Determination 460713

Claim denied for collapsed retaining wall relying on defect and deterioration exclusions

FirmFinancial Firm (Unknown - Insurer)
Decided2017-12-28
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicants' home insurer denied a claim for a collapsed retaining wall, relying on exclusions for defective design, workmanship and gradual deterioration. AFCA found the exclusions not established, ordered indemnity under the policy with interest, and ordered reimbursement of the applicants' soil testing and engineering costs.

Once a prima facie claim is shown the insurer bears the onus on exclusions, and its engineer's design check rested on unverified assumptions.

Issues

Subjects and remedies

home or building damagepay claimpay compensationpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 460713 Determination Page 1 of 5 Case number: 460713 27 November 2017 1 Overview 1.1 Dispute The financial services provider (FSP) denied the applicants’ claim for a damaged retaining wall on the basis the cause fell within a number of policy exclusions. The applicants have disputed this as they say the damage followed a landslide. 1.2 Issues and key findings Can the FSP deny the claim? The FSP cannot deny the claim because:  there is no dispute the retaining wall damage was unexpected and unintended  this type of loss falls within the insuring provision of the policy  the FSP cannot establish the exclus ions it is relying upon as its expert’s (IL) evidence is unpersuasive 1.3 Determination This determination is in favour of the applicants. The FSP is liable to indemnify the applicants in accordance with the policy. If any aspect of the claim is cash settled, the FSP is to pay interest on those amounts pursuant to section 57 of the Insurance Contracts Act 1984. Interest is payable from 8 June 2016 until the amounts are paid. The FSP is also to reimburse the applicants’ professional costs as set out in section 2.1 of this Determination. Case No: 460713 Determination Page 2 of 5 2 Reasons for determination 2.1 Can the FSP deny the claim? Applicants have established a prima facie claim The applicants are required to show, on the balance of probabilities, they have suffered a loss caused by a risk insured against under the policy. This is known as a prima facie claim. Once the applicants establishes a prima facie claim, the FSP is liable for the loss unless it shows an exclusion applies. The FSP has the onus of proof in establishing the application of the exclusion. The applicants’ policy responds in the following circumstances: “We will cover your buildings and your contents for accidental loss or accidental damage.” The expression “accidental loss” or “accidental damage” is normally interpreted as being loss or damage that is unexpected and unintended from the insured’s perspective. There is no dispute the damage to the retaining wall falls within this criteria. Therefore, the applicants have shown a prima facie claim. FSP relying upon a number of policy exclusions The FSP is relying upon the following policy exclusions to deny the claim: “We will not cover your buildings and your conten ts for any accidental loss or damage caused by:  A defect in an item, faulty workmanship, structural defects or faulty design  Rust, corrosion, gradual deterioration, depreciation, wear or tear.” The FSP is relying upon engineer IL’s reports in support of it s position. I have carefully reviewed IL’s reports. I am not persuaded by IL’s opinions for the following reasons. IL’s opinions are not persuasive First, IL’s opinions referred to defects or issues that have been substantively refuted by the applicants. These include the following:  the assumption there was no agricultural drain – the applicants provided site plans showing this was included  the back-fill being clay and inappropriate for the retaining wall – the applicants provided evidence from a geotechnical engineer as well as soil testing results showing the soil used was appropriate Second, IL’s report dated 1 June 2016 referred to the deterioration as a contributing factor. Even if I was to accept this comment, it clearly does not say this was the Case No: 460713 Determination Page 3 of 5 dominant, efficient or operative cause (proximate cause) of the loss. Therefore the exclusion for rust, corrosion, gradual deterioration, wear or tear is not engaged. Third, IL’s report dated 6 June 2017 says the inadequate design was due to “a significantly u ndersized vertical timber member”. The applicants have provided extensive submissions to dispute this latest opinion. In substance, the applicants note IL:  undertook no measurements of the size of the timbers used  did not confirm the stress grade or elasticity of these timbers  had no knowledge of the depth of embedment of the concrete footings There is force to the applicants’ position. IL’s conclusion was based on a “design check” utilising a formula computation. Assumptions were made about the above factors that were included in this formula. It is clear these assumptions were not confirmed. Further, IL’s report makes no reference to the possible error of margins these assumptions could arise. The applicants provided detailed research to indicate the error of margin could be significant. Given all this, I accept the applicants’ argument that the “design check” outcome cannot be accepted when it is reliant on numerous assumptions that were not verified or substantiated. In addition, IL provided no copy of any standard or code applicable at the time of construction to support its conclusion about the size of timbers. FSP liable to indemnify the applicants Due to the above reasoning, I am not satisfied the FSP has shown the loss falls within the policy exclusions relied upon. Given this, and the fact the applicants have established a prima facie c laim, the FSP is liable to indemnify the applicants for the losses that arose from the damaged retaining wall. In the event the FSP cash settles any aspect of the claim, the FSP is required to pay interest on that sum pursuant to section 57 of the Insurance Contracts Act 1984 (the Act). Interest is payable from 8 June 2016, being the date the FSP denied the claim, until the amount is paid. In addition, the FSP is to reimburse the applicants the costs they incurred in conducting soil tests and having their geotechnical engineer (DP) provide a report. This is because this evidence assisted the applicants in refuting IL’s opinion that the backfill was inappropriate. These costs are payable subject to the applicants producing an invoice. Case No: 460713 Determination Page 4 of 5 3 Supporting information 3.1 Expert Reports Record Key points FSP’s engineer (IL ) Report 14 - 05 - 2016  Topography of the land was found to be very steep.  Dwelling was built on cut and fill land with retaining walls located around the north, east and west elevations – front of property is presumed to face south.  A section of the retaining wall midway along the west elevation had collapsed and soil visibly slipped towards the dwelling.  Due to safety concerns, could not move debris in order to accurately ascertain the exact nature of fail ure.  Inspection of the timber members found significant timber decay to the horizontal sleepers as well as vertical collapsed member.  “Based on the visual inspection and all the information we have obtained to date we confirm that the retaining wall has co llaps ed due to the combined effect of inadequate structural design, inadequate drainage and back - fill, and the deterioration of members over a prolonged period of time.”  “While the storm event did produce the additional hydrostatic pressure that collaps ed the wall, the storm event itself was not the primary cause of the collaps e. The det erioration of the wall over time, along with the poor design and construction techniques used has finally caused the structural members to fail under applied design loads”  “ … the vertical timber members were under sized or dec ayed and were unable to perform their function”  “…agricultural drain could not been seen”  “…gradual clay fill was used as back - fill to the wall. Clay is the worst type of back - fill to use. When clay wets up…generate swelling pressures…causes the wall to lean forward with time” FSP’s engineer (IL ) Report 01 - 06 - 2016  Failure of the wall was not exclusively attributed to deteriorated members – this has been included as a contributing factor.  Evidence of rot and dec ay is undeniable – this suggests the soil is not free draining.  Classified the back - fill soil as “granular clay fill”. Applicant’s engineer (DP ) Report 11 - 07 - 2016  “visual assessment of timber faces…did not appear to be obvious signs decay of the timber. However, the advic e of a suitable experienced structural engineer should be sought regarding the condition of the timber”  “… such movement is likely to be an inadequate embedment of the posts and/or the spacing of the posts being too wide.” FSP’s engineer (IL) Report 06 - 06 - 2017  Have furt her reviewed the file, can confirm the retaining wall failed due to inadequate design and construction.  Specifically “a significantly undersized vertical timber member”.  The office carried out a design check – assu med 1,000mm of soil Case No: 460713 Determination Page 5 of 5 to be retained by timber sleepers, 250 x 75 F8 Red Gum, then transfer the loading via vertical sections, 75 x 250 F8 red Gum, (generously) spaced at 1,500mm.  Also presumed the backfill soil is free draining.  Computation shows the vertic al members failed.