the date payment is made. Whilst I note the applicant’s representative appears to take the view that the outcome of this dispute will set a ‘precedent’ for other similar claims, each dispute is determined on its individual merits, and not an indication of future determinations. Case No: 460833 Determination Page 5 of 6 3 Supporting information 3.1 JL repair costs General costs Cost (excl GST) Insuranc e $226.25 Supervision and administration $144 Site clearanc e $192 Skip bin $276 Bathroom repair costs Cost (excl GST) Disconnect / reconnect plumbing $432 Labour to strip out 20M ² wall / floor coverings $2,376 Supply 20M ² tiles $960 Remove / refit shower screen $264 Remove / refit bathroom door $132 Supply / install tile underlay $546 Supply / install 6.5M ² floor bed / hob $660 Prepare / paint 21M ² walls $504 Remove / replac e 4M ² wall linings $312 Remove / replac e 3.5M ² damaged particle board flooring $264 3.2 Policy provisions “ Section 1 Physical Loss or Damage 1. Cover This Section covers: Physical loss or destruction of or damage to Insured Property caused by an Event occurring during the Period of Insurance and not otherwise excluded. … 2. Defini tions appl ying to this Section Wherever the words listed below are used in this Section 1, they mean what is set out below: 2.1 Event Occurrence or accident causing or resulting in sudden and unforeseen, physical loss or destruction of or damage to Insured Property. … Case No: 460833 Determination Page 6 of 6 3. Exclusions applying to this Section … We will not cover … damage caused by or arising directly or indirectly fr o m: … h) wear and tear, fad ing, scratching or marring, gradual deterioration or developing flaws, normal upkeep or making good ”

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.